Académique Documents
Professionnel Documents
Culture Documents
S.G.
UNITS
Name:
Date:
1of 5
Aberdeen Drilling
Schools Rev.1
Feb.01
Well:
Rig Name:
Measured Depth :
Casing ShoeTVD(m):
S.I.C.P
Ltrs
BAR
Day:
BAR
Time:
Date
Casing T.V.D.
X 9.81 +
BAR
S.G.
Formation Breakdown
Gradient
OR
S.G.
X 9.81
BAR / m
S.G.
MAASP
Drilling Mud Weight
Maximum Allowable
Annulus Surface Pressure
Casing T.V.D.
9.81 X
S.G.
S.G.
KILL MUD
SIDPP
X 9.81 +
BAR
Kill Mud
S.G.
S.G.
S.C.R.
20 spm
Ltrs/stk
30 spm
40 spm
PUMP No 1.
PUMP No 2
BAR
BAR
BAR
BAR
BAR
BAR
METRIC
S.G.
2 of 5
Stokes
EOB to Bit
N/A
Length (MD) x Capacity =
ANNULUS DATA
N/A
Volume
Ltrs/m
Ltrs
Bit to Shoe
Volume (Ltrs)
=
Total length
(m)
Bit to Surface
Volume (Ltrs)
Total Annulus
(Ltrs)
Pump Output
=
Ltrs
Ltrs/stk
Slow Circulating
=
spm
min
ANNULUS DATA
Bit to Surface Volume
Pump Output
=
Ltrs
Ltrs/stk
Slow Circulating
=
spm
min
Ltrs
COMPLETE CIRCULATION
Surface to Bit Strokes
METRIC
S.G.
3 of 5
ICP
SIDPP
BAR
FCP
BAR
Kill Mud
P. SCR
BAR
S.G.
S.G.
)=
{(
BAR
ICP
+
_(
BAR
K.O.P. MD
P. SCR
BAR
BAR
minus
Bit TVD
K.O.P. TVD
SIDPP
Bit MD
m
K.O.P. CP
m
)=
BAR
{(
BAR
ICP
+
_(
BAR
E.O.B. MD
P. SCR
BAR
BAR
minus
Bit TVD
E.O.B. TVD
SIDPP
Bit MD
m
E.O.B. CP
m
)=
BAR
K.O.P. CP
BAR
Strokes to K.O.P
Stks
X 100
BAR
Stks
BAR
X 100
BAR/stk
=
Bar/100stks
Strokes
K.O.P to E.O.B
E.O.B. to CP
Pressure Stepdown
Pressure Stepdown
BAR/stk
=
Bar/100stks
Strokes
E.O.B to Bit
FCP
BAR
Pressure Stepdown
Stks
X 100
BAR/stk
=
Bar/100stks
METRIC
S.G.
From Surface
to K.O.P
Strokes
4 of 5
From K.O.P
to E.O.B
Pressure
Strokes
From E.O.B
to Bit
Pressure
Strokes
Surface
Bar
Pressure
Circulating Pressure
12
10
Pressure (BAR)
0
0
10
12