DATE
19/12/14
SHIFT
M/C
ACTIVITY
PROBLEM REPORTED
RBD-03
B/D
RST-03
B/D
TAKE UP PBLM
PENDING WORK
1) RBD-03 = RBD-02 SIDE SPOOLER BRAKE DISC TO BE CHECKED CHECKED
MATEREIAL FOR NIGHT
BRAKE PAD FOR NEIHOFF RBD, CHAIN LOCK 1/2" FULL AND HALF ,
FROM
FROM 12.00 TO 2.00
RUNNING SINGLE SPOOLER
THEN AFTER TAHT 50 MIN
LOSS DUE TO PRESSURE PBLM
TO
TOTAL TIME
30 MIN
DATE
3/12/2014
SHIFT
M/C
ACTIVITY
PROBLEM REPORTED
RST-02
P/M
RST-03
SKIP-01
RBD-07
B/D
B/D
B/D
TAKE UP PBLM
TAKE UP PBLM
PULLEY PBLM
PENDING WORK
1) RBD-03 SHAFT AND DISC FITTED REMANING WORK TO BE COMPLETED
2) SKIP-01 UP DOWN SCREW SHAFT BROCKEN , SHAFT TO BE CHANGED OR COUPLING TYPE ARRANGEMENT CAN BE MADE
3) oil filter to be cleaned
ACTION TAKEN
SHIFTED TO MEDIUM AS GEAR
TEETH DAMAGED
IN /OU SPROCKET CLUTCH PBLM
UP DOWN SCREW SHAFT BROCKEN
TIGHTENING AND ALIGNMENT
FROM
TO
TOTAL TIME
12
12.25 25 MIN
2
2
3.15 75 MIN
3.15 75 MIN
60 MIN
4/12/2014
SHIFT
M/C
Skip-01
TUB-04
RST-02
RBD-03
ACTIVITY
B/D
B/D
B/D
B/D
RBD-04
TUB-01 B/D
PENDING WORK
1) RBD-04 PM WORK
2) Skip-01 trvaers motor burn so reparing work
3) RBD-03 runing in single spoller
PROBLEM REPORTED
Travers motor problem
Under Roller bolt broken
Payoff problem
Changeover problem
PM
FROM
TO
11:00 PM
2:00 AM
12:00
12:00 to till
2:30 PM
4:00 AM
12:40
11:00 PM
12:00 AM
TOTAL TIME
2:30
2:00
0:40
1:00
SHIFT
05/12/14
M/C
ACTIVITY
PROBLEM REPORTED
RST-05
RST-04
Rewinding m/c
TUB-05 (Skip-02)
B/D
B/D
B/D
B/D
TUB-01
B/D
RBD-05
TUB-05 (Skip-02)
B/D
B/D
work in progress
Cradle no. 1 jam
SKIP-01
B/D
tub-04
B/D
RST-02
B/D
Rbd-07
B/D
RBD-05
PM
PENDING WORK
1) RBD-05 gear train fixing work in progress.
2) RBD-06 drawmat oil tank filling with new oil.
3) RBD-06 drawmet oil drain line welding work.
3) Bailing machine hydraulic pump problem to be attended.
4) RST-02 capstan gear vabration need to change gear on urgent basis
FROM
TO
16:00
17:30
15:00
18:35
17:00
17:45
17:00
18:50
19:45
22:15
21:30
21:45
1:00
2:30
2:00
2:30
11:00
11:40
3:00am
3:50
TOTAL TIME
1:00
0:15
2:00
0:15
2:30
0:15
1:30
0:30
0:40
0:50
MAINTENANACE ACTIVITY
DATE
07/12/14
SHIFT
M/C
ACTIVITY
RBD-05
B/D
RBD-07
RBD-01
B/D
B/D
TUB-04
B/D
TUB-03
B/D
RBD-03
B/D
Skip-02
RBD-01
RBD-06
Steel spooler
RBD-03
TUB-04
PM
B/D
B/D
PM
B/D
B/D
PENDING WORK
1) rbd-04 belt guard work in progress.
2) Bailing machine power pack connection work pending.
3) Line shaft coupling boring work done, key hole work in progress
4) Screw shaft skip -1 pending.
Take up problem
Tripping problem
Spool 1 change over cylinder hose pipe leakage
welding machine problem
drawmet oil problem
Change over problem
guard damage
protection plate sensor problem
Take up problem
ork in progress
FROM
TO
0:00
0:50
0:15
1:00
0:40
0:50
1:10
1:00
2:15
3:50
5:20
6:20
5:30
6:25
7:00
6:30
7:20
6:50
TOTAL TIME
0:15
0:10
0:30
0:10
1:35
0:10
0:05
0:20
0:20
08/12/14
SHIFT
M/C
ACTIVITY
RBD-07
RBD-01
RBD-06
RBD-03
RBD-03
B/D
B/D
B/D
B/D
B/D
PROBLEM REPORTED
Spool holding cylinder stuck of 1 side
Drawmet oil stopped
Catcher problem
protection plate sensor problem
take up trip due to protection plate not open
FROM
TO
0:15 0:35
0:20 0:25
23:20 23:25
2:25 2:30
4:25 5:20
TOTAL TIME
0:20
0:05
0:05
0:05
0:55
SHIFT
9/12/2014
C
M/C
ACTIVITY
skip-01
RST-04
RBD-01
b/d
B/D
B/D
RBD-03
PM
RBD-01
B/D
TUB-03 (Skip-01)
RST-05
B/D
PM
RST-04
B/D
PROBLEM REPORTED
take up pblm
BRAKE DISC PBLM
CAPSTAN PBLM
Spool holding cylinder
chuck nut out
Capstan no. 2 loose,
drawmet oil stops
Take up drum pin damage
12 cage emergency button damage
electrical problem in pay
off
PENDING WORK
RBD-07= PIPE TO BE FITTED
FILTER STARTED AT RBD-02 TO BE MONITORED
RBD-04 NEW FOOT SWITCH TO BE INSTALL, PENDING SINCE MACHINE ERECTION.
FROM
TO
TOTAL TIME
45min
30 MIN
30 MIN
4:20
4:40
5:30
4:20
3:00
5:50
4:40
3:10
2:00
2:05
0:20
0:20
0:20
0:10
0:05
SHIFT
M/C
ACTIVITY
PM
10/12/2014
Hyd Welding mc
Skip-01
Steel Spoller
Oil Filtration
RST-04
RST-03
RST-01
PENDING WORK
1) RST-02 Brake disc to be ready
2) R/W MACINE brass bush to be ready
3) Oil Filtraion to be start in nigt shift also
PM
PM
PM
PM
PM
PM
ACTION TAKEN
FROM
9:00 AM
9:00 AM
15:15
TO
12:00 PM
10:30 AM
17:15
TOTAL TIME
SHIFT
M/C
ACTIVITY
B/D
11/12/2014
G+B
All. spoller
SKIP-01
Oil Filtraion machine
RST-01
New Workshop
B/D
PM
PM
PM
RST MC
Machine Gaurd
PENDING WORK
1) RST-02 Brake disc to be ready
2) R/W MACINE brass bush to be ready
3) Oil Filtraion to be start in nigt shift also
4) RST-01 LAY PLATE TO BE CUTTTING AND MADE READY
5) RST-01 12 ,18,24 CAGE PINTLE MOTOR TO BE CHECK
ACTION TAKEN
open bearing change and fitted done
check and push button wire loose done ok
For ACCC Conductor
FROM
TO
TOTAL TIME
2:00 PM
4:00 PM
2:00
5:00 PM
5:30 PM
0:30
SHIFT
G+B
M/C
ACTIVITY
PROBLEM REPORTED
TUB-02
B/D
Pintle problem
RST-04
B/D
RBD-06
B/D
Travers problem
Steel Spoller
B/D
Payoff Problem
RST-05
B/D
TUB-01
B/D
RST-01
PM
RST-03
B/D
RST-05
Skip -02 (TUB-05)
B/D
B/D
B/D
RST-04
TUB-04
B/D
B/D
Air Compressor-02
PM
TUB-03
B/D
12/12/2014
TUB-04
PENDING WORK
1) RST-02 Brake disc to be ready
2) R/W MACINE brass bush to be ready
4) RST-01 LAY PLATE TO BE CUTTTING AND MADE READY
5) RST-01 12 ,18,24 CAGE PINTLE MOTOR TO BE CHECK
6) RST-03 Crane CT work in progress.
7) Air Compressor -02 drain valve blind fixing work.
8) Drum pin machining work in progress.
TY REPORT -12/12/14
ACTION TAKEN
FROM
TO
TOTAL TIME
3:00 PM 4:30 PM
1:30
4:00 PM 7:00 PM
3:00
16:00 4:40 mp
0:40
0:45
1:25
0:40
1:50
2:35
0:45
2:10
2:40
0:30
2:40
2:00
2:45
6:00
0:05
4:00
6:15
6:45
0:30
3:40
3:30
4:00
3:45
0:20
0:15
6:25
7:10
0:45
13.12.14
SHIFT
M/C
ACTIVITY
PROBLEM REPORTED
Skip-02 (TUB-05)
B/D
Crane problem
RBD-02
B/D
Take up jam
RBD-05
B/D
RST-04
TUB-02
RBD-02
RBD-07
B/D
B/D
B/D
B/D
PENDING WORK
1) RST-01 take up bottom shaft damage to be attended.
2) RST-04 take up gearbox oil leakage to be attended.
3) RBD-02 Take up pintle shaft problem to be attended.
4)
FROM
TO
TOTAL TIME
23:50
0:15
0:25
3:45
4:20
0:35
5:00
4:00
6:00
6:00
5:20
5:40
4:10
6:05
6:20
5:25
attended
attended
0:40
0:10
0:05
0:20
0:05
DATE
14/12/14
SHIFT
B
C
M/C
RBD-02
RBD-04
RBD-07
ACTIVITY
B/D
B/D
B/D
PROBLEM REPORTED
TAKE UP PBLM
MOTOR PBLM
T/UP PRESSURE VALVE PROBLEM
PENDING
1) NYLON BAR HAMMER TO BE MADE FOR RST
2) CHAIN COUPLING BORING DONE KEY WAY HAS TO BE MADE.
3) TUB-04 IN/OUT SHAFT TO BE CHECKED
4) RBD-07 T/UP PRESSURE VALVE HAS TO BE CHECKED AND MADE OK.
ACTION TAKEN
DRIVE SIDE BEARING DAMAGED, CHANGED
MOTOR CHANGED
VALVE CHANGED BUT STILL PROBLEM IS NOT FIXED
FROM
TO
4
TOTAL TIME
7.3
HANDLED AT 10.45
3
1 hrs
DATE
SHIFT
B
15/12/2014
M/C
ACTIVITY
PROBLEM REPORTED
RBD-06
B/D
TUB-01
TUB-01
TUB-01
RST-02
TUB-02
B/D
B/D
B/D
B/D
B/D
PENDING WORK
1) RST-01 - TAKE UP SCREW SHAFT READY TO BE FITTED
2) RST-03 chain sprocket work pending due to lathe problem.
ACTION TAKEN
motor and gear box assembled and then fixed,
dancer pulley problem so another pulley fixed.
attended
guide pulley welding done
new bearing fixed
CHANGED WITH NEW CHECKNUT
NEW BELT IS ALREADY CRACKED
FROM
TO
TOTAL TIME
6:30
9:15
2:45
8:30
9:10
9:40
5:00
12:00
9:00
9:30
10:00
5:30
2:00
0:30
0:20
0:20
0:30
2:00
SHIFT
B
17.12.14
M/C
ACTIVITY
PROBLEM REPORTED
Skip-02 (TUB-05)
B/D
Skip-01
TUB-04
B/D
B/D
RBD-07
B/D
TUB-01
Welding machine RBD
B/D
B/D
C
PENDING WORK
1)bailing machine pump work pending.
NO BREAKDOWN
FROM
TO
TOTAL TIME
16:30
17:15
0:45
15:00
17:45
18:00
18:00
3:00
0:15
17:45
20:20
2:35
22:10
22:20
0:10
NO BREAKDOWN
18.12.14
SHIFT
M/C
ACTIVITY
PROBLEM REPORTED
RBD-01
B/D
TUB-03
PM
RBD-07
B/D
C
TUB-04
B/D
PENDING WORK
1) RBD -07 = SECOND SPOOLER TO BE CHECKED
FROM
TO
TOTAL TIME
17:00
17:50
0:50
22:00
22:45
0:45
1 HR
19/12/14
SHIFT
M/C
ACTIVITY
PROBLEM REPORTED
RBD-03
B/D
RST-03
B/D
TAKE UP PBLM
PENDING WORK
1) RBD-03 = RBD-02 SIDE SPOOLER BRAKE DISC TO BE CHECKED CHECKED
MATEREIAL FOR NIGHT
BRAKE PAD FOR NEIHOFF RBD, CHAIN LOCK 1/2" FULL AND HALF ,
FROM
FROM 12.00 TO 2.00
RUNNING SINGLE SPOOLER
THEN AFTER TAHT 50 MIN
LOSS DUE TO PRESSURE PBLM
TO
TOTAL TIME
30 MIN
20/12/14
SHIFT
M/C
RBD-06
TUB-01
RST-05
TUB-04
ACTIVITY
B/D
B/D
B/D
B/D
PROBLEM REPORTED
Dancer pulley damage
Payoff bearing damage
18 Cage stop button damage
Crane problem
PENDING WORK
1) RBD-06 DANCER PULLEY TO BE READY
2) RBD-03 DUAL SPOLLER BRAKE DISC TO BE CHECK
3) RST-04&5 BRAKE DISC TO BE MACHIING AND LINER TO BE STICK
FROM
TO
7:45 PM
8:00 AM
5:00pm
6:00pm
11:00pm
9:30 PM
5:30pm
7:00pm
TOTAL TIME
3:15
1:30
0:30
1:00
21/12/14
SHIFT
M/C
ACTIVITY
PROBLEM REPORTED
RBD-05
B/D
traverse problem
TUB-03 (Skip-01)
B/D
RBD-07
B/D
RBD-05
TUB-04
B/D
B/D
TUB-01
B/D
RBD-03
B/D
spooler-01 tripping due to overload
PENDING WORK
1) SCREW SHAFT BUSH WORK IN PROGRESS.
2) RBD-03 DUAL SPOLLER BRAKE DISC MACHINING WORK IN PROGRESS
TY REPORT -21/12/14
ACTION TAKEN
FROM
TO
TOTAL TIME
16:40
16:50
0:10
16:15
17:30
1:15
19:20
19:55
0:35
17:30
21:55
17:50
22:25
0:20
0:30
21:20
21:35
0:15
22:00
22:20
0:20
SHIFT
M/C
23/12/14
TUB-04
RBD-04
ACTIVITY
P/M
P/M
ACTION TAKEN
FROM
TO
TOTAL TIME
45
30
23/12/14
SHIFT
M/C
ACTIVITY
PROBLEM REPORTED
RST-04
B/D
RBD-03
RST-01
B/D
B/D
TUB-03 (Skip-01)
TUB-01
B/D
B/D
RST-05
PM
Crane problem
PENDING WORK
1) Line shaft prepairing work in progress for RST-03.
2) RBD-03 spooler-01 brake disc work in progress.
23/12/14
SKIP-01
RST-04
RBD-03
TUB-04
RST-05
B/D
P/M
P/M
P/M
P/M
CRANE PBLM
CAGE BRAKE PBLM
PENDING
1) RBD-03 BRAKE UNIT TO BE FITTED , AS O RING NOT FOUND
2) RST-03 LINE SHAFT TO BE MADE READY AS STEADY REST NOT FOUND
BRAKE DISC
UNDER ROLLER
BRAKE DISC
TY REPORT -23/12/14
ACTION TAKEN
Pinion gear taken out and bearing adjusted and
capstan gear adjusted, now ok
oil level down so oil top up done, but spool
stuck so spool removed
new brake patti fixed
new key prepared and fixed, new bolt fixed,
take up up down motor with gear box fixed
attended
crane remote button not working so attended
by electrician
FROM
TO
TOTAL TIME
18:30
19:45
1:15
17:15
20:25
18:30
20:45
1:15
0:20
16:00
16:05
16:45
16:50
0:45
0:45
22:45
22:55
0:10
60 MIN
30 MIN
SHIFT
M/C
ACTIVITY
PROBLEM REPORTED
25/12/14
RBD-06
B/D
PRESSURE PBLM
PENDING WORK
1) TUB-04= TAKE SHAFT TO BE MADE , DRAWING KEPT IN FILE
UNDER ROLLER KEPT IN WSHOP STEP DEEP TO BE INCREASED
FROM
TO
1.3
5.3
TOTAL TIME
4HR
SHIFT
25/12/14
M/C
ACTIVITY
PROBLEM REPORTED
RBD-03
RBD-03
RST-02
RBD-06
RST-02
RBD-03
B/D
B/D
B/D
B/D
B/D
B/D
RBD-03
TUB-04
Tub-04
Steel Spoller
RST-02
B/D
PM
B/D
PM
PM
Changeover problem
Take up shaft making work
Screw side pintle problem
Payoff prpblem
Brakedisc ready work
PENDING WORK
1) Tub-04 take up shaft keyway work to be done
2) Rst-02 brake disc to be made ready
3)
FROM
TO
TOTAL TIME
15:50
17:30
22:20
20:20
15:15
20:30
17:15
18:05
22:40
20:35
17:15
21:00
1:25
0:35
0:20
0:15
2:00
0:30
2:30
3:30
1:00
0:30
1:00
0:30
26/12/14
SHIFT
M/C
TUB-04
RBD-03
RST-02
TUB-04
RST-3
RST-05
RBD-06
ACTIVITY
B/D
B/D
B/D
PM
PM
B/D
B/D
PROBLEM REPORTED
Cradle bolt broken
Spooler-01 tripping problem
line shaft chain problem
Take up shaft keyway work
Line shaft keyway work
Brake disc problem
Take up cylinder in out elct problem
PENDING WORK
1) Rst-02 brake disc to be made ready
2) tub-04 cradle -05 bearing housing cover to be fitted
3) RBD-06 hyd oil leakage to be arrested
FROM
TO
TOTAL TIME
4:00AM
2:00
5:00
6:00
2:45
5:30
2:00
0:45
0:30
4:00
3:00
4:30
3:45
0:30
0:45