Aker Solutions

QCF05-001
GROUT RELEASE & INSPECTION REPORT

Project No.:

TOROMOCHO CC-22

Client:

Prepared By:

Henrry Figueroa C.

Location:

VESSEL

MINERA CHINALCO PERU


13+630, 13+642, 13+654

Report No.:
Date:Pedestales

x STRUCTURAL STEEL

PUMP

GR 40

EXCHANGER

OTHER
Craft
Initial/Date

QA/QC
Initial/Date

03-04-2013
H.F.C.

Equip./Item/Column No.
Ref. Dwg.
Bases de Pedestales
SSK-C-CC2059-INF-048 H1 Rev.0
1. Item on centerline/elevation (plumb)
2. Pre-grout alignment complete (styrofoam sleeves removed if applicable)

03-04-2013
H.F.C.

3. Foundation & baseplate properly prepared

03-04-2013
H.F.C.

4. Formwork complete/correct

03-04-2013
H.F.C.

5. Correct materials & mixing


6. Proper application & finishing (foundation wetted before grouting)
7. Proper curing and form removal
TYPE OF GROUT:

Remarks

SIKAGROUT 212

BASES A VACIAR : Pedestales bases para soportes de tubera ( S13-53A, S13-54A, S13-55A)

VOLUMEN A VACIAR : 0.027 M3

Contractor/Craft

Aker Solutions Representative

Client Representative

By

By

By

Date

Date

Date