Vous êtes sur la page 1sur 6

Move Order Requisition

Setup Document
January 28, 2009

This project applies for 4 requisition scenarios:


moving product from OS to FR (putaway rule will select locator FR.VA...)
moving product from OS to FG (putaway rules will select the FG primary locator)
moving product from OS to an FR locator specified by the requestor
moving product from OS to an FG locator specified by the requestor

Project Manager: Becky Miller, becky.miller@garmin.com

Contents:
1. Pick Rule, Strategy, Workbench
2. Putaway Rule, Strategy, Workbench
3. Move Order Request Set

page 1 of 6

Pick LPN's and Eaches from OS for Move Order Requisition

page 2 of 6

page 3 of 6

Putaway to FR for Value-Added Pullaround

page 4 of 6

page 5 of 6

Move Order Request Set


The existing Garmin Move Order Reports Set must be cancelled for all 5 scheduled daily
occurrences. Then the Set must be rescheduled for the 5 scheduled daily occurrences,
with the parameters modified for the Garmin Int Move Order Transactions Report.

Parameters for the Garmin Int Move Order Transactions Report:

page 6 of 6

Vous aimerez peut-être aussi