Vous êtes sur la page 1sur 5

CONTRATISTAS E.I.R.

VALORIZACION DE OBRA N 01
Formula Unica N 01 (del 29/09/2014 al 10/10/2014)

ATENCION :
Obra

ACONDICIONAMIENTO Y MEJORA EN AMBIENTES PISOS: 2 y 3

Ejecutor

"OSCAR RAMIREZ ALEGRE CONTRATISTAS E.I.R.L."

Cliente

TGESTIONA

Ubicacin

WASHINGTON II

FECHA

10/12/2014

VALORIZACION N 1
MONTOS

VALORIZACION

VALORIZACION

VALORIZACION

SALDO POR

CONTRACTUALES

ANTERIOR

ACTUAL

ACUMULADA

VALORIZAR

ITEM

DESCRIPCION

1.00
1.01

WHASHINGTON II PISO 2
OBRAS CIVILES WASHINGTON II PISO S/.
2
INSTALACIONES ELECTRICAS

51,634.07

S/.

S/.

16,109.45

S/.

16,109.45

S/.

35,524.62

1.02

WASHINGTON II PISO 2

S/.

20,909.49

S/.

S/.

1,892.81

S/.

1,892.81

S/.

19,016.68

2.00

WHASHINGTON II PISO 3

2.01

OBRAS CIVILES WASHINGTON II PISO S/.


3
INSTALACIONES ELECTRICAS

56,159.77

S/.

S/.

11,220.17

S/.

11,220.17

S/.

44,939.60

2.02

WASHINGTON II PISO 3

S/.

28,180.48

S/.

S/.

1,368.34

S/.

1,368.34

S/.

26,812.14

S/.

156,883.80

S/.

S/.

30,590.76

S/.

30,590.76

S/.

126,293.04

S/.

28,239.08

S/.

S/.

5,506.34

S/.

5,506.34

S/.

22,732.75

S/.

185,122.89

S/.

S/.

36,097.10

S/.

36,097.10

S/.

149,025.79

COSTO DIRECTO
IGV

18.00%

TOTAL

Avance Porcentual
MONTO A FACTURAR

S/. 36,097.10

Son:
TREINTA SEIS MIL NOVENTA Y SIETE CON 10/100 Nuevos soles

CONTRATISTAS E.I.R.L.

Obra

ACONDICIONAMIENTO Y MEJORA EN AMBIENTES PISOS: 2 y 3

Ejecutor

"OSCAR RAMIREZ ALEGRE CONTRATISTAS E.I.R.L."

Cliente

LIMA

Ubicacin WASHINGTON II
Fexha :
10/12/2014
VALORIZACION
ITEM

DESCRIPCIN

UND

CANT

PU

PARCIAL

ANTERIOR

TOTAL
MET.

OBRAS CIVILES WASHINGTON II PISO 3

51,634.07

1.000

OBRAS PROVISIONALES Y PRELIMINARES

1.001
1.002

TRANSPORTE DE EQUIPO Y HERRAMIENTAS


TRAZO, NIVELACION Y REPLANTEO (C/EQUIPO)

1.00
250.00

GBL
M2

2,000.00
1.62

2,000.00
405.00

1.003
1.004

LIMPIEZA PERMANENTE DE OBRA


COBERTURA PLASTICA.

250.00
30.00

M2
M2

2.14
2.74

535.00
82.20

2.000

INSTALACIONES TEMPORALES

2.001

CERCO PERIMETRICO (triplay y parantes madera) Inc. montaje y desmontaje

3.000

DESMONTAJES Y DEMOLICIONES

3.001

RETIRO DE PUERTAS CONTRAPLACADAS

3.002

RETIRO DE VIDRIO DE 2MM H=1.60

3.003

RETIRO DE CONTRAZOCALO DE ALUMINIO, MADERA U OTROS

3.004
#REF!

RETIRO DE ALFOMBRA Y/O TAPIZON (No incluye eliminacin)


DESMONTAJE Y RETIRO DE FALSO TECHO INCLUIDO ANDAMIAJE

4.000

ACARREO Y ELIMINACION

4.001
4.002
4.003

ACARREO HORIZONTAL DE DESMONTE DE DEMOLICION


ACARREO VERTICAL DE DESMONTE
ELIMINACION DE DESMONTE DE DEMOLICION

5.000

MUROS Y TABIQUES
TABIQUERA DRY-WALL STANDARD, E= 12 CM,INC.ACCESORIOS Y

5.001

COLOCACIN.

6.000

PISOS

6.001

PISO DE ALFOMBRA DE ALTO TRANSITOTIPO NYLON 9mm

6.002

TAPAJUNTA DE JEBE NEGRO E: 1PLG

7.000

ZOCALO Y CONTRAZOCALO
CONTRAZOCALO DE ALFOMBRA Y/O TAPIZON, INC. RIBETEADO,

7.001

8.000
8.001
8.002
8.003

9.000
9.001
9.002
9.003
9.004

PEGAMENTO Y ACCESORIOS

3,022.20

TABIQUERIA
POR INSTALACION DE FALSO CIELO RASO DE BALDOSAS Y/O MODULAR,
INC. ACCESORIOS Y PERFILES, BALDOSAS MODELO SERENE
DESMONTE, MONTAJE Y PINTADO DE REJILLA DEL DIFUSOR Y REJILLAS
DE RETORNO

CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA, E= 2 plg, CON MDF O TRUPAN DE 6 mm. MARCO
CEDRO, INC. REJILLA EN LA ZONA INFERIOR
MANTENIMIENTO DE PUERTAS CONTRAPLACADAS, LIJADO EMPORRADO Y
PINTURA ESMALDTE BRILLANTE GRIS
COLOCACION DE PUERTA REUBICADA (Solo colocacin de puerta)
MANTENIMINETO DE REJILLAS DE MADERA LIJADO, PINTURA ESMALTE
COLOR BLANCO Y REINSTALACION

10.000

CERRAJERIA

10.001
10.002
10.003

CERRADURA DE PERILLA YALE DOBLE LLAVE


TOPES PARA PUERTA DE MEDIA LUNA CROMADA
BISAGRAS CAPUCH.ALuminizadas.3 1/2X 3 1/2 PLG.

11.000

LUMINARIAS

31.86

M2

43.07

1,372.21

2.00

UND

20.58

41.16

15.31

2,554.07
9.07

M2

72.00

ML

1.67

120.24

75.00
225.00

M2
M2

1.37
9.56

102.75
2,151.00

138.92

29.30
29.30
29.30

M2
M3
M3

24.50
17.47
32.22

717.85
511.87
944.05

2,173.77

15.90

M2

53.82

855.74

236.90

M2

51.52

12,205.09

7.00

ML

35.50

248.50

77.56

M2

51.52

3,995.84

MET.

16,109.45

VAL.

35,524.62

0.00

0.00

0.00%

0.50

1,000.00

50.00%

0.50

1,000.00

50.00%

0.50

1,000.00

50.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

125.00
125.00
30.00

202.50
267.50
82.20

50.00%
50.00%
100.00%

125.00
125.00
30.00

202.50
267.50
82.20

50.00%
50.00%
100.00%

125.00
125.00
0.00

202.50
267.50
0.00

50.00%
50.00%
0.00%

0.00

0.00

0.00%

31.86

1,372.21

100.00%

31.86

1,372.21

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

41.16

100.00%

0.00

0.00

0.00%

138.92

100.00%

138.92

100.00%

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

72.00
24.00

120.24
32.88

100.00%
32.00%

72.00
24.00

120.24
32.88

100.00%
32.00%

0.00
51.00

0.00
69.87

0.00%
68.00%

0.00

0.00

0.00%

180.00

1,720.80

80.00%

180.00

1,720.80

80.00%

45.00

430.20

20.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

22.00
22.00
22.00

539.00
384.34
708.84

75.09%
75.09%
75.09%

22.00
22.00
22.00

539.00
384.34
708.84

75.09%
75.09%
75.09%

7.30
7.30
7.30

178.85
127.53
235.21

24.91%
24.91%
24.91%

0.00

0.00

0.00%

15.90

855.74

100.00%

15.90

855.74

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

236.90

12,205.09

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

7.00

248.50

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

77.56

3,995.84

100.00%

9.07

9.07

0.00

ML

25.00

75.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

3.00

75.00

100.00%

M2

60.00

14,523.00

0.00

0.00

0.00%

80.68

4,841.00

33.33%

80.68

4,841.00

33.33%

161.37

9,682.00

66.67%

21.00

UND

93.10

1,955.10

0.00

0.00

0.00%

10.50

977.55

50.00%

10.50

977.55

50.00%

10.50

977.55

50.00%

901.90
1.89

M2

253.33

478.79

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.89

478.79

100.00%

6.30

M2

38.50

242.55

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

6.30

242.55

100.00%

2.00

UND

35.28

70.56

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

70.56

100.00%

2.00

UND

55.00

110.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

110.00

100.00%

3.00
3.00
9.00

UND
UND
UND

62.48
14.70
12.94

187.44
44.10
116.46

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

3.00
3.00
9.00

187.44
44.10
116.46

100.00%
100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

44.00
44.00

990.00
657.80

83.02%
83.02%

44.00
44.00

990.00
657.80

83.02%
83.02%

9.00
9.00

202.50
134.55

16.98%
16.98%

348.00

1,984.85
53.00

UNDS

22.50

1,192.50

53.00

UND

14.95

792.35

12.001
12.002

LIMPIEZA Y LIJADO EN MUROS INTERIORES


EMPASTADO DE MUROS Y CIELORRASOS
PINTURA OLEO MATE O SATINADO EN MUROS. Incluye resane y masillado

TAPAS METALICAS 1MM


TAPIADO DE PUNTOS A INUTILIZAR
REUBICACION DE PUNTO DE AGUA DE DISPENSADOR DE AGUA /BAJADA

3.00

PINTURA

13.003

16,109.45

VAL.

242.05

MANTENIMIENTO DE LUMINARIAS

VARIOS

MET.

16,553.10

PINTURA ESMALTE EN REJILLA DE LUMINARIAS

13.001
13.002

SALDO

ACUMULADO
%

3,995.84

11.001

13.000

0.00

VAL.

12,453.59

11.002

(c/andamio)

MET.

855.74

12.000

12.003

ACTUAL
%

1,372.21

FALSO CIELORRASOS
INSTALACION DE PERFIL DE ALUMINIO DE FCR EN PERIMETRO DE NUEVA

VAL.

0.00
280.6
280.6
280.6

3,482.25

M2
M2

0.67
3.41

188.00
956.85

0.00
0.00

0.00
0.00

0.00%
0.00%

200.00
200.00

134.00
682.00

71.28%
71.28%

200.00
200.00

134.00
682.00

71.28%
71.28%

80.60
80.60

54.00
274.85

28.72%
28.72%

M2

8.33

2,337.40

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

280.60

2,337.40

100.00%

1,050.00
20.00
15.00

UND
UND

7.50
15.00

150.00
225.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
8.00

0.00
120.00

0.00%
53.33%

0.00
8.00

0.00
120.00

0.00%
53.33%

20.00
7.00

150.00
105.00

100.00%
46.67%

1.00

UND

150.00

150.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

150.00

100.00%

1.00
1.00

UND
GBL

75.00
450.00

75.00
450.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

1.00
1.00

75.00
450.00

100.00%
100.00%

13.004
13.005

CON CANALETA PVC.


MANTENIMIENTO A BASE DE INODORO, SELLADO CON SIKAFLEX
LIMPIEZA FINAL DE OBRA

14.000

ADICIONALES DE OBRA

14.001

ACARREO DE MATERIALES (D=100.00M)

35.00

M3

563.85

0.00

0.00

0.00%

17.50

281.93

50.00%

17.50

281.93

50.00%

17.50

281.93

50.00%

14.002

DESINSTALACION DE CERRADURA DE PERILLA DE PUERTA EXISTENTE.

2.00

UND

11.35

22.70

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

22.70

100.00%

1.00

GLB

220.00

220.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

220.00

100.00%

1.00

GLB

80.00

80.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

80.00

100.00%

886.55
16.11

REACOMODO DE FALSO CIELO RASO EN AMBIENTES DE DEPOSITO Y


14.003

OFICINA, POR CORTE DE PERFILES PRINCIPALES, SEGUNDARIOS DE


ANTIGUO FALSO CIELO RASO

14.004

REFUERZO DE MADERA EN DRYWALL PARA SOPORTE DE PUERTA

INSTALACIONES ELECTRICAS WASHINGTON II PISO 2


1.00
1.01

DESMONTAJE
RETIRO DE ARTEFACTOS DE ILUMINACION

2.00

ILUMINACION

2.01

SALIDA DE TECHO C/TUB. SAP (3/4") CABLE NH-80 4mm2, CAJA PES.

2.02
2.03
2.04
2.03
2.04

SALIDA PARA INTERRUPTOR BIPOLAR SIMPLE MAGIC TICINO CABLE NH80 2.5mm2
SALIDA PARA INTERRUPTOR BIPOLAR DOBLE MAGIC TICINO CABLE NH-80
2.5mm2
SALIDA PARA INTERRUPTOR BIPOLAR TRIPLE MAGIC TICINO CABLE NH80 2.5mm2
BAJADAS A LUMINARIAS CON CABLE 3-1x16AWG NLT LIBRE DE
HALOGENOS Y TUBERIA 20mm EMT CONDUIT
POR INSTALACION DE LUMINARIAS EN TECHO O PARED

560.56

1,892.81

19,016.68

0.00

0.00

0.00%

44.00

474.32

84.62%

44.00

474.32

84.62%

8.00

86.24

15.38%

0.00

0.00

0.00%

17.67

1,125.37

33.33%

17.67

1,125.37

33.33%

35.33

2,250.73

66.67%

PTO.

53.01

159.03

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

3.00

159.03

100.00%

PTO.

59.65

178.95

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

3.00

178.95

100.00%

PTO.

63.70

63.70

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

63.70

100.00%

53.00

UND

43.10

2,284.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

53.00

2,284.30

100.00%

53.00

UND

10.26

543.78

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

53.00

543.78

100.00%

10.78

560.56
6,605.86

53.00

PTO.

3.00
3.00
1.00

3.01

TIERRA, SERIE MAGIC DE TICINO, PLACAS DE ALUMINIO ANODIZADO

3.00

3.02

CABLE NH-80. 4MM2


SALIDA PARA LAMPARA O SEAL EMERG. CON TOMACORRIENTE

3.00

3.02

LUZ DE EMERGENCIA 2X20W 220VAC 2 HR. AUTNOMA

3.00
3.00

UND

REFLECTORES GIRATORIOS DE 36 W, 12V, MODELO DUAL LIGHT LEP-2H.

1,892.81

3,376.10

UND

TOMACORRIENTES
SALIDAS PARA TOMACORRIENTES BIPOLAR SIMPLE CON ESPIGA A

POR INSTALACION EQUIPO DE LUZ DE EMERGENCIA CON DOS

0.00

63.70

52.00

3.00

3.03

0.00

20,909.49

956.07
78.40

235.20

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

3.00

235.20

100.00%

PTO.

66.73

200.19

UND

161.70

485.10

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

3.00
3.00

200.19
485.10

100.00%
100.00%

11.86

35.58

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

3.00

35.58

100.00%

PTO.

CONTRATISTAS E.I.R.L.

Obra

ACONDICIONAMIENTO Y MEJORA EN AMBIENTES PISOS: 2 y 3

Ejecutor

"OSCAR RAMIREZ ALEGRE CONTRATISTAS E.I.R.L."

Cliente

LIMA

Ubicacin WASHINGTON II
Fexha :
10/12/2014
VALORIZACION
ITEM

DESCRIPCIN

4.00

SALIDAS PARA SEGURIDAD

4.01
4.02
4.03

SALIDA PARA SISTEMA DE SEGURIDAD Y DETECCION CONTRAINC.


CAJA DE PASE METALICAS 100X100X50 MM
TUBERIA CONDUIT D = 1"

5.00

SALIDAS PARA TERMOSTATOS

5.01
6.00

UND

CANT

PU

PARCIAL

2,626.37

SALIDA PARA TERMOSTATO: INCLUYE TUBERA 20MM DIAMETRO PVC-P,


CAJA RECTANGULAR, SOPORTES Y ACCESORIOS

27.00
12.00
10.00

PTO.
UND
ML

80.71
9.65
33.14

2,179.17
115.80
331.40

2.00

PTOS

59.78

119.56

6.01

6.03
6.04
6.05
6.06
6.07

ACTUAL

SALDO

ACUMULADO

MET.

VAL.

MET.

VAL.

MET.

VAL.

MET.

VAL.

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

27.00
12.00
10.00

2,179.17
115.80
331.40

100.00%
100.00%
100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

119.56

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

1,200.00

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

156.80

100.00%

119.56

TABLEROS ELECTRICOS
TN- (existente)

6.02

ANTERIOR

TOTAL

1,356.80

ACONDICIONAMIENTO DE CIRCUITOS EN TABLERO EXISTENTE


INTERRUPTORES DIFERENCIALES SUPERINMUNIZADO ( IDSI ) ID 2P 25A
30mA
16201 (MARCA SHENEIDER)
TC-2 (Nuevo)
Tablero Electrico Gabinete Metal Barra Cobre 36 Polos Trifasico
MONTAJE E INSTALACION DE TABLERO ELECTRICO (NO INCLUYE
SUMINISTRO)
SERIE NS...N - REGULABLES CAPACIDAD STANDARD: COMPACT LINEA NS
100N 2P 100A
C60N 2P 20A C 24338

29600

INTERRUPTORES DIFERENCIALES SUPERINMUNIZADO ( IDSI ) ID 2P 25A

1.00

GLB

1200.00

1,200.00

1.00

UND

156.80

156.80
5,938.03

1.00

UND

654.05

654.05

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

654.05

100.00%

1.00

UND

650.00

650.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

650.00

100.00%

1.00

UND

258.30

258.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

258.30

100.00%

10.00

UND

58.80

588.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

588.00

100.00%

1,568.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

1,568.00

100.00%

10.00

UND

156.80

6.08

30mA
16201 (MARCA SHENEIDER)
CABLE 1 x 10 mm2 NH-80

112.00

ML

5.73

641.76

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

112.00

641.76

100.00%

6.09

TUBERIA CONDUIT D = 1"

28.00

ML

33.14

927.92

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

28.00

927.92

100.00%

6.10

EMPALME DE CABLE ALIMENTADOR 10mm2

1.00

GLB

650.00

650.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

650.00

100.00%

7.00

VARIOS

7.01

PRUEBAS ELECTRICAS : MEGADO DE CIRCUITOS

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

850.00

100.00%

8.000
8.01
8.02
8.03
8.04
8.05

850.00
1.00

GLB

32.00

ML

1.00
1.00

850.00

850.00

ADICIONALES DE OBRA
PICADO Y RESANE DE PISO POR INSTALACIONES SANITARIAS,
ELECTRICAS, CABLEADO O DEMOLICION DE MUROS.
PROTOCOLOS DE TABLERO ELECTRICO TC2.
STICKERS ADHESIVO PARA TABLEROS.
DESMONTAJE DE INSTALACIONES ELECTRICAS EXISTENTES. (POR
NUEVOS TRAZADOS)
PICADO,ADECUACION Y RESANE DE PARED PARA INSTALACION DE CAJA
DE TABLERO ELECTRICO NUEVO.

1,896.24
18.32

586.24

0.00

0.00

0.00%

16.00

293.12

50.00%

16.00

293.12

50.00%

16.00

293.12

50.00%

UND
GLB

500.00
350.00

500.00
350.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

500.00

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

350.00

100.00%

1.00

GLB

240.00

240.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

240.00

100.00%

1.00

GLB

220.00

220.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

220.00

100.00%

18%

72,543.56

72,543.56

0.00

13,057.84

13,057.84

0.00

3,240.41

3,240.41

9,817.43

85,601.40

85,601.40

0.00

21,242.66

21,242.66

64,358.74

18,002.25

18,002.25

54,541.30

CONTRATISTAS E.I.R.L.

Obra

ACONDICIONAMIENTO Y MEJORA EN AMBIENTES PISO 2 - EDIF. WASHINGTON II

Ejecutor

"OSCAR RAMIREZ ALEGRE CONTRATISTAS E.I.R.L."

Cliente

LIMA

Ubicacin WASHINGTON II
Fexha :
10/12/2014
VALORIZACION
ITEM

DESCRIPCIN

UND

CANT

PU

PARCIAL

ANTERIOR

TOTAL
MET.

OBRAS CIVILES WASHINGTON II PISO 3


1.000

OBRAS PROVISIONALES Y PRELIMINARES

56,159.77

VAL.

ACTUAL
%

MET.

0.00

VAL.

SALDO

ACUMULADO
%

MET.

11,220.17

VAL.

MET.

11,220.17

VAL.

44,939.60

3,303.98

1.001

TRANSPORTE DE EQUIPO Y HERRAMIENTAS

1.00

GBL

2,200.00

2,200.00

0.00

0.00

0.00%

0.50

1,100.00

50.00%

0.50

1,100.00

50.00%

0.50

1,100.00

50.00%

1.002

TRAZO, NIVELACION Y REPLANTEO (C/EQUIPO)

270.00

M2

1.62

437.40

0.00

0.00

0.00%

135.00

218.70

50.00%

135.00

218.70

50.00%

135.00

218.70

50.00%

1.003

LIMPIEZA PERMANENTE DE OBRA

270.00

M2

2.14

577.80

0.00

0.00

0.00%

135.00

288.90

50.00%

135.00

288.90

50.00%

135.00

288.90

50.00%

1.004

COBERTURA PLASTICA

32.40

M2

2.74

88.78

0.00

0.00

0.00%

16.20

44.39

50.00%

16.20

44.39

50.00%

16.20

44.39

50.00%

2.000

INSTALACIONES TEMPORALES

2.001

CERCO PERIMETRICO (triplay y parantes madera) Inc. montaje y desmontaje

0.00

0.00

0.00%

36.78

1,583.99

100.00%

36.78

1,583.99

100.00%

0.00

0.00

0.00%

3.000

DESMONTAJES Y DEMOLICIONES

3.001

50.00%

0.50

20.00

50.00%

0.50

20.00

50.00%

3.002

558.60

3.003

1,583.99
36.78

M2

43.07

1,583.99

RETIRO DE ESCALONES METALICOS. INC. RESANES

1.00

UND

40.00

40.00

0.00

0.00

0.00%

0.50

20.00

RETIRO Y REINSTALACION DE REJILLAS Y DIFUSORES DE AA


DESMONTAJE Y RETIRO DE TABIQUE DE DRYWALL O MADERA PARA

24.00

UND

93.10

2,234.40

0.00

0.00

0.00%

6.00

558.60

25.00%

6.00

25.00%

18.00

1,675.80

75.00%

6.90

M2

8.91

61.48

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

6.90

61.48

100.00%

9.84

M2

9.56

94.07

0.00

0.00

0.00%

9.84

94.07

100.00%

9.84

94.07

100.00%

0.00

0.00

0.00%

ELIMINACION

3.004

DESMONTAJE Y RETIRO DE FALSO TECHO INCLUIDO ANDAMIAJE

4.000

ACARREO Y ELIMINACION

2,429.95

555.09

4.001

ACARREO DE DESMONTE

7.48

M3

24.50

183.31

0.00

0.00

0.00%

3.74

91.65

50.00%

3.74

91.65

50.00%

3.74

91.65

50.00%

4.002

ACARREO VERTICAL DE DESMONTE

7.48

M3

17.47

130.71

0.00

0.00

0.00%

3.74

65.36

50.00%

3.74

65.36

50.00%

3.74

65.36

50.00%

4.003

ELIMINACION DE DESMONTE DE DEMOLICION

7.48

0.00

0.00

0.00%

3.74

120.54

50.00%

3.74

120.54

50.00%

3.74

120.54

50.00%

5.000

MUROS Y TABIQUES
TABIQUERA DRY-WALL STANDARD, E= 12 CM,INC.ACCESORIOS Y

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

4.80

258.34

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.10

59.85

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

12.00

1,099.08

100.00%

M3

32.22

241.07

4.8

M2

53.82

258.34

5.002

COLOCACIN.
TABIQUE DE MADERA E: 1PLG INCLUYE ELEMENTO DE SUJECION.

2.10

M2

28.50

59.85

5.003

FALSAS COLUMNAS, VIGAS Y DINTELES DE DRYWALL

12.00

ML

91.59

1,099.08

6.000

FALSO CIELORRASOS

5.001

6.001
6.002

POR INSTALACION DE FALSO CIELO RASO DE BALDOSAS Y/O MODULAR,


INC. ACCESORIOS Y PERFILES, BALDOSAS MODELO SERENE
SUMINISTRO E INSTALACION DE MANGAS FLEXIBLES CON FIBRA DE
VIDRIO. EMPALME A DUCTO RIFIDOS EXISTENTES.
SUMINISTRO E INSTALACION DE MANGAS FLEXIBLES CON FIBRA DE

1,417.27

38,140.21
278.10

M2

60.00

16,686.00

0.00

0.00

0.00%

92.70

5,562.00

33.33%

92.70

5,562.00

33.33%

185.40

11,124.00

66.67%

18.00

UND

165.00

2,970.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

18.00

2,970.00

100.00%

6.003

VIDRIO. EMPALME A DUCTO RIFIDOS EXISTENTES. INC. DUCTO RIGIDO

6.00

UND

195.00

1,170.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

6.00

1,170.00

100.00%

6.004

REDUCTOR DE 0.60X0.60 A 0.40X0.40


NUEVAS REJILLAS METALICAS DE RETORNO PARA AA 0.40X0.40M

6.00

UND

480.00

2,880.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

6.00

2,880.00

100.00%

7.000

PISOS
278.10

M2

51.52

14,327.71

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

278.10

14,327.71

100.00%

3.00

ML

35.50

106.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

3.00

106.50

100.00%

77.25

3,979.92

100.00%

7.001

PISO DE ALFOMBRA DE ALTO TRANSITOTIPO NYLON 9mm

7.002

TAPAJUNTA DE JEBE NEGRO E: 1PLG

8.000

ZOCALO Y CONTRAZOCALO
3,979.92
CONTRAZOCALO DE ALFOMBRA Y/O TAPIZON, INC. RIBETEADO,
PEGAMENTO Y ACCESORIOS
PINTURA

77.25

M2

51.52

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

9.000
9.001

LIJADO Y LIMPIEZA EN MUROS INTERIORES

231.75

M2

0.67

155.27

0.00

0.00

0.00%

57.94

38.82

25.00%

57.94

38.82

25.00%

173.81

116.45

75.00%

9.002

PINTURA OLEO MATE EN MUROS INTERIORES

231.75

M2

3.41

790.27

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

231.75

790.27

100.00%

9.003

EMPASTADO DE MUROS Y CIELORRASOS

231.75

M2

8.33

1,930.48

0.00

0.00

0.00%

115.88

965.24

50.00%

115.88

965.24

50.00%

115.88

965.24

50.00%

8.001

10.000

VARIOS

3,979.92
2,876.02

937.50

10.001

LIMPIEZA FINAL DE OBRA

1.00

GBL

450.00

450.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

450.00

100.00%

10.002

TAPAS METALICAS 1MM

25.00

UND

7.50

187.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

25.00

187.50

100.00%

10.003

TAPIADO DE PUNTOS A INUTILIZAR

20.00

UND

15.00

300.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

20.00

300.00

100.00%

35.00

M3

16.11

563.85

0.00

0.00

0.00%

17.50

281.93

50.00%

17.50

281.93

50.00%

17.50

281.93

50.00%

24.00

UND

15.50

372.00

0.00

0.00

0.00%

12.00

186.00

50.00%

12.00

186.00

50.00%

12.00

186.00

50.00%

ADICIONALES DE OBRA
ACARREO DE MATERIALES (D=100.00M)
CORTE DE DUCTERIA DE AIRE ACONDICIONADO EXISTENTE PARA LLEGAR
A NIVEL DE FALSO TECHO APROXIMADO

935.85

INSTALACIONES ELECTRICAS WASHINGTON II PISO 2


1.00
1.01

DESMONTAJE
RETIRO DE ARTEFACTOS DE ILUMINACION

2.00

ILUMINACION

2.01

SALIDA DE TECHO C/TUB. SAP (3/4") CABLE NH-80 4mm2, CAJA PES.
SALIDA PARA INTERRUPTOR BIPOLAR SIMPLE MAGIC TICINO CABLE NH-

2.02
2.03

28,180.48

80 2.5mm2
BAJADAS A LUMINARIAS CON CABLE 3-1x16AWG NLT LIBRE DE
HALOGENOS Y TUBERIA 20mm EMT CONDUIT

873.18
10.78

873.18

0.00

0.00

0.00%

40.50

436.59

50.00%

40.50

436.59

50.00%

40.50

436.59

PTO.

63.70

2,675.40

0.00

0.00

0.00%

10.50

668.85

25.00%

10.50

668.85

25.00%

31.50

2,006.55

75.00%

6.00

PTO.

53.01

318.06

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

6.00

318.06

100.00%

42.00

UND

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

42.00

1,810.20

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

42.00

430.92

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

42.00

7,199.64

100.00%

43.10

1,810.20

POR INSTALACION DE LUMINARIAS EN TECHO O PARED

42.00

UND

10.26

430.92

42.00

UND

171.42

7,199.64

TOMACORRIENTES
SALIDAS PARA TOMACORRIENTES BIPOLAR SIMPLE CON ESPIGA A

3.01

TIERRA, SERIE MAGIC DE TICINO, PLACAS DE ALUMINIO ANODIZADO

5.00

3.02

CABLE NH-80. 4MM2


SALIDA PARA LAMPARA O SEAL EMERG. CON TOMACORRIENTE

5.00

3.02

LUZ DE EMERGENCIA 2X20W 220VAC 2 HR. AUTNOMA

5.00
5.00

14.00

SALIDAS PARA SEGURIDAD

4.01

SALIDA PARA SISTEMA DE SEGURIDAD Y DETECCION CONTRAINC.

1,593.45
78.40

392.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

5.00

392.00

100.00%

PTO.

66.73

333.65

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

5.00

333.65

100.00%

UND

161.70

808.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

5.00

808.50

100.00%

UND

11.86

59.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

5.00

59.30

100.00%

PTO.

80.71

1,129.94

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

14.00

1,129.94

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

12.00

115.80

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

331.40

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

6.00

358.68

100.00%

PTO.

1,577.14

4.02

CAJA DE PASE METALICAS 100X100X50 MM

12.00

UND

9.65

115.80

4.03

TUBERIA CONDUIT D = 1"

10.00

ML

33.14

331.40

5.00

SALIDAS PARA TERMOSTATOS


SALIDA PARA TERMOSTATO: INCLUYE TUBERA 20MM DIAMETRO PVC-P,

5.01
6.00

CAJA RECTANGULAR, SOPORTES Y ACCESORIOS


TABLEROS ELECTRICOS

50.00%

12,434.22

LUMINARIA INTERIOR P. EMPOTRAR RES-A 1X4 2X36W A.F.

4.00

26,812.14

UND

2.04

REFLECTORES GIRATORIOS DE 36 W, 12V, MODELO DUAL LIGHT LEP-2H.

1,368.34

81.00

2.05

POR INSTALACION EQUIPO DE LUZ DE EMERGENCIA CON DOS

1,368.34

42.00

3.00

3.03

0.00

358.68
6.00

PTOS

59.78

358.68

1.00

GLB

1,200.00

1,200.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

1,200.00

100.00%

1.00

UND

156.80

156.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

156.80

100.00%

1.00

UND

654.05

654.05

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

654.05

100.00%

1.00

UND

650.00

650.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

650.00

100.00%

1.00

UND

258.30

258.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

258.30

100.00%

15.00

UND

58.80

882.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

15.00

882.00

100.00%

156.80

2,352.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

15.00

2,352.00

100.00%

5.73

641.76

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

112.00

641.76

100.00%

8,372.83

TN-33 (existente)
6.01
6.02

6.03
6.04
6.05
6.06
6.07

ACONDICIONAMIENTO DE CIRCUITOS EN TABLERO EXISTENTE


INTERRUPTORES DIFERENCIALES SUPERINMUNIZADO ( IDSI ) ID 2P 25A
30mA
16201 (MARCA SHENEIDER)
TC-3 (Nuevo)
Tablero Electrico Gabinete Metal Barra Cobre 36 Polos Trifasico
MONTAJE E INSTALACION DE TABLERO ELECTRICO (NO INCLUYE
SUMINISTRO)
SERIE NS...N - REGULABLES CAPACIDAD STANDARD: COMPACT LINEA NS
100N 2P 100A
29600
C60N 2P 20A C 24338
INTERRUPTORES DIFERENCIALES SUPERINMUNIZADO ( IDSI ) ID 2P 25A

15.00

UND

6.08

30mA
16201 (MARCA SHENEIDER)
CABLE 1 x 10 mm2 NH-80

112.00

ML

6.09

TUBERIA CONDUIT D = 1"

28.00

ML

33.14

927.92

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

28.00

927.92

100.00%

6.10

EMPALME DE CABLE ALIMENTADOR 10mm2

1.00

GLB

650.00

650.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

650.00

100.00%

7.00

VARIOS

7.01

DESMONTAJE DE INSTALACIONES EXISTENTES

1.00

GBL

240.00

240.00

0.00

0.00

0.00%

0.50

120.00

50.00%

0.50

120.00

50.00%

0.50

120.00

50.00%

7.02

PRUEBAS ELECTRICAS : MEGADO DE CIRCUITOS

1.00

GLB

850.00

850.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

850.00

100.00%

0.00

0.00

0.00%

7.80

142.90

20.00%

7.80

142.90

20.00%

31.20

571.58

80.00%

ADICIONALES DE OBRA
PICADO Y RESANE DE PISO POR INSTALACIONES SANITARIAS,
ELECTRICAS, CABLEADO O DEMOLICION DE MUROS.

1,090.00

1,880.98
39.00

ML

18.32

714.48

CONTRATISTAS E.I.R.L.

Obra

ACONDICIONAMIENTO Y MEJORA EN AMBIENTES PISO 2 - EDIF. WASHINGTON II

Ejecutor

"OSCAR RAMIREZ ALEGRE CONTRATISTAS E.I.R.L."

Cliente

LIMA

Ubicacin WASHINGTON II
Fexha :
10/12/2014
VALORIZACION
ITEM

DESCRIPCIN

PROTOCOLOS DE TABLERO ELECTRICO TC3.


STICKERS ADHESIVO PARA TABLEROS.
CAJA DE PASE METALICAS 100X100X50 MM (PARA EL SISTEMA DE
ILUMINACION)
PICADO,ADECUACION Y RESANE DE PARED PARA INSTALACION DE CAJA
DE TABLERO ELECTRICO NUEVO.

PARCIAL

ANTERIOR

TOTAL

ACTUAL

SALDO

ACUMULADO

UND

CANT

PU

MET.

VAL.

MET.

VAL.

MET.

VAL.

MET.

VAL.

1.00

UND

500.00

500.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

500.00

100.00%

1.00

GLB

350.00

350.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

350.00

100.00%

10.00

UND

9.65

96.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

96.50

100.00%

1.00

GLB

220.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

220.00

100.00%

0.00

220.00

#REF!
18%

11,220.17

11,220.17

45,331.60

12,588.51

12,588.51

71,751.74

84,340.25

84,340.25

0.00

15,181.24

15,181.24

0.00

2,265.93

2,265.93

12,915.31

99,521.49

99,521.49

0.00

14,854.44

14,854.44

84,667.05