Partida
Descripcin
Parcial
01.00.00
OBRAS PROVISIONALES
02.00.00
OBRAS PRELIMINARES
12,515.37
03.00.00
DEMOLICIONES Y DESMONTAJES
35,356.61
04.00.00
MOVIMIENTO DE TIERRAS
24,419.51
05.00.00
44,452.16
06.00.00
86,028.07
07.00.00
29,168.79
08.00.00
26,409.32
09.00.00
PISOS Y PAVIMENTOS
17,625.03
10.00.00
CONTRAZOCALOS
10,946.05
11.00.00
CARPINTERIA DE MADERA
3,582.53
11.00.00
CARPINTERIA DE MADERA
33,101.68
13.00.00
COBERTURA DE TECHO
10,540.82
14.00.00
LOSA ALIGERADA
41,572.00
15.00.00
16.00.00
PINTURA
17.00.00
PIZARRA
18.00.00
INSTALACIONES ELECTRICAS
5,903.96
19.00.00
INSTALACIONES SANITARIAS
6,411.44
20.00.00
4,476.24
21.00.00
4,143.82
22.00.00
5,904.65
23.00.00
VARIOS
24.00.00
EQUIPAMIENTO Y MOBILIARIO
2,608.01
9,847.43
15,084.70
830.01
4,570.00
43,784.06
COSTO DIRECTO =
479,282.26
86,270.81
47,928.23
613,481.30
110,426.63
Total = S/.
723,907.93
EJERCICIO PRESUPUESTARIO
PROYECTO
FECHA
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIN INICIAL DE LA I.E. N 017 SOR ANA DE LOS
ANGELES DEL DISTRITO DE SECHURA, PROVINCIA DE SECHURA - PIURA
MARZO 2013
ITEM
DESCRIPCION
TOTAL
1.00.00
S/.
15,000.00
2.00.00
EJECUCION DE OBRA
S/.
723,907.93
3.00.00
SUPERVISION DE OBRA
S/.
15,500.00
S/.
754,407.93
FECHA
2.6.2.3.5.3.
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIN INICIAL DE LA I.E. N 017 SOR ANA DE LOS
ANGELES DEL DISTRITO DE SECHURA, PROVINCIA DE SECHURA - PIURA
MARZO 2013
Plazo de Ejecucin :
90
723,907.93
723,907.93
TOTAL
723,907.93
FECHA
MARZO 2013
SUB META N 1 :
CODIGO
DENOMINACION
2.6.8.1.3.1
15,000.00
TOTAL
15,000.00
SUBTOTAL
Descripcin
Cantidad
Monto Total
10,000.00
1.00
S/.
10,000.00
Ing. Revisor
5,000.00
1.00
5,000.00
15,000.00
FECHA
CODIGO
DENOMINACION
2.6.2.3.2.3.
Definicin
Descripcion
EJECUCION DE
OBRA
S/.
SUBTOTAL S/.
723,907.93
723,907.93
PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIN INICIAL DE LA I.E. N 017 SOR ANA DE LOS
ANGELES DEL DISTRITO DE SECHURA, PROVINCIA DE SECHURA - PIURA
FECHA
MARZO 2013
SUB META N3
CODIGO
2.6.8.1.4.3.
SUPERVISION DE OBRA
PRESUPUESTO ANALITICO :
Descripcin
MONTO ( S/. )
DENOMINACION
15,500.00
S/.
15,500.00
Costo x Supervisin
Duracin de Contrato
Monto Total
(Mes)
S/.
-Ing./Arq. Supervisor
S/. 4,000.00
3.50
14,000.00
S/. 1,500.00
1.00
1,500.00
TOTAL
S/.
15,500.00
Descripcin
UNIDAD
METRADO
PRECIO
PARCIAL
TOTAL
15 DIAS
30 DIAS
45 DIAS
60 DIAS
75 DIAS
90 DIAS
150.00
150.00
150.00
150.00
150.00
216.67
216.67
216.67
216.67
216.67
479,282.26
01.00.00
OBRAS PROVISIONALES
01.01.00
UND
1.00
794.16
794.16
794.16
01.02.00
M2
25.00
65.78
1,644.50
1,644.50
01.03.00
UND
2.00
695.70
1,391.40
1,391.40
01.04.00
MES
3.00
300.00
900.00
150.00
01.05.00
M2
81.89
42.89
3,512.26
3,512.26
01.06.00
UND
1.00
610.14
610.14
610.14
01.07.00
GLB
1.00
76.19
76.19
76.19
01.08.00
M3
200.00
6.50
1,300.00
216.67
01.09.00
CERCO PROVISIONAL
96.00
23.82
2,286.72
2,286.72
02.00.00
OBRAS PRELIMINARES
02.01.00
M2
915.09
2.85
2,608.01
03.00.00
DEMOLICIONES Y DESMONTAJES
03.01.00
M3
127.38
212.59
27,079.71
27,079.71
03.02.00
DEMOLICION DE ALBAILERIA
M2
381.76
10.63
4,058.11
4,058.11
03.03.00
M2
22.80
18.63
424.76
424.76
03.04.00
M2
49.63
10.63
527.57
527.57
03.05.00
M2
272.35
10.63
2,895.08
2,895.08
03.06.00
UND
12.00
10.63
127.56
127.56
03.07.00
UND
1.00
243.82
243.82
04.00.00
MOVIMIENTO DE TIERRAS
04.01.00
M3
54.47
28.01
1,525.70
04.02.00
M3
26.05
23.62
615.30
615.30
04.03.00
M3
138.36
26.57
3,676.23
3,676.23
04.04.00
M3
68.07
51.78
3,524.66
3,524.66
04.05.00
M3
38.11
65.42
2,493.16
2,493.16
04.06.00
M3
440.17
17.72
7,799.81
7,799.81
04.07.00
M3
440.17
10.87
4,784.65
05.00.00
05.01.00
M3
79.57
215.52
17,148.93
17,148.93
05.02.00
M2
114.13
27.71
3,162.54
3,162.54
05.03.00
M2
322.79
34.61
11,171.76
05.04.00
CONTRAPISO DE E=2"
M2
322.79
23.81
7,685.63
7,685.63
05.05.00
M3
9.16
455.19
4,169.54
4,169.54
05.06.00
M2
19.37
40.91
792.43
792.43
05.07.00
45.45
7.07
321.33
06.00.00
06.01.00
ZAPATAS
06.01.01
M3
17.28
360.78
6,234.28
6,234.28
06.01.02
KG
367.01
4.23
1,552.45
1,552.45
06.02.00
SOBRECIMIENTOS
12,515.37
2,608.01
1,304.00
1,304.00
35,356.61
243.82
24,419.51
1,525.70
4,784.65
44,452.16
11,171.76
321.33
86,028.07
Descripcin
UNIDAD
METRADO
PRECIO
PARCIAL
TOTAL
15 DIAS
30 DIAS
45 DIAS
60 DIAS
75 DIAS
M3
11.96
457.50
5,471.70
5,471.70
M2
159.40
40.22
6,411.07
6,411.07
KG
1,811.77
4.23
7,663.79
7,663.79
M3
2.14
468.13
1,001.80
1,001.80
M2
14.25
40.91
582.97
582.97
KG
163.12
4.23
690.00
690.00
M3
14.18
445.71
6,320.17
6,320.17
M2
245.25
53.71
13,172.38
13,172.38
KG
1,750.65
4.23
7,405.25
7,405.25
M3
18.94
466.97
8,844.41
2,211.10
6,633.31
M2
133.55
58.50
7,812.68
1,953.17
5,859.51
KG
3,041.40
4.23
12,865.12
3,216.28
9,648.84
14,584.40
14,584.40
2,795.54
1,397.77
1,397.77
13,482.17
6,741.08
6,741.08
6,616.69
3,308.35
3,308.35
15.28
728.24
364.12
364.12
92.00
30.29
2,786.68
1,393.34
1,393.34
375.64
46.92
17,625.03
8,812.51
8,812.51
90 DIAS
06.02.01
06.02.02
06.02.03
06.03.00
VIGA DE CIMENTACION
06.03.01
06.03.02
06.03.03
06.04.00
COLUMNAS
06.04.01
06.04.02
06.04.03
06.05.00
VIGAS
06.05.01
06.05.02
06.05.03
07.00.00
07.01.00
08.00.00
08.01.00
M2
147.60
18.94
08.02.00
M2
683.68
19.72
08.03.00
M2
179.46
36.87
08.04.00
47.66
08.05.00
CIELORRASOS
M2
09.00.00
PISOS Y PAVIMENTOS
09.01.00
PISO DE CERAMICO 30 X 30 CM
M2
10.00.00
CONTRAZOCALOS
10.01.00
271.50
10.15
2,755.73
10.02.00
ZOCALO DE CERAMICA 30 X 30 CM
M2
147.60
55.49
8,190.32
11.00.00
CARPINTERIA DE MADERA
11.01.00
12.00.00
CARPINTERIA METALICA
12.01.00
M2
86.31
241.02
20,802.44
20,802.44
12.02.00
M2
20.22
142.15
2,874.27
2,874.27
12.03.00
PUERTA METALICA
M2
22.00
228.11
5,018.42
12.04.00
12.00
85.00
1,020.00
1,020.00
12.05.00
42.30
65.00
2,749.50
2,749.50
12.06.00
7.75
82.20
637.05
13.00.00
COBERTURA DE TECHO
13.01.00
M2
13.02.00
13.03.00
13.04.00
29,168.79
M2
441.55
66.06
29,168.79
26,409.32
17,625.03
10,946.05
2,755.73
8,190.32
3,582.53
M2
15.12
236.94
3,582.53
3,582.53
33,101.68
5,018.42
637.05
10,540.82
0.00
38.78
43.13
1,672.58
1,672.58
M2
29.35
43.53
1,277.61
1,277.61
M2
323.39
15.59
5,041.65
5,041.65
44.00
14.28
628.32
628.32
Descripcin
UNIDAD
METRADO
PRECIO
PARCIAL
UND
14.00
137.19
1,920.66
TOTAL
15 DIAS
30 DIAS
45 DIAS
60 DIAS
13.05.00
GARGOLA
14.00.00
LOSA ALIGERADA
14.01.00
M3
25.67
399.10
10,244.90
10,244.90
14.02.00
M2
293.39
68.24
20,020.93
20,020.93
14.03.00
KG
1,578.64
4.23
6,677.65
6,677.65
14.04.00
UND
1,978.00
2.34
4,628.52
15.00.00
15.01.00
16.00.00
PINTURA
16.01.00
PINTURA EN MUROS INTERIORES Y EXTERIORES (INCL. COLUMNAS Y VIGAS CON VANOS DE PUERTAS Y VENTANAS)
M2
1,016.58
12.40
12,605.59
16.02.00
M2
86.38
28.70
2,479.11
17.00.00
PIZARRA
17.01.00
18.00.00
INSTALACIONES ELECTRICAS
18.01.00
M3
13.20
26.57
350.72
350.72
18.02.00
M3
13.20
21.26
280.63
280.63
18.03.00
PTO
17.00
56.38
958.46
958.46
18.04.00
PTO
9.00
61.25
551.25
551.25
18.05.00
UND
1.00
468.67
468.67
468.67
18.06.00
UND
1.00
673.51
673.51
673.51
18.07.00
ARTEF FLUORES RECTO 2/36W C/EQUIP D ARRANQUE Y BALAST SIM. BE. JOSFEL
UND
11.00
93.56
1,029.16
18.08.00
FOCO AHORRADOR
UND
6.00
28.75
172.50
18.09.00
125.30
9.86
1,235.46
18.10.00
10.00
18.36
183.60
19.00.00
INSTALACIONES SANITARIAS
19.01.00
PTO
14.00
50.28
703.92
703.92
19.02.00
PTO
12.00
49.36
592.32
592.32
19.03.00
PTO
8.00
50.74
405.92
405.92
19.04.00
85.00
9.91
842.35
842.35
19.05.00
70.00
6.08
425.60
425.60
19.06.00
UND
5.00
10.15
50.75
50.75
19.07.00
UND
5.00
15.21
76.05
76.05
19.08.00
UND
2.00
174.29
348.58
348.58
19.09.00
85.00
11.37
966.45
966.45
19.10.00
M3
75.00
26.66
1,999.50
1,999.50
20.00.00
20.01.00
EXCAVACION DE ZANJA
80.00
6.64
531.20
20.02.00
M3
28.80
26.66
767.81
767.81
20.03.00
PTO
26.00
57.53
1,495.78
1,495.78
20.04.00
UND
8.00
84.70
677.60
677.60
20.05.00
85.00
11.81
1,003.85
1,003.85
21.00.00
75 DIAS
90 DIAS
1,920.66
41,572.00
4,628.52
9,847.43
P2
1,767.94
5.57
9,847.43
9,847.43
15,084.70
12,605.59
2,479.11
830.01
UND
3.00
276.67
830.01
830.01
5,903.96
1,029.16
172.50
1,235.46
183.60
6,411.44
4,476.24
531.20
4,143.82
METRADO
PRECIO
PARCIAL
21.01.00
Item
Descripcin
JGO
12.00
254.24
3,050.88
3,050.88
21.02.00
JGO
14.00
17.71
247.94
247.94
21.03.00
JGO
13.00
65.00
845.00
22.00.00
22.01.00
M3
3.84
373.99
1,436.12
22.02.00
M2
20.00
44.84
896.80
896.80
22.03.00
KG
489.77
4.23
2,071.73
2,071.73
22.04.00
GLB
1.00
1,500.00
1,500.00
23.00.00
VARIOS
23.01.00
GLB
1.00
3,600.00
3,600.00
23.02.00
M2
915.09
1.06
970.00
24.00.00
EQUIPAMIENTO Y MOBILIARIO
24.01.00
GLB
1.00
36,714.06
36,714.06
36,714.06
24.02.00
JUEGOS PEDAGOGICOS
GLB
1.00
1,095.00
1,095.00
1,095.00
24.03.00
GLB
1.00
5,975.00
5,975.00
5,975.00
15 DIAS
30 DIAS
45 DIAS
60 DIAS
75 DIAS
90 DIAS
845.00
5,904.65
1,436.12
750.00
750.00
4,570.00
3,600.00
970.00
43,784.06
Costo Directo
TOTAL
479,282.26
56,759.90
124,209.87
105,533.85
54,765.24
34,481.24
103,532.17
86,270.81
10,216.78
22,357.78
18,996.09
9,857.74
6,206.62
18,635.79
Utilidad (10%)
47,928.23
5,675.99
12,420.99
10,553.38
5,476.52
3,448.12
10,353.22
Sub Total
613,481.29
72,652.67
158,988.63
135,083.32
70,099.51
44,135.98
132,521.17
IGV (18%)
110,426.63
13,077.48
28,617.95
24,315.00
12,617.91
7,944.48
23,853.81
Valor Referencial
723,907.93
85,730.15
187,606.59
159,398.32
82,717.43
52,080.46
156,374.99
11.84%
25.92%
22.02%
11.43%
7.19%
21.60%
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIN INICIAL DE LA I.E. N 017 SOR ANA DE LOS ANGELES DEL DISTRITO DE SECHURA, PROVINCIA DE SECHURA - PIURA
Item
Descripcin
UNIDAD
METRADO
PRECIO
PARCIAL
TOTAL
15 DIAS
30 DIAS
45 DIAS
60 DIAS
75 DIAS
90 DIAS
16.67%
16.67%
16.67%
16.67%
16.67%
16.67%
16.67%
16.67%
16.67%
16.67%
479,282.26
01.00.00
OBRAS PROVISIONALES
01.01.00
UND
1.00
794.16
794.16
100.00%
01.02.00
M2
25.00
65.78
1,644.50
100.00%
01.03.00
UND
2.00
695.70
1,391.40
100.00%
01.04.00
MES
3.00
300.00
900.00
16.67%
01.05.00
M2
81.89
42.89
3,512.26
100.00%
01.06.00
UND
1.00
610.14
610.14
100.00%
01.07.00
GLB
1.00
76.19
76.19
100.00%
01.08.00
M3
200.00
6.50
1,300.00
16.67%
01.09.00
CERCO PROVISIONAL
96.00
23.82
2,286.72
100.00%
02.00.00
OBRAS PRELIMINARES
02.01.00
M2
915.09
2.85
2,608.01
03.00.00
DEMOLICIONES Y DESMONTAJES
03.01.00
M3
127.38
212.59
27,079.71
100.00%
03.02.00
DEMOLICION DE ALBAILERIA
M2
381.76
10.63
4,058.11
100.00%
03.03.00
M2
22.80
18.63
424.76
100.00%
03.04.00
M2
49.63
10.63
527.57
100.00%
03.05.00
M2
272.35
10.63
2,895.08
100.00%
03.06.00
UND
12.00
10.63
127.56
100.00%
03.07.00
UND
1.00
243.82
243.82
04.00.00
MOVIMIENTO DE TIERRAS
04.01.00
M3
54.47
28.01
1,525.70
100.00%
04.02.00
M3
26.05
23.62
615.30
100.00%
04.03.00
M3
138.36
26.57
3,676.23
100.00%
04.04.00
M3
68.07
51.78
3,524.66
100.00%
04.05.00
M3
38.11
65.42
2,493.16
100.00%
04.06.00
M3
440.17
17.72
7,799.81
100.00%
04.07.00
M3
440.17
10.87
4,784.65
05.00.00
05.01.00
M3
79.57
215.52
17,148.93
100.00%
05.02.00
M2
114.13
27.71
3,162.54
100.00%
05.03.00
M2
322.79
34.61
11,171.76
05.04.00
CONTRAPISO DE E=2"
M2
322.79
23.81
7,685.63
100.00%
05.05.00
M3
9.16
455.19
4,169.54
100.00%
05.06.00
M2
19.37
40.91
792.43
100.00%
05.07.00
45.45
7.07
321.33
06.00.00
06.01.00
ZAPATAS
06.01.01
M3
17.28
360.78
6,234.28
100.00%
06.01.02
KG
367.01
4.23
1,552.45
100.00%
06.02.00
SOBRECIMIENTOS
12,515.37
2,608.01
50.00%
50.00%
35,356.61
100.00%
24,419.51
100.00%
44,452.16
100.00%
100.00%
86,028.07
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIN INICIAL DE LA I.E. N 017 SOR ANA DE LOS ANGELES DEL DISTRITO DE SECHURA, PROVINCIA DE SECHURA - PIURA
Item
Descripcin
UNIDAD
METRADO
PRECIO
PARCIAL
TOTAL
15 DIAS
30 DIAS
45 DIAS
60 DIAS
75 DIAS
M3
11.96
457.50
5,471.70
100.00%
M2
159.40
40.22
6,411.07
100.00%
KG
1,811.77
4.23
7,663.79
100.00%
M3
2.14
468.13
1,001.80
100.00%
M2
14.25
40.91
582.97
100.00%
KG
163.12
4.23
690.00
100.00%
M3
14.18
445.71
6,320.17
100.00%
M2
245.25
53.71
13,172.38
100.00%
KG
1,750.65
4.23
7,405.25
100.00%
M3
18.94
466.97
8,844.41
25.00%
75.00%
M2
133.55
58.50
7,812.68
25.00%
75.00%
KG
3,041.40
4.23
12,865.12
25.00%
75.00%
50.00%
50.00%
2,795.54
50.00%
50.00%
13,482.17
50.00%
50.00%
6,616.69
50.00%
50.00%
15.28
728.24
50.00%
50.00%
30.29
2,786.68
50.00%
50.00%
90 DIAS
06.02.01
06.02.02
06.02.03
06.03.00
VIGA DE CIMENTACION
06.03.01
06.03.02
06.03.03
06.04.00
COLUMNAS
06.04.01
06.04.02
06.04.03
06.05.00
VIGAS
06.05.01
06.05.02
06.05.03
07.00.00
07.01.00
08.00.00
08.01.00
M2
147.60
18.94
08.02.00
M2
683.68
19.72
08.03.00
M2
179.46
36.87
08.04.00
47.66
08.05.00
CIELORRASOS
M2
92.00
09.00.00
PISOS Y PAVIMENTOS
09.01.00
PISO DE CERAMICO 30 X 30 CM
10.00.00
CONTRAZOCALOS
10.01.00
271.50
10.15
2,755.73
10.02.00
ZOCALO DE CERAMICA 30 X 30 CM
M2
147.60
55.49
8,190.32
11.00.00
CARPINTERIA DE MADERA
11.01.00
12.00.00
CARPINTERIA METALICA
12.01.00
M2
86.31
241.02
20,802.44
100.00%
12.02.00
M2
20.22
142.15
2,874.27
100.00%
12.03.00
PUERTA METALICA
M2
22.00
228.11
5,018.42
12.04.00
12.00
85.00
1,020.00
100.00%
12.05.00
42.30
65.00
2,749.50
100.00%
12.06.00
7.75
82.20
637.05
13.00.00
COBERTURA DE TECHO
13.01.00
M2
38.78
43.13
1,672.58
100.00%
13.02.00
M2
29.35
43.53
1,277.61
100.00%
13.03.00
M2
323.39
15.59
5,041.65
100.00%
13.04.00
44.00
14.28
628.32
100.00%
29,168.79
M2
441.55
66.06
29,168.79
26,409.32
17,625.03
M2
375.64
46.92
100.00%
17,625.03
50.00%
50.00%
10,946.05
100.00%
100.00%
3,582.53
M2
15.12
236.94
3,582.53
100.00%
33,101.68
100.00%
100.00%
10,540.82
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIN INICIAL DE LA I.E. N 017 SOR ANA DE LOS ANGELES DEL DISTRITO DE SECHURA, PROVINCIA DE SECHURA - PIURA
Item
Descripcin
UNIDAD
METRADO
PRECIO
PARCIAL
UND
14.00
137.19
1,920.66
TOTAL
15 DIAS
30 DIAS
45 DIAS
60 DIAS
13.05.00
GARGOLA
14.00.00
LOSA ALIGERADA
14.01.00
M3
25.67
399.10
10,244.90
100.00%
14.02.00
M2
293.39
68.24
20,020.93
100.00%
14.03.00
KG
1,578.64
4.23
6,677.65
100.00%
14.04.00
UND
1,978.00
2.34
4,628.52
15.00.00
15.01.00
16.00.00
PINTURA
16.01.00
PINTURA EN MUROS INTERIORES Y EXTERIORES (INCL. COLUMNAS Y VIGAS CON VANOS DE PUERTAS Y VENTANAS)
M2
1,016.58
12.40
12,605.59
16.02.00
M2
86.38
28.70
2,479.11
17.00.00
PIZARRA
17.01.00
18.00.00
INSTALACIONES ELECTRICAS
18.01.00
M3
13.20
26.57
350.72
100.00%
18.02.00
M3
13.20
21.26
280.63
100.00%
18.03.00
PTO
17.00
56.38
958.46
100.00%
18.04.00
PTO
9.00
61.25
551.25
100.00%
18.05.00
UND
1.00
468.67
468.67
100.00%
18.06.00
UND
1.00
673.51
673.51
100.00%
18.07.00
ARTEF FLUORES RECTO 2/36W C/EQUIP D ARRANQUE Y BALAST SIM. BE. JOSFEL
UND
11.00
93.56
1,029.16
18.08.00
FOCO AHORRADOR
UND
6.00
28.75
172.50
18.09.00
125.30
9.86
1,235.46
18.10.00
10.00
18.36
183.60
19.00.00
INSTALACIONES SANITARIAS
19.01.00
PTO
14.00
50.28
703.92
100.00%
19.02.00
PTO
12.00
49.36
592.32
100.00%
19.03.00
PTO
8.00
50.74
405.92
100.00%
19.04.00
85.00
9.91
842.35
100.00%
19.05.00
70.00
6.08
425.60
100.00%
19.06.00
UND
5.00
10.15
50.75
100.00%
19.07.00
UND
5.00
15.21
76.05
100.00%
19.08.00
UND
2.00
174.29
348.58
100.00%
19.09.00
85.00
11.37
966.45
100.00%
19.10.00
M3
75.00
26.66
1,999.50
20.00.00
20.01.00
EXCAVACION DE ZANJA
80.00
6.64
531.20
100.00%
20.02.00
M3
28.80
26.66
767.81
100.00%
20.03.00
PTO
26.00
57.53
1,495.78
100.00%
20.04.00
UND
8.00
84.70
677.60
100.00%
20.05.00
85.00
11.81
1,003.85
21.00.00
75 DIAS
90 DIAS
100.00%
41,572.00
100.00%
9,847.43
P2
1,767.94
5.57
9,847.43
100.00%
15,084.70
100.00%
100.00%
830.01
UND
3.00
276.67
830.01
100.00%
5,903.96
100.00%
100.00%
100.00%
100.00%
6,411.44
100.00%
4,476.24
100.00%
4,143.82
100.00%
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIN INICIAL DE LA I.E. N 017 SOR ANA DE LOS ANGELES DEL DISTRITO DE SECHURA, PROVINCIA DE SECHURA - PIURA
UNIDAD
METRADO
PRECIO
PARCIAL
21.01.00
Item
Descripcin
JGO
12.00
254.24
3,050.88
100.00%
21.02.00
JGO
14.00
17.71
247.94
100.00%
21.03.00
JGO
13.00
65.00
845.00
22.00.00
22.01.00
M3
3.84
373.99
1,436.12
100.00%
22.02.00
M2
20.00
44.84
896.80
100.00%
22.03.00
KG
489.77
4.23
2,071.73
100.00%
22.04.00
GLB
1.00
1,500.00
1,500.00
23.00.00
VARIOS
23.01.00
GLB
1.00
3,600.00
3,600.00
23.02.00
M2
915.09
1.06
970.00
24.00.00
EQUIPAMIENTO Y MOBILIARIO
24.01.00
GLB
1.00
36,714.06
36,714.06
100.00%
24.02.00
JUEGOS PEDAGOGICOS
GLB
1.00
1,095.00
1,095.00
100.00%
24.03.00
GLB
1.00
5,975.00
5,975.00
100.00%
TOTAL
15 DIAS
30 DIAS
45 DIAS
60 DIAS
75 DIAS
90 DIAS
100.00%
5,904.65
50.00%
50.00%
4,570.00
100.00%
100.00%
43,784.06
11.84%
25.92%
22.02%
11.43%
7.19%
21.60%
Item
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
01.07.00
01.08.00
01.09.00
02.00.00
02.01.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
03.06.00
03.07.00
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
04.06.00
04.07.00
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
05.07.00
06.00.00
06.01.00
06.01.01
06.01.02
06.02.00
06.02.01
06.02.02
06.02.03
06.03.00
06.03.01
06.03.02
06.03.03
06.04.00
06.04.01
06.04.02
Descripcin
Unidad Metrado Precio
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M UND
1.00
794.16
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
M2
25.00
65.78
INSTALACION PROVISIONAL PARA DEPOSITO DE AGUA UND
2.00
695.70
ALQUILER DE LOCAL PARA AULAS PROVISIONALES
MES
3.00
300.00
MEJORAMIENTO DE TECHO PARA AULAS PROVISIONALESM2
81.89
42.89
MEJORAMIENTO DE SS.HH. PARA AULAS PROVISIONALES UND
1.00
610.14
DESMONTAJE Y MONTAJE DE PANEL EN AULA PROVISIONAL
GLB
DE 1 PISO1.00
76.19
AGUA PARA LA CONSTRUCCION
M3
200.00
6.50
CERCO PROVISIONAL
M
96.00
23.82
OBRAS PRELIMINARES
TRAZO, NIVEL Y REPLANTEO
M2
915.09
2.85
DEMOLICIONES Y DESMONTAJES
DEMOLICION DE OBRAS DE CONCRETO
M3
127.38
212.59
DEMOLICION DE ALBAILERIA
M2
381.76
10.63
PICADO DE CIELO RASO
M2
22.80
18.63
DESMONTAJE DE PUERTAS Y VENTANAS
M2
49.63
10.63
DESMONTAJE DE TECHO LIVIANO
M2
272.35
10.63
DESMONTAJE DE SANITARIOS Y LAVATORIOS
UND
12.00
10.63
DESMONTAJE DE SISTEMA TANQUE - CISTERNA
UND
1.00
243.82
MOVIMIENTO DE TIERRAS
CORTE DE TERRENO NATURAL A NIVEL DE EXPLANACIONM3
54.47
28.01
RELLENO Y APISONADO CON MATERIAL PROPIO EN CAPAS
M3DE 0.20 M 26.05
23.62
EXCAVACION DE ZANJA PARA ZAPATAS, VIGA DE CONEXION
M3 Y CIMIENTOS
138.36CORRIDOS
26.57
RELLENO COMPACTADO CON MATERIAL HORMIGON
M3
68.07
51.78
RELLENO COMPACTADO CON MATERIAL AFIRMADO
M3
38.11
65.42
ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT
M3
440.17
17.72
ELIMINACION DE MATERIAL EXCEDENTE D = 5 KM
M3
440.17
10.87
OBRAS DE CONCRETO SIMPLE
CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS M3
79.57
215.52
SOLADO PARA CIMENTACION DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
M2
114.13
27.71
FALSO PISO DE 4" DE CONCRETO 1:10
M2
322.79
34.61
CONTRAPISO DE E=2"
M2
322.79
23.81
CONCRETO F'C=175 KG/CM2 PARA VEREDAS INC. UA
M3
9.16
455.19
ENCOFRADO Y DESENCOFRADO DE SARDINEL P/VEREDAS
M2
15 X 30 CM19.37
40.91
JUNTAS ASFALTICAS Y TECKNOPORT
M
45.45
7.07
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO F'C=210 KG/CM2 ZAPATAS
M3
17.28
360.78
ACERO DE REFUERZO FY=4200 KG/CM2
KG
367.01
4.23
SOBRECIMIENTOS
CONCRETO F'C= 210 KG/CM2 PARA SOBRECIMIENTO
M3
11.96
457.50
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO M2
159.40
40.22
ACERO DE REFUERZO FY=4200 KG/CM2
KG
1,811.77
4.23
VIGA DE CIMENTACION
CONCRETO F'C=210 KG/CM2 PARA VIGA DE CIMENTACIONM3
2.14
468.13
ENCOFRADO Y DESENCOFRADO PARA VIGA DE CIMENTACION
M2
14.25
40.91
ACERO DE REFUERZO FY=4200 KG/CM2
KG
163.12
4.23
COLUMNAS
CONCRETO F'C=210 KG/CM2 PARA COLUMNAS
M3
14.18
445.71
ENCOFRADO Y DESENCOFRADO PARA COLUMNAS
M2
245.25
53.71
06.04.03
06.05.00
06.05.01
06.05.02
06.05.03
07.00.00
07.01.00
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00
09.00.00
09.01.00
10.00.00
10.01.00
10.02.00
11.00.00
11.01.00
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
12.05.00
12.06.00
13.00.00
13.01.00
13.02.00
13.03.00
13.04.00
13.05.00
14.00.00
14.01.00
14.02.00
14.03.00
14.04.00
15.00.00
15.01.00
16.00.00
16.01.00
16.02.00
17.00.00
17.01.00
18.00.00
18.01.00
18.02.00
18.03.00
18.04.00
18.05.00
18.06.00
18.07.00
18.08.00
18.09.00
18.10.00
19.00.00
19.01.00
19.02.00
19.03.00
19.04.00
19.05.00
19.06.00
19.07.00
19.08.00
19.09.00
19.10.00
20.00.00
20.01.00
20.02.00
20.03.00
20.04.00
20.05.00
21.00.00
21.01.00
21.02.00
21.03.00
22.00.00
22.01.00
22.02.00
22.03.00
22.04.00
23.00.00
23.01.00
23.02.00
24.00.00
24.01.00
24.02.00
24.03.00
Parcial
Subtotal
Total
794.16
1,644.50
1,391.40
900.00
3,512.26
610.14
76.19
1,300.00
2,286.72
12,515.37
2,608.01
2,608.01
27,079.71
4,058.11
424.76
527.57
2,895.08
127.56
243.82
35,356.61
1,525.70
615.30
3,676.23
3,524.66
2,493.16
7,799.81
4,784.65
24,419.51
17,148.93
3,162.54
11,171.76
7,685.63
4,169.54
792.43
321.33
44,452.16
6,234.28
1,552.45
7,786.73
5,471.70
6,411.07
7,663.79
19,546.56
1,001.80
582.97
690.00
2,274.77
6,320.17
13,172.38
7,405.25
26,897.80
8,844.41
7,812.68
12,865.12
29,522.21 86,028.07
29,168.79
29,168.79
2,795.54
13,482.17
6,616.69
728.24
2,786.68
26,409.32
17,625.03
17,625.03
2,755.73
8,190.32
10,946.05
3,582.53
3,582.53
20,802.44
2,874.27
5,018.42
1,020.00
2,749.50
637.05
33,101.68
1,672.58
1,277.61
5,041.65
628.32
1,920.66
10,540.82
10,244.90
20,020.93
6,677.65
4,628.52
41,572.00
9,847.43
9,847.43
12,605.59
2,479.11
15,084.70
830.01
830.01
350.72
280.63
958.46
551.25
468.67
673.51
1,029.16
172.50
1,235.46
183.60
5,903.96
703.92
592.32
405.92
842.35
425.60
50.75
76.05
348.58
966.45
1,999.50
6,411.44
531.20
767.81
1,495.78
677.60
1,003.85
4,476.24
3,050.88
247.94
845.00
4,143.82
1,436.12
896.80
2,071.73
1,500.00
5,904.65
3,600.00
970.00
4,570.00
36,714.06
1,095.00
5,975.00
43,784.06
479,282.26
86,270.81
47,928.23
-------------------613,481.30
110,426.63
=============
723,907.93