T&T SIMAC
Pgina :
Presupuesto
Obra
Frmula
Cliente
Departamento
Item
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
02.03.00
03.00.00
03.01.00
03.02.00
03.03.00
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
04.06.00
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
06.00.00
06.01.00
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.01.08
06.01.09
06.01.10
06.01.11
06.01.12
Descripcin
Unidad Metrado
Precio
Parcial
2.00
2,556.65
5,113.30
600.00
8.00
138.25
3,058.37
82,950.00
24,466.96
46.39
8.00
541.86
1,500.57
25,136.89
12,004.56
1.00
57,833.75
57,833.75
1.00
14,632.96
14,632.96
1.00
1.00
8,956.50
2,480.38
8,956.50
2,480.38
M3
M3
25,900.27
3,783.40
4.58
13.40
118,623.24
50,697.56
M3
8,625.54
23.80
205,287.85
M3
28,396.47
4.24
120,401.03
M2
231,950.00
1.77
410,551.50
M3
12,886.55
5.75
74,097.66
M3
71,268.88
3.05
217,370.08
M3
50,906.35
5.70
290,166.20
M3
50,906.35
7.99
406,741.74
M3K
M3K
17,520.20
33,386.15
8.57
10.79
150,148.11
360,236.56
M2
M2
M3
M
348.84
348.84
266.25
95.20
1.21
3.48
27.56
326.64
422.10
1,213.96
7,337.85
31,096.13
M3
M3
M2
KG
M2
M2
M2
98.37
68.15
185.72
175.34
51.85
51.85
35.70
36.20
383.82
36.12
5.02
22.21
7.55
175.29
3,560.99
26,157.33
6,708.21
880.21
1,151.59
391.47
6,257.85
M3
346.13
14.26
4,935.81
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE OBRA 3.60x2.40 M DE UND
MURO DE ALBAILERIA CONFINADA C/TARRAJEO +
PINTURA
CAMPAMENTO PROVISIONAL DE LA OBRA
M2
MANTENIMIENTO DE CAMPAMENTO
MES
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
KM
TRAZO, NIVELACION Y REPLANTEO
DURANTE EL MES
PROCESO
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
GLB
SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADM. PLAN DE GLB
SEGURIDAD
EQUIPO DE PROTECCION INDIVIDUAL
GLB
SEALIZACION TEMPORAL DE SEGURIDAD
GLB
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO RENDIMIENTO=570 M3/DIA
CORTE ROCA SUELTA (PERF. Y DISP.) RENDIMIENTO=500
M3/DIA
CORTE ROCA FIJA (PERF. Y DISP.) RENDIMIENTO=320
M3/DIA
CONFORMACION DE TERRAPLENES CON MATERIAL
PROPIO (REND=940 M3/DIA)
PERFILADO Y COMPACTADO DE LA SUB RASANTE EN
ZONA DE CORTE
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO
D=5KM
AFIRMADO
EXTRACCION Y APILAMIENTO DE MATERIAL PARA
AFIRMADO REND=800 M3/DIA
SELECCION Y CLASIFICACION DE MATERIAL PARA
AFIRMADO REND=300 M3/DIA
RELLENO COMPACTADO CON MATERIAL SELECCIONADO
(AFIRMADO)
TRANSPORTE DE MATERIAL AFIRMADO D=MENOR A 1KM
TRANSPORTE DE MATERIAL AFIRMADO D=MAYOR A 1KM
Subtotal
17/07/2012
Total
112,530.26
94,975.20
26,069.84
979,658.84
1,424,662.69
90,113.50
S10
T&T SIMAC
Pgina :
Presupuesto
Obra
Frmula
Cliente
Departamento
Item
06.02.00
06.02.01
06.02.02
06.02.03
06.02.04
06.02.05
06.02.06
06.02.07
06.02.08
06.02.09
06.02.10
06.03.00
06.03.01
06.03.02
06.03.03
06.03.04
Descripcin
ALCANTARILLA DE CONCRETO (ENCOFRADO PERDIDO CAJUELA) (108 UND)
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION EN ESTRUCTURAS (MANUAL)
ENCOFRADO Y DESENCOFRADO DE MUROS Y ALERO
SUMINISTRO E INSTALAC. DE CILINDROS METALICOS
CONCRETO CICLOPEO F'C=175 KG/CM2 + 30 % P.M.
ACERO DE REFUERZO FY=4200 KG/CM2
TARRAJEO EN EXTERIORES C/MORTERO 1.5 X 1.5CM.
PINTURA EN EXTERIORES ALCANTARILLA
MAMPOSTERIA DE PIEDRA ASENT. EN CONCRETO
F'C=175KG/CM2
ELIMINACION DE MATERIAL EXCEDENTE DIST. PROM. 30 M
Unidad Metrado
Precio
Parcial
Subtotal
M2
M3
M2
UND
M3
KG
M2
M2
M2
1,377.00
1,310.06
2,356.56
648.00
910.88
951.78
372.60
372.60
178.20
3.48
27.56
36.12
54.02
383.82
5.02
22.21
7.55
175.29
4,791.96
36,105.25
85,118.95
35,004.96
349,613.96
4,777.94
8,275.45
2,813.13
31,236.68
M3
1,572.07
14.26
22,417.72
M2
M2
M3
M
148.96
148.96
162.76
39.20
1.21
3.48
27.56
467.06
180.24
518.38
4,485.67
18,308.75
M3
M3
M2
KG
M2
M2
M2
56.48
35.30
104.91
73.80
22.68
22.68
15.40
36.20
383.82
36.12
5.02
22.21
7.55
175.29
2,044.58
13,548.85
3,789.35
370.48
503.72
171.23
2,699.47
M3
211.59
14.26
3,017.27
49,637.99
M2
M2
M2
9,437.09
5,468.70
4,429.46
1.65
7.85
11.34
15,571.20
42,929.30
50,230.08
108,730.58
06.03.12
06.04.00
06.04.01
06.04.02
06.04.03
CONFORMACION DE CUNETAS
CONFORMACION DE CUNETAS EN MATERIAL SUELTO
CONFORMACION DE CUNETAS EN ROCA SUELTA
CONFORMACION DE CUNETAS EN ROCA FIJA
07.00.00
07.01.00
07.01.01
07.01.02
07.01.03
M3
UND
M3
19.25
154.00
19.25
24.44
211.78
369.35
470.47
32,614.12
7,109.99
40,194.58
07.02.00
07.02.01
07.02.02
07.02.03
07.02.04
07.02.05
07.02.06
07.02.07
SEALES INFORMATIVAS
EXCAVACION DE TIERRA O CONGLOMERADO A MANO
SEALES INFORMATIVAS 1.30 x 0.60 m
SEALES INFORMATIVAS 2.40 x 1.35 m
CONCRETO CICLOPEO F'C=175 KG/CM2 + 30 % P.M.
CONCRETO F'C=175 KG/CM2
ACERO DE REFUERZO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS
M3
UND
UND
M3
M3
KG
M2
17.28
6.00
12.00
17.28
5.40
615.30
28.80
24.44
759.29
1,285.23
383.82
438.69
5.02
25.85
422.32
4,555.74
15,422.76
6,632.41
2,368.93
3,088.81
744.48
33,235.45
07.03.00
07.03.01
07.03.02
07.03.03
07.03.04
POSTES KILOMETRICOS
EXCAVACION DE TIERRA O CONGLOMERADO A MANO
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS
HITOS KILOMETRICOS DE CONCRETO Y PINTURA
CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM.
M3
M2
UND
M3
4.99
59.41
47.00
5.88
24.44
25.85
93.55
369.35
121.96
1,535.75
4,396.85
2,171.78
8,226.34
08.00.00
08.01.00
UND
1.00
33,560.00
33,560.00
09.00.00
09.01.00
FLETES TERRESTRE
FLETE TERRESTRE DE MATERIALES DIVERSOS
GLB
1.00
37,783.33
37,783.33
Total
580,156.00
06.03.05
06.03.06
06.03.07
06.03.08
06.03.09
06.03.10
06.03.11
17/07/2012
828,638.07
81,656.37
33,560.00
S10
T&T SIMAC
Pgina :
Presupuesto
Obra
Frmula
Cliente
Departamento
Item
09.02.00
10.00.00
10.01.00
10.02.00
10.03.00
10.04.00
Descripcin
FLETE EXPLOSIVOS Y CUSTODIA POLICIAL
ACONDICIONAMIENTO AMBIENTAL
REACONDICIONAMIENTO DE AREA DE ALMACEN Y
GUARDIANIA
ACONDICIONAMIENTO DE CANTERAS
ACONDICIONAMIENTO DE BOTADERO DE MATERIAL
EXCEDENTE
ACONDICIONAMIENTO MANUAL DE PATIO DE MAQUINAS
COSTO DIRECTO
GASTOS DE OPERACION / RESIDENCIA DE OBRA
GASTOS DE SUPERVISION
GASTOS ADMINISTRATIVOS DE OBRA
COSTO TOTAL DE OBRA
Unidad Metrado
Precio
Parcial
1.00
20,509.25
20,509.25
M2
1,500.00
4.85
7,275.00
M2
M2
36,600.00
3,900.00
4.29
6.42
157,014.00
25,038.00
M2
600.00
5.82
3,492.00
GLB
17/07/2012
Subtotal
Total
58,292.58
192,819.00
3,832,862.85
306,629.03
191,643.14
38,328.63
====================
4,369,463.65