This document provides a cost estimate for construction of a proposed bleacher area and firing range at the Fernando Airbase in Lipa City, Philippines. The project involves site works including clearing, grubbing, and excavation of the lot. Concrete works will include footings, pedestals, partitions, and a slab on fill. Additional works include pre-fabricated materials like doors and windows, structural steel works, tinsmithry, hardware, plumbing, and painting. The total cost of the project is provided.
This document provides a cost estimate for construction of a proposed bleacher area and firing range at the Fernando Airbase in Lipa City, Philippines. The project involves site works including clearing, grubbing, and excavation of the lot. Concrete works will include footings, pedestals, partitions, and a slab on fill. Additional works include pre-fabricated materials like doors and windows, structural steel works, tinsmithry, hardware, plumbing, and painting. The total cost of the project is provided.
This document provides a cost estimate for construction of a proposed bleacher area and firing range at the Fernando Airbase in Lipa City, Philippines. The project involves site works including clearing, grubbing, and excavation of the lot. Concrete works will include footings, pedestals, partitions, and a slab on fill. Additional works include pre-fabricated materials like doors and windows, structural steel works, tinsmithry, hardware, plumbing, and painting. The total cost of the project is provided.
LOCATION : Fernando Airbase, Lipa City I a. Site Works Clearing & Grubbing lot Excavation lot Backfilling lot P II. Concrete Works a. Footing & Pedestal & Partition Qty = l.s. I. MATERIAL: 700 pcs. Chb #5 @ P 120 bags Cement @ P 7.5 cu.m. Sand P 14 cu.m. Gravel P 45 pcs. 10mm RSB P 30 pcs. 12mm RSB P 6 pcs. " thk Plywood P 320 bd.ft. Cocolumber 2 x 3 x 8 (77 pcs) P 12 kgs. Tie Wire P 15 kgs. CWN (Asstd) P P II. EQUIPMENT: 1 Bagger Mixer @ 7 days P 1 Misc. Hand Tools P P III. LABOR: P P b. Slab on fill Qty = l.s. I. MATERIAL: 85 bags Cement @ P 5 cu.m. Sand P 10 cu.m. Gravel P 1 lot Formworks P P II. EQUIPMENT: 1 Bagger Mixer @ 2 days P 1 Concrete Vibrator 2 days P 1 lot Misc. Hand Tools P III. LABOR: P Total Cost III. Fabricated Materials a.1. Doors 1 set D-1 0.70m x 2.10m Sliding Door 7,000.00 P 2 sets D-2 0.60m x 2.10m pvc door w/jamb 2,500.00 Materials Cost Labor P b. Window ( Labor & Materials) 2 sets W-1 1.20 x 1.20 PVC w/screen 8,500.00 P Window Sliding Type (30.96 ft 2 ) 2 sets W-2 0 .60 x 0.60 PVC w/screen 3,500.00 Sliding Window (7.74 ft 2 ) IV. Structural Steel Works Qty = L.S. I. MATERIAL: 18 pcs. 3" dia. G.i. Pipe sch. 40 @ P 12 pcs. 4" dia. G.i. Pipe sch. 40 P 36 pcs. 1 1/2" dia. G.i. Pipe sch. 40 P 30 pcs. 1" dia. G.i. Pipe sch. 40 P 50 pcs. 12mm Square Bar P 145 pcs. 2 x 3 x 1.5mm C Purlins P 8 pcs. 2 x 4 x 1.5 mm C Purlins P 24 pcs. 12mm Plain Bar P 3 boxes Welding Rod P 12 gals Red Oxide Primer P 12 gals Paint Thinner P 5 sets Oxy - Acetylene P P II. EQUIPMENT: 1 Welding Machine @ 12 days P 1 Boom Truck 2 days P 1 Bar Cutter 6 days P P III. LABOR: P V. Tinsmithry Qty = L.S. I. MATERIAL: 530.25 lmts. 0.40mm x 1.01m x L.S. Curve Rib @ P 16 pcs. 0.40mm x 0.24m x 2.44 Flashing P 4500 pcs. Tekscrew P 4 box Blind Rivets P 12 ctgs. S. Sealant P Total Cost Total Cost Total Cost P III. LABOR: P VI. Hardwares 2 sets Cylindrical Lockset 850.00 P 1 set Lever type Lockset 1,200.00 P 4 boxes Loose Pin Hinges 3" x 3" (stanley) 230.00 P Labor Item Cost P XIV. Plumbing Works Materials: 2 sets Water Closet w/Fittings 6,500.00 P 2 sets Standard Floor Drain Strainer (4"x4") 250.00 2 sets Lavatory Faucet 4,400.00 P 5 rolls Tapelon (Big) 27.50 1 lot Miscellaneous 2,500.00 Materials Labor: Labor Item Cost P V.Painting Works Qty. = l.s. 2 tincans Flat Latex White 1,700.00 P 2 tincans Semi - Gloss Latex White 2,000.00 1 tincans Flat Wall Enamel 1900.00 1 tincans Quick Dry Enamel 2600.00 4 gals Masonry Putty 300.00 5 kgs Patching Compound 20.00 2 ltrs Acry Colors 150.00 5 gals Paint Thinner 200.00 3 pcs Masking Tape 30.00 10 kgs Rag 80.00 5 mtr Sand Paper #100 (3M) 170.00 10 pcs Sand Paper #120 (3M) 20.00 3 pcs Paint Roller #9 100.00 3 pcs Paint Brush #2 50.00 3 pcs Paint Brush #3 80.00 3 pcs Paint Brush #4 100.00 1 gals Concrete Netrulizer 410.00 2 ltrs Polituff 170.00 P Labor Item Cost P SUMMARY I. Excavation P Total Cost II. Concrete Works a. Footing & Pedestal b. Slab on Fill III. Pre-Fabricated Materials IV. Structural Steel Works V. Tinsmithry VI. Hardwares VI. Plumbing Works VI. Painting Works TOTAL P