Vous êtes sur la page 1sur 3

LOWLAND FLOODING AND

MANAGEMENT

TERM PROJECT
Students

must work on a research project

aimed at addressing lowland flooding. The


~2014 Term Projects ~

topic of the final project is chosen by students


with aid from the instructors.

2014, 10, 1

Hsiao-Wen Wang
whw82@mail.ncku.edu.tw

APPROACHES IN LOWLAND FLOODING


Field

Survey

Risk

analysis

Scenario

analysis

Numerical

Studies

Temporal/Spatial

Analysis
Statistics
And

so on

WHAT SHOULD BE INCLUDED?


Field
The

visit/work is highly suggested

final report should include maps,


survey plots, photos, diagrams to document
the processes, and any analysis results. No
more than 10 pages.

SOME POTENTIAL TOPICS

SOME POTENTIAL APPROACHES

Levee

Ecosystem

effect

Efficacy

of detention ponds

Economic

Efficacy

of dikes around villages

Flooding

services

analysis

simulation

Flood

insurance

Hands-on

Flood

adaptation strategies

Questionnaire

Floating

Dragon

Risk

Balance

island

(vulnerability) analysis

TIMELINE FOR TERM PROJECT


Group
Term

forming and Topic selecting (10/1)

project proposal (10/29)

Individual

Discussion (12/24, 31)

Symposium
Final

(1/7)

paper (1/14)

PROPOSAL PRESENTATION (10/22)


Each

group will need to hand in a one-page proposal


and have 5 minutes to explain what you will do for
the term project.

Presentation

should include:
- Proposed title and Investigator(s)
- Research question (motivations/problem statement)
- Methods
- Planned schedule
- Responsibility

Questions/Comments?

Vous aimerez peut-être aussi