Based on Appendix 1, prepare an Interim Payment No. 8 for project Proposed 2-storey
Academic Block at Universiti Teknologi MARA (Perak). You may use the Appendix to do the
calculation. All calculations must be attached together.
Individual Assignment
Mark
: 100 marks
Submission date : .
A - PARTICULARS OF CONTRACT
Form of Contract
Project Title
:
:
PAM 2006
Proposed 2-storey Academic Block at
Universiti Teknologi MARA (Perak).
Contract Sum
Date of Site Possession
Date of Completion
:
:
:
:
:
:
:
:
:
:
RM1,589,425.00
1st June 2010
28th February 2011
(Extension of Time granted until 31st
March 2011)
RM400.00 per day
12 months
1 month
10th April 2011
10% of work done
5% of Contract Sum
RM1,150,000.00
DESCRIPTION
Signboards
Light & power
Water for the works
Maintenance of public roads
Contractor all risk
As-built drawing
AMOUNT (RM)
2,000.00
10,000.00
15,000.00
3,000.00
10,000.00
3,000.00
CONFIDENTIAL
7
8
9
10
Performance bond
Site telephone
Temporary hoardings
Cleaning of site
20,000.00
8,500.00
28,000.00
5,500.00
C BUILDING WORKS
ITEM
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Piling
WBLFF
Frame
Upper Floor
Roof
Staircase
External Walls
Internal Walls & Partitions
Window
Door
Int. Wall Finishes
Int. Floor Finishes
Int. Ceiling Finishes
External Finishes
Fittings and Furnishings
Sanitary Fittings
BWIC with services
AMOUNT (RM)
42,037.50
43,857.50
49,329.30
23,751.50
129,971.40
8,029.90
11,931.70
15,724.55
49,635.00
18,288.00
18,659.50
5,906.00
14,107.00
18,791.50
6,220.00
24,894.00
4,157.00
%OF
WORKDONE
100
100
100
100
100
100
100
100
80
80
90
90
90
80
70
70
80
D EXTERNAL WORKS
ITEM
1
2
3
4
5
6
DESCRIPTION
Earthworks
Soil Drainage
Surface Water Drainage
Road & Carparks
Water Reticulation
Street Lightings
AMOUNT (RM)
45,316.00
23,713.25
21,648.60
108,769.50
29,179.30
10,300.00
%OF
WORKDONE
100
100
100
80
100
50
DESCRIPTION
All Mechanical Works
All Electrical Works
AMOUNT (RM)
89,652.00
150,555.00
%OF
WORKDONE
90
90
CONFIDENTIAL
ITEM
1
DESCRIPTION
Building
Automation
System
- Profit @ 2%
- Attendance
Raised Floor
System
Profit @ 2%
Attendance
ALLOWED
FIGURE
(RM)
300,000.00
6,000.00
6,000.00
200,000.00
ACCEPTED
%OF
FIGURE
WORKDONE
(RM)
285,000.00
70
190,000.00
70
4,000.00
4,000.00
G - MATERIALS ON SITE
ITEM
1
2
3
4
DESCRIPTION
100mm
Diameter
UPVC Pipe
Water Closet
Emulsion Paint
Plywood
for
formwork
UNIT
No
QTY
20
RATE (RM)
100.00
No
Tin
Sheet
10
20
100
300.00
50.00
50.00
H VARIATION WORKS
OMISSION
(RM)
ADDITION
(RM)
ITEM
DESCRIPTION
10,500.00
25,500.00
3,000.00
8,500.00
CONFIDENTIAL
MAIN CONTRACTOR
RM
RM
RM
Nett Additions/Omissions
RM
RM
RM
DATE OF VALUATION
DATE OF COMPLETION
L.A.D./DAY
Main Contractor
a) Value of work done
RM
RM
2.
RM
3.
RM
RM
RM
RM
DEDUCTIONS
1.
2.
3.
Retention Fund
RM
RM
RM
RM
RM
Ringgit Malaysia :
......
PREPARED BY :
Date : ..
(QUANTITY SURVEYOR)
CERTIFIED BY :
Date : ..
(ARCHITECT)
CONFIDENTIAL
KEPALA :
PECAHAN KEPALA :
TAJUK KERJA :
NO. KONTRAK :
HARGA ASAL KONTRAK :
RM
RM
RM
B.
2.
TARIKH PENILAIAN :
3.
RM
4.
RM
5.
RM
6.
POTONGAN
a)
RM
i)
Amaun terkumpul
RM
ii)
Amaun terdahulu
RM
iii)
Amaun semasa
RM
b)
c)
RM
d)
RM
Jumlah potongan
RM
BAYARAN DISYORKAN
C.
PERAKUAN BAYARAN
1.
2.
RM
RM
RM
RM
RM
RM
BAYARAN DIPERAKUKAN
RM
RM
(Pegawai Penguasa)