‘Alexandria University yaa aly
Faculty of Engineering dessigh As
Production Engineering Department UN) Maaaia aad
May , 2010 Tele gle
‘Quality Improvement (07631) TVATT) Bag Game
Time allowed: Two hours tele: Gaz
1-a) Six sigma projects follow two main methodologies. What are these two
methodologies? State the main phases in each methodology.
2." Total Quality Management is a management approach to long term success
through customer satisfaction". State the main reasons to begin TOM implementation
from the point of view of management and employee.
3-.a) What are the main categories of Quality Costs?
b) Show, with the aid of drawing, the effect of increasing quality (decrease the Yage
of non-conformance) on different Quality Cost categories.
¢) Which category has the most effect on the total quality cost?
4- Using only neat sketches to show how can you know that the process is out of
control (Signal of special cause variation) in both.
a) XY-Rchart.
b) Run chart.
5- a) In a certain manufacturing company, quality manager found that the
percentage of non-conforming products increased in the last month.
~ Use cause and effect diagram to analyse the main possible causes of this problem.
b) What are T-shaped matrix diagram and X-shaped matrix diagram used for?
Examiner: