GROVE GMK4100-L 100-TONNE

GROVE GMK4100-L 100-TONNE

GROVE GMK4100-L 100-TONNE

GROVE GMK4100-L 100-TONNE

GROVE GMK4100-L 100-TONNE

KRUPP KMK5100 100-TONNE

KRUPP KMK5100 100-TONNE

KRUPP KMK5100 100-TONNE

10

KRUPP KMK5100 100-TONNE

11

KRUPP KMK5100 100-TONNE

12

GROVE TMS 870E 80-TONNE

13

GROVE TMS 870E 80-TONNE

13

GROVE TMS 870E 80-TONNE

14

KATO NK800 80-TONNE

15

KATO NK800 80-TONNE

16

KATO NK800 80-TONNE

17

KATO NK800 80-TONNE

19

P & H T500 50-TONNE

20

P & H T500 50-TONNE

20

P & H T500 50-TONNE

21

GROVE TMS5000 50-TONNE

22

GROVE TMS5000 50-TONNE

23

GROVE TMS5000 50-TONNE

24

GROVE TMS5000 50-TONNE

25

TADANO TL300E 30-TONNE

27

TADANO TL300E 30-TONNE

27

TADANO TL300E 30-TONNE

28

TADANO TL300E 30-TONNE

29

KATO NK250V 25-TONNE

30

KATO NK250V 25-TONNE

31

KATO NK250V 25-TONNE

32

TOKYU CT202A 20-TONNE

34

TOKYU CT202A 20-TONNE

35

TOKYU CT202A 20-TONNE

36

FRANNA AT14 14-TONNE

37

FRANNA AT14 14-TONNE

38

FRANNA AT14 14-TONNE

39

FRANNA AT14 14-TONNE

40

PROP SPECIFICATIONS

41

PRECAST FLOORING WEIGHTS

42

CRANE HAND SIGNALS

43

LIFTING GEAR

44

PANEL SET-OUT

45

TILT-UP PANEL CONFIGURATIONS

46

TILT-UP PANEL CONFIGURATIONS

47

TERMS & CONDITIONS OF HIRE

48

TERMS & CONDITIONS OF HIRE

49

Telephone (All Departments)


Fax
Dispatch / Enquiries
Trudy Wadams
General Manager
Barrie Mabbott
Contract Estimator
Rob Johnson
Project Manager
Tim Sheldon
Project Manager
Rob Collier
Office Manager
Linda Talbot
Safety Officer
Les Dowie
Director
Ken Drury
Telephone (All Departments)
Fax
Dispatch / Enquiries
Trudy Wadams
Propping Manager
Barrie Mabbott
Office Manager
Linda Talbot
Safety Officer
Les Dowie

09-262-1387
09-262-1391
Extn 800
021-957-828
Extn 806
021-687-800
Extn 805
021-981-847
Extn 808
021-957-810
Extn 812
021-957-821
Extn 801
021-957-811
Extn 807
021-957-822
Extn 803
021-922-091
Hi Prop Office Contact:
09-263-7692
09-263-9739
Extn 800
021-957-828
Extn 806
021-687-800
Extn 801
021-957-811
Extn 807
021-957-822

reception@hilift.co.nz
barrie@hilift.co.nz
rob@hilift.co.nz
tim@hilift.co.nz
robc@hilift.co.nz
accounts@hilift.co.nz
les@hilift.co.nz
ken@hilift.co.nz

trudy@hiprop2000.co.nz
barrie@hiprop2000.co.nz
accounts@hiprop2000.co.nz
les@hilift.co.nz

Grove GMK4100-L 100-tonne

Overall length in travelling condition


Overall height
Overall width of carrier
Overall length of carrier
Centre to centre of extended outriggers (Front to back)
Centre to centre of extended outriggers (Side to side)
Width of outrigger footing
Distance from centre of rotation to back of chassis
Distance from centre of rotation to back of counter weight.
Counterweight outside turning diameter
Outrigger loading (max)
Total weight of crane
Axle weight ( 1st )
Axle weight ( 2nd )
Axle weight ( 3rd )
Axle weight ( 4th )

A
B
C
D
E
F
G
H

13.47
3.99
2.75
10.75
8.34
7.00
0.50
3.46
3.89
7.78
80-tonne
48 tonne
12.5 tonne
12.5 tonne
11.5 tonne
11.5 tonne

Grove GMK4100-L 100-tonne

Grove GMK4100-L 100-tonne

11.65 60.0m

0 - 40
10 / 17 / 22m

7.0m

360

Main Boom

Grove GMK4100-L 100-tonne

11.65 - 60.0m
m trs
11.65*
100.0
2.5
69.0
3.0
59.0
4.0
52.0
5.0
46.0
6.0
41.0
7.0
36.0
8.0
30.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
44.0
46.0
48.0
* - 0* Over Rear

Luffing Swingaway

56.3 60.0m
m trs
m trs
10.0
11.0
12.0
13.0
14.0
15.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
44.0
46.0
48.0
50.0

7.0m
11.65

20.11

69.5
58.5
50.0
43.5
38.0
34.0
30.0

59.0
52.5
47.0
41.5
37.5
34.0
31.0
28.5
25.5
23.0
20.0
17.7
16.4
14.8

10m
0
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
4.8
4.3
4.1
3.6
3.1
2.7
2.3
1.9
1.6
1.3
1.0
0.8

20

4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.2
4.0
3.6
3.1
2.7
2.3
1.9
1.6
1.3
1.0
0.8

56.28
10.0
40

4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.0
3.8
3.4
2.9
2.5
2.1
1.8
1.5
1.2
0.9

28.25
47.0
41.5
38.0
35.0
32.0
29.5
27.5
25.5
23.0
20.5
18.1
16.2
14.8
12.8
10.8
9.2
8.0

360
35.83

30.0
30.0
30.0
29.5
28.0
26.0
24.0
21.5
19.3
17.5
15.9
14.6
12.0
10.4
9.4
8.1
7.0
6.1
5.4
4.7

7.0m
0-20

4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.2
4.0
3.6
3.1
2.7
2.3
1.9
1.6
1.3
1.0
0.8

4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.0
3.8
3.4
2.9
2.5
2.1
1.8
1.5
1.2
0.9

18.0
18.0
18.0
18.0
17.7
17.0
16.2
15.3
14.4
13.1
11.0
9.3
7.9
6.6
6.0
5.3
5.0
4.6
4.4
4.0
3.5
3.1

360

20-40

26.1 t
52.43

44.29

20

4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
3.6
3.1
2.7
2.3
1.9
1.5
1.2
0.9

4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
3.6
3.1
2.7
2.3
1.9
1.5
1.2
0.9

60.00

11.6
11.6
11.6
11.6
11.6
11.6
11.5
11.3
10.6
9.2
7.9
6.9
6.3
5.6
5.2
4.6
4.1
3.6
3.2
2.8
2.4
2.1
1.8
1.6

60.0
10.0
40

3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.5
3.0
2.5
2.1
1.8
1.5
1.1
0.8

8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
7.7
7.1
6.2
5.4
4.7
4.1
3.5
3.0
2.6
2.2
1.8
1.5
1.2
0.9

26.1 t
0-20

4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
3.6
3.1
2.7
2.3
1.9
1.5
1.2
0.9

20-40

3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.5
3.0
2.5
2.1
1.8
1.5
1.1
0.8

Grove GMK4100-L 100-tonne

Luffing Swingaway

56.3 60.0m
m trs
m trs
11.0
12.0
13.0
14.0
15.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
44.0
46.0
48.0
50.0
52.0
54.0

17m
0
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.2
3.0
2.9
2.5
2.2
1.8
1.5
1.3
1.0
0.8

20

3.3
3.3
3.3
3.3
3.3
3.2
3.1
3.0
3.0
2.8
2.8
2.5
2.2
1.8
1.5
1.3
1.0
0.8

56.28
17.0
40

2.6
2.6
2.6
2.6
2.6
2.6
2.6
2.5
2.5
2.5
2.4
2.2
1.9
1.6
1.3
1.0
0.8

7.0m
0-20

360

20-40

3.3
3.3
3.3
3.3
3.2
3.1
2.9
2.8
2.7
2.6
2.6
2.5
2.2
1.8
1.5
1.3
1.0
0.8

2.6
2.6
2.6
2.6
2.5
2.5
2.4
2.4
2.3
2.3
2.3
2.2
1.9
1.6
1.3
1.0
0.8

20

2.9
2.9
2.9
2.9
2.9
2.9
2.9
2.9
2.9
2.9
2.9
2.9
2.9
2.9
2.8
2.4
2.1
1.7
1.4
1.1
0.9

2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.4
2.0
1.7
1.4
1.1
0.9

60.0
17.0
40

2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.1
1.8
1.5
1.2
1.0
0.7

26.1 t
0-20

2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.7
2.4
2.0
1.7
1.4
1.1
0.9

20-40

2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.3
2.1
1.8
1.5
1.2
1.0
0.7

Krupp KMK5100 100-tonne

Overall length in travelling condition


Overall height
Overall width of carrier
Overall length of carrier
Centre to centre of extended outriggers (Front to back)
Centre to centre of extended outriggers (Side to side)
Width of outrigger footing
Distance from centre of rotation to back of chassis
Distance from centre of rotation to back of counter weight.
Counterweight outside turning diameter
Outrigger loading (max)
Total weight of crane
Axle weight ( 1st )
Axle weight ( 2nd )
Axle weight ( 3rd )
Axle weight ( 4th )
Axle weight ( 5th )

A
B
C
D
E
F
G
H

3.755
3.000
12.996
8.700
8.400

3.996

Krupp KMK5100 100-tonne

Krupp KMK5100 100-tonne

13.2 42.3m

12 / 19m
5 / 18 offset

8.4 x 8.7m

10

360

Krupp KMK5100 100-tonne

8.4 x 8.7m

m trs
13.2*
100.0
3.0
93.0
3.5
86.0
4.0
72.5
4.5
66.0
5.0
56.0
6.0
49.0
7.0
42.0
8.0
36.5
9.0
33.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
* - Over Rear +/- 10*

32.6 42.3

13.2
93.0
85.5
79.0
72.5
66.0
56.0
49.0
42.0
36.5
33.0

6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
44.0
46.0
48.0

32.6

43.0
43.0
43.0
42.2
38.7
35.6
33.0
30.0
27.6
25.6
23.8
21.9
19.4
17.3
13.9
11.4
9.3
7.5

18

10.5
10.0
9.6
9.2
8.9
8.6
8.3
7.7
7.3
6.9
6.6
6.3
6.0
5.8
5.4
4.6

23.0t

27.7

8.4 x 8.7m

32.6

0
18.1
18.1
18.1
17.6
16.3
15.3
14.3
13.4
12.7
12.0
11.4
10.4
9.5
8.7
8.1
7.5
7.0
6.1
5.2
4.4

360
22.9
58.0
58.0
58.0
58.0
55.5
49.0
44.0
39.5
36.0
33.2
30.3
28.0
24.3
21.3
18.8
16.8
15.4

12m

m trs

Fly Jib

Main Boom

13.2 42.3m

10.1
9.7
9.3
9.0
8.7
8.4
7.9
7.5
7.1
6.8
6.5
6.3
6.0
5.7
4.9
4.2
3.5

11

39.3

32.0
32.0
32.0
31.1
29.0
26.9
25.0
23.5
22.0
20.7
18.8
18.2
14.9
12.3
10.3
9.1
8.4
7.8

360
18
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
9.8
9.1
8.4
7.8
7.2
6.8
6.3
5.6
4.8
4.1
3.5
3.0
2.5
2.0
1.6

39.3

42.3

23.0
23.0
22.3
21.1
20.0
19.0
18.0
17.2
16.4
15.7
14.4
12.9
10.8
9.2
7.7
6.5
5.5
4.6
3.8

18.1
18.1
18.1
18.1
18.1
18.1
17.8
17.0
16.1
15.3
13.8
12.5
10.8
9.2
7.7
6.5
5.5
4.6
3.8
3.2
2.5

23.0t

42.3
0

8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.2
7.7
7.1
6.7
6.2
5.4
4.6
4.0
3.4
2.8
2.3
1.9
1.5
1.1

18

8.4
8.4
8.4
8.1
7.7
7.2
6.9
6.5
6.2
5.9
5.5
5.0
4.3
3.6
3.1
2.5
2.1
1.6

Krupp KMK5100 100-tonne

32.6 42.3

19m

Fly Jib

8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
44.0
46.0
48.0
50.0
52.0

8.4 x 8.7m

32.6

m trs
0
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.5
7.9
7.3
6.8
6.3
5.8
5.5
5.1
4.8
4.5
4.3
4.0
3.5
3.0
2.6
2.2

18

6.5
6.3
6.0
5.7
5.4
5.1
4.8
4.5
4.3
4.1
3.9
3.7
3.6
3.5
3.3
2.8
2.4

0
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
5.9
5.5
5.2
4.9
4.6
4.3
4.1
3.9
3.5
3.0
2.6
2.2
1.8
1.5
1.2

12

39.3

360

23.0t

42.3

18

18

5.7
5.4
5.1
4.8
4.5
4.3
4.1
3.9
3.7
3.5
3.4
3.2
3.1
2.9
2.5
2.1
1.7
1.3

5.1
5.1
5.1
5.1
5.1
5.1
5.1
5.1
5.1
5.1
5.1
5.1
5.1
5.0
4.8
4.5
4.3
3.8
3.3
2.8
2.4
2.0
1.6
1.3
1.0

5.1
5.1
5.1
4.8
4.5
4.3
4.1
3.9
3.7
3.6
3.4
3.3
3.2
2.8
2.4
2.0
1.6
1.2

Grove TMS 870E 80-tonne


Overall length in travelling condition
Overall height
Overall width of carrier
Overall length of carrier
Centre to centre of extended outriggers (Front to back)
Centre to centre of extended outriggers (Side to side)
Width of outrigger footing
Distance from centre of rotation to back of chassis
Distance from centre of rotation to back of counter weight.
Counterweight outside turning diameter
Outrigger loading (max)
Total weight of crane
Axle weight ( 1st )
Axle weight ( 2nd )
Axle weight ( 3rd )
Axle weight ( 4th )
Axle weight ( 5th )

A
B
C
D
E
F
G
H

17.200
3.600
3.000
14.000
6.300
7.700
0.800
3.800
4.900
9.800
55 tonne
62 tonne
12.4 tonne
12.4 tonne
12.4 tonne
12.4 tonne
12.4 tonne

Grove TMS 870E 80-tonne

11.0 34.6m

7.7 x 6.3m

13

360

Grove TMS 870E 80-tonne

11.0 34.6m

7.7 x 6.3m

14

360

Main Boom

mtrs
3
3.5
4
4.5
5
6
7
8
9
10
12
14
16
18
20
23
26
29
32

11
80.0
68.1
62.6
57.6
53.2
45.7
38.7

12.8
48.4
48.4
48.4
48.4
48.4
45.6
38.7
33.5
28.9

15.5
46.1
46.1
45.1
43.5
41.5
36.0
32.7
30.0
27.7
25.3
18.8

18.3
45.4
44.3
42.0
38.9
36.2
32.3
29.2
25.6
23.4
21.6
18.7
14.3

21
43.9
40.8
38.2
36.2
34.1
29.6
26.1
23.6
21.5
19.1
16.3
14.2
11.2
9.0

23.8
38.4
37.2
35.4
33.5
29.4
24.9
21.5
19.6
18.0
15.2
13.2
11.2
9.0
7.1

26.5

29.3
28.2
25.2
22.3
19.8
18.0
16.4
13.6
12.2
10.6
9.0
7.1
5.1

Kato NK800 80-tonne

15

29.3

32

34.6

23.5
21.1
19.1
17.6
15.9
13.3
11.3
9.9
8.7
7.1
5.1
3.7

22.0
20.0
18.0
16.3
14.8
12.4
10.6
9.3
8.1
7.1
5.1
3.7
2.7

17.6
16.2
14.9
13.9
12.9
11.3
10.1
9.0
7.8
6.8
5.1
3.7
2.7
1.9

Overall length in travelling condition


Overall height
Overall width of carrier
Overall length of carrier
Centre to centre of extended outriggers (Front to back)
Centre to centre of extended outriggers (Side to side)
Width of outrigger footing
Distance from centre of rotation to back of chassis
Distance from centre of rotation to back of counter weight.
Counterweight outside turning diameter
Outrigger loading (max)
Total weight of crane
Axle weight ( 1st )
Axle weight ( 2nd )
Axle weight ( 3rd )
Axle weight ( 4th )
Axle weight ( 5th )
Axle weight ( 6th )

Kato NK800 80-tonne


16

A
B
C
D
E
F
G
H

22.700
3.640
3.000
12.380
5.550
7.650
0.800
3.550
4.250
8.500
50 tonne
63 tonne
10.5 tonne
10.5 tonne
10.5 tonne
10.5 tonne
10.5 tonne
10.5 tonne

Kato NK800 80-tonne


17

12.0 44.0m

9.5 / 15m
5 / 30 offset

7.6 x 5.6m

18

360

12.0 44.0m
m tr s
2.5
3.0
3.5
4.0
4.5
5.0
5.3
5.4
5.8
6.0
6.5
6.9
7.0
7.9
8.5
9.5
10.0
11.0
11.3
12.0
13.0
14.0
15.0
16.0
18.0
20.0
22.0
23.0
24.0
26.0
28.0
30.0
31.0

12.0
80.0
80.0
80.0
70.0
62.0
56.0
52.0
51.0
47.0
45.0
41.0
38.0
37.1
31.5
28.6
24.0
22.0

Fly Jib

7.6 x 5.6m
24.0

18.0
45.0
45.0
45.0
45.0
45.0
45.0
45.0
44.5
41.8
40.0
36.9
34.6
34.2
30.5
27.5
23.5
21.7
18.8
18.0
16.1
14.0
12.0
10.5

12.0 44.0m

35.0
35.0
35.0
35.0
35.0
35.0
35.0
33.5
32.5
30.5
29.0
28.6
25.5
24.0
21.5
20.4
18.0
17.4
15.9
14.0
12.2
10.7
9.4
7.2
5.5

9.5
angle
80.4
80
78
76
74
72
70
68
66
64
62
60
58
56

12.0 44.0m

Fly Jib

Main Boom

Kato NK800 80-tonne

15.0
angle
80.4
80
78
76
74
72
70
68
66
64
62
60
58

Radius
11.5
13.0
15.2
17.2
19.3
21.5
23.1
25.1
27.2
29.0
30.8
32.4
34.0

36.0

27.0
27.0
27.0
27.0
27.0
27.0
26.3
24.9
23.8
23.5
21.3
20.1
18.2
17.4
15.9
15.4
14.5
12.6
11.3
10.1
9.1
7.1
5.5
4.3
3.7

Load
6.0
5.8
5.0
4.5
4.1
3.8
3.5
3.3
3.0
2.8
2.2
1.8
1.5
1.3

Load
4.0
4.0
3.6
3.2
2.9
2.6
2.5
2.3
2.2
2.1
1.7
1.4
1.2

19

Radius
18.0
18.6
20.5
22.5
24.4
26.2
28.0
29.8
31.5
33.2
34.8
36.3
37.8

18.0
18.0
18.0
18.0
17.1
15.7
15.1
14.0
13.6
12.8
11.7
10.8
9.8
8.9
7.3
6.0
4.8
4.3
3.8
3.0
2.2
1.6

360

30

Radius
14.5
15.0
17.1
18.8
20.4
22.3
23.6
25.5
26.8
28.3
29.7
31.2
32.6
34.0

7.6 x 5.6m

40.0

22.0
22.0
22.0
22.0
22.0
21.8
20.1
19.0
17.2
16.4
15.0
14.6
13.8
12.7
11.2
10.0
9.0
7.1
5.6
4.4
3.8
3.3
2.4

7.6 x 5.6m

Radius
11.0
11.5
13.7
15.7
17.3
19.2
20.7
22.3
24.1
25.7
27.4
28.9
30.3
31.7

360
30.0

Load
2.5
2.5
2.4
2.3
2.2
2.1
2.0
1.9
1.9
1.8
1.8
1.7
1.5
1.3

360

30
Load
1.3
1.3
1.2
1.1
1.1
1.0
1.0
0.9
0.9
0.8
0.8
0.7
0.7

44.0

12.0
12.0
12.0
12.0
12.0
12.0
11.3
10.5
9.7
9.0
8.4
7.4
6.2
5.1
4.6
4.2
3.3
2.6
2.0
1.7

P & H T500 50-tonne

Overall length in travelling condition


Overall height
Overall width of carrier
Overall length of carrier
Centre to centre of extended outriggers (Front to back)
Centre to centre of extended outriggers (Side to side)
Width of outrigger footing
Distance from centre of rotation to back of chassis
Distance from centre of rotation to back of counter weight.
Counterweight outside turning diameter
Outrigger loading (max)
Total weight of crane
Axle weight ( 1st )
Axle weight ( 2nd )
Axle weight ( 3rd )
Axle weight ( 4th )

A
B
C
D
E
F
G
H

13.000
3.750
2.800
10.700
5.450
6.650
0.450
2.900
3.600
7.200
22 tonne
41 tonne
10 tonne
10 tonne
10.5 tonne
10.5 tonne

P & H T500 50-tonne

10.9 42.0m

9.0 / 14.7m
10 / 30 offset

6.7 x 5.5m

20

360

P & H T500 50-tonne


10.9 42.0m

6.7 x 5.5m

21

270 Over sides & rear

Main Boom

mtrs
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
11.0
12.0
13.0
14.0
16.0
18.0
20.0
22.0
23.0
24.0
26.0
28.0
30.0
31.0

Main Boom

10.9 42.0m
mtrs
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
11.0
12.0
13.0
14.0
16.0
18.0
20.0

10.9
45.0
40.5
36.5
33.0
30.2
27.5
24.0
20.8
18.4
16.3
14.6
13.1
11.8

18.7
27.0
27.0
27.0
27.0
27.0
24.9
22.6
20.5
18.1
16.1
14.2
12.7
11.5
10.4
9.5
8.0
6.7
5.7
4.8
3.4

10.9
30.0
30.0
28.0
25.0
20.5
17.5
15.0
13.0
12.0
10.0
8.2
7.0
6.5

18.7
25.0
25.0
25.0
25.0
20.5
17.5
15.0
13.0
12.0
10.0
8.2
7.0
6.5
6.0
5.4
4.0
3.0
2.2
2.0
1.3

Fly Jib

10.9 42.0m

22.6
21.0
21.0
21.0
21.0
21.0
19.5
18.1
16.1
14.2
12.7
11.5
10.4
9.5
8.0
6.7
5.7
4.8
3.4
2.3
1.5

9.0 / 14.7m
angle
80.0
79.5
79.0
78.5
76.0
74.0
72.0
70.0
68.0
66.0
64.0
62.0
60.0

26.5

10
2.60
2.60
2.48
2.37
1.94
1.67
1.44
1.24
1.06
0.91
0.78
0.67
0.57

16.5
16.5
16.5
16.5
16.5
15.3
14.2
12.7
11.5
10.4
9.5
8.0
6.7
5.7
4.8
3.4
2.3
1.5
0.8
0.5

6.7 x 5.5m
22.6

26.5

21.0
21.0
20.5
17.5
16.0
13.0
12.0
10.0
8.2
7.0
6.5
6.0
5.0
4.2
3.0
2.2
2.0
1.3

16.5
16.5
16.5
13.0
11.0
10.0
8.2
7.0
6.5
5.6
5.0
4.0
3.0
2.2
1.8
1.3

9 m tr

6.7 x 5.5m
30
1.80
1.80
1.74
1.68
1.44
1.30
1.18
1.07
0.96
0.86
0.76
0.66

34.2

12.0
12.0
12.0
12.0
11.4
10.8
10.2
9.7
8.7
7.6
6.5
5.7
4.4
3.4
2.5
1.8
1.5
1.3
0.7
0.3

34.2

12.0
11.0
10.0
8.8
8.0
7.5
7.0
6.5
5.3
4.5
3.6
2.5
2.0
1.5

39.0

8.0
8.0
8.0
8.0
8.0
8.0
7.7
7.1
6.6
6.2
5.5
4.4
3.5
2.7
2.0
1.7
1.5
1.0
0.6
0.4

5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.2
4.7
3.9
3.1
2.4
2.1
1.8
1.3
0.9
0.6
0.4

90 Over front
39.0
42.0

8.0
8.0
8.0
8.0
7.0
6.0
5.5
5.0
4.5
3.6
3.0
2.0
1.5

Over sides & rear


14.7 m tr
10
30
1.60
1.00
1.60
1.00
1.60
1.00
1.53
1.00
1.25
0.91
1.08
0.83
0.96
0.75
0.85
0.67
0.74
0.60
0.64
0.52
0.54
0.44
0.45
0.36
0.36

Grove TMS5000 50-tonne


22

42.0

5.5
5.5
5.5
5.5
5.5
5.0
4.5
3.9
3.2
2.0
1.5
1.2

Overall length in travelling condition


Overall height
Overall width of carrier
Overall length of carrier
Centre to centre of extended outriggers (Front to back)
Centre to centre of extended outriggers (Side to side)
Width of outrigger footing
Distance from centre of rotation to back of chassis
Distance from centre of rotation to back of counter weight.
Counterweight outside turning diameter
Outrigger loading (max)
Total weight of crane
Axle weight ( 1st )
Axle weight ( 2nd )
Axle weight ( 3rd )
Axle weight ( 4th )

A
B
C
D
E
F
G
H

Grove TMS5000 50-tonne


23

11.3 35.0m

9.3 / 15.0m
5 offset

6.5 x 5.5m

Grove TMS5000 50-tonne


24

360

11.3
50.0
44.0
38.5
34.2
30.5
27.5
23.6
20.8
18.6
16.5
14.8
12.1

15.0
34.0
34.0
34.0
31.0
27.8
25.5
23.5
20.8
18.6
16.5
14.8
12.1
9.8
8.3
7.2

11.3
50.0
44.0
38.5
34.2
30.5
27.5
25.0
23.0
21.4
18.8
16.3
12.8

15.0
34.0
34.0
34.0
31.0
27.8
25.5
23.5
22.0
20.4
18.8
16.3
12.8
10.7
9.1
7.7

Main Boom

11.3 35.0m
m trs
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0

Main Boom

11.3 35.0m
m trs
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0

6.5 x 5.5m
20.0
27.0
27.0
27.0
25.2
23.7
22.0
20.4
18.5
16.5
14.8
12.1
10.1
8.5
7.5
6.5
5.7
5.0
4.4

6.5 x 5.5m
20.0
27.0
27.0
27.0
25.2
23.7
22.0
20.4
18.8
17.4
16.0
12.8
10.7
9.2
7.8
6.7
5.9
5.1
4.4

25.0
20.0
20.0
20.0
19.8
18.9
18.0
17.1
16.3
14.8
12.1
10.1
8.8
7.6
6.6
5.8
5.1
4.5
3.5
2.7
2.1

25.0
20.0
20.0
20.0
19.8
18.9
18.0
17.1
16.3
15.4
12.8
10.7
9.2
7.9
6.8
6.0
5.2
4.5
3.5
2.7
2.1

30.0

20 Over rear
35.0

15.0
15.0
15.0
15.0
14.2
13.5
12.7
11.5
10.1
8.8
7.6
6.6
5.8
5.1
4.5
3.5
2.7
2.1
1.5
1.1

30.0

10.0
10.0
10.0
10.0
10.0
10.0
10.0
8.7
7.7
6.7
5.9
5.1
4.5
3.5
2.8
2.1
1.5
1.1
0.7

Over sides
35.0

15.0
15.0
15.0
15.0
14.2
13.5
12.7
11.5
10.4
9.3
7.9
6.9
6.0
5.2
4.5
3.5
2.7
2.1
1.5
1.1

Grove TMS5000 50-tonne


25

10.0
10.0
10.0
10.0
10.0
10.0
10.0
8.7
7.9
6.9
6.0
5.2
4.5
3.5
2.8
2.1
1.5
1.1
0.7

11.3
28.0
28.0
28.0
23.5
20.0
17.0
14.5
12.5
10.7
9.2
7.9
5.6

Main Boom

11.3 35.0m
m trs
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0

9.3 / 15.0m
angle
80
75
74
72
70
68
65
60
55

Fly Jib

11.3 35.0m

15.0
24.0
24.0
24.0
21.1
18.4
16.1
14.0
12.2
10.6
9.1
7.8
5.7
4.3
3.3
2.5

6.5 x 5.5m
20.0

25.0

30.0

20.0
20.0
20.0
17.7
15.5
13.4
11.7
10.0
8.8
7.7
5.8
4.5
3.5
2.7
2.1
1.6
1.1
0.8

16.0
16.0
14.8
13.3
11.9
18.8
9.6
8.6
7.7
6.1
4.7
3.7
3.0
2.3
1.8
1.4
1.0

12.0
11.3
10.5
9.9
9.1
8.4
7.6
6.2
5.0
4.0
3.2
2.6
2.0
1.6
1.2

6.5 x 5.5m
9.3
4.5
4.5
4.5
4.5
3.6
3.0
2.2
1.3
0.7

26

Over front
35.0

Over sides & rear


15.0
3.0
3.0
3.0
2.6
2.3
2.0
1.5
0.9

9.0
9.0
9.0
8.2
7.6
6.4
5.2
4.2
3.4
2.8
2.3
1.8
1.5

Tadano TL300E 30-tonne


Overall length in travelling condition
Overall height
Overall width of carrier
Overall length of carrier
Centre to centre of extended outriggers (Front to back)
Centre to centre of extended outriggers (Side to side)
Width of outrigger footing
Distance from centre of rotation to back of chassis
Distance from centre of rotation to back of counter weight.
Counterweight outside turning diameter
Outrigger loading (max)
Total weight of crane
Axle weight ( 1st )
Axle weight ( 2nd )
Axle weight ( 3rd )
Axle weight ( 4th )

A
B
C
D
E
F
G
H

12.630
3.200
2.470
10.350
5.500
6.500
0.800
3.000
3.250
6.500
13.5 tonne
29.4 tonne
5.2 tonne
5.2 tonne
9.5 tonne
9.5 tonne

Tadano TL300E 30-tonne

10.5 33.0m

8.5 / 14.0m
5 / 30 offset

6.5 x 5.5m

27

360

Tadano TL300E 30-tonne

28

Main Boom

10.5 33.0m
mtrs
3.0
3.5
4.0
4.5
5.0
5.5
6.0
7.0
8.0
9.0
10.0
12.0
14.0
16.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0

Main Boom

10.5 33.0m
mtrs
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
9.0
10.0
12.0
14.0
15.0
16.0
17.0
18.0

10.5
30.0
25.4
22.9
21.0
19.4
17.7
16.2
13.3
11.0

14.2
20.0
20.0
20.0
20.0
18.4
16.8
15.3
12.7
11.0
9.0
7.3
5.1

6.5 x 5.5m
18.0
16.0
16.0
16.0
16.0
16.0
14.8
13.7
12.0
10.6
9.0
7.3
5.1
3.6
2.6

10.5
27.0
23.0
19.5
16.6
14.3
11.9
10.1
8.7
7.6
6.5
5.6

14.2
20.0
20.0
20.0
17.1
14.2
11.8
10.0
8.6
7.5
6.5
5.6
4.3
3.3
1.9

6.5 x 5.5m
18.0
16.0
16.0
16.0
16.0
13.8
11.6
9.9
8.6
7.4
6.4
5.5
4.3
3.3
1.9
1.0

21.7
12.0
12.0
12.0
12.0
12.0
12.0
11.0
10.2
9.2
7.7
5.4
4.0
3.0
2.2
1.6

21.7
12.0
12.0
12.0
12.0
12.0
10.3
9.0
7.9
6.8
6.0
4.7
3.7
2.4
1.4
1.1

25.5
11.5
11.5
11.5
11.5
11.5
10.0
8.9
8.1
7.3
5.7
4.3
3.2
2.5
1.9
1.4

25.5
11.5
11.5
11.5
11.5
10.3
9.2
8.2
7.2
6.4
5.0
4.0
2.6
1.7
1.3
1.0

270 Over sides & rear


29.2
33.0

9.0
9.0
9.0
9.0
8.2
7.5
6.8
5.7
4.4
3.4
2.7
2.1
1.6
1.2
0.8

90 Over front
29.2
33.0

9.0
9.0
9.0
9.0
8.4
7.4
6.6
5.2
4.2
2.8
1.9
1.6
1.2
1.0

Tadano TL300E 30-tonne

29

7.0
7.0
7.0
7.0
6.3
5.7
4.8
4.1
3.5
2.8
2.2
1.8
1.4
1.0
0.7
0.5

0.7
7.0
7.0
7.0
7.0
6.5
5.4
4.4
3.0
2.1
1.7
1.4
1.4
0.9

10.5 33.0m

8.5m

6.5 x 5.5m

Fly Jib

5
angle
80
78
77
76
75
70
65
60
55
50
45
43

10.5 33.0m

Radius
7.3
9.0
9.8
10.6
11.7
14.8
18.2
21.5
24.4
27.1
29.6
30.5

Load
3.0
3.0
3.0
3.0
3.0
2.3
1.9
1.6
1.2
0.8
0.5
0.4

14.0m

6.5 x 5.5m

Fly Jib

5
angle
80
78
77
76
75
70
65
60
55
50
45
43

Radius
9.1
11.0
11.9
12.8
13.6
17.7
21.5
25.2
28.7
31.8
34.6
35.6

Load
2.0
2.0
2.0
1.9
1.8
1.4
1.1
0.9
0.7
0.6
0.4
0.3

270 Over sides &


rear
30
Radius
Load
10.4
1.6
11.9
1.6
12.6
1.6
13.4
1.6
14.1
1.5
17.5
1.4
20.7
1.2
23.8
1.1
26.6
1.0
29.1
0.7
31.3
0.5
32.1
0.4

270 Over sides &


rear
30
Radius
Load
14.2
0.9
15.8
0.9
16.6
0.9
17.4
0.8
18.7
0.8
22.0
0.7
25.6
0.6
28.9
0.6
32.1
0.5
34.8
0.5
37.2
0.3
38.1
0.3

Kato NK250V 25-tonne

30

Overall length in travelling condition


Overall height
Overall width of carrier
Overall length of carrier
Centre to centre of extended outriggers (Front to back)
Centre to centre of extended outriggers (Side to side)
Width of outrigger footing
Distance from centre of rotation to back of chassis
Distance from centre of rotation to back of counter weight.
Counterweight outside turning diameter
Outrigger loading (max)
Total weight of crane
Axle weight ( 1st )
Axle weight ( 2nd )
Axle weight ( 3rd )
Axle weight ( 4th )

A
B
C
D
E
F
G
H

12.630
3.200
2.470
10.350
5.500
6.500
0.800
3.000
3.250
6.500
13.5 tonne
29.4 tonne
5.2 tonne
5.2 tonne
9.5 tonne
9.5 tonne

Kato NK250V 25-tonne

10.5 33.0m

8.7 / 14.5m
5 / 17 / 30 offset

6.5 x 5.5m

31

360

Kato NK250V 25-tonne

32

10.5
25.0
25.0
25.0
22.9
21.0
19.4
16.2
13.7
11.4
9.4

10.5 33.0m

Fly Jib

Main Boom

10.5 33.0m
mtrs
2.5
3.0
3.5
4.0
4.5
5.0
6.0
7.0
8.0
8.8
9.0
10.0
12.0
12.5
13.0
14.0
16.0
16.3
18.0
20.0
22.0
23.8
26.0
27.5
29.0
31.3

angle
80
76
74
70
66
62
58
56
54
50
46
43

10.5 33.0m

Radius
8.0
11.0
12.5
15.3
18.0
20.5
23.0
24.0
25.1
27.2
29.2
30.6

14.2
20.0
20.0
20.0
20.0
20.0
18.4
15.3
12.7
10.6
9.2
8.9
7.2
4.9
4.4

6.5 x 5.5m + Front Jack


18.0
21.7
16.0
16.0
16.0
12.0
16.0
12.0
16.0
12.0
16.0
12.0
13.7
12.0
12.0
11.0
10.4
10.2
9.1
9.4
8.7
9.1
7.0
7.6
4.8
5.3
4.4
4.8
4.0
4.4
3.3
3.8
2.4
2.8
2.3
2.7
2.1
1.5

8.7m
5
Load
3.0
3.0
2.7
2.3
1.9
1.7
1.3
1.1
0.9
0.5
0.3
0.1

14.5m

11.5
11.5
11.5
11.5
10.0
8.9
8.3
8.1
7.3
5.6
5.2
4.8
4.1
3.0
2.9
2.3
1.7
1.2
0.9

6.7 x 5.5m + Front Jack


17
Radius
Load
9.6
2.2
12.5
2.2
14.0
2.1
16.6
1.8
19.2
1.6
21.8
1.4
24.1
1.2
25.2
1.0
26.3
0.8
28.2
0.5
30.1
0.2
31.5
0.1

6.7 x 5.5m + Front Jack

33

360
29.2

25.5

9.0
9.0
9.0
8.2
7.6
7.5
6.8
5.6
5.3
4.9
4.3
3.3
3.2
2.5
1.9
1.4
1.1
0.8
0.5

7.0
7.0
6.4
6.3
5.7
4.8
4.6
4.5
4.1
3.4
3.3
2.6
2.0
1.5
1.2
0.9
0.7
0.5
0.3

360
30
Radius
11.3
14.0
15.3
18.0
20.4
22.8
25.0
26.0
27.1
29.0
30.7
32.2

Load
1.6
1.6
1.5
1.5
1.3
1.2
1.1
1.0
0.8
0.5
0.2
0.1

360

33.0

Tokyu CT202A 20-tonne

Overall length in travelling condition


Overall height
Overall width of carrier
Overall length of carrier
Centre to centre of extended outriggers (Front to back)
Centre to centre of extended outriggers (Side to side)
Width of outrigger footing
Distance from centre of rotation to back of chassis
Distance from centre of rotation to back of counter weight.
Counterweight outside turning diameter
Outrigger loading (max)
Total weight of crane
Axle weight ( 1st )
Axle weight ( 2nd )
Axle weight ( 3rd )

34

12.7m
A
B
C
D
E
F
G
H

2.46m
9.15m
4.95m
6.0m
0.4m
2.4m
2.83m
5.66m
18 tonnes
24.7 tonnes
7.1 tonnes
8.8 tonnes
8.8 tonnes

Tokyu CT202A 20-tonne

10.8 31.5m

7.5m
5 / 30 offset

6.0 x 5.0m

35

270 Over sides & rear

Tokyu CT202A 20-tonne

Main Boom

10.8 31.5m

mtrs
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
8.0
8.5
9.0
10.0
12.0
14.0
15.5
16.0
18.0
20.0
22.0
24.0
25.0
26.0
27.0
28.0
29.0
29.4
30.0

6.0 x 5.0m
17.0
13.5
13.5
13.5
13.5
12.8
12.0
11.5
10.4
9.3
7.6
6.9
6.2
5.1
3.6
2.6
2.1

7.5m

Fly Jib

10.8 31.5m

10.8
20.0
20.0
17.9
15.8
14.3
13.0
11.8
10.4
9.3
7.5
6.9

24.0

7.0
7.0
7.0
7.0
7.0
6.6
6.2
5.9
5.4
3.9
3.0
2.5
2.3
1.8
1.4
1.1

6.0 x 5.0m

4.5
4.5
4.5
4.5
4.2
3.6
3.1
2.6
2.4
1.9
1.4
1.1
0.9
0.8
0.7
0.6
0.5
0.4
0.4
0.4

270 Over sides &


rear

angle

30

76

2.50

1.25

70

1.90

1.10

65

1.50

1.05

60

1.35

1.00

50

0.60

0.55

40

0.20

0.15

36

270 Over sides & rear


31.5

Franna AT14 14-tonne

FRANNA 14-tonne Dimensions


Overall length in travelling condition
Overall height

2.89 metres

Overall width

2.45 metres

Overall length of carrier

6.0 metres

37

Franna AT14 14-tonne

38

Franna AT14 14-tonne

*
#
mtr

KEY
S.W.L in Kg for slew angles of 10 deg; OR LESS either side of straight ahead.
S.W.L in Kg for slew angles of 10 deg; OR GREATER either side of straight ahead
Radius in metres.
Boom length in metres - Manual Extension Retracted

Angle
60
50
40
30
20
10
0

5.56
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr

7.5
7.5
1.43
7.5
7.5
2.15
7.5
7.5
2.74
7.2
6.5
3.19
6.5
5.9
3.48
6.3
5.6
3.60

6.00

7.5
7.5
1.65
7.5
7.5
2.42
7.5
6.8
3.05
6.5
5.8
3.52
5.9
5.3
3.83
5.7
5.1
3.95

Manual Extension

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.00

10.50

11.00

11.50

12.00

12.50

13.00

13.50

13.85

16.85

17.90

7.5
7.5
1.97
7.5
7.4
2.80
6.5
5.8
3.48
5.6
5.0
3.99
5.1
4.6
4.32
4.9
4.4
4.45

7.5
7.5
1.28
7.5
7.5
2.30
7.2
6.4
3.18
5.7
5.1
3.91
4.9
4.4
4.46
4.5
4.0
4.81
4.4
3.9
4.95

7.5
7.5
1.53
7.5
7.5
2.62
6.3
5.7
3.57
5.1
4.5
4.35
4.4
3.9
4.93
4.0
3.6
5.30
3.9
3.5
5.45

7.5
7.5
1.78
7.5
7.0
2.94
5.7
5.0
3.95
4.6
4.1
4.78
3.9
3.5
5.40
3.6
3.2
5.80
3.5
3.1
5.95

7.5
7.5
2.03
7.0
6.3
3.26
5.1
4.5
4.33
4.1
3.7
5.21
3.6
3.2
5.87
3.3
2.9
6.29
3.2
2.8
6.45

7.5
7.5
2.28
6.3
5.6
3.58
4.6
4.1
4.72
3.7
3.3
5.64
3.3
2.9
6.34
3.0
2.6
6.78
2.9
2.6
6.95

7.5
7.5
2.53
5.7
5.1
3.90
4.2
3.7
5.10
3.4
3.0
6.08
3.0
2.6
6.81
2.7
2.4
7.27
2.7
2.3
7.45

7.5
7.4
2.78
5.2
4.7
4.22
3.9
3.4
5.48
3.1
2.8
6.51
2.7
2.4
7.28
2.5
2.2
7.77
2.4
2.1
7.95

6.9
6.8
3.03
4.8
4.3
4.54
3.6
3.2
5.86
2.9
2.6
6.94
2.5
2.2
7.75
2.3
2.0
8.26
2.2
2.0
8.45

5.8
5.8
3.28
4.4
3.9
4.87
3.3
2.9
6.25
2.7
2.4
7.38
2.3
2.0
8.22
2.1
1.9
8.75
2.1
1.8
8.95

5.2
5.2
3.53
4.1
3.6
5.19
3.1
2.7
6.63
2.5
2.2
7.81
2.2
1.9
8.69
2.0
1.7
9.24
1.9
1.7
9.45

4.8
4.8
3.78
3.7
3.4
5.51
2.9
2.5
7.01
2.3
2.0
8.24
2.0
1.8
9.16
1.9
1.6
9.74
1.8
1.6
9.95

4.4
4.4
4.03
3.4
3.2
5.83
2.7
2.3
7.40
2.2
1.9
8.68
1.9
1.6
9.63
1.7
1.5
10.23
1.7
1.4
10.45

4.1
4.1
4.28
3.2
3.0
6.15
2.5
2.2
7.78
2.0
1.8
9.11
1.8
1.5
10.10
1.6
1.4
10.72
1.6
1.3
10.95

3.8
3.8
4.53
3.0
2.8
6.47
2.3
2.1
8.16
1.9
1.7
9.54
1.6
1.4
10.57
1.5
1.3
11.21
1.5
1.3
11.45

3.6
3.6
4.70
2.8
2.7
6.70
2.2
2.0
8.43
1.8
1.6
9.84
1.6
1.4
10.90
1.4
1.2
11.56
1.4
1.2
11.80

2.3
2.3
6.20
1.9
1.9
8.63
1.6
1.5
10.73
1.4
1.2
12.44
1.2
1.0
13.72
1.1
0.9
14.51
1.1
0.9
14.80

1.9
1.9
6.73
1.6
1.6
9.30
1.3
1.3
11.53
1.2
1.1
13.35
1.1
9.5
14.70
1.0
0.9
15.51
1.0
0.8
15.85

39

Franna AT14 14-tonne

Boom Pivot to Inner Lug, 1st Jib Extension


Manual Extension Retracted
Angle
60
50
40
30
20
10
0

3.58
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr

14.0
14.0
1.32
14.0
13.8
1.48
14.0
13.2
1.53

4.00

14.0
14.0
1.02
14.0
14.0
1.42
13.0
11.7
1.71
11.7
10.4
1.89
11.3
10.1
1.95

4.50

14.0
14.0
1.40
11.9
10.6
1.85
9.9
8.8
2.18
9.0
8.0
2.39
8.7
7.7
2.45

5.00

14.0
14.0
1.17
12.3
11.0
1.79
9.4
8.3
2.29
7.9
7.0
2.65
7.2
6.3
2.88
6.9
6.1
2.95

5.50

13.2
13.2
1.49
9.9
8.8
2.17
7.6
6.8
2.72
6.5
5.7
3.12
5.9
5.2
3.37
5.7
5.0
3.45

6.00

6.50

7.00

7.68

11.9
10.7
1.81
8.2
7.2
2.55
6.4
5.6
3.15
5.4
4.8
3.59
5.0
4.3
3.86
4.8
4.2
3.95

12.5
12.5
1.21
10.0
8.8
2.13
6.9
6.1
2.94
5.4
4.8
3.58
4.6
4.1
4.06
4.2
3.7
4.36
4.1
3.6
4.45

11.5
11.5
1.46
8.5
7.5
2.46
5.9
5.2
3.32
4.7
4.1
4.02
4.0
3.5
4.53
3.6
3.2
4.85
3.5
3.1
4.95

10.3
10.3
1.80
7.0
6.1
2.89
4.9
4.3
3.84
3.9
3.4
4.61
3.3
2.9
5.17
3.0
2.6
5.52
2.9
2.5
5.63

Boom Pivot to Outer Lug, 1st Jib Extension


Manual Extension Retracted
Angle
60
50
40
30
20
10
0

4.70
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr
*
#
mtr

14.0
13.7
1.56
11.5
10.3
2.03
9.7
8.7
2.37
8.8
7.9
2.58
8.5
7.6
2.65

5.00

14.0
14.0
1.17
13.1
11.8
1.79
10.0
9.0
2.29
8.5
7.6
2.65
7.8
6.9
2.88
7.5
6.7
2.95

5.50

13.6
13.6
1.49
10.1
9.4
2.17
8.2
7.3
2.72
7.0
6.2
3.12
6.4
5.7
3.37
6.2
5.5
3.45

6.00

6.50

7.00

7.50

8.00

8.50

9.00

12.3
11.4
1.81
8.7
7.8
2.55
6.9
6.1
3.15
5.9
5.2
3.59
5.4
4.8
3.86
5.2
4.6
3.95

12.9
12.9
1.21
10.5
9.4
2.13
7.4
6.6
2.94
5.9
5.2
3.58
5.0
4.5
4.06
4.6
4.1
4.36
4.5
3.9
4.45

11.8
11.8
1.46
9.0
8.0
2.46
6.4
5.6
3.32
5.1
4.5
4.02
4.4
3.8
4.53
4.0
3.5
4.85
3.9
3.4
4.95

10.9
10.9
1.71
7.7
6.9
2.78
5.5
4.9
3.70
4.4
3.9
4.45
3.8
3.3
5.00
3.5
3.0
5.34
3.4
2.9
5.45

10.1
10.1
1.96
6.8
6.0
3.10
4.9
4.3
4.08
3.9
3.4
4.88
3.4
2.9
5.47
3.1
2.7
5.83
3.0
2.6
5.95

8.8
8.8
2.21
6.0
5.3
3.42
4.3
3.8
4.47
3.5
3.0
5.32
3.0
2.6
5.94
2.7
2.3
6.32
2.6
2.3
6.45

8.0
8.0
2.36
5.6
5.0
3.61
4.1
3.5
4.70
3.2
2.8
5.58
2.8
2.4
6.22
2.5
2.2
6.62
2.4
2.1
6.75

40

Prop Specifications

Lightweight, strong speedy adjustment and meets NZ code


requirements.
Suitable for positioning & stabilising precast and timber columns, precast
wall panels, blockwork walls, and formwork.
Panel props should be positioned between 60% and 85% up the face of
the panel from finished floor level.

Prop Specifications
Nominal
Length
(mtr)

Adjustable
Length
(mm)

Allowable
Axial Load
Capacity
(tonnes)

3.0
5.0
6.5
8.0

3,540-4,010
5,165-5,635
6,790-7,260
8,415-8,885

5.0t
3.6t
2.2t
1.5t

Prop Positioning (mtrs)


A
B
C
Prop
Length

Height
Up
Panel
Face
3.0
4.4
5.6
6.8

3.0
5.0
6.5
8.0

Foot
Distance
From
Panel
2.0
3.0
4.0
5.0

Prop Selection (Allowable spacing per prop (mtrs)


Panel Height
from Floor
(mtr)
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
12.0

3.0 metre
120mm
thick
panel
23.3
18.4
14.9
12.3

prop
150mm
thick
panel
21.3
16.9
13.7
11.2

5.0 metre
120mm
thick
panel

8.5
7.1
6.1
5.2
4.6
4.0

prop
150mm
thick
panel

7.8
6.6
5.6
4.9
4.2
3.7

6.5 metre
120mm
thick
panel

3.5
3.1
2.8
2.5
2.2
2.0

prop
150mm
thick
panel

3.3
2.9
2.5
2.3
2.0
1.8

8.0 metre
120mm
thick
panel

prop
150mm
thick
panel

1.9
1.7
1.5
1.4
1.3
1.2

1.7
1.5
1.4
1.3
1.2
1.1

NOTE:
Values in this table were calculated considering a 0.5kPa wind loading applied to the panel and gravity loads imposed on the prop in compression due
to a 5 degree inclination angle to the vertical. It includes a safety factor of 1.5.
Factors for earthquake loadings producing lateral acceleration of > 1/3G may be calculated using the following formula:
Earthquake Prop Spacing = (Prop spacing from table) (C 6)
Where C = earthquake coefficient from NZS 4203:1992.
A similar equation can be used for higher wind pressures than 0.5kPa.
High Wind Prop Spacing = (Prop spacing from table 0.5kPa) (Local Wind pressure (kPa))

41

Precast Flooring Weights


Unispan
1200
Item
wide
75mm Flat Slab
0.22

2400
wide
0.44

100mm Flat Slab

0.30

0.58

120mm Flat Slab

0.35

0.70

125mm Flat Slab

0.36

0.72

150mm Flat Slab

0.44

0.88

Size
200TT
250TT
300TT
350TT
400TT
450TT
500TT
550TT
Size
200TT
250TT
300TT
350TT
400TT
450TT
500TT

400 Wide Shell Beams

Double Tees
200 Web (Stahlton)
2400 wide
0.465
0.515
0.565
0.620
0.670
0.720
0.770
0.825
200 Web (Stresscrete)
2400 wide
0.468
0.515
0.561
0.605
0.647
0.687
0.725

Side 2
600
500
400
300

0.33
0.30
0.27
0.25

500
500
500

500
400
300

0.28
0.25
0.23

400
400

400
300

0.24
0.21

300

300

0.19

600 Wide Shell Beams


Side 1
Side 2
600
600
600
500
600
400
600
300

Dycore

0.38
0.35
0.33
0.31

500
500
500

500
400
300

0.33
0.31
0.29

400
400

400
300

0.30
0.26

300

300

0.25

All weights are in tonnes/ lineal metre.

Dycore 200
Dycore 300
Dycore 400

0.40
0.50
0.55

800Ti200
800Ti225
800Ti250
800Ti275
800Ti300
800Ti325
800Ti350
800Ti400

0.042
0.052
0.062
0.072
0.083
0.093
0.103
0.125

Weights are approximate and should be


checked with your Precast supplier.
Interspan Ribs
900Ti215
900Ti240
900Ti265
900Ti290
900Ti315
900Ti340
900Ti365
800 or 900 = Rib Centre
Ti = Timber Infill

Timber Infills
Size
800 x 300 x 25
800 x 200 x 25

Side 1
600
600
600
600

Per
piece
0.005
0.0033

200 or 350 etc = Floor Thickness


900 = 40mm Timber

42

0.042
0.052
0.062
0.072
0.083
0.093
0.103

Crane Hand Signals

STOP: Extend one arm forward and


hold palm of hand vertical.

LOWER HOOK: With arm extended


downward, forefinger pointing
downward, move arm in small
horizontal circles.

RAISE HOOK: With forearm


vertical, forefinger pointing up,
move hand in small horizontal
circles.

SLEW: Arm extended, point with


finger in direction of swing of boom.

EXTEND BOOM: Both fists in front


of body with thumbs pointing
outward.

RETRACT BOOM: Both fists in


front of body with thumbs pointing
towards each other.

RAISE BOOM - (LUFF UP): Arm


extended, fingers closed, thumb
pointing upward.

LOWER BOOM - (LUFF DOWN):


Arm extended, fingers closed,
thumb pointing downward.

HOLD EVERYTHING: Clasp hands


in front of body.

LOWER BOOM & RAISE LOAD: One


arm extended, fingers closed, thumb
pointing downward. One arm vertical
with forefinger pointing up, move arm
in horizontal circles.

USE MAIN HOIST: Tap fist on


head, then use regular signals.

USE FLYLINE (AUXILIARY


HOIST): Tap elbow with one hand,
then use regular signals.

43

Lifting Gear

Mancage, Machinery Platforms


and Work Platforms:
Various sizes and ratings available.

Pallet Fork:
For lifting pallets of product.

Concrete Skip:
Can pour concrete straight down or
angles with a chute.

Spreader Beam:
Various sizes, fixed and adjustable.
Lifting Beam:
Various sizes, fixed and adjustable.
Container Lifting Lugs:
For lifting shipping containers.

Tree Lifting:
We have done many palm tree
placements.

44

Panel Set-out

45

Tilt-up Panel Configurations

46

Tilt-up Panel Configurations

47

Terms & Conditions of Hire


as per Power Crane Association Documentation (in brief) and include:
Warranty and Acceptance
The Hirer acknowledges that the Owner has entered into this Agreement on the basis of information supplied to the
Owner by the Hirer and warrants that the information is accurate. Acceptance by the Hirer of the Crane shall be deemed
to be acceptance of the terms of this Agreement.
Slings
The Owner will supply its standard selection of slings and lifting equipment but accepts no responsibility for loss or delay
if these are found to be unsuitable for the purpose required. All slings and ancillary equipment shall be used by the Hirer
at the sole risk of the Hirer. The Owner does not accept responsibility for the correct use of slings or lifting equipment or
for the method of slinging. If any slings or lifting equipment being the property of the Owner shall be destroyed or
damaged, the Hirer shall pay to the Owner the costs of replacement or repair (as the case may be) resulting from that
destruction or damage.
Site Conditions and Access
The Hirer will ensure:
(i) That the ground at the site is adequate to support the Crane under its wheels, tracks and/or outriggers.
(ii) That the ground giving access to the site is stable and firm and of a gradient no steeper than 1 in 10.
(iii) That clearance of 4 metres is afforded in respect of all overhead wires and that footpaths, kerbs and
channels are suitably planked.
Should the crane need to be towed into or out of the site, the cost shall be additional to the rate quoted and will be to
the Hirers account.
Use and Handling of Crane
(a) The Crane Operator shall be under the direction and control of the Hirer.
(b) The Hirer shall not:
(i) Require, permit or suffer the Crane Operator to do anything contrary to any Act, Regulation, Code of Practice
or recognized convention.
(ii) Allow any other person to operate the Crane without first obtaining the written consent of the Owner.
Damage to Goods
The Owner accepts no responsibility for loss or damage to goods being handled by the Crane or damaged by the Crane
however caused during the period of hire except for loss or damage arising out of any negligent act or default of the
Owner.
Damage to Services and Property
The Hirer shall be solely responsible for all damage which may be caused to underground and overhead services,
footpaths, driveways, grounds, lawns, fences, structures, vehicles or any property whatsoever caused by the Hirer or the
Crane during the period of hire.
Risk
The Hirer shall not do or permit anything in connection with the Crane or its use whereby any policy or policies of
insurance effected in connection with the Crane or its use may become void or voidable.
Period of Hire
The period of hire shall be calculated on a depot to depot basis.
Additional Crane Equipment
Where the transport of additional Crane Equipment is required, the cost of it will be additional to the hire rates quoted.
Overtime
Our working hours are between 7.00am and 5.30pm, Monday to Friday. Overtime charges of $40.00 per man will be
payable by the Hirer for all work performed outside these hours.
Additional Driver Travel
If a Crane Operator is required to travel to and from site (Crane is left on site) a travel fee of $60.00 each way will apply.
Retentions
No retentions to be held.

48

Terms & Conditions of Hire


Payment Terms
Monthly payments by the 20th of each month for previous months work.
Permits
The cost of additional Council, Local Body or Utility permits required are not included in the hire rates quoted and will be
additional to the Hirers account.
Governing Law
This Agreement shall be governed by and interpreted in accordance with the laws of New Zealand. The Hirer shall
observe and comply with the provisions of all Acts, Regulations, By-laws and Codes of Practice in force during the period
of hire.