ENTIDAD
CONTRATISTA
OBRA
DEPARTAMENTO : HUANCAVELICA
PARTIDA
PROVINCIA : HUANCAVELICA
DESCRIPCION
UND.
DISTRITO : ACORIA
1ER MES
METRADO
1 SEMANA
01.00.00
01.01.00
TRABAJOS PRELIMINARES
TRAZADO Y REPLANTEO
M2
3,000.00
2,300.00
02.00.00
02.01.00
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMENTACIONES
M3
2,500.00
36,000.00
03.00.00
03.01.00
03.01.01
CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS
M2
500.00
30,000.00
03.02.00
03.02.01
SOBRECIMEINTOS
CONCRETO
M3
80.00
5,250.00
03.02.02
ENCOFRADO
M2
800.00
12,000.00
04.00.00
04.01.00
ALBAILERIA
MUROS DE ALBAILERIA
M2
5,000.00
30,000.00
2DO MES
2 SEMANA 3 SEMANA
4 SEMANA
2300
700
1,800.00
700
300.00
35
600.00
1 SEMANA 2 SEMANA
200
1000
115,550.00
23,110.00
138,660.00
131,311.02
2DO MES
3 SEMANA
4 SEMANA
200
45
4000
165,450.00
33,090.00
198,540.00
188,017.38
PRESUPUESTO DE CONTRATO
ENTIDAD
CONTRATISTA
OBRA
DEPARTAMENTO : HUANCAVELICA
PARTIDA
01.00.00
01.01.00
02.00.00
02.01.00
03.00.00
03.01.00
03.01.01
03.02.00
03.02.01
03.02.02
04.00.00
04.01.00
DESCRIPCION
TRABAJOS PRELIMINARES
TRAZADO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMENTACIONES
CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS
SOBRECIMEINTOS
CONCRETO
ENCOFRADO
ALBAILERIA
MUROS DE ALBAILERIA
PROVINCIA : HUANCAVELICA
UND.
DISTRITO : ACORIA
METRADO
P.U.
PARCIAL
M2
3,000.00
1.00
3,000.00
M3
2,500.00
20.00
50,000.00
M2
500.00
100.00
50,000.00
M3
M2
80.00
800.00
150.00
20.00
12,000.00
16,000.00
M2
5,000.00
30.00
150,000.00
281,000.00
56,200.00
337,200.00
60,696.00
397,896.00
0.947
397896
376807.512
VALORIZACION DE OBRA N 01
ENTIDAD
DEPARTAMENTO : HUANCAVELICA
PARTIDA
PROVINCIA : HUANCAVELICA
DESCRIPCION
UND.
METRADO
01.00.00
01.01.00
01.01.01
01.01.02
01.01.03
01.01.04
02.00.00
02.01.00
02.00.01
02.01.01
02.00.02
02.01.02
02.00.03
03.00.00
03.00.01
03.00.02
03.00.03
03.00.04
04.00.00
04.00.01
04.00.02
04.00.03
04.00.04
04.00.05
04.00.06
04.00.07
04.00.08
04.00.09
DISTRITO : ACORIA.
PRESUPUESTO BASE
P.U.
VALORIZA
VALORIZACION ACTUAL
CION
PARCIAL METRADO
PARCIALMETRADO
PARCIAL
VALORIZACION ACUMULADO
METRADO
PARCIAL
PARCIAL
TRABAJOS PRELIMINARES
CARTEL DE OBRAS DE 360*7.20 INC INSTALACION
M2
1.00
1.00
662.43
662.43
4.00
635.60
825.90
2.35
1.58
125.00
635.60
825.90
1,556.71
1,046.64
500.00
1
1
166
166
1
635.60
825.90
389.18
261.66
125.00
1
1
166
166
1
M3
23.46
2,640.86
98.85
63.36
5.18
3,526.67
154.22
4.44
33.04
63.76
29.55
3.60
3,618.00
11,725.42
3,266.00
4,039.83
153.07
12,696.01
6
660
25
16
1
882
904.50
2,931.35
816.50
1,009.96
38.27
3,174.00
6
660
25
16
1
882
904.50
2,931.35
816.50
1,009.96
38.27
3,174.00
153.12
32.14
428.57
18.00
253.12
262.80
44.39
49.18
38,757.73
8,446.39
19,024.22
885.24
38
8
107
5
9,689.43
2,111.60
4,756.06
221.31
38
8
107
5
9.00
282.18
2,539.62
634.91
4.83
47.25
691.36
328.31
30.00
6.15
1,585.74
1,417.50
4,251.86
1
12
173
3.98
47.45
320.52
285.21
29.93
6.15
1,135.14
1,420.18
1,971.20
1
12
80
635.60 100.00%
825.90 100.00%
389.18 25.00%
261.66 25.00%
125.00 25.00%
496.82
496.82
3.00
1,167.53
784.98
375.00
0.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
17.60
1,980.65
74.14
47.52
3.89
2,645.00
2,713.50
8,794.06
2,449.50
3,029.88
114.80
9,522.01
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
9,689.43
2,111.60
4,756.06
221.31
25.00%
25.00%
25.00%
25.00%
114.84
24.11
321.43
13.50
29,068.30
6,334.79
14,268.17
663.93
75.00%
75.00%
75.00%
75.00%
634.91
25.00%
6.75
1,904.72
75.00%
396.43
354.38
1,062.97
1
12
173
396.43
354.38
1,062.97
25.00%
25.00%
25.00%
3.62
35.44
518.52
1,189.30
1,063.13
3,188.90
75.00%
75.00%
75.00%
283.78
355.04
492.80
1
12
80
283.78
355.04
492.80
25.00%
25.00%
25.00%
2.99
35.59
240.39
851.35
1,065.13
1,478.40
75.00%
75.00%
75.00%
COLUMNA
CONCRETO EN COLUNMA FC=210KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL COLUMNA
ACERO EN LA COLUMNA FY=4200KG/CM2
VIGA
CONCRETO EN VIGA FC=210KG/CM2
ENCOFRADO Y DESENCOFRADO EN VIGA
ACERO EL COLUMNA FY=4200/CM2
121,498.01
31,470.63
31,470.63
90,027.38
18,224.70
4,720.59
4,720.59
13,504.11
UTILIDADES
6,074.90
1,573.53
1,573.53
4,501.37
SUB TOTAL:
145,797.61
37,764.75
37,764.75
108,032.86
26,243.57
6,797.66
6,797.66
19,445.91
172,041.18
0.00
44,562.41
44,562.41
127,478.77
IVG 18%
FACTOR DE RELACION F.R. 0.94700
TOTAL:
F.R = M.C/P.B
FORMULA POLINOMICA
ENTIDAD
CONTRATISTA
OBRA
DEPARTAMENTO : HUANCAVELICA
PROVINCIA : HUANCAVELICA
DISTRITO : ACORIA
MONOMIO
J
C
MD
B
GGU
ELEMENTO
SIMBOLO
CODIGO IU
MO
C
MO
L
G
47
21
43
17
39
COEFICIENTE
INCIDENCIA
0.335
0.180
0.100
0.208
0.169
100
100
100
100
100
309.81
305.2
300.48
288.3
268.3
I.U. OCT-2003
305.65
325.65
320.25
291.38
285.49
K=
0.33050176
4.16
0.331
0.192
0.107
0.210
0.180
1.0192
0.33050176
REAJUSTE DE VALORIZACION N 1
R = V x ( K-1 )
R = Reajuste
V = Valorizacin
A = Adelanto
C = Monto Contractual
K = Factor del mes
N
MES
1 OCTUBRE
380,000.00
VALORIZACION
44,562.41
K
1.019
REAJUSTE
846.69
CONTROL DE REAJUSTE
PROGRAMADO
N
MES
V1
OCT
MONTO
131,311.02
K
1.0192
REAJUSTE
2,520.14
EJECUTADO
N
MES
V1
OCT
MONTO
44,562.41
K
1.0192
REAJUSTE
855.25
A CUENTA
0
REAJUSTE MES
846.69
1.19
319328.4
PRESUPUESTO DE CONTRATO
ENTIDAD
CONTRATISTA
OBRA
DEPARTAMENTO : HUANCAVELICA
PARTIDA
1.00
1.01
2.00
2.01
3.00
3.01
4.00
4.01
5.00
5.01
6.00
6.01
7.00
7.01
8.00
8.01
8.02
8.03
DESCRIPCION
MONTO CONTRACTUAL (V)
VALORIZACION
REAJUSTE ( R)
REAJUSTE
DEDUCCIONES (D)
RETENCIONES DE REAJUSTES
VALORIZACION BRUTA (VB)
(VB=V+R-D)
AMORTIZACIONES (M)
AMORTIZACIONES POR ADELANTO
VALORIZACION NETA (VN)
(VB-M)
PROVINCIA : HUANCAVELICA
ACUMULADO
ANTERIO
DISTRITO : ACORIA
MONTO ACTUAL
-
44,562.41
855.25
ACUMULADO ACTUAL
-
855.25
-
45,417.66
-
45,417.66
45,417.66
-
45,417.66
MULTAS
MULTA POR ATRASO DE OBRA (M)
44,562.41
45,417.66
8,175.18
53,592.84
VALORIZACION DE OBRA N 02
ENTIDAD
CONTRATISTA
OBRA
DEPARTAMENTO : HUANCAVELICA
PARTIDA
DESCRIPCION
PROVINCIA : HUANCAVELICA
UND.
PRESUPUESTO BASE
METRADO
01.00.00
01.01.00
02.00.00
02.01.00
03.00.00
03.01.00
03.01.01
03.02.00
03.02.01
03.02.02
04.00.00
04.01.00
TRABAJOS PRELIMINARES
TRAZADO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMENTACIONES
CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS
SOBRECIMEINTOS
CONCRETO
ENCOFRADO
ALBAILERIA
MUROS DE ALBAILERIA
TOTAL COSTO DIRECTO:
GASTOS GENERALES Y UTILIDADES (20%):
SUB TOTAL:
DISTRITO : ACORIA
P.U.
PARCIAL
VALORIZACION
ANTERIOR
METRADO
PARCIAL
VALORIZACION ACTUAL
METRADO
PARCIAL
VALORIZACION ACUMULADO
METRADO
PARCIAL
PARCIAL
M2
3,000.00
1.00
3,000.00
1.00
635.60
1,000
1,000.00
1,001
1,635.60
33.37% 1,999.00
1,364.40
66.63%
M3
2,500.00
20.00
50,000.00
5.87
904.50
1,000
20,000.00
1,006
20,904.50
40.23% 1,494.14
29,095.50
59.77%
M2
500.00
100.00
50,000.00
#REF!
#REF!
200
20,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M3
M2
80.00
800.00
150.00
20.00
12,000.00
16,000.00
#REF!
#REF!
#REF!
#REF!
38
300
5,700.00
6,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M2
5,000.00
30.00
150,000.00
#REF!
#REF!
3,000
90,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
281,000.00
#REF!
142,700.00
#REF!
#REF!
56,200.00
#REF!
28,540.00
#REF!
#REF!
337,200.00
#REF!
171,240.00
#REF!
#REF!
319,328.40
#REF!
162,164.28
#REF!
#REF!
FORMULA POLINOMICA
ENTIDAD
CONTRATISTA
OBRA
DEPARTAMENTO : HUANCAVELICA
MONOMIO
1
2
3
4
5
PROVINCIA : HUANCAVELICA
ELEMENTO
SIMBOLO
CODIGO IU
MO
C
MO
L
G
47
21
43
17
39
DISTRITO : ACORIA
COEFICIENTE
INCIDENCIA
0.335
0.180
0.100
0.208
0.169
100
100
100
100
100
309.81
305.2
300.48
288.3
268.3
I.U. OCT-2011
I.U. OCT-2011
309.81
350.43
342.59
368.8
292.25
0.335
0.207
0.114
0.266
0.184
1.106
309.81
350.43
343.02
370.26
292.6
0.34
0.21
0.11
0.27
0.18
1.107
REAJUSTE DE VALORIZACION N 2
R = V x ( K-1 )
R = Reajuste
V = Valorizacin
A = Adelanto
C = Monto Contractual
K = Factor del mes
N
MES
VALORIZACION
1 OCTUBRE
44,562.41
1 NOVIEMBRE
162,164.28
380,000.00
K
1.106
1.107
REAJUSTE
A CUENTA REAJUSTE MES
4,723.62
846.69
3,876.93
17,351.58
0
17,351.58
21,228.51
CONTROL DE REAJUSTE
PROGRAMADO
N
MES
V1
OCT
V2
NOV
EJECUTADO
N
MES
V1
OCT
V2
NOV
MONTO
K
REAJUSTE
131,311.02
1.106
13,918.97
188,017.38
1.107
20,117.86
34,036.83
MONTO
K
REAJUSTE
44,562.41
1.106
4,723.62
162,164.28
1.107
17,351.58
206,726.69
22,075.19
RESUMEN DE VALORIZACION 2
ENTIDAD
CONTRATISTA
OBRA
DEPARTAMENTO : HUANCAVELICA
PARTIDA
1.00
1.01
2.00
2.01
3.00
3.01
4.00
4.01
5.00
5.01
6.00
6.01
7.00
7.01
8.00
8.01
8.02
8.03
DESCRIPCION
MONTO CONTRACTUAL (V)
VALORIZACION
REAJUSTE ( R)
REAJUSTE
DEDUCCIONES (D)
RETENCIONES DE REAJUSTES
VALORIZACION BRUTA (VB)
(VB=V+R-D)
AMORTIZACIONES (M)
AMORTIZACIONES POR ADELANTO
VALORIZACION NETA (VN)
(VB-M)
PROVINCIA : HUANCAVELICA
ACUMULADO ANTERIO
DISTRITO : ACORIA
MONTO ACTUAL
44,562.41
162,164.28
855.25
21,228.51
45,417.66
ACUMULADO ACTUAL
-
22,083.76
-
183,392.79
-
45,417.66
206,726.69
228,810.44
183,392.79
228,810.44
MULTAS
MULTA POR ATRASO DE OBRA (M)
45,417.66
8,175.18
53,592.84
183,392.79
33,010.70
216,403.49
228,810.44
41,185.88
269,996.32