When it is necessary to
temporarily deny access to owners
or tenants to their property or
when any utility service
connection has to be interrupted,
the Contractor shall give written
notice as prescribed herein or by
the relevant Authority sufficiently
in advance to enable the affected
persons to provide for their needs.
Notices shall include appropriate
information concerning the
interruption and instructions on
how to limit their inconvenience.

All tasks above shall be deemed
covered by the Contractor
generally within his rates and
prices in the Bill of Quantities.



So that where possible the crops may be harvested before excavation or trenching is
started. The Contractor shall be responsible for all damage outside of the way-leave and
shall make Satisfactory settlement at his own cost for the damage directly with the
property owner and/or tenant involved. The Contractor shall prepare a Condition Report
of the area likely to be affected by the works to be agreed with the owner/tenant and the
Engineer.