FORM # J-015 (12/26/09) SHT 1 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


INSTRUMENT AND CONTROL CABLES
EQUIPMENT TYPE: USER REFERENCE:
EQUIPMENT TAG NO.: DESCRIPTION:
BI/JO NO.: PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.: SERIAL NO.:
COMMISSIONING DATE:

CABLE TAG NO.: CABLE GLANDING:


CABLE TYPE: CABLE SEALING:
CABLE SIZE: CABLE ROUTING:
CABLE MARKING:

MEGGERING

PAIR INSULATION RESISTANCE M CONTINUITY RESULT


NO. Ω

CORE TO CORE CORE TO SCREEN

FOR THE TEST EQUIPMENT USED, PLEASE ENTER THE FOLLOWING:

EQUIPMENT
NAME:

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist.
Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project
Acceptance Committee.

APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
FORM # J-015 (12/26/09) SHT 2 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


INSTRUMENT AND CONTROL CABLES
EQUIPMENT TYPE: USER REFERENCE:
EQUIPMENT TAG NO.: DESCRIPTION:
BI/JO NO.: PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.: SERIAL NO.:
COMMISSIONING DATE:

MANUFACTURER DATE CALIBRATED:


:

REMARKS:

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist.
Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project
Acceptance Committee.

APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.