Vous êtes sur la page 1sur 2

KEGIATAN : PEMBANGUNAN TEMPAT PEMBUANGAN BENDA PADAT/CAIR YANG MENIMBULKAN POLUSI

PEKERJAAN : PEMBANGUNAN DAN PENGADAAN ALAT INSTALASI PENGOLAHAN AIR LIMBAH (IPAL)
PUSKESMAS LANGSAT, KAPASITAS 6 M3/HARI
LOKASI : JL. MELUR, KOTA PEKANBARU
TAMBAH KURANG TAMBAH KURANG
1 2 3 4 5.00 6 =4x5 7 8 =4x7 9 =7-5 10 =5-7 11 =8-6 12 =6-8
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lapangan dan pengukuran / Uitzet M2 6,000.00 170.00 1,020,000.00 170.00 1,020,000.00
2 Pek. Pasang Bowplank M' 40,520.00 85.00 3,444,200.00 85.00 3,444,200.00
3 Pek. Pembongkaran lantai beton M' 15,040.00 25.00 376,000.00 25.00 376,000.00
4 Pek, Pembongkaran Lantai keramik M2 15,040.00 2.00 30,080.00 2.00 30,080.00
5 Pek. Pembongkaran septictank Ls 1,500,000.00 1.00 1,500,000.00 - - 1.00 1,500,000.00
II PEKERJAAN SIPIL
A. Pekerjaan Fondasi
1 Pek. Galian tanah M3 15,040.00 67.65 1,017,456.00 14.85 223,344.00 52.80 794,112.00
2 Pek. Urugan Pasir M3 221,360.00 2.00 442,720.00 0.34 74,709.00 1.66 368,011.00
3 Pek. Pasang Lantai kerja 1:3:6 M3 658,048.00 4.00 2,632,192.00 0.34 222,091.20 3.66 2,410,100.80
4 Pek. Pondasi setempat beton bertulang M3 1,000,000.00 0.27 270,000.00 1.35 1,350,000.00 1.08 1,080,000.00
5 Pek. Fondasi batu-bata 1:3 M2 148,532.80 2.60 386,185.28 - - 2.60 386,185.28
6 Pek. Raben Fondasi 1:3 M2 50,000.00 36.00 1,800,000.00 - - 36.00 1,800,000.00
7 Pek. Urugan Tanah bekas galian M2 72,840.00 25.00 1,821,000.00 4.46 324,502.20 20.55 1,496,497.80
B. Pekerjaan Struktur
1 Pek. Cor Sloof Beton Bertulang 20 x 25 cm M3 5,964,720.00 1.30 7,754,136.00 - - 1.30 7,754,136.00
2 Pek. Cor kolomBeton Bertulang 20 x 20 cm M3 6,174,936.00 0.72 4,445,953.92 0.43 2,667,572.35 0.29 1,778,381.57
3 Pek. Cor reng Balok Beton Bertulang 20 x 20 cm M3 5,801,776.00 1.04 6,033,847.04 0.63 3,655,118.88 0.41 2,378,728.16
4 Pek. Dak Beton bertulang T =20 cm M3 5,380,840.00 4.00 21,523,360.00 1.35 7,264,134.00 2.65 14,259,226.00
C. Pekerjaan Plasteran
1 Pek. Plasteran dinding 1: 4 M2 25,020.80 156.00 3,903,244.80 18.90 472,893.12 137.10 3,430,351.68
Pek. Pas Batu Bata 1:4 M2 66,184.00 18.90 1,250,877.60 18.90 1,250,877.60
D. Pekerjaan Lantai
1 Pek. Urugan Tanah Bawah Lantai M3 7,208.00 3.23 23,281.84 - - 3.23 23,281.84
2 Pek. Urugan Pasir Bawah Lantai M3 221,360.00 2.15 475,924.00 - - 2.15 475,924.00
3 Pek. Cor Lantai Beton Tumbuk 1:3:5 M3 658,048.00 2.15 1,414,803.20 - - 2.15 1,414,803.20
VOLUME
JUMLAH HARGA
(Rp)
PEKERJAAN TAMBAH KURANG
NO URAIAN PEKERJAAN SAT
HARGA SATUAN
(Rp)
KONTRAK REALISASI SELISIH HARGA
VOLUME
JUMLAH HARGA
(Rp)
VOLUME JUMLAH HARGA
TAMBAH KURANG TAMBAH KURANG
1 2 3 4 5.00 6 =4x5 7 8 =4x7 9 =7-5 10 =5-7 11 =8-6 12 =6-8
VOLUME
JUMLAH HARGA
(Rp)
NO URAIAN PEKERJAAN SAT
HARGA SATUAN
(Rp)
KONTRAK REALISASI SELISIH HARGA
VOLUME
JUMLAH HARGA
(Rp)
VOLUME JUMLAH HARGA
T O T A L
III PEKERJAAN PENGADAAN UNIT SEWAGE TRATMENT PLANT
(STP) 4 M3/hari, Merek Bestindo type BMS-4.4 Set 94,000,000.00 1.00 94,000,000.00 1.00 94,000,000.00
- -
IV. Pekerjaan Pemasangan Intalasi Pemipaan & Electrical M' 100,050.00 55.00 5,502,750.00 69.00 6,903,450.00 14.00 1,400,700.00
V. Pekerjaan Electrical M' 33,800.00 65.00 2,197,000.00 10.00 338,000.00
- -
VI. PEKERJAAN LAIN-LAIN - -
1. Pek. Pembuangan bekas pembongkaran Ls 1,000,000.00 1.00 1,000,000.00 1.00 1,000,000.00
2. Pek. Kerangkeng +Gembok Ls 1,000,000.00 1.00 1,000,000.00 1.00 1,000,000.00
163,014,134.08 125,616,972.35 4,731,577.60 40,269,739.33
16,301,413.41 12,561,697.24
179,315,547.49 138,178,669.59
179,315,000.00 138,178,000.00
NIP. 196408121990071001 NIP. 196009211983301001 NIP. 197406132005011001 Direktur
Ir. H. DEDI GUSRIADI, MT ARMAN YEDI, ST JOENAFRIKO, ST Drs. ISHARUDIN
KEPALA BADAN LINGKUNGAN HIDUP PEJABAT PELAKSANA TEKNIS KEGIATAN PENGAWAS LAPANGAN KONTRAKTOR PELAKSANA
KOTA PEKANBARU BADAN LINGKUNGAN HIDUP KOT PEKANBARU DINAS PEKERJAAN UMUM KOT PEKANBARU CV. RIZKI JAYA
Disetujui Oleh Disetujui Oleh Diperiksa Oleh: Dibuat Oleh:
JUMLAH TOTAL
DIBULATKAN
Pekanbaru, November 2009
JUMLAH
PPN 10 %