Vous êtes sur la page 1sur 13

TECN. LESLY ELIAS A.

CELULAR: 949535451

PRESUPUESTO
OBRA: AMPLIACIN DE OFICINA DE TOPOGRAFIA
PROPIETARIO: SENCICO
CONTRATISTA: ELIAS CONTRATISTA GENERALES SAC

ITEM
1.0000
1.010
1.01.01
1.01.02
1.01.03
1.020
1.02.01
1.02.02
1.02.03
1.030
1.03.01
1.03.02
1.03.03
1.03.04
2.0000
2.01
2.02

DESCRIPCIN
CONCRETO ARMADO
COLUMNAS
CONCRETO F'C= 175 KG/CM2.
ENCOFRADO-DESENCOFRADO
ACERO
VIGAS
CONCRETO F'C= 175 KG/CM2.
ENCOFRADO-DESENCOFRADO
ACERO
LOSA ALIGERADA
CONCRETO F'C= 175 KG/CM2.
ENCOFRADO-DESENCOFRADO
LADRILLO 0.15X 0.30X 0.30
ACERO
MUROS
DE LADRILLO KK 18 HCO.SOGA
DE LADRILLO KK 18 HCO.CABEZA

FECHA:
May-13
UBICACIN: AV. CANAD N 1500. SAN BORJA. LIMA
REA GEOGRFICA: 02

UND.

CANT.

P. UNIT.

PARCIAL

IMPORTE

M3.
M2.
KG.

13.00
80.00
950.00

337.17
35.82
4.24

4,383.21
2,865.60
4,028.00

11,276.81

M3.
M2.
KG.

9.00
45.00
700.00

308.76
40.54
4.24

2,778.84
1,824.30
2,968.00

7,571.14

M3.
M2.
UND.
KG.

8.00
110.00
916.30
695.00

282.47
28.22
1.62
4.24

2,259.76
3,104.20
1,484.41
2,946.80

9,795.17

35.00
54.13
1,894.55
65.00
85.46
5,554.90
COSTO DIRECTO
GASTOS GENERALES ( 15% )
UTILIDAD ( 10 % )
SUBTOTAL
IGV ( 18%)
TOTAL

7,449.45
36,092.57
5,413.89
3,609.26
45,115.72
8,120.83
53,236.55

M2.
M2.

TECN. LESLY ELIAS A.


CELULAR: 949535451

SAN BORJA. LIMA

IU
#
ITEM

DESCRIPCIN

1.0000

CONCRETO ARMADO

1.010

COLUMNAS

UND.

CANT.

P. UNIT.

PARCIAL

M3.

13.00

337.17

4,383.21

1.01.01

CONCRETO F'C= 175 KG/CM2.

1.01.02

ENCOFRADO-DESENCOFRADO

M2.

80.00

35.82

2,865.60

1.01.03

ACERO

KG.

950.00

4.24

4,028.00

1.020

VIGAS

1.02.01

CONCRETO F'C= 175 KG/CM2.

M3.

9.00

308.76

2,778.84

1.02.02

ENCOFRADO-DESENCOFRADO

M2.

45.00

40.54

1,824.30

1.02.03

ACERO

KG.

700.00

4.24

2,968.00

M3.

8.00

282.47

2,259.76

1.030

LOSA ALIGERADA

1.03.01

CONCRETO F'C= 175 KG/CM2.

1.03.02

ENCOFRADO-DESENCOFRADO

1.03.03

LADRILLO 0.15X 0.30X 0.30

1.03.04

ACERO

2.0000

MUROS

M2.

110.00

28.22

3,104.20

UND.

916.30

1.62

1,484.41

KG.

695.00

4.24

2,946.80

2.01

DE LADRILLO KK 18 HCO.SOGA

M2.

35.00

54.13

1,894.55

2.02

DE LADRILLO KK 18 HCO.CABEZA

M2.

65.00

85.46

5,554.90

C.I.
1.001
0.999

1.000

CI= IMPORTE DE CADA INSUMO


SUBTOTAL

NOTA.CI= COEFICIENTE DE INCIDENCIA


0.abc

IMPORTE DE INSUMOS POR ACTIVIDAD


( S/.)

21
1
CEM.

4
2
A.G.

5
3
P.CH.

43
4
MAD.

2
5
ALAMB#8

2
6
CLAV.

2
7
ALMB.#16

1,589.64
-----

252.85
-----

544.18
-----

--896.00
---

--37.60
---

--60.80
---

----95.00

1,100.52
-----

175.05
-----

376.74
-----

--519.75
---

--10.80
---

--31.05
---

----70.00

978.24
-------

155.60
-------

334.88
-------

--979.00
-----

--26.40
-----

--41.80
-----

----69.50

116.55
367.25
4,152.20

38.85
143.65
766.00

----1,255.80

29.05
53.95
2,477.75

----74.80

1.40
2.60
137.65

----234.50

0.092

0.017

0.028

0.055

0.002

0.003

0.005

0.010
0.065

DESCRIPCIN
ARENA GRUESA
P.CHANCADA
MAQ.

IU.
004
005
048

CI
0.017
0.028
0.010
0.055

0.010

%
30.91
50.91
18.18
100.00

75.51
12.82
88.33

3
8
FE.

17
9
LAD. TECHO

17
10
LAD. KK

47
11
CAP.

47
12
OP.

47
13
OFIC.

47
14
PE.

----2,698.00

-------

-------

34.45
106.40
190.00

297.57
916.00
541.50

252.33
776.80
456.00

1,136.20
-----

----1,988.00

-------

-------

20.52
71.55
140.00

176.58
618.30
399.00

74.88
524.25
336.00

674.19
-----

-----

---------

20.40
116.60
91.63
139.00

131.84
1,007.60

74.56
853.60

1,973.80

----788.02
---

396.15

333.60

436.32
--604.76
---

----6,659.80

----788.02

789.95
2,696.20
3,486.15

59.50
148.20
1,138.25

511.35
1,275.30
6,271.19

----3,682.02

312.55
779.35
3,943.37

0.148

0.017

0.077

0.025

0.139

0.082

0.087

0.094

DESCRIPCIN IU.
MADERA
043
HERR.
037

70.51
16.67
12.82
100.00

0.333

CI

%
0.065
0.013
0.078

83.33
16.67
100

83.33
16.67
100.00

48
15
MEZCLA.

48
16
VIBRA.

48
17
WUINCH.

37
18
HERR.

39
19
GGUU

131.04
-----

76.18
-----

-------

68.77
72.00
47.50

-----

54.18
-----

31.50
-----

56.79
-----

37.89
48.60
35.00

-------

38.56
-------

22.40
-------

40.40
-------

26.56
79.20
34.75

---------

----223.78

----130.08

----97.19

35.35
88.40
574.02

----9,023.15

0.005

0.003

0.002

0.013

0.200

0.010

CI= 1.000

ANALISIS DE COSTO

PARTIDA: 1.01.01
DESCRIPCIN: CONCRETO F'C=175 KG/CM2. COLUMNA
CUADRILLA: 0.1 CAP + 1 OP. + 1 OFIC. + 5 PE.
RENDIMIENTO: 6.00 M3/DA

IU
004
005
021

MATERIALES
Arena gruesa
Piedra chancada
Cemento PORTLAND TIPO-I

UND
M3.
M3.
Bls.

CANT.
0.5100
0.7600
8.6600

UND.: M3.
FECHA. MAYO 2013
ELABORADO POR: LESLY ELIAS

P.UNIT
P.PARCIAL
38.14
19.45
55.08
41.86
14.12
122.28

IMPORTE

183.59
IU
47
47
47
47

MANO DE OBRA
Cap.
Op.
Ofic.
Ay.

UND
H-H
H-H
H-H
H-H

CANT.
0.1333
1.3333
1.3333
6.6667

P.UNIT
19.92
17.17
14.56
13.11

P.PARCIAL
2.65
22.89
19.41
87.40

IMPORTE

132.35
IU
048
048
037

MAQUINARIA-EQUIPO
Mezcladora de 11p3.
Vibradora
Herr.

UND
H-M
H-M
%

CANT.
0.6700
0.6700
4 M.O.

P.UNIT
P.PARCIAL
15.05
10.08
8.75
5.86
132.35
5.29

IMPORTE

21.23
P. UNIT.

ANALISIS DE COSTO

PARTIDA: 1.01.02
DESCRIPCIN: ENCOF.-DESENCOF. COLUMNAS
CUADRILLA: 0.1 CP. + 1 OP. +1 OFIC.

UND.: M2.
FECHA. MAYO 2013
ELABORADO POR: LESLY ELIAS

337.17

RENDIMIENTO: 12.00M2/DA

IU

MATERIALES

002 Alambre negro N8


043 Madera tornillo
002 Clavo

UND
Kg.
p2.
Kg.

CANT.
0.2000
4.4800
0.2000

P.UNIT P.PARCIAL
2.35
0.47
2.50
11.20
3.80
0.76

IMPORTE

12.43
IU
047
047
047

MANO DE OBRA
Cap.
Op.
Ofic.

UND
H-H
H-H
H-H

CANT.
0.0667
0.6667
0.6667

P.UNIT
19.92
17.17
14.56

P.PARCIAL
1.33
11.45
9.71

IMPORTE

22.49
IU MAQUINARIA-EQUIPO
037 HERR.

UND
%

CANT.
4.0000

P.UNIT P.PARCIAL
22.49
0.90

IMPORTE

0.90
P. UNIT.

35.82

ANALISIS DE COSTO

PARTIDA: 1.01.03
DESCRIPCIN: ACERO CORRUGADO .COLUMNAS.
CUADRILLA: 0.3 CAP. + 1 OP. + 1 OFIC.
RENDIMIENTO: 240.00 KG/DA

IU

MATERIALES

003 Fierro de construccin


002 Alambre N16

UND
Kg.
Kg.

UND.: KG.
FECHA. MAYO 2013
ELABORADO POR: LESLY ELIAS

CANT.
1.0700
0.0250

P.UNIT P.PARCIAL
2.65
2.84
4.16
0.10

IMPORTE

2.94
IU
047
047
047

MANO DE OBRA
Cap.
Op.
Ofic.

UND
H-H
H-H
H-H

CANT.
0.0100
0.0333
0.0333

P.UNIT
19.92
17.17
14.56

P.PARCIAL
0.20
0.57
0.48

IMPORTE

1.25
IU MAQUINARIA-EQUIPO
037 HERR.

UND
%

CANT.
4.0000

P.UNIT P.PARCIAL
1.25
0.05

IMPORTE

0.05
P. UNIT.

4.24

OP=

1x8
6

1.3333

5/8"

14.04 KG
1 KG.

9 ML,

X
S/.
37.2
2.65

1.56 KG/ML.

14.04 KG.

EXCAVACIN ZANJA:
R= 4.00 M3/DA

JB.

8 HORAS
8.5 HR.

4M3.
4.25

M3.

COSTO DE LA HERRAMIENTA
MNIMO= 2% M.O.
EL COSTO EST EN FUNCIN DEL COSTO DE LA MANO DE OBRA
MXIMO = 5% M.O.

COSTO DEL CAPATAZ


MNIMO= 10 % OP.
EL COSTO DEL CAPATAZ ES UN PORCENTAJE DEL OPERARIO
MXIMO = 20% OP

NIMO= 2% M.O.

XIMO = 5% M.O.

NIMO= 10 % OP.

XIMO = 20% OP