5.1.1 Conclusion To achieve the objective of this project work we have done the design of the die initially and manufacturing of the die finally. In the design stage, the design calculation of the die components as well as we select proper material with consideration of cost and availability. In the manufacturing stage, by selecting proper manufacturing processes, machine tools and cutting parameters we prepared manufacturing processes plan for each components of the progressive die. Finally, by preparing progressive die based on the provided design analysis and manufacturing processes, it is possible to produce the washer. Hence, we would like to say the objective of the project is achieved. 5.1.2 Recommendation We recommended BALI to manufacture the washer according to provided design and manufacturing processes properly in order to get economical benefit by saving the foreign currency.