Vous êtes sur la page 1sur 7
aoe Double-Power Automatic Transfer Switch foe ANSIK ED sees won scr coar AESIK AP crocs nan msc sre Brief Introduction to Company santigeti it!Ee Co eaed Yagto. th hy which oma netting att (cone 1. Type and Its Meaning sk D9 ~ Gar oP Number of poles Design current {-Stndeconiguton pe 2 Superiniyps “Fly atomaticte Etamvaltype Ciscation yee Ninteligerttvps Eienainetype YANGZHOU ASSKAI ELECTRIC CO.LID. 2. Typical Projects ‘Shandong Telacommunicstion Base Station Project siangsu Yizheng Chemical Fibre Group Co, Li. ‘Shandong Uni~Com information Base Statin (athe province) ‘Kunshan Auehan Supermarkat Embessy ofthe People" s Republic of China inthe Syrian Arab Republic (Power ganarating system of matching generator set) ‘Sinopec indonesia Co.,Ltd. Power generating system of matching generator set) the province} AMEIK EE son nn some esr MEIKE vecce wane macimecosre 3. Main Technical Parameters 4. Description of Switch Structure Far op “ype and speiiations fsa 00 gL. 61 conatvotage — GT retrtten Tee ET oO Electrickey lock Mechanical padlock ete a foe | ea arn niin ne mx | some | seca | sen | sata a De ov Hm ER a aw [7 [ono [ a cease CC KT? series AMEIK EE son nn some esr 204-216 Onemteitemia Sv ateewtenandrg atin ermine KX2, SKTI 6 Electric key lack To conto th internal onto line power uppy in ‘he switch Wnen the elec kay locks obo opened automate mote contal is impiemonted inthe suiten andwnen the saci oy oek tobe closoa, ony manval oparation ie mplomented Fc Key ook shoulé be closed, Mcnaniai padiosk hen making an overhaul frat use the eperation| Neale to putt site othe 0 sition, hen pul p the pack ‘mechaniom ana hove tsekedbetore sesining the overhaul pling “pthemecnanism peclock means to cutoff te iteral corr! power ‘Stoplyinthe switch, sothal he switch can noe slacthcaly operated isd manu) eatin ndeaion Te show the work status poston ofthe switch “ou MEIKE vecce wane macimecosre 5. Installation Dimensions (1), SKT2, SKX2 installation dimensions (2). SKT series installation dimensions -f, Beet ets a AMEIK EE son nn some esr 6, Mode of Connection (1), 8KT2 series connection mode UTE] ts (2). SKT1 and SKX2 series fully automatic connection mode -LLl[-l+] ‘0 om MEIKE vecce wane macimecosre (3). SKT1 and SKX2 series fully automatic + compulsory 0" connection mode (4). SKT1 and SKX2 series automatic + ‘manual (remote control) connection mode tease — ANSIK ED sees won scr coar 7. Operation Method of Terminal Connection 8. Correct Installation Method of Switch ie B 2 weet © i (A) (B) (C)Corrset___(0) Wrong AESIK AP vwrocs nano msc sore 8. Description of Switch Connection (See Correct Installation Method of Switch A) (1). The wiring copper bars of channel Land i ofthe switch are connacted frm the lato the right to RB, Cand N phases pectively ofthe commonly used power supply (Front) and standby power supply (8 (2). The contral power supply comes from the C andN phases of the ‘commonly used power supply and the standby power supply. (3). The control power supply AC 220 Vet the Channel | andl are connected respectively tothe terminals 102103 and 104~108, the 102 andthe 108 ofwhich arelive wires ofthe common used power supply and the standby power supoly ‘The terminals 107 and 106 are usae only forthe control power ‘supply ofthe signal ights xBe sure not to connect 101 and 106 with any other lines! (Forth incoming wires rom above below), copper bara or conductors ate vsecto connect eA 8, Cand Nphases of tho channel anit oft upper ower so rospectvely for eutout 410.In case of switch does not act or failure, as shown below Click to play Open the side cover check for damage and replace the fuse (fuse contact Local Sealer or offices) “Side cover ool « ANSIK ED sees won scr coar 10. Description of Switch Commissioning (1. Connaet he commonly usas power supply (I) nd the standby power supply I} othe wiring copper bars accordingly. Fully automatic commissioning: Commonly used power supply is powered up. Standby power supply is powered up. The channel of the switch is put through, Commonly used power supply sulfrs loss of power. Standby power supply is powered up. The channel lof he switch is put through Commonly used power supply is powered vp. The channel lof ‘the switch is put through. (See the white indication arcow on the witch pane!) ‘Turn the function selection switch othe remate contro (manual) position: The awiteh should be actuated ae requted in article 2. (2). When the switch sin the channel or I pulting-through state, ‘the signallighton the panel shouldbe it up accordingly. 8). With the commissioning complted,tst turnoff the power supply and then turn the handle the “0° position (the central postion, see the whlta incleation arrow onthe switch panel for reference) AESIK AP crocs nan msc sre 11, Maintenance Items ‘& This switchs aninteligent integra product, which, the driving ‘mechanism and the electric contol area are not al ptuously, is fe0 of any maintenance basicaly, 4 This switch should be kept rom any moisture, cust or vt ++ The ambian temperature in the suroundings should net be mor than +40'C forthe upper limit and -6°C for he lower limit and the average value within 24 hours should nol be more than +35°C. ‘#The height above sea ovel where tls switchs ins ‘nt be mare than 2000, ‘ Tho rlative humidity inthe atmosphere should not be more than 50% when te tomperature in the surtoundings is +40°C, There ‘maybe ahigher humidity in ower temperature humidity may be 80% on an average, when the minimum temp- eratuteis #25°Con an averagein the wettest month and dewing produced on the surface ofthe product asa resultofthe change ofthe humidity shouldbe taken into consideration ‘ke pollution Is Grade I. ‘The place whore this switchs used shouldbe fee of trong vibration and impact, harmful gases leading fo corrosion against metals and damage to insulation, thick dust, electri conduction pantcies, explosive anc dangerous substances ar strong slec~ womagnete eld interferences fod prosu- sd should The max

Vous aimerez peut-être aussi