Vous êtes sur la page 1sur 10

FLEXI BTS

SITE FOLDER
SITE NAME:
NEMAM
SITE ADDRESS:
MR.R.GOPALAKRISHNAN S/O RAMARAJ
NEMAN, TALUKA-THIRUKKATTUPPALLI
THANJAVUR , PH:-9976714935

INDEX
Department: NSN SITE
ENGINEERING
Prepared By: Site
Engineering India

Approved By: K.M.Zeegham
Client: VODAFONE Date : 03/04/07 Page: 1

1 SARF 2
2 SITE ACQUISITION & HANDOVER
DOCUMENTS FOR SITE DEVELOPMENT
3-4
3 CIVIL WORKS 5-1
4 ELECTRICAL RECOMMENDATIONS 11-13
5 INFRA CHECKLIST! RFI" 14-15
# ANTENNA & FEEDER INFORMATION 1#
$ BTS INSTALLATION CHECKS 1$-1%
% POWER S&STEM INFORMATION 1'
' MW INSTALLATION CHECKS 2-21
1 CERTIFICATE ( TI 22
11 INVENTOR& REPORT 23
12 SITE HANDOVER DETAIL 24
13 OUT STANDIN) TASKS 25
Department: NSN SITE
ENGINEERING
Prepared By: Site Engineering
India
Approved By: K.M.Zeegham Client: VODAFONE Date: 03/04/07 Page: 2

1* SEARCH AREA REQUEST FORM !SARF":
)ENERAL DETAILS: DATE:
SITE NAME
NEMAM
SITE ID TN1934
!TS T"PE INDOORD OUTDOOR MI#RO
LATITUDE: LONGITUDE:
LINE O$ SITE %LOS&

#LEAR
NOT
#LEAR
NOT
#HE#KED
NOT RE'UIRED
#ONNI#TIVIT" T"PE M( LEASE LINE
E1 SHARED (ITH OPERATOR AIRTEL IDEA !SNL OTHER)))))
E'UIPMENT INSTALLED !TS !S# SDH ))))))))))))
HT O$ GSM ANTENNA %*& SE#1: 4 SE#+: 4
SE#3: 4
SE#4)))))
GSM ANT. ORIENTATION
%DEG&
SE#1: + SE#+: 13 SE#3: +1 SE#4)))))
M( ANT HEIGHT%*& DIR1: +, DIR+: +, DIR3)))))) OTHER)))))
SI-E O$ M( ANTENNA DIR1: .6 DIR+: .6 DIR3))))))) OTHER)))))
M( ANT ORIENTATION
%DEG&
DIR1: 175.+ DIR+: 355.+ DIR3))))))) OTHER)))))
PROPOSED TO(ER/ POLE TO(ER POLE
HEIGHT O$ TO(ER/ POLE%*&
NEAREST PO(ER $EED
$ROM SITE
%.M/KM&
T"PE O$ PO(ER AVAILA!LE SINGLE PHASE THREE PHASE
PROPOSED SITE LA"OUT
ATTA#HED&
"ES NO
EARTH PITS SHO(N IN
LA"OUT
P1 P+ P3
METER !O/ LO#ATION !1 !+ !3
NAME AND SIGNATURE NAME AND SIGNATURE
O$ SITE A#'UISITION PERSON O$ R$ ENGINEER
.
Department: NSN SITE
ENGINEERING
Prepared By: Site Engineering
India
Approved By: K.M.Zeegham Client: VODAFONE Date: 03/04/07 Page: 3

#* ANTENNA AND FEEDER S&STEM INFORMATION
#*1 DETAILED INFORMATION ABOUT ANTENNAS AND FEEDERS
ITEM SEC-1 SEC-2 SEC-3
DIVERSIT&
MECHANICAL
TILTIN) AN)LE
!D)R"
T//R/
+
2 2
ELECTRICAL
TILTIN) AN)LE
!D)R"
T//R/
2 2 2
+UMPER
CABLES
USED! ,-. 1*5M"
T// R/
E/TERNAL
3*0 + 3*0+ 3*0+
T//R/ INTERNAL
1.5*0+ 1.5*0+ 1.5*0+
EARTHIN) KITS
USED
'T"
4 4 4
FEEDER CABLE
MARKIN) PER
SECTOR
'T"
"12 "12 "12
#*2 ANTENNALINE CHECKS PRIOR TO BTS COMMISSIONIN)
REF* IMPLEMENTATION PHASE COMPLETED
4.3.1. ALL #A!LES ARE RESTORED TO NORMAL POSITION $OR !TS
OPERATION A$TER VS(R/ RL/ DT$ #HE#KS.

4.3.+. ALL #ONNE#TORS ARE PROPERL" TIGHTENED.
4.3.3. ALL E/TERNAL #ONNE#TORS ARE SEALED AND THE" ARE
(EATHERPROO$.

4.3.4 VS(R/ RL/ DT$ #HE#K RESULTS ATTA#HED%SE#TOR(ISE&
A##EPTED !":
%DATE&
%NOKIA3S REPRESENTATIVE& %SIGNATURE&
Department: NSN SITE
ENGINEERING
Prepared By: Site Engineering
India
Approved By: K.M.Zeegham Client: VODAFONE Date: 03/04/07 Page: 4


$* BTS INSTALLATION CHECKS
ITEM DESCRIPTION CHECKED
1 #A!INET $I/ED TO (ALL/$LOOR, SE#URED
AND $EET ADJUSTED 4 LEVELED.

+ INTERNAL #A!LE LADER INSTALED PROPER".

3 #A!LE LADERS % INT. 4 E/T. & EARTHED
PROPERL" 4 #ONNE#TED TO EARTH
#OLLE#TING !ARS % EG! 4 IG! & $OR
E'UIPOTENTIAL !ONDING.

4 (T$ INSTALLED PROPERL" 4 ALL THE HOLES
ARE SEALED.

5 R$ #A!LES ROUTED PROPERL" 4 #LAMPED


PROPERL".
6 EMP INSTALED !ET(EEN IN#OMING $EEDER
4 !TS JUMPER #A!LES %56171 899:;<8=:1&.

7 EMP EARTHED 4 #ONNE#TED TO EARTH


#OLE#TING !AR.

, !TS #A!INET INSTALLED PROPERL" 4


GROUTED.
9 #A!INET EARTHING #A!LESINSTALLED
!ET(EEN #A!INETS AND EARTHING !US!AR
4 TERMINATED PROPERL".
1 ALL $EEDER / JUMPER #ONNE#TORS ARE
TIGHTENED %+5N-M&

11 ALL !TS PLUG-IN UNITS INSTALLED 4
PROPERL" SE#URED IN THE #A!INET.

1+ !TS INPUT PO(ER SUPPL" #A!LES INSTALLED
4 TERMINATED PROPEL".

13 #USTOMER ALARMS (IRED 4 TERMINATED
TO DD$.

ITEM DESCRIPTION CHECKED
14 PLUG-IN MODULES INTER#ONNE#TION
#A!LES #ONNE#TED AND TIGHTENED. %SMA
>?7@A1 >? 11 B-*&.

Department: NSN SITE
ENGINEERING
Prepared By: Site
Engineering India

Approved By: K.M.Zeegham
Client: VODAFONE Date : 03/04/07 Page: 5

15 ALL #ONNE#TORS TIGHTENED #ORRE#TL"
% N- T"PE , DATA, PO(ER, ALARM, 1><. &

16 MEASURED D# VOLTAGE ON !TS ROO$TOP
CCC.CC..V

17 A-!IS INTER$A#E INSTALLED AND (IRED TO
DD$ / M(.

1, LA!LEING DONE PROPEL"


% E/: D?7 187>6:;BE <8=:1 11
$?7 D# 9?517 <8=:1 34
R/ / T/ M( :;BF D11G17 41 &
R1D17 L8=1::;BE #687>.

19 SET THE !TS #LO#K TO 13. MH- % NOTE: UP
TO , DIGIT A##URA#" &

+ MESURE THE RADIATED PO(ER / TR/

TR/1

TR/+
TR/3

TR/4

TR/5

TR/6
TR/7

TR/,

TR/9

TR/1
TR/11

TR/1+

21
MESURE THE $EEDER #A!LE VS(R


SE#TOR 1 M8;B CCC.. D;HCCC..


SE#TOR + M8;B CC.. D;HCC.C..


SE#TOR 3 M8;B C. D;HCCC.C


%?9>;?B8:& SE#TOR 4 M8;B CCC.
D;H CCCC.C..

A##EPTED !":
%DATE&
%NOKIA3S REPRESENTATIVE& %SIGNATURE&
%* POWER S&STEM INSTALLATION CHECK LIST
Department: NSN SITE
ENGINEERING
Prepared By: Site Engineering
India
Approved By: K.M.Zeegham Client: VODAFONE Date: 03/04/07 Page:

ITEM DESCRIPTION CHECKED
1. EQUIPMENT PREPARATION
+. POWER S&STEM INSTALLATION/
+.1. PO(ER S"STEM RA#K I#HASISJ 4 J KVE !US !ARJ
#ONNE#TED TO THE MAIN GROUNDING !US !AR.

+.7. E/TERNAL #A!LES LA!ELLED #ORRE#TL".
3. BATTER& INSTALLATION/
3.1. !ATTER" #APA#IT" )))6)))))))A6
3.+. !ATTER" STAND GROUNDED.
3.3. !ATTER" #ELLS #ONNE#TED AND ALL S#RE(S AND NUTS
TIGHTENED TO RE#OMMENDED TOR'UE ONL". SEE
!ATTER" MANUAL.

3.4. PETROLEUM JELL" USED $OR !ATTER" TERMINAL POLES.


3.5. !ATTER" #A!LE RATING. 5 2@
**
$OR
+++
5 2@
**
$OR
444
3.6. !ATTER" TEMPERATURE SENSOR INSTALLED NEAR
!ATTERIES.
NOTE L SENSOR SHOULD HANG $REEL" IN AIR AND
SHOULD NOT TOU#H AN" METALLI# PART.

3.7. !ATTER" PILOT #ELL VOLTAGE RE#ORDED AND #ELL NO


RE#ORDED ))))))+.5V))))))))))) %P;:?> #1:: ;2 #1:: 5;>6
L?512> #1:: V?:>8E1&

3.,. ENSURE !ATTER" $LOAT VOLTAGE IN LINE (ITH


RE#OMMENDATION
ENSURE !ATTER" #HARGING #URRENT IN LINE (ITH
!ATTER" RE#OMMENDATION

0 R1D17 P?517 P:8B> 4 !8>>17M M8BA8:2.


Department: NSN SITE
ENGINEERING
Prepared By: Site Engineering
India
Approved By: K.M.Zeegham Client: VODAFONE Date: 03/04/07 Page: 7

'* MW HOPS INSTALLATION
S*N0* DESCRIPTION CHECKED
!SITE A"
CHECKED
!SITE B"
1. !n"tallation done li#e "$o%n in t$e do&'(entation
)pole* dire&tion* polari"ation+

+. Align(ent 'nit and antenna are in"talled properly
and "&re%" are tig$tened

3. ,aveg'ide i" properly (o'nted )-eparate antenna
or .-B &on/ig'ration+
4. 0$e "erial n'(1er o/ t$e antenna2333333

5. O4 i" in"talled properly )"&re%" are tig$tened*
"ealing i" in rig$t po"ition* eno'g$ "pa&e le/t /or de
in"tallation+

6. O4 i" gro'nded
7. O4 i" (ar#ed %it$ a /ar end -ite !D

,. 5a1el" are (o'nted to t$e !43O4 &a1le" )Ca1le
n'(1er"+

9. Conne&tor" at O4* !4 and in B0- are tig$tened
properly2

1. O4 &onne&tor i" "ealed2
11. The serial number of the OU's.
1+. !4 i" in"talled &orre&tly )&apa&ity* red'ndant 'nit*
&a1ling and &onne&tor"+

13. 67 B'" -y"te( i" i(ple(ented &orre&tly*
(anage(ent 1'" &a1le" are in"talled )not
appli&a1le /or 88!C+
14. All ne&e""ary 2 91it/" Ca1le" are in"talled )not
appli&a1le /or 88!C+
15. Fle: 1'" &a1le &onne&ted to !4 i" la1elled %it$ /ar
end -ite !D

16. Ca1le" to DDF are la1elled )not appli&a1le /or
88!C+

17. 0$e "erial n'(1er" o/ t$e !4;"2

Department: NSN SITE
ENGINEERING
Prepared By: Site Engineering
India
Approved By: K.M.Zeegham Client: VODAFONE Date: 03/04/07 Page: <


MW
COMMISSIONING
SITE A SITE B
Single terminal / main
unit from redundant
air
!edundant
unit
Single terminal / main
unit from redundant
air
!edundant unit
-ite Na(e
NEMAM
B't$arayanall'r Ar#ad'
Antenna -i=e 02 02
Antenna .eig$t 30 30
Antenna 9a#e Andre% Andre%
!F Ca1le (a#e
)8>223/8>274/Fle:1'"+
Fle:i1'" Fle:i1'"
Antenna Orientation
)Deg+
30<23 72<23
Polari"ation V V
Fre?'en&y 74<@2A B.= 7A372A B$=
Capa&ity
Cal&'lated 8C level 340242 dB( 74 dB( 340242 dB( 74 dB(
9ea"'red 8C level 347 dB( 74 dB( 342 dB( 74 dB(
0$e di//eren&e 1et%een
a1ove val'e" i"
a&&epta1le )D4 E 32 dB+
OB OB OB OB
9ea"'red A>C voltage FFFFFFFV FFFF * FFFFV FFF FFFFV FFFF * FFFFV
Con/ig'ration "tored on
di"#
OB Filena(e: OB Filena(e: OB Filena(e: OB Filena(e:
-tati"ti&" "tored on di"# OB Filena(e: OB Filena(e: OB Filena(e: OB Filena(e:
N9- &o((i""ioning OB )te"ted lo&ally+
OB )te"ted /ro(
O9C+
OB )te"ted
lo&ally+
OB )te"ted
/ro( O9C+
OB )te"ted lo&ally+
OB )te"ted /ro(
O9C+
OB )te"ted
lo&ally+
OB )te"ted
/ro( O9C+
STABILIT& TEST
Stati"ti#" during $% min. Te"t
&A!AMETE! -!0E A -!0E B
>2<2 00 0otal 0i(e
>2<2 A0 Availa1le ti(e
>2<2 E- Error "e&ond"
>2<2 BBE Ba&#gro'nd BE8
&A!AMETE! -!0E A -!0E B
>2<2 -E- -everely error "e&ond"
>2<2 EB Error Blo&#"
8e"'lt o/ t$e BE8 te"t a&&epta1le OB
REMARKS:
%PLA#E& %DATE&
%NOKIA3S REPRESENTATIVE& %SIGNATURE&
1* CERTIFICATE OF COMPLETION FOR
Department: NSN SITE
ENGINEERING
Prepared By: Site
Engineering India

Approved By: K.M.Zeegham
Client: VODAFONE Date : 03/04/07 Page: 9


13* OUTSTANDIN) TASKS
13*1 L123 04 O5323678179 T62:2 !N0:16;2 R<2=0721>1?13@"
13*2 L123 04 O5323678179 T62:2 !C5230A<B;2 R<2=0721>1?13@"
Note ' &lea"e agree the time line to #lo"e the ending un#h oint (a"ed on
"e)erit* +"er)i#e affe#ting or non "er)i#e affe#ting,.
Department: NSN SITE
ENGINEERING
Prepared By: Site
Engineering India

Approved By: K.M.Zeegham
Client: VODAFONE Date : 03/04/07 Page: 10
S.No.
-ESC!I&TION O.
O/TSTAN-ING WO!K
!AISE- B0
COM&1ETE-
B0
-ign2 -ign2
Na(e Na(e
Date Date
-ign2 -ign2
Na(e Na(e
Date Date
-ign2 -ign2
Na(e Na(e
Date Date
-ign2 -ign2
Na(e Na(e
Date Date
-ign2 -ign2
Na(e Na(e
Date Date
S.No. -ESC!I&TION O.
O/TSTAN-ING WO!K
!AISE- B0 COM&1ETE-
B0
-ign2 -ign2
Na(e Na(e
Date Date
-ign2 -ign2
Na(e Na(e
Date Date
-ign2 -ign2
Na(e Na(e
Date Date
-ign2 -ign2
Na(e Na(e
Date Date
-ign2 -ign2
Na(e Na(e
Date Date

Vous aimerez peut-être aussi