Académique Documents
Professionnel Documents
Culture Documents
QCF05-001
GROUT RELEASE & INSPECTION REPORT
Project No.:
TOROMOCHO CC-22
Client:
Prepared By:
Henrry Figueroa C.
Location:
VESSEL
Report No.:
Date:Pedestales
x STRUCTURAL STEEL
PUMP
GR 40
EXCHANGER
OTHER
Craft
Initial/Date
QA/QC
Initial/Date
03-04-2013
H.F.C.
Equip./Item/Column No.
Ref. Dwg.
Bases de Pedestales
SSK-C-CC2059-INF-048 H1 Rev.0
1. Item on centerline/elevation (plumb)
2. Pre-grout alignment complete (styrofoam sleeves removed if applicable)
03-04-2013
H.F.C.
03-04-2013
H.F.C.
4. Formwork complete/correct
03-04-2013
H.F.C.
Remarks
SIKAGROUT 212
BASES A VACIAR : Pedestales bases para soportes de tubera ( S13-53A, S13-54A, S13-55A)
Contractor/Craft
Client Representative
By
By
By
Date
Date
Date