Vous êtes sur la page 1sur 2

CALCULATION OF BLOW-DOWN QUENCHING WATER

Particularts

Value

Unit

Boiler Blow Down Water Flow

QB

Boiler Blow Down Water temperature


Boiler Blow Down Water Pressure

TB
PB

3
5 m /hr
o
150 C
5 bar

Specific Volume of Blow-Down Water


Boiler Blow Down Water Flow

vB
mB

3
0.00109 m /kg
4585.10 kg/hr

CBD Tank Pressure

P1

Quality of Blow Down in CBD Tank


Boiler Blow Down Water released as flash Steam

x1
m1

0.0818472
375.28 kg/hr

Drain Water from CBD to IBD Tank

m1'

4209.82 kg/hr

IBD Tank Pressure

P2

1.01325 bar

Quality of Drain from CBD in IBD Tank


Drain Water from IBD, Released as Flash Steam

x2
m2

0.0133571
56.23 kg/hr

Drain Water from IBD Tank


Enthalpy of IBD Tank Drain Water

m2'
h2'

4153.59 kg/hr
418.99 kJ/kg

Qenching Water Temperature

Tq

Drain Water Temperature after Quenching

TD

Quenching Water Flow Required

mq
Qq

Total Drain Water

Please input the process data

1.3 bar

o
30 C
o
60 C

5557.42 kg/hr
3
5.65 m /hr
9711.01 kg/hr
3
9.88 m /hr

ENCHING WATER
Remark
Process Data
Process Data
Steam Table
Steam Table
M

4585.1

Process Data
Steam Table

X1

0.08176
374.896
4210.2
1.01325

Steam Table

0.01335
56.1978

Steam Table

M1
H1

4154.01
419.06

Process Data

H2

125.75

Process Data

251.16

M2

5561.42
5.65596

Vous aimerez peut-être aussi