Partida N: 1-II Descripcin: E-437.071.S/C.- SUMINISTRO, TRANSPORTE Y COLOCACION DE MARCOS PARA PUERTAS DE CHAPA DOBLADA DE HIERRO EN PAREDES DE E=15 cms.
Unidad : ML Cantidad : 156.06 Rendimiento (R): 70.000 ML/da
N Das : 2.23 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 2 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M194 MORTERO CEMENTO ARENA M3 0.0199 185000.00 3,681.50 M813 MARCO DE HIERRO CAL #18 3X3" E=15 CM ML 1.0000 15001.70 15,001.70 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 18,683.20 Costo por Unidad (I): 18,683.20 64.63 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 0.25 350000 3.33 2913.75 2,913.75 E429 *HERRAMIENTAS MENORES 0.50 2000000 0.50 5000.00 0.10 1000.00 6,000.00 E449 *CAMION DINA CAP= 3 TON 0.10 56500000 0.20 11300.00 0.05 2825.00 0.07 3955.00 18,080.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 19213.75 2825.00 4955.00 Unitarios: 274.48 40.36 70.79 Costo Unitario Equipos: (II) 385.63 1.33 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 0.50 24,551.56 12,275.78 P230 0.25 28,046.87 7,011.72 P259 1.00 32,968.75 32,968.75 P304 0.10 42,051.56 4,205.16 +------------------------------------------------------------------------------------------------------------+ HhU= 0.326 Total Personal: 82,750.47 HhT= 50.876 Costo por Unidad: 1,182.15 Bs/hH= 11,603.93 220.00% Prestaciones Sociales 2,600.73 3,782.88 13.09 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 3,782.88 13.09 Costo Directo (I+II+III) 22,851.71 79.05 15.00% Administracin y Gastos Generales gg 3,427.76 26,279.47 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 2,627.95 28,907.42 9.09 Precio Unitario 28,907.42 100.00 Precio Unitario Asumido 27,754.05 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: II-2 Descripcin: E-437.071.010.- SUMINISTRO, TRANSPORTE Y COLOCACION DE MARCOS PARA PUERTAS, DOBLADAS EN CHAPAS PARA PAREDES DE E= 10 cms.
Unidad : ML Cantidad : 74.90 Rendimiento (R): 70.000 ML/da
N Das : 1.07 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 3 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M194 MORTERO CEMENTO ARENA M3 0.0192 185000.00 3,552.00 M4511 MARCO DE HIERRO #18, E=10 CMS ML 1.0200 14559.00 14,850.18 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 18,402.18 Costo por Unidad (I): 18,402.18 64.45 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 0.25 350000 3.33 2913.75 2,913.75 E429 *HERRAMIENTAS MENORES 0.50 2000000 0.50 5000.00 0.10 1000.00 6,000.00 E449 *CAMION DINA CAP= 3 TON 0.10 56500000 0.20 11300.00 0.05 2825.00 0.07 3955.00 18,080.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 19213.75 2825.00 4955.00 Unitarios: 274.48 40.36 70.79 Costo Unitario Equipos: (II) 385.63 1.35 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 0.50 24,551.56 12,275.78 P230 0.25 28,046.87 7,011.72 P259 1.00 32,968.75 32,968.75 P304 0.10 42,051.56 4,205.16 +------------------------------------------------------------------------------------------------------------+ HhU= 0.326 Total Personal: 82,750.47 HhT= 24.417 Costo por Unidad: 1,182.15 Bs/hH= 11,603.93 220.00% Prestaciones Sociales 2,600.73 3,782.88 13.25 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 3,782.88 13.25 Costo Directo (I+II+III) 22,570.69 79.05 15.00% Administracin y Gastos Generales gg 3,385.60 25,956.29 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 2,595.63 28,551.92 9.09 Precio Unitario 28,551.92 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 3-II Descripcin: E-437.011.S/C.- SUMINISTRO, TRANSPORTE, FABRICACION Y COLOCACION DE REJAS DE PROTECCION EN VENTANAS CON BARRAS LISAS DE 1/2" @12,5 CMS Y PLETINAS DE 1"x 1/4".
N Das : 15.25 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 6 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4388 BARNIZ TIPO A MADERAS GAL 0.0500 50000.00 2,500.00 M4389 SELLADOR GAL 0.0200 45000.00 900.00 M4512 THINER DISOLVENTE GL 0.0200 4750.00 95.00 M4513 LIJA 80-120 PLIGO 0.0684 750.00 51.30 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 3,546.30 Costo por Unidad (I): 3,546.30 33.23 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E316 ANDAMIOS METALICOS (2 CUERPOS)2. 1.00 850000 0.25 2125.00 0.85 7225.00 9,350.00 E628 EQUIPO DE PINTURA 1.00 500000 0.50 2500.00 0.03 150.00 2,650.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 4625.00 7375.00 Unitarios: 57.81 92.19 Costo Unitario Equipos: (II) 150.00 1.41 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P275 2.00 32,968.75 65,937.50 +------------------------------------------------------------------------------------------------------------+ HhU= 0.400 Total Personal: 118,515.62 HhT= 488.000 Costo por Unidad: 1,481.45 Bs/hH= 11,851.60 220.00% Prestaciones Sociales 3,259.19 4,740.64 44.42 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 4,740.64 44.42 Costo Directo (I+II+III) 8,436.94 79.05 15.00% Administracin y Gastos Generales gg 1,265.54 9,702.48 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 970.25 10,672.73 9.09 Precio Unitario 10,672.73 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 5-II Descripcin: E-631.001.051.- SUMINISTRO,TRANSPORTE Y COLOCACION DE LLAVE DE PASO DE BRONCE, TIPO COMPUERTA DE DIAMETRO DE 2" (50 mm) (150 psi).
N Das : 0.10 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 8 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4514 LLAVE DE PASO COMPUERTA-BRONCE (150 LBS) PZA 1.0000 45724.36 45,724.36 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 45,724.36 Costo por Unidad (I): 45,724.36 52.56 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E22 EQUIPO DE PLOMERIA 0.50 1000000 1.43 7150.00 7,150.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 7150.00 Unitarios: 715.00 Costo Unitario Equipos: (II) 715.00 0.82 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P276 1.00 32,968.75 32,968.75 P304 0.25 42,051.56 10,512.89 +------------------------------------------------------------------------------------------------------------+ HhU= 1.800 Total Personal: 69,770.70 HhT= 1.800 Costo por Unidad: 6,977.07 Bs/hH= 12,403.68 220.00% Prestaciones Sociales 15,349.55 22,326.62 25.67 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 22,326.62 25.67 Costo Directo (I+II+III) 68,765.98 79.05 15.00% Administracin y Gastos Generales gg 10,314.90 79,080.88 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 7,908.09 86,988.97 9.09 Precio Unitario 86,988.97 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 6-II Descripcin: E-S/C.- CONSTRUCCION DE SALIDA DE PUNTO ELECTRICO PARA TOMA DE A/ACONDICIONADO (220 VOL.), CON TUBERIA ELECTRICA PLASTICA D= 3/4", INCLUYE CAJETIN RECTANGULAR, CONEXIONES Y TRES CABLES THW #10.
Unidad : PUNTO Cantidad : 5.00 Rendimiento (R): 8.000 PUNTO/da
N Das : 0.63 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 10 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4024 Z-CABLE THW CAL 10 AWG ML 9.0000 1606.01 14,454.09 M4026 Z-CAJETIN CON TAPA 4X2X1/2" PIEZA 1.0000 2738.15 2,738.15 M4039 Z-MATERIALES VARIOS INSTALACIONES ELECT. SG 0.0500 28500.00 1,425.00 M4055 Z-CURVA PVC SIN ROSCA D=3/4" PIEZA 1.0000 833.97 833.97 M839 TUBO PVC PAVCO A.B 3/4" ML 3.0000 1400.00 4,200.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 23,651.21 Costo por Unidad (I): 23,651.21 35.87 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E491 Z-EQUIPO PARA ELECTRICIDAD 1.00 600000 0.75 4500.00 4,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 4500.00 Unitarios: 562.50 Costo Unitario Equipos: (II) 562.50 0.85 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P263 1.00 32,968.75 32,968.75 P304 0.25 42,051.56 10,512.89 +------------------------------------------------------------------------------------------------------------+ HhU= 2.250 Total Personal: 69,770.70 HhT= 11.250 Costo por Unidad: 8,721.34 Bs/hH= 12,403.68 220.00% Prestaciones Sociales 19,186.95 27,908.29 42.33 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 27,908.29 42.33 Costo Directo (I+II+III) 52,122.00 79.05 15.00% Administracin y Gastos Generales gg 7,818.30 59,940.30 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,994.03 65,934.33 9.09 Precio Unitario 65,934.33 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 7-II Descripcin: E-S/C.- I.E.TABLERO METALICO, COVERTIBLE, PARA EMBUTIR, CON PUERTAS, 3 FASES+NEUTRO, 6 CIRCUITOS, BARRA DE 125 AMP.NO INCLUYE BREAKERS.
N Das : 0.25 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 11 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M194 MORTERO CEMENTO ARENA M3 0.0100 185000.00 1,850.00 M4515 TABLERO ELECTRICO NAB 06 CIRCUITOS PZA 1.0000 65000.00 65,000.00 M4516 CONECTOR DE 2"EMT-PVC PZA 1.0000 8500.00 8,500.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 75,350.00 Costo por Unidad (I): 75,350.00 31.75 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 0.50 350000 3.33 5827.50 5,827.50 E19 EQUIPO DE ELECTRICISTA 1.00 2500000 1.00 25000.00 0.10 2500.00 27,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 30827.50 2500.00 Unitarios: 7706.88 625.00 Costo Unitario Equipos: (II) 8,331.88 3.51 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.50 26,289.06 39,433.59 P218 1.00 24,551.56 24,551.56 P259 1.00 32,968.75 32,968.75 P263 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 9.000 Total Personal: 129,922.65 HhT= 9.000 Costo por Unidad: 32,480.66 Bs/hH= 11,548.68 220.00% Prestaciones Sociales 71,457.45 103,938.11 43.79 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 103,938.11 43.79 Costo Directo (I+II+III) 187,619.99 79.05 15.00% Administracin y Gastos Generales gg 28,143.00 215,762.99 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 21,576.30 237,339.29 9.09 Precio Unitario 237,339.29 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 8-II Descripcin: E-S/C.- I.E.TABLERO METALICO, COVERTIBLE, PARA EMBUTIR, CON PUERTAS, 3 FASES+NEUTRO, 24 CIRCUITOS, BARRA DE 225 AMP.NO INCLUYE BREAKERS.(TABLERO PRINCIPAL).
N Das : 0.58 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 25 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M478 BARRA COPPERWELD 5/8" X8' PZA 1.0000 28500.00 28,500.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 28,500.00 Costo por Unidad (I): 28,500.00 45.18 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E19 EQUIPO DE ELECTRICISTA 1.00 2500000 1.00 25000.00 0.10 2500.00 27,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 25000.00 2500.00 Unitarios: 2083.33 208.33 Costo Unitario Equipos: (II) 2,291.66 3.63 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 0.50 24,551.56 12,275.78 P263 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 1.667 Total Personal: 71,533.59 HhT= 11.669 Costo por Unidad: 5,961.13 Bs/hH= 11,443.08 220.00% Prestaciones Sociales 13,114.49 19,075.62 30.24 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 19,075.62 30.24 Costo Directo (I+II+III) 49,867.28 79.05 15.00% Administracin y Gastos Generales gg 7,480.09 57,347.37 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,734.74 63,082.11 9.09 Precio Unitario 63,082.11 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 22-II Descripcin: E-521.S/C.- CABLE DE COBRE, DESNUDO, AWG, CALIBRE #2 PARA ATERRAMIENTOS.
Unidad : ML Cantidad : 36.00 Rendimiento (R): 175.000 ML/da
N Das : 0.21 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 26 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4524 CABLE TRENZ. DESNUDO, #2 AWG ML 1.0500 17968.00 18,866.40 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 18,866.40 Costo por Unidad (I): 18,866.40 73.35 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E19 EQUIPO DE ELECTRICISTA 1.00 2500000 1.00 25000.00 0.10 2500.00 27,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 25000.00 2500.00 Unitarios: 142.86 14.29 Costo Unitario Equipos: (II) 157.15 0.61 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 0.50 24,551.56 12,275.78 P263 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 0.114 Total Personal: 71,533.59 HhT= 4.104 Costo por Unidad: 408.76 Bs/hH= 11,473.95 220.00% Prestaciones Sociales 899.27 1,308.03 5.09 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 1,308.03 5.09 Costo Directo (I+II+III) 20,331.58 79.05 15.00% Administracin y Gastos Generales gg 3,049.74 23,381.32 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 2,338.13 25,719.45 9.09 Precio Unitario 25,719.45 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 23-II Descripcin: E-572.111.025.- I.E. TRANSFORMADORES MONOFASICOS REFRIGERADOS EN ACEITE, DE 13,8 Kv., 240/120 VOL., CAP=25 KVA.
Unidad : UND Cantidad : 3.00 Rendimiento (R): 3.000 UND/da
N Das : 1.00 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 27 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M2527 ABRAZADERA DE 6-1/2" UND 1.0000 24000.00 24,000.00 M4525 TRANSFORMADOR MONOFA/ACEITE-25 KVA UNI 1.0000 3650000.00 3,650,000.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 3,674,000.00 Costo por Unidad (I): 3,674,000.00 73.13 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E19 EQUIPO DE ELECTRICISTA 1.00 2500000 1.00 25000.00 0.10 2500.00 27,500.00 E84 *CAMION 750 CON BRAZO HIDRAULICO 1.00180000000 0.20 360000.00 0.05 90000.00 0.05 90000.00 540,000.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 385000.00 90000.00 92500.00 Unitarios: 128333.33 30000.00 30833.33 Costo Unitario Equipos: (II) 189,166.66 3.77 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 0.50 24,551.56 12,275.78 P252 1.00 29,864.06 29,864.06 P263 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 9.333 Total Personal: 101,397.65 HhT= 27.999 Costo por Unidad: 33,799.22 Bs/hH= 11,588.72 220.00% Prestaciones Sociales 74,358.28 108,157.50 2.15 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 108,157.50 2.15 Costo Directo (I+II+III) 3,971,324.16 79.05 15.00% Administracin y Gastos Generales gg 595,698.62 4,567,022.78 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 456,702.28 5,023,725.06 9.09 Precio Unitario 5,023,725.06 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 24-II Descripcin: C-20-01-021-01.- CONCRETO RCC28= 210 KG/CM2 PARA LA CONSTRUCCION DE BROCAL CUNETAS.INCLUYE EL ENCOFRADO Y EL TRANSPORTE DEL CEMENTO HASTA 50KM.EXCLUYE EL REFUERZO METALICO.
N Das : 2.00 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 28 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M1675 AGUA LTS 0.2000 3.00 0.60 M205 PIEDRA PICADA N 1 M3 0.7000 45000.00 31,500.00 M3854 ENCOFRADO METALICO P/BROCALES ML 0.9975 8357.00 8,336.11 M627 ARENA LAVADA M3 0.4500 30700.00 13,815.00 M674 CEMENTO PORLAND GRIS SACO 7.0000 14500.00 101,500.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 155,151.71 Costo por Unidad (I): 155,151.71 34.47 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E429 *HERRAMIENTAS MENORES 1.00 2000000 0.40 8000.00 0.10 2000.00 10,000.00 E440 *TROMPO PARA CONCRETO CAP 1 SAC0 1.00 15000000 0.50 75000.00 0.05 7500.00 0.08 12000.00 94,500.00 E449 *CAMION DINA CAP= 3 TON 0.50 56500000 0.20 56500.00 0.05 14125.00 0.07 19775.00 90,400.00 E605 *CARRETON CAP=200 LITROS 2.00 750000 0.10 1500.00 1,500.00 E607 *VIBRADOR ELECTRICO 1.75HP 1.00 3720000 0.80 29760.00 0.10 3720.00 33,480.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 170760.00 21625.00 37495.00 Unitarios: 28460.00 3604.17 6249.17 Costo Unitario Equipos: (II) 38,313.34 8.51 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P218 6.00 24,551.56 147,309.36 P230 0.50 28,046.87 14,023.44 P243 2.00 29,473.43 58,946.86 P259 2.00 32,968.75 65,937.50 P290 0.50 36,484.37 18,242.19 +------------------------------------------------------------------------------------------------------------+ HhU= 14.667 Total Personal: 304,459.35 HhT= 176.004 Costo por Unidad: 50,743.23 Bs/hH= 11,071.00 220.00% Prestaciones Sociales 111,635.11 162,378.34 36.07 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 162,378.34 36.07 Costo Directo (I+II+III) 355,843.39 79.05 15.00% Administracin y Gastos Generales gg 53,376.51 409,219.90 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 40,921.99 450,141.89 9.09 Precio Unitario 450,141.89 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 25-II Descripcin: C-20-01-S/C.- CONCRETO RCC28=210 KG/CM2 PARA LA CONSTRUCCION DE CANALES RECTANGULAR. INCLUYE REJILLA MARCO DE ACERO, ACERO DE REFUERZO Y EL ENCOFRADO.
N Das : 0.50 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 29 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M1675 AGUA LTS 0.1600 3.00 0.48 M1931 MALLA ELECTROSOLDADA 100X100X4 MM M2 5.0000 3500.00 17,500.00 M205 PIEDRA PICADA N 1 M3 0.7500 45000.00 33,750.00 M3854 ENCOFRADO METALICO P/BROCALES ML 1.0000 8357.00 8,357.00 M437 REJILLA ACEROGRILL 1"X3/16" M2 2.7700 88100.00 244,037.00 M627 ARENA LAVADA M3 0.5000 30700.00 15,350.00 M674 CEMENTO PORLAND GRIS SACO 7.0000 14500.00 101,500.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 420,494.48 Costo por Unidad (I): 420,494.48 53.72 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E440 *TROMPO PARA CONCRETO CAP 1 SAC0 1.00 15000000 0.50 75000.00 0.05 7500.00 0.08 12000.00 94,500.00 E449 *CAMION DINA CAP= 3 TON 0.50 56500000 0.20 56500.00 0.05 14125.00 0.07 19775.00 90,400.00 E604 *PALA REDONDA 4.00 12000 0.55 264.00 264.00 E605 *CARRETON CAP=200 LITROS 1.00 750000 0.10 750.00 750.00 E607 *VIBRADOR ELECTRICO 1.75HP 1.00 3720000 0.80 29760.00 29,760.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 162274.00 21625.00 31775.00 Unitarios: 27045.67 3604.17 5295.83 Costo Unitario Equipos: (II) 35,945.67 4.59 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P218 6.00 24,551.56 147,309.36 P230 0.50 28,046.87 14,023.44 P243 2.00 29,473.43 58,946.86 P259 2.00 32,968.75 65,937.50 P290 0.50 36,484.37 18,242.19 +------------------------------------------------------------------------------------------------------------+ HhU= 14.667 Total Personal: 304,459.35 HhT= 44.001 Costo por Unidad: 50,743.23 Bs/hH= 11,071.00 220.00% Prestaciones Sociales 111,635.11 162,378.34 20.74 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 162,378.34 20.74 Costo Directo (I+II+III) 618,818.49 79.05 15.00% Administracin y Gastos Generales gg 92,822.77 711,641.26 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 71,164.13 782,805.39 9.09 Precio Unitario 782,805.39 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 26-II Descripcin: E.S/C REMOCION ORDINARIA DE TIERRA DESECHABLE EN LA BASE DE TERRAPLENES, CON EMPLEO DE RETROEXCAVADORA (CAPA VEGETAL 10 Cms)
N Das : 1.65 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 34 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- +------------------------------------------------------------------------------------------------------------+ Total Materiales: Costo por Unidad (I): 0.00 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E492 Z-EQUIPO DE MOVIMIENTO DE TIERRA 3.00 440000 0.80 10560.00 10,560.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 10560.00 Unitarios: 1615.91 Costo Unitario Equipos: (II) 1,615.91 1.45 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P218 6.00 24,551.56 147,309.36 P235 1.00 29,473.43 29,473.43 +------------------------------------------------------------------------------------------------------------+ HhU= 8.569 Total Personal: 176,782.79 HhT= 92.545 Costo por Unidad: 27,051.69 Bs/hH= 10,102.16 220.00% Prestaciones Sociales 59,513.72 86,565.41 77.60 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 86,565.41 77.60 Costo Directo (I+II+III) 88,181.32 79.05 15.00% Administracin y Gastos Generales gg 13,227.20 101,408.52 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 10,140.85 111,549.37 9.09 Precio Unitario 111,549.37 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 29-II Descripcin: E-317.000.000 COMPACTACION DE RELLENOS CON APISONADORES DE PERCUCION CORRESPONDIENTE A LOS ASIENTOS DE FUNDACIONES, ZANJAS U OTROS
N Das : 0.59 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 36 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- +------------------------------------------------------------------------------------------------------------+ Total Materiales: Costo por Unidad (I): 0.00 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E492 Z-EQUIPO DE MOVIMIENTO DE TIERRA 3.00 440000 0.80 10560.00 10,560.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 10560.00 Unitarios: 312.43 Costo Unitario Equipos: (II) 312.43 1.58 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P218 6.00 24,551.56 147,309.36 P235 0.50 29,473.43 14,736.72 +------------------------------------------------------------------------------------------------------------+ HhU= 1.538 Total Personal: 162,046.08 HhT= 30.806 Costo por Unidad: 4,794.26 Bs/hH= 9,975.05 220.00% Prestaciones Sociales 10,547.37 15,341.63 77.47 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 15,341.63 77.47 Costo Directo (I+II+III) 15,654.06 79.05 15.00% Administracin y Gastos Generales gg 2,348.11 18,002.17 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 1,800.22 19,802.39 9.09 Precio Unitario 19,802.39 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 31-II Descripcin: E-134.030.S/C CARGA CON EQUIPO PESADO DEL MATERIAL PROVENIENTE DE LA PREPARACION DEL SITIO (DEFORESTACION Y CORTE DE CAPA VEGETAL)
N Das : 0.41 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 37 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- +------------------------------------------------------------------------------------------------------------+ Total Materiales: Costo por Unidad (I): 0.00 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E39 *RETROEXCAVADORA DE CAUCHOS TIPO 1.00220000000 0.15 330000.00 0.03 66000.00 0.10 220000.00 616,000.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 330000.00 66000.00 220000.00 Unitarios: 446.55 89.31 297.70 Costo Unitario Equipos: (II) 833.56 57.56 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P219 1.00 26,289.06 26,289.06 P286 0.25 36,484.37 9,121.09 P299 1.00 36,484.37 36,484.37 +------------------------------------------------------------------------------------------------------------+ HhU= 0.024 Total Personal: 71,894.52 HhT= 7.244 Costo por Unidad: 97.29 Bs/hH= 12,972.08 220.00% Prestaciones Sociales 214.04 311.33 21.50 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 311.33 21.50 Costo Directo (I+II+III) 1,144.89 79.05 15.00% Administracin y Gastos Generales gg 171.73 1,316.62 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 131.66 1,448.28 9.09 Precio Unitario 1,448.28 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 32-II Descripcin: E-904.241.010 TRANSPORTE NO URBANO EN CAMIONES DE MATERIALES PROVENIENTES DE MOVIMIENTO DE TIERRA, MEDIDO POR SECCIONES A DISTANCIAS ENTRE 8 Y 10 KM.
N Das : 2.86 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 39 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- +------------------------------------------------------------------------------------------------------------+ Total Materiales: Costo por Unidad (I): 0.00 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E9 *CAMION VOLTEO DE 15 M3 2.00252000000 0.15 756000.00 0.01 50400.00 0.02 100800.00 907,200.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 756000.00 50400.00 100800.00 Unitarios: 1680.00 112.00 224.00 Costo Unitario Equipos: (II) 2,016.00 58.96 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P219 1.00 26,289.06 26,289.06 P255 2.00 30,613.31 61,226.62 P286 0.25 36,484.37 9,121.09 +------------------------------------------------------------------------------------------------------------+ HhU= 0.058 Total Personal: 96,636.77 HhT= 74.674 Costo por Unidad: 214.75 Bs/hH= 11,848.28 220.00% Prestaciones Sociales 472.45 687.20 20.10 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 687.20 20.10 Costo Directo (I+II+III) 2,703.20 79.05 15.00% Administracin y Gastos Generales gg 405.48 3,108.68 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 310.87 3,419.55 9.09 Precio Unitario 3,419.55 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 34-II Descripcin: E-351.110.210 SUMINISTRO Y TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO Fy 4200 KGF/CM2, UTILIZANDO CABILLA 3/8"
N Das : 0.84 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 41 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3902 Z-CABILLA ESTRIADA DE 3/8" RAT 2100 KG. 1.0250 2113.92 2,166.77 M3905 Z-ALAMBRE LISO GALVANIZADO CALIBRE # 18 KG. 0.0150 4150.00 62.25 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 2,229.02 Costo por Unidad (I): 2,229.02 53.16 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E429 *HERRAMIENTAS MENORES 1.00 2000000 0.50 10000.00 0.10 2000.00 12,000.00 E485 Z-EQUIPO DE CABILLA 1.00 13330000 0.23 30659.00 30,659.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 40659.00 2000.00 Unitarios: 72.06 3.54 Costo Unitario Equipos: (II) 75.60 1.80 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P261 2.00 32,968.75 65,937.50 P304 0.25 42,051.56 10,512.89 +------------------------------------------------------------------------------------------------------------+ HhU= 0.089 Total Personal: 178,131.63 HhT= 41.959 Costo por Unidad: 315.70 Bs/hH= 11,351.01 220.00% Prestaciones Sociales 694.54 1,010.24 24.09 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 1,010.24 24.09 Costo Directo (I+II+III) 3,314.86 79.05 15.00% Administracin y Gastos Generales gg 497.23 3,812.09 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 381.21 4,193.30 9.09 Precio Unitario 4,193.30 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 35-II Descripcin: E-351.120.210 SUMINISTRO Y TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO Fy 4200 Kgf/CM2, UTILIZANDO CABILLA 1/2"
N Das : 1.71 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 42 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3903 Z-CABILLA ESTRIADA DE 1/2" RAT. 2100 KG. 1.0250 2044.80 2,095.92 M3905 Z-ALAMBRE LISO GALVANIZADO CALIBRE # 18 KG. 0.0150 4150.00 62.25 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 2,158.17 Costo por Unidad (I): 2,158.17 46.24 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E429 *HERRAMIENTAS MENORES 1.00 2000000 0.50 10000.00 0.10 2000.00 12,000.00 E485 Z-EQUIPO DE CABILLA 1.00 13330000 0.23 30659.00 30,659.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 40659.00 2000.00 Unitarios: 101.65 5.00 Costo Unitario Equipos: (II) 106.65 2.28 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P261 2.00 32,968.75 65,937.50 P304 0.25 42,051.56 10,512.89 +------------------------------------------------------------------------------------------------------------+ HhU= 0.125 Total Personal: 178,131.63 HhT= 85.348 Costo por Unidad: 445.33 Bs/hH= 11,400.48 220.00% Prestaciones Sociales 979.73 1,425.06 30.53 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 1,425.06 30.53 Costo Directo (I+II+III) 3,689.88 79.05 15.00% Administracin y Gastos Generales gg 553.48 4,243.36 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 424.34 4,667.70 9.09 Precio Unitario 4,667.70 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 36-II Descripcin: E-351.120.210 SUMINISTRO TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO Fy 4200 KGF/CM2, UTILIZANDO CABILLA 5/8"
N Das : 3.65 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 47 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3905 Z-ALAMBRE LISO GALVANIZADO CALIBRE # 18 KG. 0.1000 4150.00 415.00 M3907 Z-CLAVO DE 3 1/2" KG. 0.5700 4250.00 2,422.50 M3936 Z-CUARTON AURORA 5 * 10 CM. M3 0.0045 1095000.00 4,927.50 M3937 Z-TABLA SAQUI-SAQUI M3 0.0028 1395000.00 3,906.00 M3938 Z-VIGAS PARA APUNTALAR DE MADERA H=4M PIEZA 0.0560 25000.00 1,400.00 M3938 Z-VIGAS PARA APUNTALAR DE MADERA H=4M PIEZA 0.0560 25000.00 1,400.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 14,471.00 Costo por Unidad (I): 14,471.00 21.48 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E477 Z-CEPILLO PARA CARPINTERO 1.00 164000 0.23 377.20 377.20 E487 Z-EQUIPO DE CARPINTERIA 1.00 680000 0.52 3536.00 3,536.00 E508 Z-SIERRA DE MESA, DISCO 35 CMS. 1.00 720000 0.28 2016.00 2,016.00 E509 Z-TALADRO INSDUSTRIAL 1.00 1080000 0.24 2592.00 2,592.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 8521.20 Unitarios: 1065.15 Costo Unitario Equipos: (II) 1,065.15 1.58 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 1.00 24,551.56 24,551.56 P262 1.00 32,968.75 32,968.75 P304 0.25 42,051.56 10,512.89 +------------------------------------------------------------------------------------------------------------+ HhU= 3.250 Total Personal: 94,322.26 HhT= 94.933 Costo por Unidad: 11,790.28 Bs/hH= 11,608.89 220.00% Prestaciones Sociales 25,938.62 37,728.90 55.99 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 37,728.90 55.99 Costo Directo (I+II+III) 53,265.05 79.05 15.00% Administracin y Gastos Generales gg 7,989.76 61,254.81 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 6,125.48 67,380.29 9.09 Precio Unitario 67,380.29 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 40-II Descripcin: E-321.190.050.- PILOTES PERFORADOS (CON EXTRACCION DE TIERRA) DE DIAMETRO 0.45 M. SIN CAMISA Y SIN LODOS BENTONITICOS.
Unidad : ML Cantidad : 62.50 Rendimiento (R): 35.000 ML/da
N Das : 1.79 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 49 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3942 Z-CONCRETO PREMEZCLADO RCC28=180 KG/CM2 M3 0.1626 198750.00 32,316.75 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 32,316.75 Costo por Unidad (I): 32,316.75 44.65 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E39 *RETROEXCAVADORA DE CAUCHOS TIPO 1.00 95840000 0.15 143760.00 0.03 28752.00 0.15 143760.00 316,272.00 E429 *HERRAMIENTAS MENORES 1.00 2000000 0.50 10000.00 0.10 2000.00 12,000.00 E550 EQUIPO/ROTOEXCAVADOR-HIDRAULICO 1.00 30000000 0.25 75000.00 0.15 45000.00 120,000.00 E551 MECHA HELICOIDAL D= 0.45 X L= 3, 1.00 5000000 0.25 12500.00 0.20 10000.00 22,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 241260.00 28752.00 200760.00 Unitarios: 6893.14 821.49 5736.00 Costo Unitario Equipos: (II) 13,450.63 18.59 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P218 2.00 24,551.56 49,103.12 P219 1.00 26,289.06 26,289.06 P231 1.00 28,750.00 28,750.00 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.029 Total Personal: 125,167.96 HhT= 64.313 Costo por Unidad: 3,576.23 Bs/hH= 11,121.42 220.00% Prestaciones Sociales 7,867.71 11,443.94 15.81 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 11,443.94 15.81 Costo Directo (I+II+III) 57,211.32 79.05 15.00% Administracin y Gastos Generales gg 8,581.70 65,793.02 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 6,579.30 72,372.32 9.09 Precio Unitario 72,372.32 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 41-II Descripcin: E-322.000.120.- CONCRETO DE Fc 210 Kgf/CM2 A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE CABEZALES DE PILOTES, INCLUYE EL TRANSPORTE DEL CEMENTO Y AGREGADOS HASTA 50 KM Y EXCLUYE EL REFUERZO MATALICO Y EL ENCOFRADO.
N Das : 0.16 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 50 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 7.5000 14500.00 108,750.00 M3928 Z-ARENA LAVADA M3 0.4599 25000.00 11,497.50 M3929 Z-PIEDRA PICADA T MAX 1" M3 0.8900 50000.00 44,500.00 M4111 Z-AGUA M3 0.2001 8300.00 1,660.83 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 166,408.33 Costo por Unidad (I): 166,408.33 41.17 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E475 Z-CARRETILLA 3.00 85000 0.48 1224.00 1,224.00 E476 Z-CARRETON CAP = 200 LITROS 1.00 850000 0.58 4930.00 4,930.00 E482 Z-CUCHARA PLANA 6" 4.00 39200 0.64 1003.52 1,003.52 E501 Z-TROMPO MEZCLADORA, CAP.=.33 M3 2.00 6200000 0.97 120280.00 120,280.00 E502 Z-PALA REDONDA 4.00 44000 0.75 1320.00 1,320.00 E510 Z-VIBRADOR ELECTRICO 1.75HP CABE 2.00 2640000 0.95 50160.00 50,160.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 178917.52 Unitarios: 22997.11 Costo Unitario Equipos: (II) 22,997.11 5.69 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 6.00 24,551.56 147,309.36 P243 1.00 29,473.43 29,473.43 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 11.825 Total Personal: 316,324.19 HhT= 14.781 Costo por Unidad: 40,658.64 Bs/hH= 11,002.76 220.00% Prestaciones Sociales 89,449.01 130,107.65 32.19 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 130,107.65 32.19 Costo Directo (I+II+III) 319,513.09 79.05 15.00% Administracin y Gastos Generales gg 47,926.96 367,440.05 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 36,744.00 404,184.06 9.09 Precio Unitario 404,184.06 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 42-II Descripcin: E-325.000.120 CONCRETO DE Fc 210 Kgf/CM2 A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE VIGAS DE RIOSTRA, TIRANTES Y FUNDACIONES DE PARED, INCLUYE TRANSPORTE DE CEMENTO Y AGRGADOS HASTA 50KM Y EXCLUYE EL REFUERZO METALICO Y EL ENCOFRADO
N Das : 1.57 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 51 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 7.5000 14500.00 108,750.00 M3928 Z-ARENA LAVADA M3 0.4500 25000.00 11,250.00 M3929 Z-PIEDRA PICADA T MAX 1" M3 0.9000 50000.00 45,000.00 M4111 Z-AGUA M3 0.1801 8300.00 1,494.83 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 166,494.83 Costo por Unidad (I): 166,494.83 39.42 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E475 Z-CARRETILLA 3.00 85000 0.48 1224.00 1,224.00 E476 Z-CARRETON CAP = 200 LITROS 1.00 850000 0.58 4930.00 4,930.00 E482 Z-CUCHARA PLANA 6" 4.00 39200 0.64 1003.52 1,003.52 E501 Z-TROMPO MEZCLADORA, CAP.=.33 M3 2.00 6200000 0.97 120280.00 120,280.00 E502 Z-PALA REDONDA 4.00 44000 0.75 1320.00 1,320.00 E510 Z-VIBRADOR ELECTRICO 1.75HP CABE 2.00 2640000 0.95 50160.00 50,160.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 178917.52 Unitarios: 22211.98 Costo Unitario Equipos: (II) 22,211.98 5.26 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 8.00 24,551.56 196,412.48 P243 1.00 29,473.43 29,473.43 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 13.408 Total Personal: 365,427.31 HhT= 169.477 Costo por Unidad: 45,366.52 Bs/hH= 10,827.33 220.00% Prestaciones Sociales 99,806.34 145,172.86 34.37 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 145,172.86 34.37 Costo Directo (I+II+III) 333,879.67 79.05 15.00% Administracin y Gastos Generales gg 50,081.95 383,961.62 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 38,396.16 422,357.78 9.09 Precio Unitario 422,357.78 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 43-II Descripcin: E-326.000.120 CONCRETO DE FC 210KGF/CM2 A LOS 28 DIAS ACABADO CORRIENTE PARA LA CONSTRUCCION DE LOSA FUNDACIONES DE TIPO MACIZADO INCLUYE TRANSPORTE DE CEMENTO Y AGRGADOS HASTA 50 KM. EXCLUYE EL REFUERZO METALICO Y EL ENCOFRADO
N Das : 4.17 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 52 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 7.5000 14500.00 108,750.00 M3928 Z-ARENA LAVADA M3 0.4500 25000.00 11,250.00 M3929 Z-PIEDRA PICADA T MAX 1" M3 0.9930 50000.00 49,650.00 M4111 Z-AGUA M3 0.1801 8300.00 1,494.83 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 171,144.83 Costo por Unidad (I): 171,144.83 41.82 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E475 Z-CARRETILLA 3.00 85000 0.48 1224.00 1,224.00 E476 Z-CARRETON CAP = 200 LITROS 1.00 850000 0.58 4930.00 4,930.00 E482 Z-CUCHARA PLANA 6" 4.00 39200 0.64 1003.52 1,003.52 E501 Z-TROMPO MEZCLADORA, CAP.=.33 M3 2.00 6200000 0.97 120280.00 120,280.00 E502 Z-PALA REDONDA 4.00 44000 0.75 1320.00 1,320.00 E510 Z-VIBRADOR ELECTRICO 1.75HP CABE 2.00 2640000 0.95 50160.00 50,160.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 178917.52 Unitarios: 20216.67 Costo Unitario Equipos: (II) 20,216.67 4.94 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 8.00 24,551.56 196,412.48 P243 1.00 29,473.43 29,473.43 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 12.203 Total Personal: 365,427.31 HhT= 450.413 Costo por Unidad: 41,291.22 Bs/hH= 10,827.82 220.00% Prestaciones Sociales 90,840.68 132,131.90 32.29 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 132,131.90 32.29 Costo Directo (I+II+III) 323,493.40 79.05 15.00% Administracin y Gastos Generales gg 48,524.01 372,017.41 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 37,201.74 409,219.15 9.09 Precio Unitario 409,219.15 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 44-II Descripcin: E-334.000.120 CONCRETO DE FC 210 KGF/CM2 A LOS 28 DIAS ACABADO CORRIENTE, PARA LA CONSTRUCCION DE MACHONES, VIGAS DE CORONA, DIENTES, ARRIOSTAMIENTO DE PAREDES, INCLUYE TRANSPORTE DE CEMENTO Y AGRGADOS HASTA 50 KM. Y EXCLUYE REFUERZO METALICO Y ENCOFRADO
N Das : 0.99 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 53 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 7.5000 14500.00 108,750.00 M3928 Z-ARENA LAVADA M3 0.4250 25000.00 10,625.00 M3929 Z-PIEDRA PICADA T MAX 1" M3 0.8500 50000.00 42,500.00 M4111 Z-AGUA M3 0.1701 8300.00 1,411.83 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 163,286.83 Costo por Unidad (I): 163,286.83 36.79 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E475 Z-CARRETILLA 3.00 85000 0.48 1224.00 1,224.00 E476 Z-CARRETON CAP = 200 LITROS 1.00 850000 0.58 4930.00 4,930.00 E482 Z-CUCHARA PLANA 6" 3.00 39200 0.64 752.64 752.64 E501 Z-TROMPO MEZCLADORA, CAP.=.33 M3 2.00 6200000 0.97 120280.00 120,280.00 E502 Z-PALA REDONDA 4.00 44000 0.75 1320.00 1,320.00 E510 Z-VIBRADOR ELECTRICO 1.75HP CABE 2.00 2640000 0.95 50160.00 50,160.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 178666.64 Unitarios: 39703.70 Costo Unitario Equipos: (II) 39,703.70 8.95 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 4.00 24,551.56 98,206.24 P243 1.00 29,473.43 29,473.43 P259 1.00 32,968.75 32,968.75 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 13.333 Total Personal: 207,963.26 HhT= 59.465 Costo por Unidad: 46,214.06 Bs/hH= 11,091.65 220.00% Prestaciones Sociales 101,670.93 147,884.99 33.32 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 147,884.99 33.32 Costo Directo (I+II+III) 350,875.52 79.05 15.00% Administracin y Gastos Generales gg 52,631.33 403,506.85 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 40,350.69 443,857.54 9.09 Precio Unitario 443,857.54 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 45-II Descripcin: E-362.410.012 SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICAS DE COLUMNAS SIMPLES CON PERFILES IPN 12. INCLUYE TRANSPORTE HASTA 50 KM DE DISTANCIA Y FONDO ANTICORROSIVO
N Das : 2.81 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 55 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3898 Z-PERFIL IPN 120 MM KG 1.0250 3891.00 3,988.27 M3908 Z-ELECTRODO R10 E60 3/32" KG. 0.0500 8100.00 405.00 M4102 Z-FONDO ANTICORROSIVO GALON 0.0040 54000.00 216.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 4,609.27 Costo por Unidad (I): 4,609.27 46.72 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E517 Z-CAMION GRUA, CAPACIDAD 4-6 TON 0.50128000000 0.24 153600.00 153,600.00 E522 Z-EQUIPO PARA ACERO 1.00 2400000 0.24 5760.00 5,760.00 E523 Z-EQUIPO COLOCACION DE ESTRUCTUR 1.00 39000000 0.24 93600.00 93,600.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 252960.00 Unitarios: 843.20 Costo Unitario Equipos: (II) 843.20 8.55 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P252 0.50 29,864.06 14,932.03 P275 0.50 32,968.75 16,484.38 P277 1.00 32,968.75 32,968.75 P304 0.50 42,051.56 21,025.78 P308 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 0.200 Total Personal: 220,060.93 HhT= 168.720 Costo por Unidad: 733.54 Bs/hH= 11,736.65 220.00% Prestaciones Sociales 1,613.79 2,347.33 23.79 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 2,347.33 23.79 Costo Directo (I+II+III) 7,799.80 79.05 15.00% Administracin y Gastos Generales gg 1,169.97 8,969.77 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 896.98 9,866.75 9.09 Precio Unitario 9,866.75 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 46-II Descripcin: E.S/C SUMINISTRO CONFECCION Y COLOCACION EN ESTRUCTURA METALICA DE CARTELAS SIMPLE PERFILES IPN 12. INCLUYENDO TRANSPORTE HASTA 50 KM. DE DISTANCIAS Y FONDO ANTICORROSIVO
N Das : 0.88 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 56 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3898 Z-PERFIL IPN 120 MM KG 1.0300 3891.00 4,007.73 M3908 Z-ELECTRODO R10 E60 3/32" KG. 0.0500 8100.00 405.00 M4102 Z-FONDO ANTICORROSIVO GALON 0.0039 54000.00 210.60 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 4,623.33 Costo por Unidad (I): 4,623.33 52.31 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E517 Z-CAMION GRUA, CAPACIDAD 4-6 TON 0.50128000000 0.24 153600.00 153,600.00 E522 Z-EQUIPO PARA ACERO 1.00 2400000 0.24 5760.00 5,760.00 E523 Z-EQUIPO COLOCACION DE ESTRUCTUR 1.00 39000000 0.24 93600.00 93,600.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 252960.00 Unitarios: 624.59 Costo Unitario Equipos: (II) 624.59 7.07 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P252 0.50 29,864.06 14,932.03 P275 0.50 32,968.75 16,484.38 P277 1.00 32,968.75 32,968.75 P304 0.50 42,051.56 21,025.78 P308 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 0.148 Total Personal: 220,060.93 HhT= 52.570 Costo por Unidad: 543.36 Bs/hH= 11,748.31 220.00% Prestaciones Sociales 1,195.39 1,738.75 19.67 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 1,738.75 19.67 Costo Directo (I+II+III) 6,986.67 79.05 15.00% Administracin y Gastos Generales gg 1,048.00 8,034.67 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 803.47 8,838.14 9.09 Precio Unitario 8,838.14 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 47-II Descripcin: E-362.420.012 SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICAS DE VIGAS SIMPLES, CON PERFILES IPN 12. INCLUYE TRANSPORTE HASTA 50 KM. DE DISTANCIA Y FONDO ANTICORROSIVO
N Das : 2.82 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 57 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3898 Z-PERFIL IPN 120 MM KG 1.0300 3891.00 4,007.73 M3908 Z-ELECTRODO R10 E60 3/32" KG. 0.0500 8100.00 405.00 M4102 Z-FONDO ANTICORROSIVO GALON 0.0043 54000.00 232.20 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 4,644.93 Costo por Unidad (I): 4,644.93 53.24 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E517 Z-CAMION GRUA, CAPACIDAD 4-6 TON 0.50128000000 0.24 153600.00 153,600.00 E522 Z-EQUIPO PARA ACERO 1.00 2400000 0.24 5760.00 5,760.00 E523 Z-EQUIPO COLOCACION DE ESTRUCTUR 1.00 39000000 0.24 93600.00 93,600.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 252960.00 Unitarios: 595.20 Costo Unitario Equipos: (II) 595.20 6.82 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P252 0.50 29,864.06 14,932.03 P275 0.50 32,968.75 16,484.38 P277 1.00 32,968.75 32,968.75 P304 0.50 42,051.56 21,025.78 P308 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 0.141 Total Personal: 220,060.93 HhT= 168.718 Costo por Unidad: 517.79 Bs/hH= 11,751.28 220.00% Prestaciones Sociales 1,139.14 1,656.93 18.99 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 1,656.93 18.99 Costo Directo (I+II+III) 6,897.06 79.05 15.00% Administracin y Gastos Generales gg 1,034.56 7,931.62 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 793.16 8,724.78 9.09 Precio Unitario 8,724.78 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 48-II Descripcin: E-362.420.000 SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICAS DE VIGAS SIMPLES, CON PERFILES IPN 10. INCLUYE TRANSPORTE HASTA 50 KM. DE DISTANCIA Y FONDO ANTICORROSIVO
N Das : 1.66 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 58 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3895 Z-ELECTRODO R10 E603/32" KG 0.0200 8100.00 162.00 M3916 Z-PERFIL IPN 100 MM KG 1.0300 3891.11 4,007.84 M4102 Z-FONDO ANTICORROSIVO GALON 0.0040 54000.00 216.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 4,385.84 Costo por Unidad (I): 4,385.84 50.34 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E517 Z-CAMION GRUA, CAPACIDAD 4-6 TON 1.00128000000 0.24 307200.00 307,200.00 E522 Z-EQUIPO PARA ACERO 1.00 2400000 0.24 5760.00 5,760.00 E523 Z-EQUIPO COLOCACION DE ESTRUCTUR 1.00 39000000 0.24 93600.00 93,600.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 406560.00 Unitarios: 956.61 Costo Unitario Equipos: (II) 956.61 10.98 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P275 0.50 32,968.75 16,484.38 P277 1.00 32,968.75 32,968.75 P304 0.50 42,051.56 21,025.78 P308 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 0.132 Total Personal: 205,128.90 HhT= 92.915 Costo por Unidad: 482.66 Bs/hH= 11,700.83 220.00% Prestaciones Sociales 1,061.85 1,544.51 17.73 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 1,544.51 17.73 Costo Directo (I+II+III) 6,886.96 79.05 15.00% Administracin y Gastos Generales gg 1,033.04 7,920.00 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 792.00 8,712.00 9.09 Precio Unitario 8,712.00 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 49-II Descripcin: E-362.510.000 SUMINISTRO, CONFECCION Y COLOCACION EN ESTRUCTURAS METALICAS EN CORREAS, CON PERFILES CONDUVEN 80x40MM. INCLUYENDO TRANSPORTE HASTA 50 KM DE DISTANCIA Y FONDO ANTICORROSIVO.
N Das : 4.35 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 59 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3895 Z-ELECTRODO R10 E603/32" KG 0.0200 8100.00 162.00 M3914 Z-PERFIL CONDUVEN 80 * 40 KG. 1.0259 5110.00 5,242.35 M4102 Z-FONDO ANTICORROSIVO GALON 0.0041 54000.00 221.40 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 5,625.75 Costo por Unidad (I): 5,625.75 59.50 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E517 Z-CAMION GRUA, CAPACIDAD 4-6 TON 1.00128000000 0.24 307200.00 307,200.00 E522 Z-EQUIPO PARA ACERO 1.00 2400000 0.24 5760.00 5,760.00 E523 Z-EQUIPO COLOCACION DE ESTRUCTUR 1.00 39000000 0.24 93600.00 93,600.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 406560.00 Unitarios: 707.06 Costo Unitario Equipos: (II) 707.06 7.48 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P275 0.50 32,968.75 16,484.38 P277 1.00 32,968.75 32,968.75 P304 0.50 42,051.56 21,025.78 P308 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 0.097 Total Personal: 205,128.90 HhT= 242.523 Costo por Unidad: 356.75 Bs/hH= 11,769.07 220.00% Prestaciones Sociales 784.85 1,141.60 12.07 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 1,141.60 12.07 Costo Directo (I+II+III) 7,474.41 79.05 15.00% Administracin y Gastos Generales gg 1,121.16 8,595.57 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 859.56 9,455.13 9.09 Precio Unitario 9,455.13 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 50-II Descripcin: E.S/C SUMINISTRO, CONFECCION Y COLOCACION DE PLANCHAS ANCLAJE 250*250*6 MM CON HUECOS 5/8". INCLUYENDO TRANSPORTE HASTA 50 KM. DE DISTANCIA Y FONDO ANTICORROSIVO.
N Das : 3.13 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 60 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3908 Z-ELECTRODO R10 E60 3/32" KG. 0.0500 8100.00 405.00 M3910 Z-LAMINA DE H.N. E=8 MM 1 * 2 M. KG. 3.0000 3380.00 10,140.00 M4102 Z-FONDO ANTICORROSIVO GALON 0.0040 54000.00 216.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 10,761.00 Costo por Unidad (I): 10,761.00 10.86 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E522 Z-EQUIPO PARA ACERO 1.00 2400000 0.24 5760.00 5,760.00 E523 Z-EQUIPO COLOCACION DE ESTRUCTUR 1.00 39000000 0.24 93600.00 93,600.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 99360.00 Unitarios: 12420.00 Costo Unitario Equipos: (II) 12,420.00 12.54 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 1.00 24,551.56 24,551.56 P277 1.00 32,968.75 32,968.75 P304 0.50 42,051.56 21,025.78 P308 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 4.500 Total Personal: 137,803.90 HhT= 112.500 Costo por Unidad: 17,225.49 Bs/hH= 12,249.24 220.00% Prestaciones Sociales 37,896.08 55,121.57 55.65 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 55,121.57 55.65 Costo Directo (I+II+III) 78,302.57 79.05 15.00% Administracin y Gastos Generales gg 11,745.39 90,047.96 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 9,004.80 99,052.76 9.09 Precio Unitario 99,052.76 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 51-II Descripcin: E.S/C SUMINISTRO, CONFECCION Y COLOCACION DE PERNOS ROSCADOS PARA ANCLAJE DE D=1/2", CON TURCA, INCLUYENDO TRANSPORTE HASTA 50 KM. DE DISTANCIA Y FONDO ANTICORRECIVO.
N Das : 9.71 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 63 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4389 SELLADOR GAL 0.0250 53640.00 1,341.00 M4504 MADERA MACHIHEMBRADA SEMIDURA, TEKA/CEDR M2 1.1000 35346.58 38,881.24 M4513 LIJA 80-120 PLIGO 0.2500 750.00 187.50 M890 CLAVOS P/ENCOFRAR KG 0.0150 3500.00 52.50 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 40,462.24 Costo por Unidad (I): 40,462.24 50.72 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E18 EQUIPO DE CARPINTERIA I 1.00 3500000 0.20 7000.00 0.30 10500.00 17,500.00 E429 *HERRAMIENTAS MENORES 1.00 2000000 0.50 10000.00 0.10 2000.00 12,000.00 E449 *CAMION DINA CAP= 3 TON 0.50 56500000 0.20 56500.00 0.05 14125.00 0.07 19775.00 90,400.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 73500.00 14125.00 32275.00 Unitarios: 2161.76 415.44 949.26 Costo Unitario Equipos: (II) 3,526.46 4.42 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P230 0.50 28,046.87 14,023.44 P262 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.647 Total Personal: 202,667.96 HhT= 543.988 Costo por Unidad: 5,960.82 Bs/hH= 11,581.43 220.00% Prestaciones Sociales 13,113.80 19,074.62 23.91 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 19,074.62 23.91 Costo Directo (I+II+III) 63,063.32 79.05 15.00% Administracin y Gastos Generales gg 9,459.50 72,522.82 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 7,252.28 79,775.10 9.09 Precio Unitario 79,775.10 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 53-II Descripcin: E-421.203.301 CAPA INPERMEABILIZADORA EN LOSAS O PLACAS INCLINADAS CON UNA MEMBRANA ASFALTICA (MANTO) DE ESPESOR 3 MM REFORZADA CON VELO DE POLIESTAR.
N Das : 11.31 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 65 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 0.3251 14500.00 4,713.95 M3928 Z-ARENA LAVADA M3 0.0399 25000.00 997.50 M3952 Z-TEJA CUADRADA G DE ARCILLA 40*19*1 CM.PIEZA 32.0002 1218.25 38,984.24 M4111 Z-AGUA M3 0.0891 8300.00 739.53 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 45,435.22 Costo por Unidad (I): 45,435.22 53.95 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E468 Z-ANDAMIO TUBULAR 2.00 252000 0.69 3477.60 3,477.60 E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E488 Z-EQUIPO PARA ALBAILERIA 1.00 281000 0.72 2023.20 2,023.20 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 21704.35 Unitarios: 723.48 Costo Unitario Equipos: (II) 723.48 0.86 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P230 0.10 28,046.87 2,804.69 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.760 Total Personal: 191,449.21 HhT= 597.186 Costo por Unidad: 6,381.64 Bs/hH= 11,602.98 220.00% Prestaciones Sociales 14,039.61 20,421.25 24.25 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 20,421.25 24.25 Costo Directo (I+II+III) 66,579.95 79.05 15.00% Administracin y Gastos Generales gg 9,986.99 76,566.94 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 7,656.69 84,223.63 9.09 Precio Unitario 84,223.63 100.00 Precio Unitario Asumido 81,120.50 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 55-II Descripcin: E-411.011.010 CONSTRUCCION DE PAREDES DE BLOQUES HUECOS DE ARCILLA, ACABADO CORRIENTE E=10 CM, NO INCLUYE MACHONES, DINTELES Y BROCALES. INCLUYE TRANSPORTE DE LOS BLOQUES HASTA 50 KM.
N Das : 1.35 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 67 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 0.0500 14500.00 725.00 M3932 Z-ARENA LIGADA M3 0.0500 25191.00 1,259.55 M3946 Z-BLOQUES DE ARCILLA 10 * 20 * 30 CM. PIEZA 17.5000 950.00 16,625.00 M4111 Z-AGUA M3 0.1000 8300.00 830.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 19,439.55 Costo por Unidad (I): 19,439.55 35.88 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 2.00 350000 3.33 23310.00 23,310.00 E316 ANDAMIOS METALICOS (2 CUERPOS)2. 2.00 850000 0.25 4250.00 0.85 14450.00 18,700.00 E449 *CAMION DINA CAP= 3 TON 0.25 56500000 0.20 28250.00 0.05 7062.50 0.07 9887.50 45,200.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 55810.00 7062.50 24337.50 Unitarios: 1829.84 231.56 797.95 Costo Unitario Equipos: (II) 2,859.35 5.28 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P230 0.25 28,046.87 7,011.72 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.770 Total Personal: 195,656.24 HhT= 72.694 Costo por Unidad: 6,414.96 Bs/hH= 11,597.67 220.00% Prestaciones Sociales 14,112.91 20,527.87 37.89 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 20,527.87 37.89 Costo Directo (I+II+III) 42,826.77 79.05 15.00% Administracin y Gastos Generales gg 6,424.02 49,250.79 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 4,925.08 54,175.87 9.09 Precio Unitario 54,175.87 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 56-II Descripcin: E-411.011.015 CONSTRUCCION DE PAREDES DE BLOQUES HUECOS DE ARCILLA. ACABADO CORRIENTE E=15 CM. NO INCLUYE MACHONES, DINTELES Y BROCALES. INCLUYE TRASPORTE DE LOS BLOQUES HASTA 50 KM.
N Das : 0.57 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 69 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 0.0500 14500.00 725.00 M3932 Z-ARENA LIGADA M3 0.0400 25191.00 1,007.64 M3941 Z-BLOQUE ORNAMENTAL DE DOS HUECOS E=15CMPIEZA 15.0000 2140.00 32,100.00 M4111 Z-AGUA M3 0.0100 8300.00 83.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 33,915.64 Costo por Unidad (I): 33,915.64 44.65 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 2.00 350000 3.33 23310.00 23,310.00 E316 ANDAMIOS METALICOS (2 CUERPOS)2. 2.00 850000 0.25 4250.00 0.85 14450.00 18,700.00 E449 *CAMION DINA CAP= 3 TON 0.50 56500000 0.20 56500.00 0.05 14125.00 0.07 19775.00 90,400.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 84060.00 14125.00 34225.00 Unitarios: 2802.00 470.83 1140.83 Costo Unitario Equipos: (II) 4,413.66 5.81 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P252 0.50 29,864.06 14,932.03 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.867 Total Personal: 203,576.55 HhT= 31.739 Costo por Unidad: 6,785.89 Bs/hH= 11,630.88 220.00% Prestaciones Sociales 14,928.96 21,714.85 28.59 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 21,714.85 28.59 Costo Directo (I+II+III) 60,044.15 79.05 15.00% Administracin y Gastos Generales gg 9,006.62 69,050.77 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 6,905.08 75,955.85 9.09 Precio Unitario 75,955.85 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 58-II Descripcin: E-412.102.003 CONSTRUCCION Y REVESTIMIENTO INTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO LISO. INCLUYE FRISO BASE.
N Das : 9.40 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 70 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 0.1000 14500.00 1,450.00 M3926 Z-CAL EN PASTA SACO 0.2950 16200.00 4,779.00 M3930 Z-POLVO DE PIEDRA M3 0.0013 55000.00 71.50 M3932 Z-ARENA LIGADA M3 0.0210 25191.00 529.01 M4111 Z-AGUA M3 0.0989 8300.00 820.87 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 7,650.38 Costo por Unidad (I): 7,650.38 23.17 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 2.00 350000 3.33 23310.00 23,310.00 E316 ANDAMIOS METALICOS (2 CUERPOS)2. 2.00 850000 0.25 4250.00 0.85 14450.00 18,700.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 27560.00 14450.00 Unitarios: 787.43 412.86 Costo Unitario Equipos: (II) 1,200.29 3.64 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.486 Total Personal: 188,644.52 HhT= 488.998 Costo por Unidad: 5,389.84 Bs/hH= 11,606.66 220.00% Prestaciones Sociales 11,857.65 17,247.49 52.24 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 17,247.49 52.24 Costo Directo (I+II+III) 26,098.16 79.05 15.00% Administracin y Gastos Generales gg 3,914.72 30,012.88 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 3,001.29 33,014.17 9.09 Precio Unitario 33,014.17 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 59-II Descripcin: E-412.202.003 CONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON MORTERO, A BASE DE CAL, ACABADO LISO. INCLUYE FRISO BASE.
N Das : 9.73 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 71 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 0.1000 14500.00 1,450.00 M3926 Z-CAL EN PASTA SACO 0.3200 16200.00 5,184.00 M3930 Z-POLVO DE PIEDRA M3 0.0013 55000.00 71.50 M3932 Z-ARENA LIGADA M3 0.0230 25191.00 579.39 M4111 Z-AGUA M3 0.0100 8300.00 83.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 7,367.89 Costo por Unidad (I): 7,367.89 20.16 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 2.00 350000 3.33 23310.00 23,310.00 E316 ANDAMIOS METALICOS (2 CUERPOS)2. 2.00 850000 0.25 4250.00 0.85 14450.00 18,700.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 27560.00 14450.00 Unitarios: 918.67 481.67 Costo Unitario Equipos: (II) 1,400.34 3.83 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.733 Total Personal: 188,644.52 HhT= 505.776 Costo por Unidad: 6,288.15 Bs/hH= 11,611.13 220.00% Prestaciones Sociales 13,833.93 20,122.08 55.06 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 20,122.08 55.06 Costo Directo (I+II+III) 28,890.31 79.05 15.00% Administracin y Gastos Generales gg 4,333.55 33,223.86 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 3,322.39 36,546.25 9.09 Precio Unitario 36,546.25 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 60-II Descripcin: E-412.110.007 CONSTRUCCION Y REVESTIMIENTO INTERIOR EN PAREDES CON BALDOSAS DE CERAMICAS NACIONAL, ACABADO NATURAL. INCLUYE FRISO BASE.
N Das : 4.88 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 72 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 0.1000 14500.00 1,450.00 M3924 Z-CEMENTO PORTLAND BLANCO SACO 0.0250 23850.00 596.25 M3925 Z-PEGO BLANCO SACO 0.1250 6650.83 831.35 M3932 Z-ARENA LIGADA M3 0.0250 25191.00 629.78 M3954 Z-CERAMICA 15*15 COLOR (PARELLA) M2 1.0500 20000.00 21,000.00 M4111 Z-AGUA M3 0.0963 8300.00 799.29 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 25,306.67 Costo por Unidad (I): 25,306.67 43.56 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 2.00 350000 3.33 23310.00 23,310.00 E316 ANDAMIOS METALICOS (2 CUERPOS)2. 2.00 850000 0.25 4250.00 0.85 14450.00 18,700.00 E449 *CAMION DINA CAP= 3 TON 0.20 56500000 0.20 22600.00 0.05 5650.00 0.07 7910.00 36,160.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 50160.00 5650.00 22360.00 Unitarios: 1475.29 166.18 657.65 Costo Unitario Equipos: (II) 2,299.12 3.96 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P252 0.20 29,864.06 5,972.81 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.576 Total Personal: 194,617.33 HhT= 261.427 Costo por Unidad: 5,724.04 Bs/hH= 11,622.42 220.00% Prestaciones Sociales 12,592.89 18,316.93 31.53 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 18,316.93 31.53 Costo Directo (I+II+III) 45,922.72 79.05 15.00% Administracin y Gastos Generales gg 6,888.41 52,811.13 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,281.11 58,092.24 9.09 Precio Unitario 58,092.24 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 61-II Descripcin: E.S/C EMBONADO DE COLUMNAS CON MORTERO DE CEMENTO Y BLOQUE. INCLUYE FRISO LISO.
Unidad : ML Cantidad : 58.90 Rendimiento (R): 50.000 ML/da
N Das : 1.18 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 73 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3899 Z-MALLA EXPANDIDA SEN-SEN 2.44 * 0.60 M M2 0.5000 11000.00 5,500.00 M3943 Z-MORTERO DE CEMENTO M3 0.0158 160000.00 2,528.00 M3951 Z-TABELON DE ARCILLA 6*20*60 CMS. PIEZA 1.0015 2500.00 2,503.75 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 10,531.75 Costo por Unidad (I): 10,531.75 31.47 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 2.00 350000 3.33 23310.00 23,310.00 E316 ANDAMIOS METALICOS (2 CUERPOS)2. 2.00 850000 0.25 4250.00 0.85 14450.00 18,700.00 E449 *CAMION DINA CAP= 3 TON 0.20 56500000 0.20 22600.00 0.05 5650.00 0.07 7910.00 36,160.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 50160.00 5650.00 22360.00 Unitarios: 1003.20 113.00 447.20 Costo Unitario Equipos: (II) 1,563.40 4.67 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P230 0.20 28,046.87 5,609.37 P259 2.00 32,968.75 65,937.50 P262 1.00 32,968.75 32,968.75 P287 0.50 36,484.37 18,242.19 +------------------------------------------------------------------------------------------------------------+ HhU= 1.232 Total Personal: 224,439.05 HhT= 72.565 Costo por Unidad: 4,488.78 Bs/hH= 11,659.17 220.00% Prestaciones Sociales 9,875.32 14,364.10 42.92 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 14,364.10 42.92 Costo Directo (I+II+III) 26,459.25 79.05 15.00% Administracin y Gastos Generales gg 3,968.89 30,428.14 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 3,042.81 33,470.95 9.09 Precio Unitario 33,470.95 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 62-II Descripcin: E.S/C CONSTRUCCION DE REVESTIMIENTO DE PISO CON LOSETAS TIPO CAICO DE 25x25 CON JUNTAS DE CEMENTO.INCLUYE MORTERO BASE (TARIMA).
N Das : 1.25 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 74 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 0.1500 14500.00 2,175.00 M3925 Z-PEGO BLANCO SACO 0.2450 6650.83 1,629.45 M3932 Z-ARENA LIGADA M3 0.0300 25191.00 755.73 M3953 Z-LOSETA DE ARCILLA DE 20 * 10 CMS. M2 1.0500 18490.00 19,414.50 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 23,974.68 Costo por Unidad (I): 23,974.68 40.21 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 2.00 350000 3.33 23310.00 23,310.00 E449 *CAMION DINA CAP= 3 TON 0.25 56500000 0.20 28250.00 0.05 7062.50 0.07 9887.50 45,200.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 51560.00 7062.50 9887.50 Unitarios: 1718.67 235.42 329.58 Costo Unitario Equipos: (II) 2,283.67 3.83 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P230 0.25 28,046.87 7,011.72 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.800 Total Personal: 195,656.24 HhT= 67.680 Costo por Unidad: 6,521.87 Bs/hH= 11,594.43 220.00% Prestaciones Sociales 14,348.11 20,869.98 35.01 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 20,869.98 35.01 Costo Directo (I+II+III) 47,128.33 79.05 15.00% Administracin y Gastos Generales gg 7,069.25 54,197.58 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,419.76 59,617.34 9.09 Precio Unitario 59,617.34 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 63-II Descripcin: E-414.094.050 CONSTRUCCION DE REVESTIMIENTO DE PISOS CON BALDOSAS DE CERAMICA NACIONAL. ACABADO NATURAL. INCLUYE MORTERO BASE.
N Das : 1.28 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 75 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 0.1000 14500.00 1,450.00 M3924 Z-CEMENTO PORTLAND BLANCO SACO 0.0250 23850.00 596.25 M3925 Z-PEGO BLANCO SACO 0.1250 6650.83 831.35 M3932 Z-ARENA LIGADA M3 0.0250 25191.00 629.78 M3954 Z-CERAMICA 15*15 COLOR (PARELLA) M2 1.0500 20000.00 21,000.00 M4111 Z-AGUA M3 0.0963 8300.00 799.29 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 25,306.67 Costo por Unidad (I): 25,306.67 43.56 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 2.00 350000 3.33 23310.00 23,310.00 E316 ANDAMIOS METALICOS (2 CUERPOS)2. 2.00 850000 0.25 4250.00 0.85 14450.00 18,700.00 E449 *CAMION DINA CAP= 3 TON 0.20 56500000 0.20 22600.00 0.05 5650.00 0.07 7910.00 36,160.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 50160.00 5650.00 22360.00 Unitarios: 1475.29 166.18 657.65 Costo Unitario Equipos: (II) 2,299.12 3.96 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P252 0.20 29,864.06 5,972.81 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.576 Total Personal: 194,617.33 HhT= 68.698 Costo por Unidad: 5,724.04 Bs/hH= 11,622.42 220.00% Prestaciones Sociales 12,592.89 18,316.93 31.53 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 18,316.93 31.53 Costo Directo (I+II+III) 45,922.72 79.05 15.00% Administracin y Gastos Generales gg 6,888.41 52,811.13 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,281.11 58,092.24 9.09 Precio Unitario 58,092.24 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 64-II Descripcin: E-414.033.450 REVESTIMIENTO DE PISO CON GRANITO GRIS. ACABADO LISO CON JUNTAS DE FLEJES DE PLASTICO E= 5 MM. INCLUYE MORTERO BASE.
N Das : 5.17 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 76 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M1830 FLEJE PLAST.P/REVEST.PISO GRANITO E=5CMS ML 2.7500 2750.00 7,562.50 M4508 GRANITO GRIS #2 SACO 1.5000 15119.88 22,679.82 M4509 PIEDRA PARA PULIR GRANITO (JGO) JGO 0.0250 100000.00 2,500.00 M4510 CERA EN PASTA PARA PISOS KG 0.0250 25000.00 625.00 M627 ARENA LAVADA M3 0.0300 30700.00 921.00 M674 CEMENTO PORLAND GRIS SACO 1.0000 14500.00 14,500.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 48,788.32 Costo por Unidad (I): 48,788.32 54.46 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 2.00 350000 3.33 23310.00 23,310.00 E449 *CAMION DINA CAP= 3 TON 0.50 56500000 0.20 56500.00 0.05 14125.00 0.07 19775.00 90,400.00 E627 PULIDORA DE GRANITO 1.00 15000000 0.20 30000.00 0.10 15000.00 0.20 30000.00 75,000.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 109810.00 29125.00 49775.00 Unitarios: 2889.74 766.45 1309.87 Costo Unitario Equipos: (II) 4,966.06 5.54 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P218 2.00 24,551.56 49,103.12 P230 0.50 28,046.87 14,023.44 P259 2.00 32,968.75 65,937.50 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 1.474 Total Personal: 202,667.96 HhT= 289.553 Costo por Unidad: 5,333.37 Bs/hH= 11,578.55 220.00% Prestaciones Sociales 11,733.41 17,066.78 19.05 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 17,066.78 19.05 Costo Directo (I+II+III) 70,821.16 79.05 15.00% Administracin y Gastos Generales gg 10,623.17 81,444.33 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 8,144.43 89,588.76 9.09 Precio Unitario 89,588.76 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 65-II Descripcin: E-414.S/C.- CONSTRUCCION DE MESONES DE CONCRETO A= 0,60x E=5 CMS. INCLUYE EL ENCOFRADO Y REFUERZO MET. EXCLUYE LA CERAMICA Y PAREDES DE APOYO.
Unidad : ML Cantidad : 20.60 Rendimiento (R): 6.000 ML/da
N Das : 3.43 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 77 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3900 Z-MALLA ELECTROSOLDADA 4" * 4" KG 1.4000 2850.00 3,990.00 M3905 Z-ALAMBRE LISO GALVANIZADO CALIBRE # 18 KG. 0.1000 4150.00 415.00 M3928 Z-ARENA LAVADA M3 0.0250 45000.00 1,125.00 M3929 Z-PIEDRA PICADA T MAX 1" M3 0.0250 85000.00 2,125.00 M4335 Z-CLAVOS 1-" KG 0.1000 3912.60 391.26 M4495 MADERA ENCOFRADO CORRIENTE (TRES USOS M3 0.0500 475000.00 23,750.00 M674 CEMENTO PORLAND GRIS SACO 0.2500 14500.00 3,625.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 35,421.26 Costo por Unidad (I): 35,421.26 27.39 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 0.50 350000 3.33 5827.50 5,827.50 E18 EQUIPO DE CARPINTERIA I 0.50 3500000 0.20 3500.00 0.30 5250.00 8,750.00 E429 *HERRAMIENTAS MENORES 0.50 2000000 0.50 5000.00 0.10 1000.00 6,000.00 E449 *CAMION DINA CAP= 3 TON 0.20 56500000 0.20 22600.00 0.05 5650.00 0.07 7910.00 36,160.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 36927.50 5650.00 14160.00 Unitarios: 6154.58 941.67 2360.00 Costo Unitario Equipos: (II) 9,456.25 7.31 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 1.00 24,551.56 24,551.56 P228 0.20 27,442.18 5,488.44 P259 0.50 32,968.75 16,484.38 P262 0.50 32,968.75 16,484.38 P287 0.50 36,484.37 18,242.19 +------------------------------------------------------------------------------------------------------------+ HhU= 4.933 Total Personal: 107,540.01 HhT= 101.620 Costo por Unidad: 17,923.34 Bs/hH= 11,626.74 220.00% Prestaciones Sociales 39,431.35 57,354.69 44.35 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 57,354.69 44.35 Costo Directo (I+II+III) 102,232.20 79.05 15.00% Administracin y Gastos Generales gg 15,334.83 117,567.03 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 11,756.70 129,323.73 9.09 Precio Unitario 129,323.73 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 66-II Descripcin: E-437.071.015 SUMINISTRO, TRANSPORTE Y COLOCACION DE MARCOS DE CHAPA DOBLADA DE HIERRO, EN PAREDES DE 15 CM. DE ESPESOR.
Unidad : ML Cantidad : 123.60 Rendimiento (R): 70.000 ML/da
N Das : 1.77 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 79 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M194 MORTERO CEMENTO ARENA M3 0.0199 185000.00 3,681.50 M813 MARCO DE HIERRO CAL #18 3X3" E=15 CM ML 1.0000 15001.70 15,001.70 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 18,683.20 Costo por Unidad (I): 18,683.20 64.63 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E16 EQUIPO DE ALBAILERIA 0.25 350000 3.33 2913.75 2,913.75 E429 *HERRAMIENTAS MENORES 0.50 2000000 0.50 5000.00 0.10 1000.00 6,000.00 E449 *CAMION DINA CAP= 3 TON 0.10 56500000 0.20 11300.00 0.05 2825.00 0.07 3955.00 18,080.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 19213.75 2825.00 4955.00 Unitarios: 274.48 40.36 70.79 Costo Unitario Equipos: (II) 385.63 1.33 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 0.50 24,551.56 12,275.78 P230 0.25 28,046.87 7,011.72 P259 1.00 32,968.75 32,968.75 P304 0.10 42,051.56 4,205.16 +------------------------------------------------------------------------------------------------------------+ HhU= 0.326 Total Personal: 82,750.47 HhT= 40.294 Costo por Unidad: 1,182.15 Bs/hH= 11,603.93 220.00% Prestaciones Sociales 2,600.73 3,782.88 13.09 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 3,782.88 13.09 Costo Directo (I+II+III) 22,851.71 79.05 15.00% Administracin y Gastos Generales gg 3,427.76 26,279.47 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 2,627.95 28,907.42 9.09 Precio Unitario 28,907.42 100.00 Precio Unitario Asumido 27,754.05 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 67-II Descripcin: E-437.011.451 SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADA DE HIERRO Y VISOR. INCLUYE VIDRIO (P-1).
N Das : 0.48 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 82 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M194 MORTERO CEMENTO ARENA M3 0.0500 185000.00 9,250.00 M4086 Z-PUERTA ROMAN. METAL. Y TUBO 21/2X11/2" M2 1.0000 175000.00 175,000.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 184,250.00 Costo por Unidad (I): 184,250.00 64.41 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.25 67514796 0.24 40508.88 40,508.88 E487 Z-EQUIPO DE CARPINTERIA 1.00 680000 0.52 3536.00 3,536.00 E488 Z-EQUIPO PARA ALBAILERIA 0.25 281000 0.72 505.80 505.80 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 44550.68 Unitarios: 4455.07 Costo Unitario Equipos: (II) 4,455.07 1.56 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.50 26,289.06 39,433.59 P230 0.25 28,046.87 7,011.72 P259 0.50 32,968.75 16,484.38 P262 1.00 32,968.75 32,968.75 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 3.000 Total Personal: 116,924.22 HhT= 14.490 Costo por Unidad: 11,692.42 Bs/hH= 12,471.91 220.00% Prestaciones Sociales 25,723.32 37,415.74 13.08 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 37,415.74 13.08 Costo Directo (I+II+III) 226,120.81 79.05 15.00% Administracin y Gastos Generales gg 33,918.12 260,038.93 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 26,003.89 286,042.82 9.09 Precio Unitario 286,042.82 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 70-II Descripcin: E-437.011.S/C.-214 SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANA BATIENTE TIPO ACORDEON DE TUBULARES 2x1"Y LAMINA DIAMANTE EN CAFETIN Y COMEDOR.
N Das : 0.79 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 83 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M194 MORTERO CEMENTO ARENA M3 0.0500 185000.00 9,250.00 M4528 Z-VENTANA BATIENTE LAMINA METALICA CON 1.0000 175000.00 175,000.00 M4529 MARCO ANGULO HIERRO 30X30X5 MM ML 2.0000 4750.00 9,500.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 193,750.00 Costo por Unidad (I): 193,750.00 65.00 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.25 67514796 0.24 40508.88 40,508.88 E487 Z-EQUIPO DE CARPINTERIA 1.00 680000 0.52 3536.00 3,536.00 E488 Z-EQUIPO PARA ALBAILERIA 0.25 281000 0.72 505.80 505.80 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 44550.68 Unitarios: 4455.07 Costo Unitario Equipos: (II) 4,455.07 1.49 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.50 26,289.06 39,433.59 P230 0.25 28,046.87 7,011.72 P259 0.50 32,968.75 16,484.38 P262 1.00 32,968.75 32,968.75 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 3.000 Total Personal: 116,924.22 HhT= 23.760 Costo por Unidad: 11,692.42 Bs/hH= 12,471.91 220.00% Prestaciones Sociales 25,723.32 37,415.74 12.55 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 37,415.74 12.55 Costo Directo (I+II+III) 235,620.81 79.05 15.00% Administracin y Gastos Generales gg 35,343.12 270,963.93 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 27,096.39 298,060.32 9.09 Precio Unitario 298,060.32 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 71-II Descripcin: E-473.632.252 CERRADURA DE EMBUTIR, ACABADO DE ACERO NIQUELADO, CILINDRO MOVIL, CERROJO SIMPLE AMBOS LADOS CON LLAVE. DISTANCIA DEL CILINDRO AL BORDE 25 MM.
N Das : 0.50 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 84 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3961 Z-CERRADURA PARA EMPOTRAR 35MM PIEZA 1.0000 42764.30 42,764.30 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 42,764.30 Costo por Unidad (I): 42,764.30 53.49 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E487 Z-EQUIPO DE CARPINTERIA 1.00 680000 0.52 3536.00 3,536.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 3536.00 Unitarios: 353.60 Costo Unitario Equipos: (II) 353.60 0.44 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P289 1.00 36,484.37 36,484.37 +------------------------------------------------------------------------------------------------------------+ HhU= 1.600 Total Personal: 62,773.43 HhT= 8.000 Costo por Unidad: 6,277.34 Bs/hH= 12,554.68 220.00% Prestaciones Sociales 13,810.15 20,087.49 25.12 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 20,087.49 25.12 Costo Directo (I+II+III) 63,205.39 79.05 15.00% Administracin y Gastos Generales gg 9,480.81 72,686.20 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 7,268.62 79,954.82 9.09 Precio Unitario 79,954.82 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 72-II Descripcin: E-471.311.220 CERRADURA DE PLOMO, ACABADO CROMO BRILLANTE, SIN CILINDRO, SIN CERROJO, PESTILLO SIMPLE, POMO EXTERIOR LIBRE, POMO INTERIOR CON BOTON.
N Das : 3.55 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 86 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4088 Z-VENTANAS DE ROMANILLA DE ALUMINIO M2 1.0000 146461.92 146,461.92 M4200 SELLADOR PARA JUNTAS CARTUC 0.2500 12000.00 3,000.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 149,461.92 Costo por Unidad (I): 149,461.92 63.77 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.20 67514796 0.24 32407.10 32,407.10 E489 Z-EQUIPO DE ACABADOS INTERIORES 1.00 156000 0.40 624.00 624.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 33031.10 Unitarios: 2752.59 Costo Unitario Equipos: (II) 2,752.59 1.17 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.50 26,289.06 39,433.59 P230 0.50 28,046.87 14,023.44 P259 0.50 32,968.75 16,484.38 P270 1.00 32,968.75 32,968.75 P304 0.50 42,051.56 21,025.78 +------------------------------------------------------------------------------------------------------------+ HhU= 2.667 Total Personal: 123,935.94 HhT= 113.454 Costo por Unidad: 10,328.00 Bs/hH= 12,392.05 220.00% Prestaciones Sociales 22,721.60 33,049.60 14.10 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 33,049.60 14.10 Costo Directo (I+II+III) 185,264.11 79.05 15.00% Administracin y Gastos Generales gg 27,789.62 213,053.73 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 21,305.37 234,359.10 9.09 Precio Unitario 234,359.10 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 74-II Descripcin: E-437.011.S/C SUMINISTRO, TRANSPORTE, FABRICACION Y COLOCACION DE REJAS METALICAS CONFECCIONADA CON BARRAS LISAS DE D= 1/2" Y PLATINAS DE 1" EN VENTANAS.
N Das : 0.58 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 95 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4092 Z-MATERIALES VARIOS PARA PINTURA GRUPO 0.0040 31500.00 126.00 M4097 Z-ESMALTE KEN ESMALTE. GALON 0.0270 90160.00 2,434.32 M4100 Z-SOLVENTE UNIVERSAL GALON 0.0050 36900.00 184.50 M4102 Z-FONDO ANTICORROSIVO GALON 0.0100 54000.00 540.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 3,284.82 Costo por Unidad (I): 3,284.82 29.06 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E468 Z-ANDAMIO TUBULAR 2.00 252000 0.69 3477.60 3,477.60 E493 Z-EQUIPO DE PINTURA 2.00 244000 0.82 4001.60 4,001.60 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 7479.20 Unitarios: 101.63 Costo Unitario Equipos: (II) 101.63 0.90 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P275 2.00 32,968.75 65,937.50 P296 0.25 36,484.37 9,121.09 +------------------------------------------------------------------------------------------------------------+ HhU= 0.462 Total Personal: 127,636.71 HhT= 19.653 Costo por Unidad: 1,734.34 Bs/hH= 12,012.75 220.00% Prestaciones Sociales 3,815.55 5,549.89 49.09 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 5,549.89 49.09 Costo Directo (I+II+III) 8,936.34 79.05 15.00% Administracin y Gastos Generales gg 1,340.45 10,276.79 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 1,027.68 11,304.47 9.09 Precio Unitario 11,304.47 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 82-II Descripcin: E-621.211.S/C PUNTOS DE AGUAS CLARAS DE PAVCO, ISO II, 150 PSI, DIAMETRO 3/4" (19 MM). AMBIENTE INTERIOR AL RECINTO SANITARIO (SALIDA 1/2")
N Das : 1.44 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 101 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3956 Z-PEGAMENTO PARA TUBO PVC NACIONAL GAL 0.0100 66500.00 665.00 M3967 Z-TUBO PVC, AGUAS NEGRAS D=2" ML 3.0000 2320.92 6,962.76 M3971 Z-CODO DE 90 GRADOS, PVC D=2" PIEZA 0.5000 1150.00 575.00 M3978 Z-TEE PVC D=2" PIEZA 1.0000 4745.00 4,745.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 12,947.76 Costo por Unidad (I): 12,947.76 25.83 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.15 67514796 0.24 24305.33 24,305.33 E521 Z-EQUIPO PARA PLOMERIA 1.00 704000 0.68 4787.20 4,787.20 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 29092.53 Unitarios: 2999.23 Costo Unitario Equipos: (II) 2,999.23 5.98 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.15 27,442.18 4,116.33 P276 1.00 32,968.75 32,968.75 P304 0.20 42,051.56 8,410.31 +------------------------------------------------------------------------------------------------------------+ HhU= 1.938 Total Personal: 71,784.45 HhT= 27.132 Costo por Unidad: 7,400.46 Bs/hH= 12,219.54 220.00% Prestaciones Sociales 16,281.01 23,681.47 47.24 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 23,681.47 47.24 Costo Directo (I+II+III) 39,628.46 79.05 15.00% Administracin y Gastos Generales gg 5,944.27 45,572.73 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 4,557.27 50,130.00 9.09 Precio Unitario 50,130.00 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 87-II Descripcin: E-611.111.S/C TUBERIAS AGUAS CLARAS, PAVCO (FRIA), DIAMETRO 1", AMBIENTE EXTERIOR AL RECINTO SANITARIO. INCLUYE CONEXIONES.
Unidad : ML Cantidad : 41.00 Rendimiento (R): 48.000 ML/da
N Das : 0.85 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 102 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3979 Z-LIMPIADOR REMOVEDOR PAVCO ENV. 760 GMSENVASE 0.0100 26599.99 266.00 M3994 Z-PEGAMENTO PAVCO P/TUBO PVC(ENV.1/4 GAL1/4 GA 0.0100 53448.00 534.48 M4201 Z-TUBO A/F PAVCO AB 1" 200 PSI UND 1.0500 5850.00 6,142.50 M4203 Z-CONEX AF CODO PAVCO 1"X90 PZA 0.1500 3975.00 596.25 M4204 Z-CONEX AF TEE PAVCO 1" PZA 0.1500 2875.00 431.25 M4205 Z-CONEX AF UNION PAVCO 1" PZA 0.1435 1750.00 251.12 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 8,221.60 Costo por Unidad (I): 8,221.60 44.18 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E521 Z-EQUIPO PARA PLOMERIA 1.00 704000 0.68 4787.20 4,787.20 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 20990.75 Unitarios: 437.31 Costo Unitario Equipos: (II) 437.31 2.35 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 1.00 24,551.56 24,551.56 P228 0.10 27,442.18 2,744.22 P276 1.00 32,968.75 32,968.75 P304 0.10 42,051.56 4,205.16 +------------------------------------------------------------------------------------------------------------+ HhU= 0.533 Total Personal: 90,758.75 HhT= 21.853 Costo por Unidad: 1,890.81 Bs/hH= 11,351.95 220.00% Prestaciones Sociales 4,159.78 6,050.59 32.52 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 6,050.59 32.52 Costo Directo (I+II+III) 14,709.50 79.05 15.00% Administracin y Gastos Generales gg 2,206.43 16,915.93 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 1,691.59 18,607.52 9.09 Precio Unitario 18,607.52 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 88-II Descripcin: E-611.111.S/C TUBERIAS AGUAS CLARAS, PAVCO (FRIA) DIAMETRO DE 3/4". AMBIENTE EXTERIOR AL RECINTO SANITARIO. INCLUYE CONEXIONES.
Unidad : M Cantidad : 15.00 Rendimiento (R): 40.000 M/da
N Das : 0.38 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 103 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3979 Z-LIMPIADOR REMOVEDOR PAVCO ENV. 760 GMSENVASE 0.0100 26599.99 266.00 M3981 Z-TUBO A/F PAVCO AB 3/4"X6MTS. 400PSI ML 1.0689 3750.00 4,008.38 M3982 Z-CONEX. AF ANILLO PAVCO 3/4" PIEZA 0.3330 980.00 326.34 M3983 Z-CONEX AF CODO PAVCO 3/4"X90 GRADOS PIEZA 0.3330 686.00 228.44 M3984 Z-CONEX AF TEE PAVCO 3/4" PIEZA 0.3330 1067.58 355.50 M3994 Z-PEGAMENTO PAVCO P/TUBO PVC(ENV.1/4 GAL1/4 GA 0.0100 53448.00 534.48 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 5,719.14 Costo por Unidad (I): 5,719.14 33.48 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E521 Z-EQUIPO PARA PLOMERIA 1.00 704000 0.68 4787.20 4,787.20 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 20990.75 Unitarios: 524.77 Costo Unitario Equipos: (II) 524.77 3.07 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 1.00 24,551.56 24,551.56 P228 0.10 27,442.18 2,744.22 P276 1.00 32,968.75 32,968.75 P304 0.10 42,051.56 4,205.16 +------------------------------------------------------------------------------------------------------------+ HhU= 0.640 Total Personal: 90,758.75 HhT= 9.600 Costo por Unidad: 2,268.97 Bs/hH= 11,344.84 220.00% Prestaciones Sociales 4,991.73 7,260.70 42.50 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 7,260.70 42.50 Costo Directo (I+II+III) 13,504.61 79.05 15.00% Administracin y Gastos Generales gg 2,025.69 15,530.30 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 1,553.03 17,083.33 9.09 Precio Unitario 17,083.33 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 89-II Descripcin: E-612.191.102 TUBERIAS DE AGUAS NEGRAS, DE PVC, DIAMETRO DE 4" (110 MM), AMBIENTE EXTERIOR AL RECINTO SANITARIO. INCLUYE CONEXIONES.
Unidad : M Cantidad : 11.00 Rendimiento (R): 45.000 M/da
N Das : 0.24 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 104 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3956 Z-PEGAMENTO PARA TUBO PVC NACIONAL GAL 0.0080 66500.00 532.00 M3969 Z-TUBO PVC. AGUAS NEGRAS D=4" ML 1.1000 6826.68 7,509.35 M3976 Z-YEE PVC D=4" PIEZA 0.3300 6733.12 2,221.93 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 10,263.28 Costo por Unidad (I): 10,263.28 51.82 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E521 Z-EQUIPO PARA PLOMERIA 1.00 704000 0.68 4787.20 4,787.20 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 20990.75 Unitarios: 466.46 Costo Unitario Equipos: (II) 466.46 2.36 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.10 27,442.18 2,744.22 P276 1.00 32,968.75 32,968.75 P287 0.20 36,484.37 7,296.87 +------------------------------------------------------------------------------------------------------------+ HhU= 0.409 Total Personal: 69,298.90 HhT= 4.499 Costo por Unidad: 1,539.98 Bs/hH= 12,048.75 220.00% Prestaciones Sociales 3,387.96 4,927.94 24.88 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 4,927.94 24.88 Costo Directo (I+II+III) 15,657.68 79.05 15.00% Administracin y Gastos Generales gg 2,348.65 18,006.33 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 1,800.63 19,806.96 9.09 Precio Unitario 19,806.96 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 90-II Descripcin: E-631.001.025 SUMINISTRO Y TRANSPORTE DE LLAVE DE PASO TIPO COMPUERTA, DE BRONCE, DIAMETRO 1" (25 MM). (150 PSI).
N Das : 0.20 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 106 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3924 Z-CEMENTO PORTLAND BLANCO SACO 0.1000 23850.00 2,385.00 M4007 Z-W.C. SAVEX BLANCO PIEZA 1.0000 179858.30 179,858.30 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 182,243.30 Costo por Unidad (I): 182,243.30 70.24 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E521 Z-EQUIPO PARA PLOMERIA 0.50 704000 0.68 2393.60 2,393.60 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 18597.15 Unitarios: 1859.72 Costo Unitario Equipos: (II) 1,859.71 0.72 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.10 27,442.18 2,744.22 P276 1.00 32,968.75 32,968.75 P287 0.10 36,484.37 3,648.44 +------------------------------------------------------------------------------------------------------------+ HhU= 1.760 Total Personal: 65,650.47 HhT= 3.520 Costo por Unidad: 6,565.05 Bs/hH= 11,936.45 220.00% Prestaciones Sociales 14,443.11 21,008.16 8.10 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 21,008.16 8.10 Costo Directo (I+II+III) 205,111.17 79.05 15.00% Administracin y Gastos Generales gg 30,766.68 235,877.85 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 23,587.79 259,465.64 9.09 Precio Unitario 259,465.64 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 92-II Descripcin: E-661.110.111 SUMINISTRO, TRANSPORTE E INSTALACION DE LAVAMANOS PARA EMPOTRAR, DE 1 LLAVE, BLANCO O COLOR CLARO, DE ANCHO MENOR A 54 CM. RESCTANGULAR (INCLUYE GRIFERIA).
N Das : 0.33 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 110 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3831 TEFLON ROLLO 0.1000 3500.00 350.00 M4000 Z-LLAVE DE ARRESTO D=1/2" PIEZA 1.0000 10036.87 10,036.87 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 10,386.87 Costo por Unidad (I): 10,386.87 39.00 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E521 Z-EQUIPO PARA PLOMERIA 0.50 704000 0.68 2393.60 2,393.60 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 2393.60 Unitarios: 132.98 Costo Unitario Equipos: (II) 132.98 0.50 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P276 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 0.889 Total Personal: 59,257.81 HhT= 5.334 Costo por Unidad: 3,292.10 Bs/hH= 11,850.08 220.00% Prestaciones Sociales 7,242.62 10,534.72 39.55 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 10,534.72 39.55 Costo Directo (I+II+III) 21,054.57 79.05 15.00% Administracin y Gastos Generales gg 3,158.19 24,212.76 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 2,421.28 26,634.04 9.09 Precio Unitario 26,634.04 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 96-II Descripcin: E-666.311.S/C SUMINISTRO, TRANSPORTE E INSTALACION DE CENTRO DE PISO CIRCULAR ESTANDAR DE BRONCE, PARA TUBO DE DESCARGA DE 2"
N Das : 0.32 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 111 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3963 Z-CENTRO PISO, BRONCE D=2X3" PIEZA 1.0000 7383.78 7,383.78 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 7,383.78 Costo por Unidad (I): 7,383.78 42.99 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E521 Z-EQUIPO PARA PLOMERIA 0.50 704000 0.68 2393.60 2,393.60 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 2393.60 Unitarios: 77.21 Costo Unitario Equipos: (II) 77.21 0.45 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P276 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 0.516 Total Personal: 59,257.81 HhT= 5.160 Costo por Unidad: 1,911.54 Bs/hH= 11,854.52 220.00% Prestaciones Sociales 4,205.39 6,116.93 35.61 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 6,116.93 35.61 Costo Directo (I+II+III) 13,577.92 79.05 15.00% Administracin y Gastos Generales gg 2,036.69 15,614.61 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 1,561.46 17,176.07 9.09 Precio Unitario 17,176.07 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 97-II Descripcin: E-666.311.S/C SUMINISTRO, TRANSPORTE E INSTALACION DE CENTRO DE PISO CIRCULAR ESTANDAR DE BRONCE, PARA TUBO DE DESCRAGA DE 3"
N Das : 0.53 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 115 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M1931 MALLA ELECTROSOLDADA 100X100X4 MM M2 2.0000 3500.00 7,000.00 M205 PIEDRA PICADA N 1 M3 0.0500 75000.00 3,750.00 M4278 CONCRETO RCC=180 KG/CM2 M3 0.2500 205000.00 51,250.00 M4495 MADERA ENCOFRADO CORRIENTE (TRES USOS M3 0.1000 475000.00 47,500.00 M920 PERFIL L 50X50X5MM ML 2.4000 4500.00 10,800.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 120,300.00 Costo por Unidad (I): 120,300.00 46.65 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E487 Z-EQUIPO DE CARPINTERIA 0.50 1500000 0.75 5625.00 5,625.00 E488 Z-EQUIPO PARA ALBAILERIA 0.50 281000 0.72 1011.60 1,011.60 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 22840.15 Unitarios: 6090.71 Costo Unitario Equipos: (II) 6,090.71 2.36 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 1.00 24,551.56 24,551.56 P228 0.10 27,442.18 2,744.22 P259 0.50 32,968.75 16,484.38 P262 0.50 32,968.75 16,484.38 P304 0.10 42,051.56 4,205.16 +------------------------------------------------------------------------------------------------------------+ HhU= 6.827 Total Personal: 90,758.76 HhT= 13.654 Costo por Unidad: 24,202.34 Bs/hH= 11,344.29 220.00% Prestaciones Sociales 53,245.15 77,447.49 30.04 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 77,447.49 30.04 Costo Directo (I+II+III) 203,838.20 79.05 15.00% Administracin y Gastos Generales gg 30,575.73 234,413.93 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 23,441.39 257,855.32 9.09 Precio Unitario 257,855.32 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 101-II Descripcin: E.S/C CONSTRUCCION DE SALIDA DE PUNTO ELECTRICO PARA ILUMINACION EN TECHO, CON TUBERIA ELECTRICA PLASTICA D=3/4". INCLUYE CAJETIN OCTOGONAL, CONEXIONES, CABLE THW # 12 AWG. NO INCLUYE LUMINARIA.
N Das : 2.07 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 117 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4023 Z-CABLE THW CAL. 12AWG ML 3.5000 1214.20 4,249.70 M4028 Z-CAJETIN OCTOGONAL CON TAPA 4X3/4" PIEZA 1.0000 3795.00 3,795.00 M4039 Z-MATERIALES VARIOS INSTALACIONES ELECT. SG 0.0500 28500.00 1,425.00 M4050 Z-TUBO PVC D=3/4" ELEC. ML 3.7500 1013.52 3,800.70 M4055 Z-CURVA PVC SIN ROSCA D=3/4" PIEZA 1.0000 833.97 833.97 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 14,104.37 Costo por Unidad (I): 14,104.37 23.55 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.20 67514796 0.24 32407.10 32,407.10 E491 Z-EQUIPO PARA ELECTRICIDAD 1.00 600000 0.75 4500.00 4,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 36907.10 Unitarios: 4488.82 Costo Unitario Equipos: (II) 4,488.82 7.50 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.20 27,442.18 5,488.44 P263 1.00 32,968.75 32,968.75 P293 0.25 36,484.37 9,121.09 +------------------------------------------------------------------------------------------------------------+ HhU= 2.384 Total Personal: 73,867.34 HhT= 40.528 Costo por Unidad: 8,984.11 Bs/hH= 12,059.21 220.00% Prestaciones Sociales 19,765.04 28,749.15 48.00 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 28,749.15 48.00 Costo Directo (I+II+III) 47,342.34 79.05 15.00% Administracin y Gastos Generales gg 7,101.35 54,443.69 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,444.37 59,888.06 9.09 Precio Unitario 59,888.06 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 102-II Descripcin: E.S/C CONSTRUCCION DE SALIDA DE PUNTO ELECTRICO PARA ILUMINACION EN PARED CON TUBERIA ELECRICA PLASTICA DE D+3/4". INCLUYE CAJETIN OCTOGONAL, CONEXIONES, CABLES THW # 12 AWG. NO INCLUYE LUMINARIA
N Das : 1.82 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 118 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4023 Z-CABLE THW CAL. 12AWG ML 3.5000 1214.20 4,249.70 M4028 Z-CAJETIN OCTOGONAL CON TAPA 4X3/4" PIEZA 1.0000 3795.00 3,795.00 M4039 Z-MATERIALES VARIOS INSTALACIONES ELECT. SG 0.0500 28500.00 1,425.00 M4050 Z-TUBO PVC D=3/4" ELEC. ML 3.7500 1013.52 3,800.70 M4055 Z-CURVA PVC SIN ROSCA D=3/4" PIEZA 1.0000 833.97 833.97 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 14,104.37 Costo por Unidad (I): 14,104.37 23.55 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.20 67514796 0.24 32407.10 32,407.10 E491 Z-EQUIPO PARA ELECTRICIDAD 1.00 600000 0.75 4500.00 4,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 36907.10 Unitarios: 4488.82 Costo Unitario Equipos: (II) 4,488.82 7.50 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.20 27,442.18 5,488.44 P263 1.00 32,968.75 32,968.75 P293 0.25 36,484.37 9,121.09 +------------------------------------------------------------------------------------------------------------+ HhU= 2.384 Total Personal: 73,867.34 HhT= 35.760 Costo por Unidad: 8,984.11 Bs/hH= 12,059.21 220.00% Prestaciones Sociales 19,765.04 28,749.15 48.00 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 28,749.15 48.00 Costo Directo (I+II+III) 47,342.34 79.05 15.00% Administracin y Gastos Generales gg 7,101.35 54,443.69 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,444.37 59,888.06 9.09 Precio Unitario 59,888.06 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 103-II Descripcin: E.S/C CONSTRUCCION DE SALIDA DE PUNTO ELECTRICO PARA INTERRUCIONES, PULSADOR Y CONTROL DE VENTILADORES, CON TUBERIA ELECTRICA PLASTICA D=3/4", INCLUYE CAJETIN RECTANGULAR DE 2"*4", CONEXIONES, CABLE THW # 12 AWG. NO INCLUYE INTERUCTOR.
N Das : 0.45 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 119 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4023 Z-CABLE THW CAL. 12AWG ML 3.5000 1214.20 4,249.70 M4028 Z-CAJETIN OCTOGONAL CON TAPA 4X3/4" PIEZA 1.0000 3795.00 3,795.00 M4039 Z-MATERIALES VARIOS INSTALACIONES ELECT. SG 0.0500 28500.00 1,425.00 M4050 Z-TUBO PVC D=3/4" ELEC. ML 3.7500 1013.52 3,800.70 M4055 Z-CURVA PVC SIN ROSCA D=3/4" PIEZA 1.0000 833.97 833.97 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 14,104.37 Costo por Unidad (I): 14,104.37 24.98 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.20 67514796 0.24 32407.10 32,407.10 E491 Z-EQUIPO PARA ELECTRICIDAD 1.00 600000 0.75 4500.00 4,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 36907.10 Unitarios: 4123.70 Costo Unitario Equipos: (II) 4,123.70 7.30 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.20 27,442.18 5,488.44 P263 1.00 32,968.75 32,968.75 P293 0.25 36,484.37 9,121.09 +------------------------------------------------------------------------------------------------------------+ HhU= 2.190 Total Personal: 73,867.34 HhT= 8.760 Costo por Unidad: 8,253.33 Bs/hH= 12,059.66 220.00% Prestaciones Sociales 18,157.33 26,410.66 46.77 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 26,410.66 46.77 Costo Directo (I+II+III) 44,638.73 79.05 15.00% Administracin y Gastos Generales gg 6,695.81 51,334.54 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,133.45 56,467.99 9.09 Precio Unitario 56,467.99 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 104-II Descripcin: E.S/C CONSTRUCCION DE SALIDA DE PUNTO ELECTRICO PARA CAJA DE PASO EN PARED CON TUBERIA ELECTRICA PLASTICA D+3/4". INCLUYE CAJETIN CUADRADO, CONEXIONES, CABLES THW # 12 AWG, NO INCLUYE INTERRUCTOR.
N Das : 0.44 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 120 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3382 CAJETIN 5"X5"X2" ACERO GALVANIZADO UND 1.0000 4500.00 4,500.00 M4023 Z-CABLE THW CAL. 12AWG ML 3.0000 1214.20 3,642.60 M4039 Z-MATERIALES VARIOS INSTALACIONES ELECT. SG 0.0550 28500.00 1,567.50 M4050 Z-TUBO PVC D=3/4" ELEC. ML 3.7500 1013.52 3,800.70 M4055 Z-CURVA PVC SIN ROSCA D=3/4" PIEZA 1.0000 833.97 833.97 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 14,344.77 Costo por Unidad (I): 14,344.77 25.36 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.20 67514796 0.24 32407.10 32,407.10 E491 Z-EQUIPO PARA ELECTRICIDAD 1.00 600000 0.75 4500.00 4,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 36907.10 Unitarios: 4100.79 Costo Unitario Equipos: (II) 4,100.79 7.25 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.20 27,442.18 5,488.44 P263 1.00 32,968.75 32,968.75 P293 0.25 36,484.37 9,121.09 +------------------------------------------------------------------------------------------------------------+ HhU= 2.178 Total Personal: 73,867.34 HhT= 8.712 Costo por Unidad: 8,207.48 Bs/hH= 12,058.74 220.00% Prestaciones Sociales 18,056.46 26,263.94 46.44 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 26,263.94 46.44 Costo Directo (I+II+III) 44,709.50 79.05 15.00% Administracin y Gastos Generales gg 6,706.43 51,415.93 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,141.59 56,557.52 9.09 Precio Unitario 56,557.52 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 105-II Descripcin: E.S/C CONSTRUCCION DE SALIDA DE PUNTO ELECTRICO PARA TOMACORRIENTE DE PARED (120 V), CON TUBERIA ELECRICA PLASTICA D=3/4". INCLUYE CAJETIN RECTANGULAR, CONEXIONES, CABLES THW 3 10 AWG. NO INCLUYE TOMACORRIENTE.
N Das : 1.44 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 121 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4023 Z-CABLE THW CAL. 12AWG ML 3.5000 1214.20 4,249.70 M4039 Z-MATERIALES VARIOS INSTALACIONES ELECT. SG 0.0500 28500.00 1,425.00 M4050 Z-TUBO PVC D=3/4" ELEC. ML 3.7500 1013.52 3,800.70 M4055 Z-CURVA PVC SIN ROSCA D=3/4" PIEZA 1.0000 833.97 833.97 M4151 Z-CAJETIN RECTANGULAR ECON. 2*4**3/4" PZA 1.0000 3972.17 3,972.17 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 14,281.54 Costo por Unidad (I): 14,281.54 25.29 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.20 67514796 0.24 32407.10 32,407.10 E491 Z-EQUIPO PARA ELECTRICIDAD 1.00 600000 0.75 4500.00 4,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 36907.10 Unitarios: 4100.79 Costo Unitario Equipos: (II) 4,100.79 7.26 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.20 27,442.18 5,488.44 P263 1.00 32,968.75 32,968.75 P293 0.25 36,484.37 9,121.09 +------------------------------------------------------------------------------------------------------------+ HhU= 2.178 Total Personal: 73,867.34 HhT= 28.314 Costo por Unidad: 8,207.48 Bs/hH= 12,058.74 220.00% Prestaciones Sociales 18,056.46 26,263.94 46.50 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 26,263.94 46.50 Costo Directo (I+II+III) 44,646.27 79.05 15.00% Administracin y Gastos Generales gg 6,696.94 51,343.21 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,134.32 56,477.53 9.09 Precio Unitario 56,477.53 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 106-II Descripcin: E-S/C CONSTRUCCION DE SALIDA DE PUNTO ELECTRICO PARA NEVERA, CONGELADOR Y BOMBA DE AGUA EN PARED (120V), CON TUBERIA ELECTRICA PLASTICA D=3/4", INCLUYE CAJETIN RECTANGULAR, CONEXIONES Y CBLES THW # 10 AWG, NO INCLUYE TOMA CORRIENTE.
N Das : 0.44 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 122 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4024 Z-CABLE THW CAL 10 AWG ML 3.5000 1627.23 5,695.31 M4028 Z-CAJETIN OCTOGONAL CON TAPA 4X3/4" PIEZA 1.0000 3795.00 3,795.00 M4039 Z-MATERIALES VARIOS INSTALACIONES ELECT. SG 0.0500 28500.00 1,425.00 M4050 Z-TUBO PVC D=3/4" ELEC. ML 3.7500 1013.52 3,800.70 M4055 Z-CURVA PVC SIN ROSCA D=3/4" PIEZA 1.0000 833.97 833.97 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 15,549.98 Costo por Unidad (I): 15,549.98 26.77 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.20 67514796 0.24 32407.10 32,407.10 E491 Z-EQUIPO PARA ELECTRICIDAD 1.00 600000 0.75 4500.00 4,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 36907.10 Unitarios: 4100.79 Costo Unitario Equipos: (II) 4,100.79 7.06 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.20 27,442.18 5,488.44 P263 1.00 32,968.75 32,968.75 P293 0.25 36,484.37 9,121.09 +------------------------------------------------------------------------------------------------------------+ HhU= 2.178 Total Personal: 73,867.34 HhT= 8.712 Costo por Unidad: 8,207.48 Bs/hH= 12,058.74 220.00% Prestaciones Sociales 18,056.46 26,263.94 45.22 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 26,263.94 45.22 Costo Directo (I+II+III) 45,914.71 79.05 15.00% Administracin y Gastos Generales gg 6,887.21 52,801.92 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,280.19 58,082.11 9.09 Precio Unitario 58,082.11 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 107-II Descripcin: E.S/C CONSTRUCCION DE SALIDA DE PUNTO ELECTRICO PARA VENTILADOR EN TECHO, CON TUBERIA ELECTRICA PLASTICA D=3/4", INCLUYE CAJETIN OCTOGONAL, CONEXIONES Y CABLES THW # 12 AWG. NO INCLUYE LUMINARIA.
N Das : 0.97 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 123 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4023 Z-CABLE THW CAL. 12AWG ML 3.5000 1214.20 4,249.70 M4028 Z-CAJETIN OCTOGONAL CON TAPA 4X3/4" PIEZA 1.0000 3795.00 3,795.00 M4039 Z-MATERIALES VARIOS INSTALACIONES ELECT. SG 0.0500 28500.00 1,425.00 M4050 Z-TUBO PVC D=3/4" ELEC. ML 3.7500 1013.52 3,800.70 M4055 Z-CURVA PVC SIN ROSCA D=3/4" PIEZA 1.0000 833.97 833.97 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 14,104.37 Costo por Unidad (I): 14,104.37 23.55 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.20 67514796 0.24 32407.10 32,407.10 E491 Z-EQUIPO PARA ELECTRICIDAD 1.00 600000 0.75 4500.00 4,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 36907.10 Unitarios: 4488.82 Costo Unitario Equipos: (II) 4,488.82 7.50 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.20 27,442.18 5,488.44 P263 1.00 32,968.75 32,968.75 P293 0.25 36,484.37 9,121.09 +------------------------------------------------------------------------------------------------------------+ HhU= 2.384 Total Personal: 73,867.34 HhT= 19.072 Costo por Unidad: 8,984.11 Bs/hH= 12,059.21 220.00% Prestaciones Sociales 19,765.04 28,749.15 48.00 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 28,749.15 48.00 Costo Directo (I+II+III) 47,342.34 79.05 15.00% Administracin y Gastos Generales gg 7,101.35 54,443.69 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 5,444.37 59,888.06 9.09 Precio Unitario 59,888.06 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 108-II Descripcin: E-551.110.612 I.E. TABLERO METALICO CONVERTIBLE, EMBUTIBLE, CON PUERTA, 1 FASE + NEUTRO, 8 CIRCUITOS, BARRAS DE 125 A. NO INCLUYE BREKER.
N Das : 0.89 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 132 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4039 Z-MATERIALES VARIOS INSTALACIONES ELECT. SG 0.0500 28500.00 1,425.00 M4083 Z-VENTILADOR DE TECHO ASPA 12" PIEZA 1.0000 110000.89 110,000.89 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 111,425.89 Costo por Unidad (I): 111,425.89 63.19 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E468 Z-ANDAMIO TUBULAR 2.00 252000 0.69 3477.60 3,477.60 E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E491 Z-EQUIPO PARA ELECTRICIDAD 1.00 600000 0.75 4500.00 4,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 24181.15 Unitarios: 2686.79 Costo Unitario Equipos: (II) 2,686.79 1.52 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.10 27,442.18 2,744.22 P263 1.00 32,968.75 32,968.75 P293 0.25 36,484.37 9,121.09 +------------------------------------------------------------------------------------------------------------+ HhU= 2.089 Total Personal: 71,123.12 HhT= 16.712 Costo por Unidad: 7,902.57 Bs/hH= 12,105.42 220.00% Prestaciones Sociales 17,385.65 25,288.22 14.34 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 25,288.22 14.34 Costo Directo (I+II+III) 139,400.90 79.05 15.00% Administracin y Gastos Generales gg 20,910.13 160,311.03 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 16,031.10 176,342.13 9.09 Precio Unitario 176,342.13 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 117-II Descripcin: U-S/C CONSTRUCCION DE BANCADA ELECTRICA BAJA TENSION (30x50CM.), FORMADA POR UN TUBO PVC D=1". INCLUYE EXCAVACION, EMBOBINADO, RELLENO Y COMPACTACION.
Unidad : ML Cantidad : 19.00 Rendimiento (R): 25.000 ML/da
N Das : 0.76 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 133 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 0.6000 14500.00 8,700.00 M3928 Z-ARENA LAVADA M3 0.1000 25000.00 2,500.00 M3929 Z-PIEDRA PICADA T MAX 1" M3 0.1500 50000.00 7,500.00 M3965 Z-PEGAMENTO PARA TUBOS DE PVC, TANGIT. KG. 0.0160 58350.00 933.60 M4051 Z-TUBO PVC 1" ELECT. ML 1.0500 2962.25 3,110.36 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 22,743.96 Costo por Unidad (I): 22,743.96 44.57 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E492 Z-EQUIPO DE MOVIMIENTO DE TIERRA 1.00 440000 0.80 3520.00 3,520.00 E496 Z-EQUIPO PARA ALBAILERIA TIPO 2 1.00 220000 1.16 2552.00 2,552.00 E520 Z-EQUIPO PARA TUBERIA ELECTRICA 1.00 460000 0.56 2576.00 2,576.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 24851.55 Unitarios: 994.06 Costo Unitario Equipos: (II) 994.06 1.95 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 2.00 26,289.06 52,578.12 P228 0.10 27,442.18 2,744.22 P259 1.00 32,968.75 32,968.75 P263 1.00 32,968.75 32,968.75 P304 0.20 42,051.56 8,410.31 +------------------------------------------------------------------------------------------------------------+ HhU= 1.376 Total Personal: 129,670.15 HhT= 26.144 Costo por Unidad: 5,186.81 Bs/hH= 12,062.35 220.00% Prestaciones Sociales 11,410.98 16,597.79 32.53 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 16,597.79 32.53 Costo Directo (I+II+III) 40,335.81 79.05 15.00% Administracin y Gastos Generales gg 6,050.37 46,386.18 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 4,638.62 51,024.80 9.09 Precio Unitario 51,024.80 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 118-II Descripcin: E-521.223.023.- I.E. CABLE DE COBRE, TRENSADO, REVESTIDO,THW, CALIBRE 12 AWG, (2.32 MM)
Unidad : M Cantidad : 90.00 Rendimiento (R): 220.000 M/da
N Das : 0.41 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 134 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M1624 CONSUMIBLE PARA CONEXIONADO ELECTRICO UND 0.0001 1000000.00 100.00 M2092 CABLE # 12 THW 600V 75 C ML 1.0500 1245.50 1,307.78 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 1,407.78 Costo por Unidad (I): 1,407.78 43.25 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E19 EQUIPO DE ELECTRICISTA 1.00 2500000 1.00 25000.00 0.10 2500.00 27,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 25000.00 2500.00 Unitarios: 113.64 11.36 Costo Unitario Equipos: (II) 125.00 3.84 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 0.50 24,551.56 12,275.78 P263 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 0.091 Total Personal: 71,533.59 HhT= 8.190 Costo por Unidad: 325.15 Bs/hH= 11,433.85 220.00% Prestaciones Sociales 715.33 1,040.48 31.96 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 1,040.48 31.96 Costo Directo (I+II+III) 2,573.26 79.05 15.00% Administracin y Gastos Generales gg 385.99 2,959.25 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 295.93 3,255.18 9.09 Precio Unitario 3,255.18 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 119-II Descripcin: E-521.223.030 I.E. CABLE DE COBRE, TRENSADO, REVESTIDO, TW CALIBRE 10 AWG (3.95 MM).
Unidad : M Cantidad : 48.00 Rendimiento (R): 175.000 M/da
N Das : 0.27 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 135 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M1331 CABLE #10 AWG 600V THV ML 1.0500 1911.35 2,006.92 M1624 CONSUMIBLE PARA CONEXIONADO ELECTRICO UND 0.0001 1000000.00 100.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 2,106.92 Costo por Unidad (I): 2,106.92 46.63 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E19 EQUIPO DE ELECTRICISTA 1.00 2500000 1.00 25000.00 0.10 2500.00 27,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 25000.00 2500.00 Unitarios: 142.86 14.29 Costo Unitario Equipos: (II) 157.15 3.48 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 0.50 24,551.56 12,275.78 P263 1.00 32,968.75 32,968.75 +------------------------------------------------------------------------------------------------------------+ HhU= 0.114 Total Personal: 71,533.59 HhT= 5.472 Costo por Unidad: 408.76 Bs/hH= 11,473.95 220.00% Prestaciones Sociales 899.27 1,308.03 28.95 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 1,308.03 28.95 Costo Directo (I+II+III) 3,572.10 79.05 15.00% Administracin y Gastos Generales gg 535.82 4,107.92 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 410.79 4,518.71 9.09 Precio Unitario 4,518.71 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 120-II Descripcin: E-521.222.030.- I.E. CABLE DE COBRE, TRENSADO, REVESTIDO, THW. CALIBRE 8 AWG (3.71 MM).
Unidad : M Cantidad : 30.00 Rendimiento (R): 120.000 M/da
N Das : 0.25 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 136 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M1330 CABLE #8 AWG 600V THW ML 1.0200 4253.22 4,338.28 M4039 Z-MATERIALES VARIOS INSTALACIONES ELECT. SG 0.0010 28500.00 28.50 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 4,366.78 Costo por Unidad (I): 4,366.78 56.08 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E491 Z-EQUIPO PARA ELECTRICIDAD 1.00 600000 0.75 4500.00 4,500.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 4500.00 Unitarios: 37.50 Costo Unitario Equipos: (II) 37.50 0.48 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P228 0.10 27,442.18 2,744.22 P263 1.00 32,968.75 32,968.75 P293 0.10 36,484.37 3,648.44 +------------------------------------------------------------------------------------------------------------+ HhU= 0.147 Total Personal: 65,650.47 HhT= 4.410 Costo por Unidad: 547.09 Bs/hH= 11,909.46 220.00% Prestaciones Sociales 1,203.60 1,750.69 22.48 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 1,750.69 22.48 Costo Directo (I+II+III) 6,154.97 79.05 15.00% Administracin y Gastos Generales gg 923.25 7,078.22 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 707.82 7,786.04 9.09 Precio Unitario 7,786.04 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 121-II Descripcin: E-S/C CONSTRUCCION DE TANQUILLA PARA BAJA TENSION DE 40x50x80 CMS. INCLUYE EXCAVACION Y TAPA DE CONCRETO.
N Das : 0.67 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 137 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3900 Z-MALLA ELECTROSOLDADA 4" * 4" KG 3.2500 2672.33 8,685.07 M3923 Z-CEMENTO PORTLAND GRIS. SACO 1.4000 14500.00 20,300.00 M3928 Z-ARENA LAVADA M3 0.0700 25000.00 1,750.00 M3929 Z-PIEDRA PICADA T MAX 1" M3 0.1500 50000.00 7,500.00 M3939 Z-TABLERO PARA ENCOFRADO M3 0.0077 450000.00 3,465.00 M4111 Z-AGUA M3 0.0250 8300.00 207.50 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 41,907.57 Costo por Unidad (I): 41,907.57 21.00 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E487 Z-EQUIPO DE CARPINTERIA 0.50 1500000 0.75 5625.00 5,625.00 E488 Z-EQUIPO PARA ALBAILERIA 1.00 281000 0.72 2023.20 2,023.20 E492 Z-EQUIPO DE MOVIMIENTO DE TIERRA 1.00 440000 0.80 3520.00 3,520.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 27371.75 Unitarios: 9123.92 Costo Unitario Equipos: (II) 9,123.92 4.57 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.50 26,289.06 39,433.59 P228 0.10 27,442.18 2,744.22 P259 1.00 32,968.75 32,968.75 P262 0.50 32,968.75 16,484.38 P304 0.20 42,051.56 8,410.31 +------------------------------------------------------------------------------------------------------------+ HhU= 8.800 Total Personal: 100,041.25 HhT= 17.600 Costo por Unidad: 33,347.08 Bs/hH= 12,126.21 220.00% Prestaciones Sociales 73,363.58 106,710.66 53.48 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 106,710.66 53.48 Costo Directo (I+II+III) 157,742.15 79.05 15.00% Administracin y Gastos Generales gg 23,661.32 181,403.47 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 18,140.35 199,543.82 9.09 Precio Unitario 199,543.82 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 122-II Descripcin: E-S/C CONSTRUCCION DE BASE TANQUILLA PARA POSTE H=3M. INCLUYE PERNOS ROSCADO D=1/2", CURVA PVC 1/2", INCLUYE TAPA PARA TANQUILLA Y EXCAVACION.
N Das : 0.29 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 138 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3923 Z-CEMENTO PORTLAND GRIS. SACO 0.7660 14500.00 11,107.00 M3928 Z-ARENA LAVADA M3 0.1000 25000.00 2,500.00 M3929 Z-PIEDRA PICADA T MAX 1" M3 0.1750 50000.00 8,750.00 M3939 Z-TABLERO PARA ENCOFRADO M3 0.0080 450000.00 3,600.00 M4054 Z-CURVA PVC SIN ROSCA D=1/2" PIEZA 1.0000 715.85 715.85 M4075 Z-PERNO DE ANCLAJE DE 5/8"X0.4M PIEZA 4.0000 6679.46 26,717.84 M4111 Z-AGUA M3 0.0310 8300.00 257.30 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 53,647.99 Costo por Unidad (I): 53,647.99 29.22 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E492 Z-EQUIPO DE MOVIMIENTO DE TIERRA 1.00 440000 0.80 3520.00 3,520.00 E531 Z-EQUIPO DE COLOCACION DE CONCRE 1.00 1531000 0.25 3827.50 3,827.50 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 23551.05 Unitarios: 3364.44 Costo Unitario Equipos: (II) 3,364.44 1.83 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P118 1.00 26,375.00 26,375.00 P121 0.50 26,375.00 13,187.50 P163 0.20 33,641.25 6,728.25 P216 1.00 26,289.06 26,289.06 P218 1.00 24,551.56 24,551.56 P228 0.10 27,442.18 2,744.22 P259 1.00 32,968.75 32,968.75 P262 0.50 32,968.75 16,484.38 P304 0.10 42,051.56 4,205.16 P74 2.00 19,641.25 39,282.50 +------------------------------------------------------------------------------------------------------------+ HhU= 8.457 Total Personal: 192,816.38 HhT= 16.914 Costo por Unidad: 27,545.20 Bs/hH= 10,422.68 220.00% Prestaciones Sociales 60,599.44 88,144.64 48.00 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 88,144.64 48.00 Costo Directo (I+II+III) 145,157.07 79.05 15.00% Administracin y Gastos Generales gg 21,773.56 166,930.63 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 16,693.06 183,623.69 9.09 Precio Unitario 183,623.69 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 123-II Descripcin: E-S/C SUMINISTRO, TRANSPORTE Y COLOCACION DE POSTE ORNAMENTAL HEXAGONAL H=3M. INCLUYE CABLE No. 12 TW-AWG Y PINTURA ESMALTADA INDUSTRIAL.
N Das : 2.43 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 142 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3933 Z-PLANCHA DE CONCR. 1.60"0.50M INC REF.MPIEZA 1.0000 28622.87 28,622.87 M3943 Z-MORTERO DE CEMENTO M3 0.0250 160000.00 4,000.00 M3948 Z-LADRILLO MACIZO ARCILLA 6 * 12 * 25 CMPIEZA 48.0000 1868.75 89,700.00 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 122,322.87 Costo por Unidad (I): 122,322.87 47.45 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E488 Z-EQUIPO PARA ALBAILERIA 1.00 281000 0.72 2023.20 2,023.20 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 18226.75 Unitarios: 3037.79 Costo Unitario Equipos: (II) 3,037.79 1.18 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.50 26,289.06 39,433.59 P218 2.00 24,551.56 49,103.12 P228 0.10 27,442.18 2,744.22 P259 1.00 32,968.75 32,968.75 P262 0.50 32,968.75 16,484.38 P304 0.15 42,051.56 6,307.73 +------------------------------------------------------------------------------------------------------------+ HhU= 7.000 Total Personal: 147,041.79 HhT= 101.920 Costo por Unidad: 24,506.97 Bs/hH= 11,203.19 220.00% Prestaciones Sociales 53,915.33 78,422.30 30.42 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 78,422.30 30.42 Costo Directo (I+II+III) 203,782.96 79.05 15.00% Administracin y Gastos Generales gg 30,567.44 234,350.40 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 23,435.04 257,785.44 9.09 Precio Unitario 257,785.44 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 126-II Descripcin: E.S/C CONCRETO DE Fc 210 KG/CM2 A LOS 28 DIAS, PARA LA CONSTRUCCION DE PAVIMENTO PARA LA CANCHA (PAOS DE 2.50MTS.) INCLUYE JUNTAS DE ASFALTO LIQUIDO, TRANSPORTE DEL CEMENTO Y AGRGADOS HASTA 50 KM. Y EXCLUYE EL REFUERZO METALICO Y EL ENCOFRADO.
N Das : 0.63 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 146 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4092 Z-MATERIALES VARIOS PARA PINTURA GRUPO 0.0030 31500.00 94.50 M4100 Z-SOLVENTE UNIVERSAL GALON 0.0060 36900.00 221.40 M4104 Z-PINTURA ANTIRRES VERDE GALON 0.0500 89017.50 4,450.88 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 4,766.78 Costo por Unidad (I): 4,766.78 32.98 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E493 Z-EQUIPO DE PINTURA 1.00 244000 0.82 2000.80 2,000.80 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 2000.80 Unitarios: 41.68 Costo Unitario Equipos: (II) 41.68 0.29 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P248 1.00 29,473.43 29,473.43 P275 1.00 32,968.75 32,968.75 P304 0.25 42,051.56 10,512.89 +------------------------------------------------------------------------------------------------------------+ HhU= 0.542 Total Personal: 99,244.13 HhT= 16.260 Costo por Unidad: 2,067.59 Bs/hH= 12,207.18 220.00% Prestaciones Sociales 4,548.70 6,616.29 45.78 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 6,616.29 45.78 Costo Directo (I+II+III) 11,424.75 79.05 15.00% Administracin y Gastos Generales gg 1,713.71 13,138.46 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 1,313.85 14,452.31 9.09 Precio Unitario 14,452.31 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 129-II Descripcin: E.S/C DEMARCACION CON PINTURA ESPAECIAL PARA PAVIMENTO (TRAFICO), LINEA CONTINUA BLANCA.
Unidad : ML Cantidad : 229.00 Rendimiento (R): 145.000 ML/da
N Das : 1.58 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 147 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4092 Z-MATERIALES VARIOS PARA PINTURA GRUPO 0.0030 31500.00 94.50 M4098 Z-PINTURA ZONA DE TRAFICO GALON 0.0050 89017.50 445.09 M4100 Z-SOLVENTE UNIVERSAL GALON 0.0060 36900.00 221.40 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 760.99 Costo por Unidad (I): 760.99 20.29 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E493 Z-EQUIPO DE PINTURA 1.00 244000 0.82 2000.80 2,000.80 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 2000.80 Unitarios: 13.80 Costo Unitario Equipos: (II) 13.80 0.37 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P248 1.00 29,473.43 29,473.43 P275 1.00 32,968.75 32,968.75 P304 0.25 42,051.56 10,512.89 +------------------------------------------------------------------------------------------------------------+ HhU= 0.179 Total Personal: 99,244.13 HhT= 40.991 Costo por Unidad: 684.44 Bs/hH= 12,235.81 220.00% Prestaciones Sociales 1,505.77 2,190.21 58.39 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 2,190.21 58.39 Costo Directo (I+II+III) 2,965.00 79.05 15.00% Administracin y Gastos Generales gg 444.75 3,409.75 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 340.98 3,750.73 9.09 Precio Unitario 3,750.73 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 130-II Descripcin: E.S/C DEMARCACION CON PINTURA ESPECIAL PARA PAVIMENTO (TRAFIC), LINEA DISCONTINUA BLANCA
Unidad : ML Cantidad : 24.00 Rendimiento (R): 145.000 ML/da
N Das : 0.17 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 148 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4092 Z-MATERIALES VARIOS PARA PINTURA GRUPO 0.0030 31500.00 94.50 M4098 Z-PINTURA ZONA DE TRAFICO GALON 0.0050 89017.50 445.09 M4100 Z-SOLVENTE UNIVERSAL GALON 0.0060 36900.00 221.40 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 760.99 Costo por Unidad (I): 760.99 20.29 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E493 Z-EQUIPO DE PINTURA 1.00 244000 0.82 2000.80 2,000.80 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 2000.80 Unitarios: 13.80 Costo Unitario Equipos: (II) 13.80 0.37 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P248 1.00 29,473.43 29,473.43 P275 1.00 32,968.75 32,968.75 P304 0.25 42,051.56 10,512.89 +------------------------------------------------------------------------------------------------------------+ HhU= 0.179 Total Personal: 99,244.13 HhT= 4.296 Costo por Unidad: 684.44 Bs/hH= 12,235.81 220.00% Prestaciones Sociales 1,505.77 2,190.21 58.39 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 2,190.21 58.39 Costo Directo (I+II+III) 2,965.00 79.05 15.00% Administracin y Gastos Generales gg 444.75 3,409.75 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 340.98 3,750.73 9.09 Precio Unitario 3,750.73 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 131-II Descripcin: E.S/C DEMANCACION CON PINTURA ESPECIAL PARA PAVIMENTO (TRAFICO), LINE CONTINUA AMARILLA
Unidad : ML Cantidad : 76.00 Rendimiento (R): 145.000 ML/da
N Das : 0.52 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 149 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M4092 Z-MATERIALES VARIOS PARA PINTURA GRUPO 0.0030 31500.00 94.50 M4098 Z-PINTURA ZONA DE TRAFICO GALON 0.0050 89017.50 445.09 M4100 Z-SOLVENTE UNIVERSAL GALON 0.0060 36900.00 221.40 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 760.99 Costo por Unidad (I): 760.99 20.29 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E493 Z-EQUIPO DE PINTURA 1.00 244000 0.82 2000.80 2,000.80 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 2000.80 Unitarios: 13.80 Costo Unitario Equipos: (II) 13.80 0.37 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P248 1.00 29,473.43 29,473.43 P275 1.00 32,968.75 32,968.75 P304 0.25 42,051.56 10,512.89 +------------------------------------------------------------------------------------------------------------+ HhU= 0.179 Total Personal: 99,244.13 HhT= 13.604 Costo por Unidad: 684.44 Bs/hH= 12,235.81 220.00% Prestaciones Sociales 1,505.77 2,190.21 58.39 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 2,190.21 58.39 Costo Directo (I+II+III) 2,965.00 79.05 15.00% Administracin y Gastos Generales gg 444.75 3,409.75 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 340.98 3,750.73 9.09 Precio Unitario 3,750.73 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 132-II Descripcin: E.S/C SUMINISTRO, TRANSPORTE Y COLOCACION DE TABLERO METALICO PRINCIPAL DE BALONCESTO. INCLUYE PARAL PARA TUBO DE HG D=3", ARO Y MALLA
N Das : 1.00 Fecha: 10/02/2007 +-----------------------------------------------------------------------------------------------------------------------------------+ Cd. 150 Proyecto: 969 I.) MATERIALES: +------------------------------------------------------------------------------------------------------------+ Peso CODIGO DESCRIPCION UNIDAD CANTIDAD COSTO UNITARIO Bs/Und TOTAL Bs en % +------+----------------------------------------+------+--------------+---------------------+---------------- M3897 Z-TABLERO CON ARCO, MALLA Y PARAL HG 3" SG 1.0000 426802.94 426,802.94 +------------------------------------------------------------------------------------------------------------+ Total Materiales: 426,802.94 Costo por Unidad (I): 426,802.94 53.25 II.) EQUIPOS: +-----------------------------------------------------------------------------------------------------------------------------+ COMBUSTIBLE Y MANTENIMIENTO Y CAN- VALOR DEPRECIACION LUBRICANTES REPUESTOS CODIGO DESCRIPCION TI- DEL +-----------------+----------------+----------------- DAD. EQUIPO % Bs/Da % Bs/Da % Bs/Da TOTAL DIARIO Bs. +------+--------------------------------+-----+---------+-----+-----------+-----+----------+-----+-----------+---------------- E474 Z-CAMION 350 0.10 67514796 0.24 16203.55 16,203.55 E523 Z-EQUIPO COLOCACION DE ESTRUCTUR 1.00 39000000 0.24 93600.00 93,600.00 +-----------------------------------------------------------------------------------------------------------------------------+ Totales: 109803.55 Unitarios: 54901.78 Costo Unitario Equipos: (II) 54,901.78 6.85 III.) PERSONAL: +------------------------------------------------------------------------------------------------------------+ CODIGO DESCRIPCION CANTIDAD SALARIO (Bs/da) TOTAL +------+----------------------------------------+---------------------+---------------------+---------------- P216 1.00 26,289.06 26,289.06 P218 1.00 24,551.56 24,551.56 P228 0.10 27,442.18 2,744.22 P277 1.00 32,968.75 32,968.75 P304 0.20 42,051.56 8,410.31 +------------------------------------------------------------------------------------------------------------+ HhU= 13.200 Total Personal: 94,963.90 HhT= 26.400 Costo por Unidad: 47,481.95 Bs/hH= 11,510.78 220.00% Prestaciones Sociales 104,460.29 151,942.24 18.96 Bono Alimentario (Bs. 0.00) 0.00 Agua, Hielo e Implementos de Seguridad (U) 0.00 Total Costo Unitario Mano de Obra Directa (III) 151,942.24 18.96 Costo Directo (I+II+III) 633,646.96 79.05 15.00% Administracin y Gastos Generales gg 95,047.04 728,694.00 11.86 ---------------------------- 10.00% Imprevisto y Utilidades 72,869.40 801,563.40 9.09 Precio Unitario 801,563.40 100.00 SCHICARO CONSTRUCCIONES, C.A. ANALISIS DE PRECIO UNITARIO +-----------------------------------------------------------------------------------------------------------------------------------+ Proyecto: CONSTRUCCION DE LA ESCUELA BASICA, II ETAPA, SECTOR COSTO UNIDO, VIA OROCUAL, MUNICIPIO MATURIN, ESTADO MONAGAS.
Partida N: 133-II Descripcin: E.S/C SUMINISTRO, TRANSPORTE Y COLOCACION DE DOS CAMISAS CON TUBO METALICOS DE HG=4" Y DOS TUBOS METALICOS HG D=3", PARA POSTES DE APOYO. INCLUYE MALLA DE VOLEIBOL.