Vous êtes sur la page 1sur 5

No.

Site Name Scope


1 Kyanja Requires new DC BTS
2 Seeta_Town Requires new DC BTS
3 Ambassador_House Requires new DC BTS
4 Eagen Requires new DC BTS
5 Sembatya Plaza Requires new DC BTS
6 Nsangi Requires new DC BTS
7 Kawempe Sure Requires new DC BTS
8 Lungujja/Lubiri Swapp ZTE BTS
9 Lubya Hill Swapp ZTE BTS
10 Namaganda
Requires AC for a new
APM30(Swapp ZTE BTS)
11 Old Kampala
Requires AC for a new
APM30(Swapp ZTE BTS)
12 Nansana
Requires new DC BTS (Replacing
Bwaise)
13 Wakiso Requires new DC BTS
14 Cargen Requires new DC BTS
15 Kasangati
Requires new DC BTS /Replacing
Banda TC
Feeder run per sector No of Feeder Run Feeder BTS/APM30 Installed Antennas Required
45 12 540 1 3
45 12 540 1 3
20 12 240 1 3
55 12 660 1 3
35 12 420 1 3
40 12 480 1 3
40 12 480 2 3
40 12 480 1 3
40 12 480 1 3
40 12 480 2 3
10 12 120 2 3
12 0
45 12 540 1 3
40 12 480 1 3
40 12 480 1 3
6420 17 42
Drum 12.84
BTS Jumpers Installed Antenna Jumpers installed Power RRU Grounding Cable
12 18 12
12 18 12
12 18 12
12 18 15
12 18 12
12 18 12
12 18
12 18 12
12 18 12
12 18 15
12 18 15
12 18 12
12 18 12
12 18 12
168 252 165
Total power B/B
Total power Grounding
Total Feeder Cables
Total 3G Cables per site
RRU Power Cables per sector RRU Power cables Per Site Power BTS B/B Power 3G B/B
45 130 4 4
45 130 0 2
20 60 5 5
55 140 5 5
35 110 0 5
40 120 4 4
40 120 4 4
40 120 0 5
40 120 0 5
40 120 5 5
10 30 6 6
0 0
45 135 6 6
40 120 0 2
40 120 4 4
535 1575 43 62
105
201
6420
1575
Power BTS Grounding
2
2
3
2
2
2
4
2
3
3
4
0
2
3