Académique Documents
Professionnel Documents
Culture Documents
HLY CCT 1
OTA CCT 4
OTA CCT 3
OTA CCT 2
OTA CCT 1
Future supply
bank
HLE Bus A
HLE Bus B
HAM CCT 1
HLY CCT 2
WKM CCT3
WKM CCT 2
WKM CCT 1
Future supply
bank
Notes:
1. A fault of the half CB will cause the tripping of both circuits. Therefore, a single
fault could cause the outage of the OTA-(HLE-)WKM 3 circuit, which is the most
onerous circuit outage for the existing system. HLE provides no increase in
security for this particular fault compared with the existing system.
2. The dotted bus extension is for the possible future connection of OTA-WKM 1&2
and/or supply transformers. The site layout will allow for these possible future
connections if this can be reasonably achieved considering the site contours.
HLY CCT 1
OTA CCT 4
OTA CCT 3
OTA CCT 2
OTA CCT 1
Future supply
bank
HLE Bus A
HLE Bus B
HAM CCT 1
HLY CCT 2
WKM CCT 3
WKM CCT 2
WKM CCT 1
Notes:
1. A fault of any equipment (CB, CT, DIS or bus section) will cause the tripping of
either one or no circuits. Therefore, no single fault will cause an outage of the
OTA-WKM 3 circuit (i.e. through transmission from WKM to OTA), which is the
most onerous circuit outage for the existing system.
2. The dotted bus extension is for the possible future connection of OTA-WKM 1&2
and/or supply transformers. The site layout will allow for these possible future
connections if this can be reasonably achieved considering the site contours.
Future supply
bank