Vous êtes sur la page 1sur 5

Performance Relationship Map

1. Should


2. Should

Business Need:

Operational Results On-the-Job Performance
Casual Linkage
A specific Business Need is written (example: increase
reliability, improve profits, increase number of students
in graduate school)

Box 1 expresses the criteria for the operational result
(examples: reliability of 98%, volume of 26 million,
120 graduate students on the roster each fall)
Performance Relationship Map

1. Should


2. Should

Business Need:

Operational Results On-the-Job Performance
Casual Linkage
Box 2 requires information regarding the type of
performance that people SHOULD demonstrate if the
desired operational results are to be realized.
(examples: immediately report quality inspection
results that fall below 3 %, use long-cycle sales
techniques, attend 5 recruitment days)
What research has indicated is
appropriate
Performance Relationship Map

4. Is


3. Is

Business Need:

Operational Results On-the-Job Performance
Casual Linkage

Box 3 identifies the current performance, the IS of the
situation (examples: report when rejected parts falls
above 5%, use short-cycle sales techniques, visits one
site per semester)
Performance Relationship Map

4. Is


3. Is

Business Need:

Operational Results On-the-Job Performance
Casual Linkage
Box 4 represents the current performance that is a
direct result of box 3. If there is a GAP then there is a
need for continued investigation.
Performance Relationship Map

4. Is


3. Is


Gap Gap
Casual Linkage
Box 5 identifies the various factors and forces that
impact upon the desired performance. These can be
EXTERNAL CAUSES or INTERNAL CAUSES

5. Environmental Factors
Impacting Performance

External Causes
Internal Causes

Vous aimerez peut-être aussi