Vous êtes sur la page 1sur 10

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO

Obra
Cliente
Departamento

REHABILITACION Y MEJORAMIENTO DE LA CARRETRA DEPARTAMENTAL EMPALME PE - 5N (PUENTE COLOMBIA) - SHAPAJA - CHAZUTA


DIRECCION REGIONAL DE TRANSPORTES Y COMUNICACIONES DE S
SAN MARTIN
PARTIDA
DESCRIPCION

ITEM
01
01.01

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO

01.02

TRAZO, REPLANTEO Y GEOREFERENCIACION

01.03

MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL

01.04

COSTO PARCIAL
200,000.00

30 D.C

60 D.C

90 D.C

120 D.C

Plazo de Ejecucion:
Costo a:

150 D.C

DIAS CALENDARIOS
180 D.C
210 D.C

240 D.C

270 D.C

100,000.00

44,180.54

3,770.21

3,398.50

3,699.41

3,699.41

3,646.31

3,699.41

3,849.87

3,646.31

3,699.41

250,000.00

21,334.13

19,230.77

20,933.49

20,933.49

20,633.01

20,933.49

21,784.86

20,633.01

20,933.49

ACCESO A CANTERAS

32,524.20

12,603.13

19,921.07

01.05

HABILITACION DE CANTERAS

32,063.54

01.06

CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 M X 4.80 M.

02
02.01

19,906.11

12,157.43

4,143.03

10,330.68

11,245.38

11,245.38

11,083.96

5,757.20

11,909.49

861.87

2,149.08

2,339.36

2,339.36

2,305.78

1,914.02

6,979.20

505.07

1,259.40

1,370.91

1,370.91

1,351.24

1,121.66

86,250.00

934.38

13,800.00

15,021.88

15,021.88

14,806.25

15,021.88

11,643.75

204,735.14

342,317.15

342,317.15

337,403.51

342,317.15

356,239.14

337,403.51

161,331.29

225,444.28

245,405.50

245,405.50

241,882.93

245,405.50

255,386.10

241,882.93

12,328.98

38,874.27

95,584.96

95,584.96

94,212.93

95,584.96

99,472.39

94,212.93

63,342.19

15,788.49

27,964.36

9,767.45

2,500.00

2,500.00

MOVIMIENTO DE TIERRAS
DESBROCE Y LIMPIEZA DE BOSQUE

53,805.65

02.02

DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS

02.03

DEMOLICION DE ESTRUCTURAS

02.04

REMOCION DE CERCAS DE ALAMBRE

02.05

EXCAVACION EN EXPLANACIONES ENC ROCA FIJA

2,424,064.03

02.06

EXCAVACION EN EXPLANACIONES EN ROCA SUELTA

1,831,734.81

02.07

EXCAVACION EN MATERIAL COMUN

676,869.61

02.08

ENSAYOS DE DEFLECTOMETRIA

02.09

REMOCION DE CAPA VEGETAL

02.10

EXCAVACION EN ZONAS DE PRESTAMO

02.11

EXCAVACIONES COMPLEMENTARIAS

02.12

EXCAVACION PARA MEJORAMIENTO DE SUBRASANTE

02.13

TERRAPLENES

02.14

REMOCION DE DERRUMBES

02.15

PERFILADO Y COMPACTADO EN ZONA DE CORTE

03
03.01
03.01.01

PAVIMENTOS
SUB BASE GRANULAR
SUB BASE GRANULAR (E=0.30 M)

03.02
03.02.01

BASE GRANULAR
BASE GRANULAR (E=0.20 M)

1,337,641.15

03.03
03.03.01

PAVIMENTO ASFALTICO
IMPIMACION ASFALTICA

108,800.05

03.03.02

CARPETA ASFALTICA EN CALIENTE DE E=0. 025 M (BERMAS)

241,778.31

03.03.03

CARPETA ASFALTICA EN CALIENTE DE E=0.050 M

03.03.04
03.03.05

118,593.09

53,520.30
8,580.00
364,700.00
6,264.00

615.96

1,514.54

1,514.54

1,492.80

1,514.54

1,576.14

351.46

42,693.06

75,617.36

74,531.94

75,617.36

78,692.71

17,547.57

733.29

1,298.79

1,280.14

1,298.79

1,351.61

301.39

32,810.00

3,840.85

6,802.87

6,705.22

6,802.87

7,079.54

1,578.66

597,739.32

53,434.27

94,642.06

93,283.56

94,642.06

98,491.14

93,283.56

69,962.67

570.41

685.15

675.31

685.15

713.01

675.31

60.65

196,779.48

17,590.89

31,156.75

30,709.52

31,156.75

32,423.89

30,709.52

23,032.14

1,969,182.14

48,272.55

265,499.02

261,688.03

265,499.02

276,296.83

261,688.03

265,499.02

144,209.56

177,887.24

180,477.83

187,817.83

177,887.24

180,477.83

2,740.28

14,474.31

14,685.10

15,282.34

14,474.31

14,685.10

1,935,560.50

256,565.07

261,571.21

272,209.28

257,816.60

261,571.21

CEMENTO ASFALTICO PEN 60/70

3,388,534.51

450,453.22

459,242.55

477,919.88

452,650.55

459,242.55

ASFALTO DILIUDO RC-250

1,590,154.65

210,520.63

214,628.35

223,357.25

211,547.56

214,628.35

4,065.00

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra
Cliente
Departamento

REHABILITACION Y MEJORAMIENTO DE LA CARRETRA DEPARTAMENTAL EMPALME PE - 5N (PUENTE COLOMBIA) - SHAPAJA - CHAZUTA


DIRECCION REGIONAL DE TRANSPORTES Y COMUNICACIONES DE S
SAN MARTIN
PARTIDA
DESCRIPCION

ITEM

COSTO PARCIAL

30 D.C

60 D.C

90 D.C

120 D.C

FILLER MINERAL (CEMENTO HIDRAULICO)

04
04.01
04.01.01
04.01.01.1

OBRAS DE ARTE Y DRENAJE


PUENTES
TRABAJOS PRELIMINARES
DEFENSA PROVISIONAL DEL AREA DE EXCAVACION

154,557.54

47,832.76

47,832.76

04.01.02
04.01.02.1

MOVIMIENTO DE TIERRAS
EXCAVACION EN TERRENO SEMIROCOSO

30,362.42

29,486.58

875.84

04.01.02.3

RELLENO CON MATERIAL DE PRESTAMO PARA ESTRUCTURAS

04.01.02.4

PERFILADO Y REFINE DE ZAPATA

1,792.71

119.51

04.01.02.5

ELIMINACION DE MATERIAL EXCEDENTE DE PUENTES A BOTADERO

75,992.75

04.01.03
04.01.03.1

ENCOFRADOS
ENCOFRADO Y DESENCOFRADO PARA ZAPATAS

16,030.22

1,918.51

8,185.65

04.01.03.2

ENCOFRADO DE LOSA DE APROXIMACION

1,569.66

711.25

858.41

04.01.03.3

ENCOFRADO DE ESTRIBOS AMBAS MARGENES CARA VISTA

16,702.22

110,580.24

04.01.03.4

ENCOFRADO Y DESENCOFRADO SUPERESTRUCTURA

83,771.82

04.01.04
04.01.04.1

OBRAS DE CONCRETO SIMPLE


CONCRETO EN SOLADO FC=140 KG/CM2

24,600.60

04.01.05
04.01.05.2

OBRAS DE CONCRETO ARMADO


CONCRETO EN ESTRIBOS, LOSA DE APROXIMACION FC=210 KG/CM2

422,417.97

04.01.05.3

CONCRETO VIGA, LOSA, Y VEREDAS FC=280 KG/CM2

150,857.69

04.01.06
04.01.06.1

ARMADURA Y ESTRUCTURA METALICA


ACERO FY=4,200 KG/CM2 EN ESTRIBOS AMBAS MARGENES

495,665.00

311,572.15

230,375.49

04.01.06.2

ACERO FY=4,200 KG/CM2 EN VIGA, LOSA Y VEREDA

347,032.25

04.01.06.3

ACERO FY=4,200 KG/CM2 EN LOSA DE APROXIMACION

130,056.40

04.01.07
04.01.07.1

VARIOS
TUBO FIERRO NEGRO 4"

150 D.C
20,538.76

03.03.06

1,912.23

Plazo de Ejecucion:
Costo a:

144,534.86

167,037.29

20,660.53

48,920.33

43,718.42

40,053.40

220,449.38

201,968.59

DIAS CALENDARIOS
180 D.C
210 D.C
20,939.52

20,939.52

22,172.58

21,000.24

21,306.06

5,926.07

103,093.03

24,600.60

116,510.63
164,782.25

275,515.92

55,366.83
160,984.40

43,236.84

72,291.99

34,347.06

186,047.85

14,527.58
8,179.47

11,744.88
64,347.94

3,565.41

58,953.50

FALSO PUENTE

123,301.44

04.01.07.3

BARANDAS METALICAS

289,536.00

88,308.48

201,227.52

04.01.07.4

JUNTAS DE DILATACION

66,756.60

28,068.12

38,688.48

04.01.07.5

PINTURA DE ESTRUCTURAS METALICAS

24,252.48

24,252.48

04.01.07.6

PRUEBA DE CARGA EN PUENTES

60,000.00

60,000.00

04.02
04.02.01
04.02.01.1

ALCANTARILLAS
MOVIMIENTO DE TIERRAS
TRAZO Y REPLANTEO

27,402.79

2,397.74

23,863.26

1,141.78

154,953.19

1,325.26

21,306.06

21,306.06

EXCAVACION EN ALCANTARILLAS

270 D.C

20,638.95

6,411.89

04.01.07.2

04.02.01.2

240 D.C

21,791.13

21,000.24

21,306.06

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO

Departamento

REHABILITACION Y MEJORAMIENTO DE LA CARRETRA DEPARTAMENTAL EMPALME PE - 5N (PUENTE COLOMBIA) - SHAPAJA - CHAZUTA


DIRECCION REGIONAL DE TRANSPORTES Y COMUNICACIONES DE S
SAN MARTIN

ITEM
04.02.01.3

PARTIDA
DESCRIPCION
RELLENO CON MATERIAL GRANULAR COMPACTADO

04.02.01.4

CAMA DE MATERIAL GRANULAR

04.02.01.5

ELIMINACION MATERIAL EXCEDENTE

04.02.02
04.02.02.1

OBRAS DE CONCRETO SIMPLE


SOLADO DE CONCRETO FC=100 KG/CM2

Obra
Cliente

COSTO PARCIAL

30 D.C

60 D.C

90 D.C

198,706.61

120 D.C
18,380.36
291.83

3,154.94
30,959.94
937.96

8.02

Plazo de Ejecucion:
Costo a:

150 D.C
34,111.30

DIAS CALENDARIOS
180 D.C
210 D.C
34,608.07
36,015.57

240 D.C
34,111.30

270 D.C
34,608.07

541.60

549.48

571.83

541.60

549.48

4,709.99

6,269.99

6,524.99

6,179.99

6,269.99

128.97

128.97

127.12

128.97

134.21

127.12

128.97

04.02.02.2

CONCRETO FC=175 KG/CM2 (cabezal y aleros)

138,599.19

6,318.49

21,299.43

20,993.70

21,299.43

22,165.68

20,993.70

21,299.43

04.02.02.3

ENCOFRADO Y DESENCOFRADO EN CABEZAL

134,401.68

6,127.13

20,654.38

20,357.90

20,654.38

21,494.39

20,357.90

20,654.38

04.02.02.4

MAMPOSTERIA DE PIEDRA EMBOQUILADA

160,323.90

14,829.96

27,522.27

27,923.08

29,058.71

27,522.27

27,923.08

04.02.03
04.02.03.1

OBRAS DE CONCRETO ARMADO


CONCRETO F'C=175 KG/CM2 EN CAJAS

31,172.80

266.61

4,286.26

4,286.26

4,224.73

4,286.26

4,460.58

4,224.73

4,286.26

04.02.03.2

CONCRETO FC=210 KG/CM2

267,063.76

2,284.10

36,721.27

36,721.27

36,194.17

36,721.27

38,214.72

36,194.17

36,721.27

04.02.03.3

ENCOFRADO Y DESENCOFRADO

322,267.73

2,756.24

44,311.81

44,311.81

43,675.76

44,311.81

46,113.97

43,675.76

44,311.81

04.02.03.4

ACERO FY=4,200 KG/CM2 GRADO 60

394,654.61

3,375.34

54,265.01

54,265.01

53,486.08

54,265.01

56,471.96

53,486.08

54,265.01

04.03
04.03.01

CUNETAS TRIANGULARES; FC=140 KG/CM2


EXCAVACION PARA ESTRUCTURAS

04.03.02

CONCRETO F'C=140 KG/CM2

04.03.03

ENCOFRADO Y DESENCOFRADO DE CUNETAS

04.03.04

JUNTAS ASFALTICAS EN CUNETAS

04.04.00
04.04.01

CUNETAS RECTANGULARES
EXCAVACION PARA ESTRUCTURAS

04.04.02
04.04.03

7,294.54

8,812.48

9,170.89

8,685.99

8,812.48

188,824.85

228,117.88

237,395.40

224,843.46

228,117.88

61,412.26

8,300.25

10,027.47

10,435.29

9,883.53

10,027.47

93,202.50

12,596.90

15,218.22

15,837.15

14,999.77

15,218.22

3,989.73

3,989.73

CONCRETO FC=175 KG/CM2- CUNETAS

65,376.44

41,268.88

ENCOFRADO Y DESENCOFRADO DE CUNETAS

20,146.59

18,761.51

1,385.08

04.04.04

ACERO FY=4,200 KG/CM2 EN CUNETAS RECT.

89,071.40

69,587.03

19,484.37

04.04.05

JUNTAS ASFALTICAS EN CUNETAS

1,975.40

950.66

1,024.74

04.05.00
04.05.01

MUROS CONCRETO ARMADO


EXCAVACION PARA ESTRUCTURAS

15,278.39

04.05.02

ENCOFRADO Y DESENCOFRADO EN MUROS

73,664.93

04.05.03

CONCRETO FC=210 KG/CM2

246,984.39

243,279.62

3,704.77

04.05.04

ACERO DE REFUERZO EN MUROS

230,930.30

04.05.05

LLORADORES PVC D=3

04.05.06

RELLENO CON MATERIAL GRANULAR COMPACTADO

53,971.19
1,397,085.58

503.01
122,538.72

10,026.44

24,107.56

5,251.95
72,928.28

736.65

230,930.30
220.07

282.94
122,538.72

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO

Departamento

REHABILITACION Y MEJORAMIENTO DE LA CARRETRA DEPARTAMENTAL EMPALME PE - 5N (PUENTE COLOMBIA) - SHAPAJA - CHAZUTA


DIRECCION REGIONAL DE TRANSPORTES Y COMUNICACIONES DE S
SAN MARTIN

ITEM
04.06.00
04.06.01

PARTIDA
DESCRIPCION
CUNETAS DE CORONACION TRAPEZ.
EXCAVACION DE CUNETAS DE CORONACION

04.06.02

CONCRETO F'C=140 KG/CM2 - CUNETAS DE CORONACION

04.06.03

ENCOFRADO Y DESENCOFRADO DE CUNETAS

1,998.90

04.06.04

JUNTAS ASFALTICAS EN CUNETAS

1,487.29

04.07.00
04.07.01

ESTRUCTURAS DRENABLES DE PIEDRAS


CORTE DE MATERIAL SUELTO

4,886.16

04.07.02

ELIMINACION MATERIAL EXCEDENTE

8,649.50

04.07.03

RELLENO CON MATERIAL DE PRESTAMO PARA ESTRUCTURAS (GRANULAR

5,337.78

04.07.04

GEOTEXTIL

04.07.05

RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20

05
05.01.00

TRANSPORTE
TRANSPORTE DE MATERIAL PARA SUB BASE

05.02.00

TRANSPORTE DE MATERIAL PARA BASE

05.03.00

TRANSPORTE DE MAT. EXCENT. A BOTADEROS

05.04.00

TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM. (CANT. - PLANTA CHANC

05.06.00

TRANSPORTE DE MEZCLA ASFALTICA A MAS DE 1 KM.

94,572.63

06
06.01.00

SEALIZACION Y SEGURIDAD VIAL


SEALES PREVENTIVAS (0.75 X 0.75)

45,585.54

06.02.00

SEALES REGLAMENTARIAS CIRCULAR DIAM. 0.60 M.

19,139.12

06.03.00

SEAL INFORMATIVA

26,407.18

06.04.00

POSTES DE SOPORTE DE SEALES

68,118.45

06.05.00

ESTRUCTURAS DE SOPORTE DE SEALES

12,391.31

06.06.00

CIMENTACION Y MONYAJE DE SEAL INFORMATIVA

10,724.78

06.07.00

POSTES DELINEADOR

06.08.00

TACHAS RETROREFLEXIVAS

06.09.00

MARCAS RETRORFLEXIVAS CON PINTURA DE TRANSITO CONVENCIONAL

06.10.00

GUARDAVIA METALICO

06.11.00

SECCION FINAL

18,083.04

06.12.00

SECCION DE AMORTIGUACION

22,674.50

06.13.00

CAPTAFAROS

56,810.22

06.14.00

POSTES DE KILOMETRAJE

Obra
Cliente

COSTO PARCIAL

30 D.C

60 D.C

90 D.C

120 D.C

Plazo de Ejecucion:
Costo a:

150 D.C

DIAS CALENDARIOS
180 D.C
210 D.C

16,494.10

19,123.60
99.95

1,487.29
4,886.16
1,126.24
778.43
291.77

1,863.00

2,418.68

9,777.98
266,297.85
195,914.29
1,722,468.54

3,901.20

81,812.54

2,140.67

1,931.25

83,003.99

86,379.75

1,692.74

18,369.37

81,812.54

83,003.99

15,091.63

83,003.99
38,756.73

47,807.70

48,503.93

50,476.58

47,807.70

48,503.93

164,432.58

291,240.76

287,060.27

291,240.76

303,085.48

287,060.27

291,240.76

58,002.47

71,547.96

72,589.92

75,542.14

71,547.96

72,589.92

12,427.81

12,670.31

13,185.61

12,488.44

12,670.31

330,187.84

466,798.35

2,629.49

1,898.96

20,062.11

2,720,105.12

270 D.C

7,548.36

7,548.36

610,110.74

240 D.C

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra
Cliente
Departamento

REHABILITACION Y MEJORAMIENTO DE LA CARRETRA DEPARTAMENTAL EMPALME PE - 5N (PUENTE COLOMBIA) - SHAPAJA - CHAZUTA


DIRECCION REGIONAL DE TRANSPORTES Y COMUNICACIONES DE S
SAN MARTIN
PARTIDA
DESCRIPCION

ITEM
07
07.01.00

PROTECCION AMBIENTAL
REGEVETACION

07.02.00

APERTURA DE DEPOSITOS DE DESECHOS

07.03.00

DEPOSITOS DE DESECHOS (ACOMODO)

07.04.00

READECUACION AMBIENTAL EN AREAS DE CANTERAS Y PLANTAS

07.05.00

READECUACION AMBIENTAL EN AREAS DE CAMPAMENTOS Y ALMACENES

07.06.00

PROGRAMA DE EDUCACION AMBIENTAL

07.07.00

PROGRAMA DE SEALIZACION AMBIENTAL

07.08.00

PROGRAMA DE CONTINGENCIA Y PROMOCION AL TURISMO

07.09.00

PROGRAMA DE SEGUIMIENTO Y VIGILANCIA


COSTO DIRECTO
GASTOS GENERALES (10% C.D.)
UTILIDAD (10% C.D.)
SUB TOTAL
I.G.V. (19% S.T.)
TOTAL PRESUPUESTO
AVANCE PORCENTUAL
AVANCE PORCENTUAL ACUMULADO

COSTO PARCIAL

30 D.C

60 D.C

90 D.C

120 D.C

Plazo de Ejecucion:
Costo a:

150 D.C

DIAS CALENDARIOS
180 D.C
210 D.C

240 D.C

270 D.C
2,861.58

18,231.23
8,515.80

1,622.89

3,350.48

3,542.43

396,233.47

17,514.12

36,158.19

39,359.69

39,359.69

38,794.72

39,359.69

40,960.45

38,794.72

39,359.69

48,750.00

4,160.16

3,750.00

4,082.03

4,082.03

4,023.44

4,082.03

4,248.05

4,023.44

4,082.03

5,437.95

4,826.18

611.77

60,695.30

5,179.53

4,668.87

5,009.31

5,082.26

52,500.00

4,480.17

4,038.46

4,396.03

4,396.03

4,332.93

4,396.03

4,574.82

4,332.93

4,396.03

987,922.12
98,792.21
98,792.21
1,185,506.54
225,246.24
1,410,752.79
3.04%
4.28%

1,902,835.97
190,283.60
190,283.60
2,283,403.17
433,846.60
2,717,249.77
5.86%
10.14%

3,108,066.82
310,806.68
310,806.68
3,729,680.18
708,639.23
4,438,319.42
9.57%
19.71%

4,702,023.16
470,202.32
470,202.32
5,642,427.80
1,072,061.28
6,714,489.08
14.48%
34.19%

4,007,041.21
400,704.12
400,704.12
4,808,449.46
913,605.40
5,722,054.85
12.34%
46.53%

3,604,170.17
360,417.02
360,417.02
4,325,004.21
821,750.80
5,146,755.01
11.10%
57.62%

3,326,584.52
332,658.45
332,658.45
3,991,901.42
758,461.27
4,750,362.69
10.24%
67.87%

2,889,520.37
288,952.04
288,952.04
3,467,424.44
658,810.64
4,126,235.09
8.90%
76.77%

39,200.00
1,620.00

32,474,743.57
3,247,474.36
3,247,474.36
38,969,692.28
7,404,241.53
46,373,933.81
100.00%
100.00%

401,471.99
40,147.20
40,147.20
481,766.39
91,535.61
573,302.00
1.24%
1.24%

.
5,082.26

5,082.26

5,009.31

5,082.26

5,288.95

360 DIAS CALENDARIOS


FEBRERO 2009

300 D.C

330 D.C

360 D.C
100,000.00

3,796.77

3,548.96

3,725.96

21,484.38

20,082.13

21,083.73

272,485.84

64,786.84

185,227.24

113,122.47

15,071.55

14,087.86

4,110.42

94,345.06

104,509.31

51,342.48

268,454.67

250,933.15

123,276.39

471,327.88

440,565.22

216,437.28

220,276.46

205,899.45

101,152.60

360 DIAS CALENDARIOS


FEBRERO 2009

300 D.C

330 D.C

360 D.C

21,490.56

20,087.91

9,868.63

4,230.63

360 DIAS CALENDARIOS


FEBRERO 2009

300 D.C
6,871.94

330 D.C

109.11
1,005.00
25.61
4,229.31
4,101.23
5,544.53
851.10
7,291.54
8,798.76
10,775.11
9,044.39

2,150.41

234,120.98

55,665.13

10,291.35

2,446.89

15,618.70

3,713.53

360 D.C

360 DIAS CALENDARIOS


FEBRERO 2009

300 D.C

330 D.C

360 D.C

3,865.25

3,612.97

45.05

85,188.30

20,254.56

49,780.35

30,401.99

298,904.99

279,396.04

226,443.18

13,003.74

12,155.01

5,971.41

26,445.46

19,140.08

10,121.65

9,017.47

44,977.97

12,611.12

13,796.06

30,784.30

37,334.15

4,646.74

7,744.57

3,196.81

6,892.05

635.92

2,162.44

6,283.61

1,331.94

38,408.34

171,130.51

56,759.00

13,186.54

125,900.05

56,827.70

1,090,344.66

632,123.87

10,055.79

8,027.25

10,864.86

11,809.64

22,851.54

33,958.68

1,269.14

2,632.06

360 DIAS CALENDARIOS


FEBRERO 2009

300 D.C

330 D.C

360 D.C

5,554.83

5,192.27

4,622.55

40,395.48

26,177.02

7,664.10

25,191.03

6,344.87

316.73

1,041.06

262.21

4,189.45

3,916.02

4,111.33

5,216.00

4,875.56

5,118.73

4,511.72

4,217.25

4,427.58

2,602,002.01
260,200.20
260,200.20
3,122,402.41
593,256.46
3,715,658.87
8.01%
84.78%

3,250,654.60
325,065.46
325,065.46
3,900,785.52
741,149.25
4,641,934.77
10.01%
94.79%

1,692,450.62
169,245.06
169,245.06
2,030,940.75
385,878.74
2,416,819.49
5.21%
100.00%

Vous aimerez peut-être aussi