Académique Documents
Professionnel Documents
Culture Documents
School/Dept. Code
Description
CP
Classroom space
CP
Playground equipment
CP
CP
CP
CP
CP
Parking
Proper ventilation in the Art room.
CP
Security cameras
DP
DP
DP
DP
DP
A
A
A
A
S
DP
DP
DP
Classroom
DP
DP
DP
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
Description
DP
DP
A
A
DP
DP
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
Description
GH
GL
Classroom addition
GL
GL
HL
Hl
HL
Walls
NV
Loading dock
NV
NV
NV
S
S
A
NV
NV
Boiler repair
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
Description
NV
NV
NV
NV
NV
NV
NV
NV
NV
A
A
S
S
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
Description
PV
Classroom space
PV
PV
PV
PV
PV
PW
RE
RE
RP
RP
SV
Intercoms in 10 classrooms
SV
Kindergarten Playground
SV
SV
SV
SV
SV
SV
SV
SV
TL
S
A
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
15,000.00
Description
TL
Replacement plan for iPad and teacher computers, office computers as well
TL
TL
TL
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
Description
BHMS
Additional cameras
BHMS
Reconfiguration of the main entry way routing folks directly through the office
BHMS
BHMS
BHMS
Office: Replacing the current air conditioning unit with a more efficient one
Custodial Related: New tractor
Learning and Technology: Student devices, continue to replace and/or upgrade
computers
STEM: Resources available for all Middle Schools to facilitate this
programming.
BHMS
BHMS
DHMS
DHMS
DHMS
DHMS
DHMS
DHMS
DHMS
DHMS
DHMS
DHMS
DHMS
DHMS
A
S
S
New PA System
Visitor Badge System
Double-door Entry Vestibule
Tech Ed Room Renovations
Project Lead the Way Equipment
New Main Gymnasium Sound System
New Cafeteria Sound System
Two Large Screen Video Projection Systems (for Lecture Rooms)
Media Center Renovation with Upgraded Technology
RMS
RMS
A
A
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
Description
RMS
RMS
RMS
RMS
RMS
RMS
RMS
RMS
RMS
RMS
RMS
RMS
RMS
E
E
A
A
RMS
RMS
SHMS
SHMS
SHMS
SHMS
Amount
With the main office/student services addition add a sick bay for the nurse
A
S
Athletic Directors
Athletic Directors
The general fund should cover the following: transportation to and from all
events, athletic trainers, event workers contract increases, officials increases.
Athletic Directors
Send the monies collected for entrants fees and registration fees back to the
four buildings divided equally among all four schools.
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
$10,000+
Description
Athletic Directors
Turf each stadium field and one additional practice field to bring us up to the
standard of all the other schools in our conference. These fields would be
used by marching bands, soccer teams, football teams, lacrosse teams,
baseball teams, softball teams, Physical Education classes and our community.
AVHS
AVHS
AVHS
New construction to create adequate facilities for CBP Sp Ed students and staff
AVHS
AVHS
AVHS
AVHS
AVHS
AVHS
AVHS
AVHS
AVHS
EHS
EHS
Team Lockers
EHS
Secure entrances
EHS
EHS
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
$900 each
$
$
50,000.00
31,000.00
Description
EHS
EHS
EHS
EHS
EHS
EHS
EHS
RHS
Rosemount High Schools lacks double entry doors at both the main and east
entrances of the school . It also lacks any foyer space just within these doors.
RHS
Rosemount High School lacks space for students waiting for after school rides.
The Rosemount High School dance, choral music and instrumental music
programs have out grown their current facility spaces.
The Rosemount High School PAC foyer lacks adequate space and rest room
facilities for full house events.
RHS
RHS
RHS
The Rosemount High School Guidance and Main Office facilities have not been
renovated since additions to the school created the current spaces
RHS
Other than the latest additions to the school, hallways in the school are either
poorly or not ventilated.
RHS
Much of the lower level of the school is used by students and accessed by the
public, but has exposed concrete floors and exposed ceilings.
RHS
RHS
RHS
Rosemount High School has 3.5 gyms. The least of any high school in the
district.
Strong athletic participation has caused us to outgrow our current Fitness
Center.
Our parking lot is poorly designed and creates confusion and accidents for our
students, parents and visitors.
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
Description
RHS
Our stadium stands are too close to the track, with narrow walk ways. In the
event of an emergency, evacuation of the stadium would be slow.
RHS
Storage space within our building is in short supply. The loss of the portable
will further contribute to this.
RHS
RHS
There is no central location for technology support staff. The ITC should be
reconfigured to include a locked storage area and locked offices for tech
support staff who commonly work with expensive equipment and proprietary
applications.
RHS
The exterior of our school is showing its age. The face of the exterior brick
needs to be cleaned. The light poles on our campus need to be replaced. The
entries should be architecturally redesigned and altered. Trees on our campus
are dying and need to be replaced. Professional landscaping is needed along
the front of the building. The balcony off the IMC needs to be refurbished.
RHS
Many of our restrooms are original to the building and need to be refurbished.
RHS
RHS
The current instrumental music capital outlay amount is helpful but far short of
amounts from the past, and more importantly, short of our needs, causing us
to borrow instruments from other school districts. We need an increase in
instrumental music capital outlay.
RHS
SES
SES
SES
SES
Amount
A
A
$6,000
$2,000
$1,000
Add five new 45 degree angle concrete pads to main entry sidewalk.
$4,800
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Description
SES
$3,000
$1,000
$3,500
SES
SES
Four HS principals
Four HS principals
Four HS principals
Four HS principals
Four HS principals
Update all restrooms, locker rooms and drinking fountains that are more than
20 years old.
Four HS principals
Update all science rooms that have not been updated in the last 20 years
Update classroom furniture that is more than 20 years old. (sled desks, tables
and chairs)
Update all technical education facilities that have not been updated in 20
years.
Four HS principals
Four HS principals
Four HS principals
Four HS principals
Four HS principals
Four HS principals
Four HS principals
Adding to and upgrading all security camera and head end systems
Updating the standard technology features of every classroom including
standard teacher station.
Updating all offices and guidance offices that have not been refurbished in 20
years.
Add storage space
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
Description
Additional gymnasiums at all four of the high schools or field houses at each
high school.
Field turf in all four district stadiums as well as one practice field at all four
high schools.
Four HS principals
Ice arena for EVHS and a second sheet of ice available for all four high schools.
Four HS principals
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Amount
Description
Amount
Technology
1,200,000.00
Technology
600,000.00
Technology
655,000.00
Technology
Technology
Technology
$
$
$
170,000.00
3,500,000.00
1,500,000.00
Technology
100,000.00
Technology
3,750,000.00
Technology
1,200,000.00
Magnet/STEM/Equ
ity
Capacity
Technology
M
C
T
Entry/Traffic Flow
Alternative
Facilities
Security/Safety
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Equity
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
Some band, choir, dance rooms, PAC foyers are too small
given the current size of programs.
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx
file:///var/www/apps/conversion/tmp/scratch_4/257982257.xlsx