The contractor submitted a request for inspection and approval of the first floor slab concrete casting at the dormitory of the Nyamango Technical Institute project. The contractor plans to cast the first floor slab concrete on September 5, 2014 at 11:00 am. The resident engineer will inspect the works and indicate whether they are approved or not approved, including any remarks.
The contractor submitted a request for inspection and approval of the first floor slab concrete casting at the dormitory of the Nyamango Technical Institute project. The contractor plans to cast the first floor slab concrete on September 5, 2014 at 11:00 am. The resident engineer will inspect the works and indicate whether they are approved or not approved, including any remarks.
The contractor submitted a request for inspection and approval of the first floor slab concrete casting at the dormitory of the Nyamango Technical Institute project. The contractor plans to cast the first floor slab concrete on September 5, 2014 at 11:00 am. The resident engineer will inspect the works and indicate whether they are approved or not approved, including any remarks.
CLIENT: PROJECT: Consultant: Site location: Nyamango - Kyenjojo To, The Project Manager, Date:29/August/2014 MBW Consulting ltd The following works will be ready for inspection and approval: First floor Slab concrete casting at Dormitory On (date): 5/September/2014 at (time)11:00 a.m Description of works: Approval for casting First Floor Slab concrete at Dormitory Submitted by:Mbayo David Godfrey (Contractor) Date: 29/08/2014 Time 11:10 Received by:..(Consultant) Date: Time:.. Works are: Approved / Not Approved Remarks: Signed by: Resident Engineer Date:.. Time Received by: Contractor Date:.. Time REQUEST FOR INSPECTION / APPROVAL M.o.E.S MBW Consulting ltd Construction of Nyamango Technical Institute