Vous êtes sur la page 1sur 9

Activity ID Activity Name Original

Duration
Remaining
Duration
Start Finish At
Completion
Schedule
%
Complete
SUB ESTACIN SUB ESTACIN
182.00 182.00 03-Jan-14 03-Jul-146010 0%
A2080 INICIO DE LABORES 0.00 0.00 03-Jan-14 03-Jan-14 0 0%
SALA ELECTRICA GIS 33Kv SALA ELECTRICA GIS 33Kv
18.00 18.00 05-Feb-14 22-Feb-14500 0%
A1010 MONTAJE DE MODULO 3 1.00 1.00 05-Feb-14* 05-Feb-14 40 0%
A1020 MONTAJE DE MODULO 1 1.00 1.00 05-Feb-14* 05-Feb-14 40 0%
A1030 DESPLAZAMIENTO MODULO 4 1.00 1.00 06-Feb-14* 06-Feb-14 50 0%
A1031 ALINEAMIENTO DE MODULO 3 2.00 2.00 07-Feb-14 08-Feb-14 40 0%
A1040 ALINEAMIENTO DE MODULO4 2.00 2.00 09-Feb-14* 10-Feb-14 40 0%
A1050 ALINEAMIENTO MODULO 1 2.00 2.00 11-Feb-14 12-Feb-14 40 0%
A1060 SOLDEO DE SALAS 5.00 5.00 13-Feb-14 17-Feb-14100 0%
A1070 COLOCACIN DE TAPAS DE SELLO 5.00 5.00 18-Feb-14 22-Feb-14150 0%
PUENTE GRA GIS 220 Kv PUENTE GRA GIS 220 Kv
25.00 25.00 08-Feb-14 04-Mar-14790 0%
A1080 INSTALACIN DE ANDAMIOS 2.00 2.00 08-Feb-14* 09-Feb-14 20 0%
A1090 ANCLAJE LADO 1 2.00 2.00 10-Feb-14 11-Feb-14 40 0%
A1100 FABRICACIN DE LAINAS 2.00 2.00 10-Feb-14 11-Feb-14 0 0%
A1110 INSTALACIN DE LAINAS 2.00 2.00 12-Feb-14 13-Feb-14 40 0%
A1120 MONTAJE Y COLOCAICN DE PLACABASE 2.00 2.00 13-Feb-14 14-Feb-14 60 0%
A1130 GROUTEO DE PLACABASE 1 2.00 2.00 15-Feb-14 16-Feb-14 60 0%
A1131 ANCLAJE LADO 2 2.00 2.00 15-Feb-14 16-Feb-14 60 0%
A1132 INSTALACIN DE LAINAS 2 2.00 2.00 17-Feb-14 18-Feb-14 40 0%
A1133 MONTAJE Y COLOCACIN DE PLACABASE 1.00 1.00 19-Feb-14 19-Feb-14 40 0%
A1134 GROUTEO DE PLACABASE 2 2.00 2.00 20-Feb-14 21-Feb-14 0 0%
A1140 MONTAJE, NIVELACIN Y ALINEAMIENTO DE RIELES 2.00 2.00 22-Feb-14 23-Feb-14 80 0%
A1150 FIJACIN DE RIELES 4.00 4.00 24-Feb-14 27-Feb-14160 0%
A1160 TRASLADO Y MONTAJE DE PUENTE GRA. 2.00 2.00 28-Feb-14 01-Mar-14100 0%
A1170 ALINEAMIENTO DE PUENTE GRA 1.00 1.00 02-Mar-14 02-Mar-14 30 0%
A1180 DESINSTALACIN DE ANDAMIOS 2.00 2.00 03-Mar-14 04-Mar-14 60 0%
TRANSFORMADOR CONDENSADOR SINCRONO TRANSFORMADOR CONDENSADOR SINCRONO
76.00 76.00 03-Jan-14 19-Mar-14360 0%
A1280 FABRICACIN DE LAINAS 2.00 2.00 13-Jan-14* 14-Jan-14 40 0%
A1290 INSTALACIN DE RIELES 4.00 4.00 06-Feb-14* 09-Feb-14 80 0%
A1291 COLOCACIN DE MICROCLIMA 1.00 1.00 03-Jan-14 03-Jan-14 0 0%
A1292 SOLDEO DE RIELES 3.00 3.00 03-Mar-14* 05-Mar-14 60 0%
A1300 GROUTEO DE RIELES 7.00 7.00 06-Mar-14 12-Mar-14 0 0%
A1320 MONTAJE DE TRANSFORMADOR 3.00 3.00 13-Mar-14* 15-Mar-14180 0%
A1340 GROUTEO 4.00 4.00 16-Mar-14 19-Mar-14 0 0%
TRANSFORMADOR CONDENSADOR SINCRONO-1 TRANSFORMADOR CONDENSADOR SINCRONO-1
70.00 70.00 13-Jan-14 23-Mar-14360 0%
A1350 FABRICACIN DE LAINAS 2.00 2.00 13-Jan-14* 14-Jan-14 40 0%
A1360 INSTALACIN DE RIELES 4.00 4.00 01-Feb-14* 04-Feb-14 80 0%
A1361 COLOCACIN DE MICROCLIMA 1.00 1.00 05-Feb-14 05-Feb-14 0 0%
A1370 SOLDEO DE RIELES 3.00 3.00 06-Mar-14* 08-Mar-14 60 0%
A1380 GROUTEO DE RIELES 7.00 7.00 09-Mar-14 15-Mar-14 0 0%
A1400 MONTAJE DE TRANSFORMADOR 3.00 3.00 17-Mar-14* 19-Mar-14180 0%
A1420 GROUT 4.00 4.00 20-Mar-14 23-Mar-14 0 0%
TRANSFORMADOR DE POTECIA 75/100/125 MVA, 220-33 Kv-1 TRANSFORMADOR DE POTECIA 75/100/125 MVA, 220-33 Kv-1
71.00 71.00 13-Jan-14 24-Mar-14310 0%
A1190 PRE-ARMADO DE CAJONES DE ANCLAJE 3.00 3.00 13-Jan-14* 15-Jan-14120 0%
A1200 COLOCACIN DE CAJONES DE ANCLAJE 1.00 1.00 16-Jan-14 16-Jan-14 40 0%
A1210 NIVELACIN Y ALINEAMIENTO DE TRANSFORMADOR 3.00 3.00 18-Mar-14* 20-Mar-14150 0%
A1211 GROUT 4.00 4.00 21-Mar-14 24-Mar-14 0 0%
Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S
Jan 05 Jan 12 Jan 19 Jan 26 Feb 02 Feb 09
Feb 16
INICIO DE LABORES
MONTAJE DE MODULO 3
MONTAJE DE MODULO 1
DESPLAZAMIENTO MODULO 4
ALINEAMIENTO DE MODULO 3
ALINEAMIENTO DE MODULO4
ALINEAMIENTO MODULO 1
INSTALACIN DE ANDAMIOS
ANCLAJE LADO 1
FABRICACIN DE LAINAS
INSTALACIN DE LAINAS
MONTAJE Y COLOCAICN DE PLACABASE
FABRICACIN DE LAINAS
INSTALACIN DE RIELES
COLOCACIN DE MICROCLIMA
FABRICACIN DE LAINAS
INSTALACIN DE RIELES
COLOCACIN DE MICROCLIMA
PRE-ARMADO DE CAJONES DE ANCLAJE
COLOCACIN DE CAJONES DE ANCLAJE
SUB ESTACIN Classic WBS Layout 08-Feb-14 11:30
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 1 of 9 TASK filter: All Activities
Primavera Systems, Inc.
M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat
S
Feb 16 Feb 23 Mar 02 Mar 09 Mar 16 Mar 23 Mar 30 Apr 06 Apr 13 Apr 20
Apr 27
22-Feb-14, SALAELECTRICA GIS 33Kv
ALINEAMIENTO DE MODULO4
ALINEAMIENTO MODULO 1
SOLDEO DE SALAS
COLOCACIN DE TAPAS DE SELLO
04-Mar-14, PUENTE GRAGIS 220 Kv
INSTALACIN DE ANDAMIOS
FABRICACIN DE LAINAS
INSTALACIN DE LAINAS
MONTAJE Y COLOCAICN DE PLACABASE
GROUTEO DE PLACABASE 1
ANCLAJE LADO 2
INSTALACIN DE LAINAS 2
MONTAJE Y COLOCACIN DE PLACABASE
GROUTEO DE PLACABASE 2
MONTAJE, NIVELACIN Y ALINEAMIENTO DE RIELES
FIJACIN DE RIELES
TRASLADO Y MONTAJE DE PUENTE GRA.
ALINEAMIENTO DE PUENTE GRA
DESINSTALACIN DE ANDAMIOS
19-Mar-14, TRANSFORMADOR CONDENSADOR SINCRONO
SOLDEO DE RIELES
GROUTEO DE RIELES
MONTAJE DE TRANSFORMADOR
GROUTEO
23-Mar-14, TRANSFORMADOR CONDENSADOR SINCRONO-1
SOLDEO DE RIELES
GROUTEO DE RIELES
MONTAJE DE TRANSFORMADOR
GROUT
24-Mar-14, TRANSFORMADOR DE POTECIA75/100/125 MVA, 220-33 Kv-1
NIVELACIN Y ALINEAMIENTO DE TRANSFORMADOR
GROUT
SUB ESTACIN Classic WBS Layout 08-Feb-14 11:30
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 2 of 9 TASK filter: All Activities
Primavera Systems, Inc.
S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat
Apr 27 May 04 May 11 May 18 May 25 Jun 01 Jun 08 Jun 15 Jun 22 Jun 29
03-Jul-14, SUB ESTACIN
SUB ESTACIN Classic WBS Layout 08-Feb-14 11:30
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 3 of 9 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish At
Completion
Schedule
%
Complete
TRANSFORMADOR DE POTECIA 75/100/125 MVA, 220-33 Kv-2 TRANSFORMADOR DE POTECIA 75/100/125 MVA, 220-33 Kv-2
72.00 72.00 15-Jan-14 27-Mar-14310 0%
A1220 PRE-ARMADO DE CAJONES DE ANCLAJE 3.00 3.00 15-Jan-14* 17-Jan-14120 0%
A1230 COLOCACIN DE CAJONES DE ANCLAJE 1.00 1.00 18-Jan-14 18-Jan-14 40 0%
A1240 NIVELACIN Y ALINEAMIENTO DE TRANSFORMADOR 3.00 3.00 21-Mar-14 23-Mar-14150 0%
A1241 GROUT 4.00 4.00 24-Mar-14 27-Mar-14 0 0%
TRANSFORMADOR DE POTECIA 75/100/125 MVA, 220-33 Kv-3 TRANSFORMADOR DE POTECIA 75/100/125 MVA, 220-33 Kv-3
75.00 75.00 15-Jan-14 30-Mar-14310 0%
A1250 PRE-ARMADO DE CAJONES DE ANCLAJE 3.00 3.00 15-Jan-14* 17-Jan-14120 0%
A1260 COLOCACIN DE CAJONES DE ANCLAJE 1.00 1.00 18-Jan-14 18-Jan-14 40 0%
A1270 NIVELACIN Y ALINEAMIENTO DE TRANSFORMADOR 3.00 3.00 24-Mar-14 26-Mar-14150 0%
A1271 GROUT 4.00 4.00 27-Mar-14 30-Mar-14 0 0%
GENERADOR DIESEL RESERVA, 2000 KVA, 4.16 kV GENERADOR DIESEL RESERVA, 2000 KVA, 4.16 kV
4.00 4.00 20-Mar-14 23-Mar-14160 0%
A2060 TRASLADO AL PUNTO DE TRABAJO 1.00 1.00 20-Mar-14* 20-Mar-14 40 0%
A2070 MONTAJE, NIVELACIN Y ALINEAMIENTO 3.00 3.00 21-Mar-14 23-Mar-14120 0%
GENERADOR DE EMERGENCIA 500 kV, 480 V. GENERADOR DE EMERGENCIA 500 kV, 480 V.
4.00 4.00 24-Mar-14 27-Mar-14160 0%
A1700 TRASLADO DEL EQUIPO 1.00 1.00 24-Mar-14* 24-Mar-14 40 0%
A1710 MONTAJE, ALINEAMIENTO Y NIVELACIN 3.00 3.00 25-Mar-14 27-Mar-14120 0%
SWITCHGEAR GIS 220 kV SWITCHGEAR GIS 220 kV
2.00 2.00 05-Apr-14 06-Apr-14100 0%
A1430 MONTAJE Y POSCICIONAMIENTO DE EQUIPO 2.00 2.00 05-Apr-14* 06-Apr-14100 0%
TRANFORMADOR 2000 KVA, 33KV - 400/231V PARA PARA SS.AA TRANFORMADOR 2000 KVA, 33KV - 400/231V PARA PARA SS.AA
4.00 4.00 01-Apr-14 04-Apr-14220 0%
A1640 TRASLADO 1.00 1.00 01-Apr-14* 01-Apr-14 40 0%
A1650 MONTAJE, ALINEAMIENTO Y NIVELACION 3.00 3.00 02-Apr-14 04-Apr-14180 0%
TRANFORMADOR 2000 KVA, 33KV - 400/231V PARA PARA SS.AA-1 TRANFORMADOR 2000 KVA, 33KV - 400/231V PARA PARA SS.AA-1
8.00 8.00 02-Apr-14 09-Apr-14220 0%
A1660 TRASLADO 1.00 1.00 02-Apr-14* 02-Apr-14 40 0%
A1670 MONTAJE, ALINEAMIENTO Y NIVELACION 3.00 3.00 07-Apr-14* 09-Apr-14180 0%
TRANSFORMADOR ELEVADOR, 3MVA, 4.16-33 kV TRANSFORMADOR ELEVADOR, 3MVA, 4.16-33 kV
10.00 10.00 03-Apr-14 12-Apr-14220 0%
A1680 TRASLADO 1.00 1.00 03-Apr-14* 03-Apr-14 40 0%
A1690 MONTAJE, ALINEAMIENTO Y NIVELACION 3.00 3.00 10-Apr-14 12-Apr-14180 0%
RESISTENCIA NEUTRO 200A, 10 SEG.-3 RESISTENCIA NEUTRO 200A, 10 SEG.-3
6.00 6.00 26-Apr-14 01-May-14190 0%
A1780 TRASLADO 1.00 1.00 26-Apr-14* 26-Apr-14 30 0%
A1781 ARMADO Y MONTAJE DE ESTRUCTURASUPORTE 2.00 2.00 27-Apr-14 28-Apr-14 60 0%
A1782 VERTICALIZACION Y GROUT - ESTRUCTURA 2.00 2.00 29-Apr-14 30-Apr-14 60 0%
A1790 MONTAJE Y FIJACIN 1.00 1.00 01-May-14 01-May-14 40 0%
RESISTENCIA NEUTRO 200A, 10 SEG.-4 RESISTENCIA NEUTRO 200A, 10 SEG.-4
6.00 6.00 30-Apr-14 05-May-14180 0%
A1900 TRASLADO 1.00 1.00 30-Apr-14* 30-Apr-14 30 0%
A1910 ARMADO Y MONTAJE DE ESTRUCTURASUPORTE 2.00 2.00 01-May-14 02-May-14 60 0%
A1920 VERTICALIZACION Y GROUT - ESTRUCTURA 2.00 2.00 03-May-14 04-May-14 60 0%
A1930 MONTAJE Y FIJACIN 1.00 1.00 05-May-14 05-May-14 30 0%
RESISTENCIA NEUTRO 200A, 10 SEG.-5 RESISTENCIA NEUTRO 200A, 10 SEG.-5
6.00 6.00 02-May-14 07-May-14220 0%
A1940 TRASLADO 1.00 1.00 02-May-14* 02-May-14 30 0%
A1950 ARMADO Y MONTAJE DE ESTRUCTURASUPORTE 2.00 2.00 03-May-14 04-May-14 60 0%
A1960 VERTICALIZACION Y GROUT - ESTRUCTURA 2.00 2.00 05-May-14 06-May-14 80 0%
A1970 MONTAJE Y FIJACIN 1.00 1.00 07-May-14 07-May-14 50 0%
UNIDAD DE LUBRICACIN DE CONDENSDOR SINCRONO 2 UNIDAD DE LUBRICACIN DE CONDENSDOR SINCRONO 2
8.00 8.00 19-Jun-14 26-Jun-14160 0%
A1480 COLOCACIN DE ANCLAJES 2.00 2.00 19-Jun-14* 20-Jun-14 40 0%
A1490 TRASLADO 1.00 1.00 21-Jun-14 21-Jun-14 30 0%
A1500 MONTAJE, NIVELACIN Y ALINEAMIENTO 3.00 3.00 22-Jun-14 24-Jun-14 90 0%
A1510 GROUT 2.00 2.00 25-Jun-14 26-Jun-14 0 0%
UNIDAD DE LUBRICACIN DE CONDENSDOR SINCRONO 1 UNIDAD DE LUBRICACIN DE CONDENSDOR SINCRONO 1
8.00 8.00 21-Jun-14 28-Jun-14160 0%
Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S
Jan 05 Jan 12 Jan 19 Jan 26 Feb 02 Feb 09
Feb 16
PRE-ARMADO DE CAJONES DE ANCLAJE
COLOCACIN DE CAJONES DE ANCLAJE
PRE-ARMADO DE CAJONES DE ANCLAJE
COLOCACIN DE CAJONES DE ANCLAJE
SUB ESTACIN Classic WBS Layout 08-Feb-14 11:30
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 4 of 9 TASK filter: All Activities
Primavera Systems, Inc.
M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat
S
Feb 16 Feb 23 Mar 02 Mar 09 Mar 16 Mar 23 Mar 30 Apr 06 Apr 13 Apr 20
Apr 27
27-Mar-14, TRANSFORMADOR DE POTECIA75/100/125 MVA, 220-33 Kv-2
NIVELACIN Y ALINEAMIENTO DE TRANSFORMADOR
GROUT
30-Mar-14, TRANSFORMADOR DE POTECIA75/100/125 MVA, 220-33 Kv-3
NIVELACIN Y ALINEAMIENTO DE TRANSFORMADOR
GROUT
23-Mar-14, GENERADOR DIESEL RESERVA, 2000 KVA, 4.16 kV
TRASLADO AL PUNTO DE TRABAJO
MONTAJE, NIVELACIN Y ALINEAMIENTO
27-Mar-14, GENERADOR DE EMERGENCIA500 kV, 480 V.
TRASLADO DEL EQUIPO
MONTAJE, ALINEAMIENTO Y NIVELACIN
06-Apr-14, SWITCHGEAR GIS 220 kV
MONTAJE Y POSCICIONAMIENTO DE EQUIPO
04-Apr-14, TRANFORMADOR 2000 KVA, 33KV - 400/231V PARA PARA SS.AA
TRASLADO
MONTAJE, ALINEAMIENTO Y NIVELACION
09-Apr-14, TRANFORMADOR 2000 KVA, 33KV - 400/231V PARA PARA SS.AA-1
TRASLADO
MONTAJE, ALINEAMIENTO Y NIVELACION
12-Apr-14, TRANSFORMADOR ELEVADOR, 3MVA, 4.16-33 kV
TRASLADO
MONTAJE, ALINEAMIENTO Y NIVELACION
TRASLADO
SUB ESTACIN Classic WBS Layout 08-Feb-14 11:30
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 5 of 9 TASK filter: All Activities
Primavera Systems, Inc.
S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat
Apr 27 May 04 May 11 May 18 May 25 Jun 01 Jun 08 Jun 15 Jun 22 Jun 29
09-Apr-14, TRANFORMADOR 2000 KVA, 33KV - 400/231V PARA PARA SS.AA-1
12-Apr-14, TRANSFORMADOR ELEVADOR, 3MVA, 4.16-33 kV
01-May-14, RESISTENCIANEUTRO 200A, 10 SEG.-3
TRASLADO
ARMADO Y MONTAJE DE ESTRUCTURASUPORTE
VERTICALIZACION Y GROUT - ESTRUCTURA
MONTAJE Y FIJACIN
05-May-14, RESISTENCIANEUTRO 200A, 10 SEG.-4
TRASLADO
ARMADO Y MONTAJE DE ESTRUCTURASUPORTE
VERTICALIZACION Y GROUT - ESTRUCTURA
MONTAJE Y FIJACIN
07-May-14, RESISTENCIANEUTRO 200A, 10 SEG.-5
TRASLADO
ARMADO Y MONTAJE DE ESTRUCTURASUPORTE
VERTICALIZACION Y GROUT - ESTRUCTURA
MONTAJE Y FIJACIN
26-Jun-14, UNIDAD DE LUBRICACIN DE CONDENSDOR SINCRONO 2
COLOCACIN DE ANCLAJES
TRASLADO
MONTAJE, NIVELACIN Y ALINEAMIENTO
GROUT
28-Jun-14, UNIDAD DE LUBRICACIN DE CONDENSDOR SINCRONO 1
SUB ESTACIN Classic WBS Layout 08-Feb-14 11:30
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 6 of 9 TASK filter: All Activities
Primavera Systems, Inc.
Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish At
Completion
Schedule
%
Complete
A1440 COLOCACIN DE ANCLAJES 2.00 2.00 21-Jun-14* 22-Jun-14 40 0%
A1450 TRASLADO 1.00 1.00 23-Jun-14 23-Jun-14 30 0%
A1460 MONTAJE, NIVELACIN Y ALINEAMIENTO 3.00 3.00 24-Jun-14 26-Jun-14 90 0%
A1470 GROUT 2.00 2.00 27-Jun-14 28-Jun-14 0 0%
UNIDAD DE ENFRIAMIENTO CONDENSADOR SINCRONICO 1 UNIDAD DE ENFRIAMIENTO CONDENSADOR SINCRONICO 1
7.00 7.00 23-Jun-14 29-Jun-14170 0%
A1520 COLOCACIN DE ANCLAJES 2.00 2.00 23-Jun-14* 24-Jun-14 40 0%
A1530 TRASLADO 1.00 1.00 25-Jun-14 25-Jun-14 40 0%
A1540 MONTAJE, NIVELACIN Y ALINEAMIENTO 3.00 3.00 26-Jun-14 28-Jun-14 90 0%
A1550 GROUT 1.00 1.00 29-Jun-14 29-Jun-14 0 0%
UNIDAD DE ENFRIAMIENTO CONDENSADOR SINCRONICO 2 UNIDAD DE ENFRIAMIENTO CONDENSADOR SINCRONICO 2
7.00 7.00 25-Jun-14 01-Jul-14 170 0%
A1560 COLOCACIN DE ANCLAJES 2.00 2.00 25-Jun-14* 26-Jun-14 40 0%
A1570 TRASLADO 1.00 1.00 27-Jun-14 27-Jun-14 40 0%
A1580 MONTAJE, NIVELACIN Y ALINEAMIENTO 3.00 3.00 28-Jun-14 30-Jun-14 90 0%
A1590 GROUT 1.00 1.00 01-Jul-1401-Jul-14 0 0%
UNIDAD DE BOMBEO SISTEMA DE ENFRIAMIENTO UNIDAD DE BOMBEO SISTEMA DE ENFRIAMIENTO
7.00 7.00 27-Jun-14 03-Jul-14 170 0%
A1600 COLOCACIN DE ANCLAJES 2.00 2.00 27-Jun-14* 28-Jun-14 40 0%
A1610 TRASLADO 1.00 1.00 29-Jun-14 29-Jun-14 40 0%
A1620 MONTAJE, NIVELACIN Y ALINEAMIENTO 3.00 3.00 30-Jun-14 02-Jul-14 90 0%
A1630 GROUT 1.00 1.00 03-Jul-1403-Jul-14 0 0%
RESISTENCIA NEUTRO 200A, 10 SEG. RESISTENCIA NEUTRO 200A, 10 SEG.
7.00 7.00 01-Mar-14 07-Mar-14190 0%
A2020 TRASLADO 1.00 1.00 01-Mar-14* 01-Mar-14 30 0%
A2030 ARMADO Y MONTAJE DE ESTRUCTURASUPORTE 2.00 2.00 02-Mar-14 03-Mar-14 60 0%
A2040 VERTICALIZACION Y GROUT - ESTRUCTURA 2.00 2.00 04-Mar-14 05-Mar-14 60 0%
A2050 MONTAJE Y FIJACIN 2.00 2.00 06-Mar-14 07-Mar-14 40 0%
RESISTENCIA NEUTRO 200A, 10 SEG.-1 RESISTENCIA NEUTRO 200A, 10 SEG.-1
8.00 8.00 04-Mar-14 11-Mar-14190 0%
A1980 TRASLADO 1.00 1.00 04-Mar-14* 04-Mar-14 30 0%
A1990 ARMADO Y MONTAJE DE ESTRUCTURASUPORTE 3.00 3.00 05-Mar-14 07-Mar-14 60 0%
A2000 VERTICALIZACION Y GROUT - ESTRUCTURA 2.00 2.00 08-Mar-14 09-Mar-14 60 0%
A2010 MONTAJE Y FIJACIN 2.00 2.00 10-Mar-14 11-Mar-14 40 0%
RESISTENCIA NEUTRO 200A, 10 SEG.-2 RESISTENCIA NEUTRO 200A, 10 SEG.-2
6.00 6.00 07-Mar-14 12-Mar-14190 0%
A2090 TRASLADO 1.00 1.00 07-Mar-14* 07-Mar-14 30 0%
A2100 ARMADO Y MONTAJE DE ESTRUCTURASUPORTE 2.00 2.00 08-Mar-14 09-Mar-14 60 0%
A2110 VERTICALIZACION Y GROUT - ESTRUCTURA 2.00 2.00 10-Mar-14 11-Mar-14 60 0%
A2120 MONTAJE Y FIJACIN 1.00 1.00 12-Mar-14 12-Mar-14 40 0%
Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S
Jan 05 Jan 12 Jan 19 Jan 26 Feb 02 Feb 09
Feb 16
SUB ESTACIN Classic WBS Layout 08-Feb-14 11:30
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 7 of 9 TASK filter: All Activities
Primavera Systems, Inc.
M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat
S
Feb 16 Feb 23 Mar 02 Mar 09 Mar 16 Mar 23 Mar 30 Apr 06 Apr 13 Apr 20
Apr 27
07-Mar-14, RESISTENCIANEUTRO 200A, 10 SEG.
TRASLADO
ARMADO Y MONTAJE DE ESTRUCTURASUPORTE
VERTICALIZACION Y GROUT - ESTRUCTURA
MONTAJE Y FIJACIN
11-Mar-14, RESISTENCIA NEUTRO 200A, 10 SEG.-1
TRASLADO
ARMADO Y MONTAJE DE ESTRUCTURASUPORTE
VERTICALIZACION Y GROUT - ESTRUCTURA
MONTAJE Y FIJACIN
12-Mar-14, RESISTENCIANEUTRO 200A, 10 SEG.-2
TRASLADO
ARMADO Y MONTAJE DE ESTRUCTURASUPORTE
VERTICALIZACION Y GROUT - ESTRUCTURA
MONTAJE Y FIJACIN
SUB ESTACIN Classic WBS Layout 08-Feb-14 11:30
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 8 of 9 TASK filter: All Activities
Primavera Systems, Inc.
S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat S M T W Thr Fri Sat
Apr 27 May 04 May 11 May 18 May 25 Jun 01 Jun 08 Jun 15 Jun 22 Jun 29
COLOCACIN DE ANCLAJES
TRASLADO
MONTAJE, NIVELACIN Y ALINEAMIENTO
GROUT
29-Jun-14, UNIDAD DE ENFRIAMIENTO CONDENSADOR SINCRONICO 1
COLOCACIN DE ANCLAJES
TRASLADO
MONTAJE, NIVELACIN Y ALINEAMIENTO
GROUT
01-Jul-14, UNIDAD DE ENFRIAMIENTO CONDENSADOR SINCRONICO 2
COLOCACIN DE ANCLAJES
TRASLADO
MONTAJE, NIVELACIN Y ALINEAMIENTO
GROUT
03-Jul-14, UNIDAD DE BOMBEO SISTEMADE ENFRIAMIENTO
COLOCACIN DE ANCLAJES
TRASLADO
MONTAJE, NIVELACIN Y ALINEAMIENTO
GROUT
SUB ESTACIN Classic WBS Layout 08-Feb-14 11:30
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 9 of 9 TASK filter: All Activities