1C.2.6. Description wrong Article should be 1C.2.6. instead 1C.2.7.

1C.3.4. the word Substation at the end in description should be deleted.


1C.7.3 item g) wrongly written as a)
Page 24 of 31, first item has incomplete description missing Contractors, etc.
1.C.11- Main Heading 132/33/11kV at the end of the description should be deleted.
1C.11.1.2. Figures are not entered according to the latest L & T offer dated 02.06.2013.