MONTO
EJECUTADO
2011
16,236,047
3,539,920
TERMINO
PROYECTO
PROG.
DIAS
CALEN
REAL
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
27-Nov-09
3-Aug-10
88%
100%
100%
2-Feb-10
1-Jun-10
91%
100%
100%
95%
PROGRAMADO
DIAS
CALEN
PROG.
INICIO
PROYECTO
PROG.
TERMINO
PROYECTO
REAL
% AVANCE FSICO
PROGRAMADO
MONTO
EJECUTADO
AL 2010
% AVANCE FSICO
REAL
% AVANCE
FNANCIERO REAL
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
MODALIDAD DE
EJECUCIN
CODIGO SNIP
AO DE INICIO
FUNCION
DISTRITO
CC
PROVINCIA
ITEM
OBSERVACIONES / INFORMES
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
10
11
SUPERVISION
SUPERVISION
S/C
1,496,163
1,496,163
72661
79096
2008
40992
1,651,916
1,651,916
28,259
28,259
CONTRATA
A P.U.
0.00
120
2-Feb-10
2-Jun-10
120
EPI A P.U.
294,763.37
6,406,361.15
1,425,958.67
120
9-Jun-10
7-Oct-10
120
+35
+27
+44
9-Jun-10
30-Jan-11
107%
100%
EPI A P.U.
1,251,427
27-Mar-10
225,022.87
26,727.95
120
9-Jun-10
7-Oct-10
120
9-Jun-10
7-Oct-10
100%
100%
100%
DIRECTA
1,251,427
27-Nov-09
0.00
285,099.99
180
1-Mar-11
28-Aug-11
90
1-Mar-11
29-May-11
70%
100%
74%
DIRECTA
S/C
120
0.00
275,970.07
180
1-Mar-11
28-Aug-11
180
1-Mar-11
28-Aug-11
22%
65%
65%
DIRECTA
2009
2011
1,374,789
2011
7,348,867
0.00
0.00
668,761.10
180
1-Mar-11
28-Aug-11
60
16-Mar-11
15-May-11
45%
56%
62%
CONTRATA
A PRECIOS UNITARIOS
2009
2009
2009
AGROPECUARIA
AGROPEC
UARIA
AGROPECUARIA
CULTURA Y
DEPORTE
SECHURA
SECHURA
325,187
1,374,789
A2 CULTURA Y DEPORTE
12
216,303
5,004,516.18
120
+119
+11
CONTRATA A
Precios Unitarios
09 0139
5,710,712
S/C
AGROPECUARI
A
0040
5,595,950
6,998,921
AGROPECUARI
A
08
0158
RINCONADA
07
23,983,111
2011
PIURA
CASTILLA
24,222,205
23,067,921
183,773
2009
PIURA
PIURA
CATACAOS
C.P. PAREDONES
PIURA
PIURA
9254
23,307,016
183,788
2009
AGROPECUARIA
05
AGROPECUA
PROTECCI
ON SOCIAL AGROPECUARIA
RIA
0144 SUPERVISION
AGROPECUARIA
04
AGROPECUARIO
REHABILITACIN Y MEJORAMIENTO DE LA
CARRETERA SAN MIGUEL DE EL FAIQUEHUARMACA EMP. 02 (CRUCE PALAMBLA) CASERO PIEDRA GRANDE (KM 7+100 - 18+080)
PIURA
CATACAOS
0095
PIURA
03
PIURA
02
HUANCABAMBA
01
MEJORAMIENTO DEL CANAL DE RIEGO 52.81 0160 MEDIO PIURA (BONOS SOBERANOS) DS-1742009-EF
PIURA
A1 AGROPECUARIA
AMPLIACIONES
N 01 por 27 d. con RGR N 204-2010 (27.08.10) denegada
Obra culminada, recepcionada y liquidada con Resolucin RORA N 061-2011/GRPN 02 por 119 d. con RGR N 129-2010 (04.06.10) aprobada
ORA del 13.04.2011. Valor Final de Obra es S/. 5,893,541.00 con saldo en contra del
N 03 por 9 d. con RGR N 082--2009 (29.04.10) denegada
contratista de S/. 566,585.17 por que obtuvo penalidad por mora en ejecucin de
N 04 por 11 d. con RGR N 180-2009 (03.08.10) aprobada
Obra. Actualmente en trmite de transferencia.
ADICIONALES
N 01 - por S/. 372,458.65 con RGR N 412-2010/GRP (14.05.10)
AMPLIACIONES
N 01 - RGR 293-2010/GRP-GRI de 35 das (23.11.10) Aprob.
N 02 - RGR 294-2010/GRP-GRI de 27 das (23.11.10) Aprob.
N 03 - RGR N 005-2011/GRP-GRI de 44 das (02.02.2011) Aprob.
N 04 - RGR 004-2011/GRP-GRI 20 d. denegada (02.02.2011) Deneg.
Obra culminada y recepcionada, Contratista ha ido a arbitraje por la denegacin de
ADICIONALES
ampliacin de plazo de 20 das con lo cual tendra 10 das de penalidad.
N 01 - RER N 1006-2010/GRP.PR -S/. 246,415.18 (29.11.2010) Aprob.
N 02 - RER N 1032-2010/GRP-PR (02.12.2010) denegada
N 03 - RER N 1074-2010/GRP-PR S/. 573,571.69 (29.11.2010) Aprob.
DEDUCTIVOS
N 01 - por S/. 154,274.33 con REG 1005-2010/GRP-PR del 29.11.2010
508,377.02
852,901.94
120
9-Nov-10
8-Mar-11
120
+9
+18
+18
+18
+18
+18
9-Nov-10
15-Jun-11
82%
100%
99%
AMPLIACIONES
N 01: RGR N 028-2011 del 24.03.2011 por 100 das (denegada)
N 02: RGR N 032-2011 del 04.04.2011 por 9 das parcial (aprobada)
N 03: RGR N 037-2011 del 08.04.2011 por 18 das parcial (aprobada)
N 04: RGR N 035-2011 del 07.04.2011 por 18 das parcial (aprobada)
N 05: RGR N 036-2011 del 07.04.2011 por 14 das parcial (denegada)
N 06: RGR N 044-2011 del 29.04.2011 por 18 das parcial (aprobada)
La Obra est casi al 100%, solo falta colocacin de compuertas sub laterales. Fecha
N 07: RGR N 052-2011 del 04.05.2011 por 18 das parcial (denegada)
de trmino es el 15.06.2011. Se acuerdo al cronograma la obra debe estar al 100%,
N 08: RGR N 063-2011 del 25.05.2011 por 18 das parcial (aprobada)
en la primera quincena de Junio. En el adicional N 03 se detalla un problema con un
N 09: RGR N 083-2011 del 07.06.2011 por 18 das parcial (aprobada)
acueducto, se sugiere hacer como obra complementaria .
ADICIONALES
N 01 aprobado con RER N 528-2011/GRP (30.05.2011) S/. 37,634.34
N 02 en trmite por partidas adicionales por S/. 38,257.48
N 03 en trmite por mayores metrados por S/. 85,380.46
DEDUCTIVOS
N 01 aprobado con RER N 528-2011 (30.05.2011) por S/. 22,378.24
N 02 en trmite por S/. 21,082.50
28,258.26
4,500.00
120
9-Nov-10
8-Mar-11
120
9-Nov-10
8-Mar-11
30%
100%
93%
AMPLIACIONES
N 01 - 37 d. - RGR N 33-2010/GRP denegada (26.02.10)
N 02 - 30 d. - RGR N 120-2010/GRP aprobada (28.05.10)
Obra concluida al 100%, recepcionada e inaugurada, Contratista ha desistido al
N 03 - N d. - RGR N 171-2010/GRP denegada (21.07.10)
abritraje por los dos adicionales y 04 ampliaciones de plazo y Entidad le est
N 04 - N d. - RGR N 172-2010/GRP denegada (21.07.10)
cobrando mxima penalidad. El Coordinador de Obra Ing. Juan Custodio Salazar con N 05 - N d. - RGR N 173-2010/GRP denegada (21.07.10)
Informe N 153-2011 ha reiterado a la Procuradora Pblica Regional que se
N 06 - N d. - RGR N 174-2010/GRP denegada (21.07.10)
pronuncie sobre la situacin actual de este proceso.
ADICIONALES
Adic. N 01 por S/. 74,229.37 con RGR N 576-2010 aprobada (05.07.10)
Adic. N 02 con RGR N 703 -2009 denegada (18.08.10)
Adic. N 03 con RGR N 701-2009 denegada (18.08.10)
21-Nov-09
19-Apr-10
82%
100%
100%
3,768,748.27
0.00
120
21-Nov-09
20-Mar-10
238,658
251,936.26
0.00
120
21-Nov-09
20-Mar-10
120
21-Nov-09
20-Mar-10
106%
100%
100%
3,367,219
3,362,108
3,211,789
33,203
2,310,141.19
2,305,029
2,305,029.32
0.00
150DC
13-Jul-09
9-Dec-09
150DC
+20
+15
+17
13-Jul-09
30-Jan-10
100%
100%
100%
4,270,405.46
4,612,018
238,658
AMPLIACIONES
N 01 - RGR 308-2010/GRP-GRI de 35 das (03.12.2010)
N 02 - RGR 339-2010/GRP-GRI de 27 das (27.12.2010)
N 03 RGR 478-2011/GRP-GRI de 44 das (09.05.2011)
ADICIONALES
N 01 con RER N 1121-2010/GRP.GRI por S/. 26,727.95 del 29.11.2010
N 02 con RER N 478-2011/GRP-PR por S/. 18,952.02 del 09.05.2011
120+
30
ENCARGO
UNOPS CONTRATA
A OBRAS
CONTRATA
UNIDAD EJECUTORA
S/C
PIURA
PIURA
EDUCACION
2009
49390
AMPLIACION Y MEJORAMIENTO DE LA
INFRAESTRUCTURA EDUCATIVA EN LA I.E. N
14144 SANTA ROSA - CENTRO POBLADO
PALOMINO - DISTRITO DE TAMBOGRANDE
TAMBOGRANDE
EDUCACION
2009
110691
LA ARENA
EDUCACION
20
0098
21
SUSTITUCIN Y MEJORAMIENT0 DE LA
INFRAESTRUCTURA DE LA INSTITUCIN
0099
EDUCATIVA EN LA I.E. N 14123 DEL CENTRO
POBLADO DE SINCAPE - DISTRITO DE LA ARENA
2009
SUSTITUCION Y MEJORAMIENTO DE LA
INFRAESTRUCTURA EDUCATIVA EN LA I.E. N
14007 URB. PIURA (25)
PIURA
19
PIURA
A4 EDUCACION
55927
350,000
1,302,633
1,229,617
TERMINO
PROYECTO
REAL
% AVANCE FSICO
REAL
INICIO
PROYECTO
REAL
% AVANCE FSICO
PROGRAMADO
DIAS
CALEN
REAL
OBSERVACIONES / INFORMES
45
7-Sep-10
21-Oct-10
45
+25
+17
+25
7-Sep-10
27-Dec-10
100%
100%
100%
350,000
86
10-Nov-10
3-Feb-11
86
10-Nov-10
3-Feb-11
75%
100%
98%
350,000
86
10-Nov-10
3-Feb-11
86
10-Nov-10
3-Feb-11
100%
100%
0%
1,098,743
55,801
AMPLIACIONES
N 01 - 47 d. - RGR N 143-2010/GRP-GRI (26.06.10) denegada
ADICIONALES
N 05 por S/. 674.09 - RER N 575-2010/GRP-PR del 05.07.2010 por
Mayor Metrado de Vlvula de Compuerta HFD de 110 mm
N 04 por S/. 2,268.88 - RER N 574-2010/GRP-PR del 05.07.2010 por
Mayores Metrados detubera PVC, S-20 de 200 mm de Alcantarillado,
Obra culminada, recepcionada, inaugurada y liquidada con Resolucin Oficina
N 02 por S/. 10,019.56 - RER N 574-2010/GRP-PR del 05.07.2010 por
Regional de Administracin 423 - 2010/GRP - ORA del 21/10/2010, inaugurada el
mayores prestaciones en obras de agua potable.
29/06/2010.
N 01 por S/. 15,969.94 - RER N 535-2010/GRP-PR del 24.06.2010 por
mayores metrados de eliminacin de material excedente.
DEDUCTIVOS
N 01 por S/. 27,885.02 - RER N 473-2010/Gob.Reg.Piura-PR del
10.06.10
N 02 por S/. 9,241.66 - RER N 563-2010/Gob.Reg.Piura-PR del
30.06.2010
11-Mar-10
8-Jun-10
90
11-Mar-10
8-Jun-10
90%
100%
100%
128,495.00
0.00
21
23-Feb-10
15-Mar-10
21
23-Feb-10
15-Mar-10
100%
100%
100%
128,495
291,370.74
319,481
17,094,806
17,005,782
1,553,519
1,475,772
703,514
703,514
AMPLIACIONES
N 01 con RGR 272-2010/GRP.Piura-GRI por 25 d. (27.1010) Aprob.
N 02 con RGR 298-2010/GRP.Piura-GRI por 17 d (24.11.10) Aprob.
N 03 con RGR 326-2010/GRP.Piura-GRI por 25 d (15.12.10) Aprob.
ADICIONALES
N 01 - S/. 59,389. - RER N 1070-2010/GOB.REG.PIURA-PR (24,839%)
del 15.12.2010 por mayores metrados en diferentes partidas, asi como por
la modificacin del techo de las tribunas del coliseo.
DEDUCTIVOS
N 01 - S/. 55,213.17 - RER N 929-2010/GOB.REG.PIURA-PR (02-112010)
N 02 - S/. 2,615.74 - RER N 345-2011//GOB.REG.PIURAPR (23-032011)
33,203.46
90
142,773
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
206,759.65
781,641
1,379,018
TERMINO
PROYECTO
PROG.
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
706,203.05
868,490.00
1,379,017.61
INICIO
PROYECTO
PROG.
% AVANCE
FNANCIERO REAL
MODALIDAD DE
EJECUCIN
CONTRATA
350,000
467,984
DIAS
CALEN
PROG.
CONTRATA
2009
2008
57916
467,984
MONTO
EJECUTADO
2011
CONTRATA
DESARROLLO URBANO
DESARROLLO
URBANO
DESARROLLO URBANO
17
239,095
CONTRATA
A PRECIOS UNITARIOS
PIURA
PIURA
PIURA
2009
PIURA
PIURA
DE LA CIUDAD DE PIURA.
PIURA
A3 DESARROLLO SOCIAL
239,095
MONTO
EJECUTADO
AL 2010
55,801.04
10,520,438
2,615,673
1,521,437.10
0.00
90 DC
27-Sep-09
25-Dec-09
90
+45
+3
+90
27-Sep-09
8-Mar-10
103%
100%
100%
628,533.67
0.00
90
23-Nov-09
20-Feb-10
90
+45
23-Nov-09
18-Mar-10
89%
100%
100%
31-Mar-10
150
+33
+41
1,569,917.35
10,171.00
60
150
15-Sep-10
2-Nov-09
13-Nov-10
60
+25
+12
+52
264,044.47
CONTRATA A P.U.
S/C
EPD
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
EPD
CODIGO SNIP
2009
15
2009
AO DE INICIO
1010
CULTURA Y
DEPORTE
S/C
CULTURA Y
DEPORTE
FUNCION
CULTURA Y DEPORTE
BELLAVISTA
DISTRITO
PIURA
14
CURA MORI
PROVINCIA
35247
DEPORTIVO.
PIURA
SECHURA
CC
PIURA
ITEM
15-Sep-10
2-Nov-09
10-Feb-11
13-Jun-10
91%
115%
100%
100%
57%
100%
GANIMEDES INGENIERIA DE LA
CONSTRUCCION Y SERVICIOS S.R.L
S.: Vctor Boyer Oyola 969592397
R: Luis R. La Cherre Vsques 968171897
AMPLIACIONES
N 01 con RGR 299-2010/GRP.Piura-GRI por 12 d (24.11.10)
N 02 con RGR 296-2010/GRP.Piura-GRI por 25 d (23.11.10)
N 03 por 52 das consentida a la espera de Resolucin
ADICIONALES
N 01 por S/. 135,979.37 - RER 1069-2010/G.R.P.PR del 14.12.2010
DEDUCTIVOS
N 01 - por S/. 102,099.45 - RER 1025-2010/GRP-PR del 01.12.2010
AMPLIACIONES
N 01 - 45 d. - RGR N 210-2009/GRP-GRI-Aprob.
N 02 - 3 d. - RGR N 011-2009/GRP-GRI Aprob.
N 03 - 13 d. - Oficio N 079-2010-440310
N 04 - 36 d. - Oficio N 078-2010-440310
N 05 - 41 d. - Oficio N 080-2010-440310
ADICIONALES
N 01 - RER N 707-2009/GRP-PR -S/. 9,519.14 (01.01.2010)-Aprob.
N 02 - RER N 878-2009/GRP-PR -S/. 11,477.35 del 01.01.2010-AproN 03 - RER N 895-2009/GRP-PR - S/. 533.00 (01.01.2010) Aprob.
N.04 - RER N 895-2009/GRP-PR - S/. 19,488.16 (01.01.2010) Aprob.
N.05 - RER N 895-2009/GRP-PR - S/. 10,104.73 (01.01.2010)Aprob.
E: SANTA LUCIA S.A.C. CONSTRUCCIONES, Obra culminada, recepcionada, inaugurada, transferida provisionalmente a la
direccin del colegio, se encuentra en arbitraje por las ampliaciones de plazo 03, 04 N.06 - RER N 895-2009/GRP-PR - S/. 5,174.83 (01.01.2010) Aprob.
MAQUNARIAS, EQUIPOS Y SERVICIOS
GENERALES
y 05. Proceso de arbitraje se encuentra en la etapa final.. el 05/04/2011 se ha
N 07 - RER N 062-2010/GRP-PR - S/. 3,714.60 (01.01.2010) Aprob.
R : Ing Jos E. Cumpa Angeles
programado reunin para dar informes orales, a mas tardar a fines de Abril tribunal N 08 - RER N 062-2010/GRP-PR - S/. 1,647.65 (01.01.2010)Aprob.
S : Ing Luis Alberto Vallejos Vilchez
dar a conocer sentencia.
N 09 - RER N 061-2010/GRP-PR - S/. 4,155.82 (01.01.2010) Aprob.
N 10 - RER N 061-2010/GRP-PR - S/. 650.26 (01.01.2010) Aprob.
N 11 - RER N 087-2010/GRP-PR - S/. 0.00 (01.01.2010) Deneg.
N 12 - RER N 158-2010/GRP-PR - S/. 1,987.92 (01.01.2010) Aprob.
N 13 - RER N 022-2010/GRP-PR - S/. 0.00 (01.01.2010) Deneg.
N 14 - RER N 175-2010/GRP-PR - S/. 4,604.27 (01.01.2010) Aprob.
N 15 - RER N 199-2010/GRP-PR - S/. 32,737.47 (01.01.2010) Aprob.
DEDUCTIVOS
N 01 - S/. 8,630.13 - RER N 179-2010/GRP-PR (01.01.27)
N 02- S/. 1,469.78 - RER N 179-2010/GRP-PR (01.01.10)
N 03- S/. 598.65 - RER N 179-2010/GRP-PR (01.01.10)
N
04- S/. 22,084.54-RER 199-2010/GRP-PR (01.01.10)
AMPLIACIONES
La obra se encuentra culminada e inaugurada, se ha solicitado Certificacin
R: Ing Gustavo Zegarra
N 01 por 45 d. con RGR 88-2010/GRP (05.05.10)
S: Arq. Jos Ralph Correa Serrano
Presupuestal para el levantamiento de observaciones.
AMPLIACIONES
N 01 - 33 d. - RGR N 037-2010/Gob.Reg.Piura-GRI del 03.03.10
Obra terminada al 100%. Gerencia de Planeamiento, Presupuesto y
N 02 - 41 d. - RGR N 097-2010/Gob.Reg.Piura-GRI del 12.05.10
Acondicionamiento Territorial otorg Certificacin Presupuestal, actualmente est en
N 03 - 17 d. - RGR N 144-2010/Gob.Reg.Piura-GRI del 23.06.10
levantamiento de observaciones.
ADICIONALES
N 01 en trmite por S/. 312,094.62
29 0197
SUPERVISION
2009
ENERGIA
TAMBO GRANDE
0171
PIURA
30
54120
27-Jan-10
17-Dec-10
23-Nov-10
300
+36
+185
+116
300
+30
+25
+12
+39
15-Sep-10
1-Jun-21
46,329.27
0.00
120
15-Sep-10
1-Jun-21
120
50,000
1,944,778
1,944,778
24,508
24,508
1,463,576
1,463,576
7,125,218
20-Feb-10
27-Feb-10
TERMINO
PROYECTO
REAL
18-Nov-11
8-Apr-11
68%
98%
76%
88%
% AVANCE FSICO
REAL
INICIO
PROYECTO
REAL
% AVANCE FSICO
PROGRAMADO
DIAS
CALEN
REAL
% AVANCE
FNANCIERO REAL
MODALIDAD DE
EJECUCIN
CONTRATA
A.P.U.
C.P.N 004-2009 POR CONTRATA
300
20-Feb-10
TERMINO
PROYECTO
PROG.
CONTRATA
0.00
300
INICIO
PROYECTO
PROG.
120
50,000
3,909,434
439,227.28
577,410.85
DIAS
CALEN
PROG.
63,535.96
980,318
3,814,347.03
5,263,972.02
MONTO
EJECUTADO
2011
816,513.38
990,740
7,102,937
MONTO
EJECUTADO
AL 2010
CONTRATA
2010
2010
2010
EDUCACION
EDUCAC
ION
A5 ENERGIA
120
+15
+15
37575
448,191
CONTRATA
A PRECIOS UNITARIOS
CODIGO SNIP
AO DE INICIO
2008
FUNCION
EDUCACION
95190
EDUC
ACIO
N
EDUCACION
39907
8,536,108
CONTRATA A P.U.
8,536,962
448,191
2010
MEJORAMIENTO DE LA INFRAESTRUCTURA Y
EDUCACION
DISTRITO
PAITA
SUPERVISION
19093
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
EDUC
ACIO
N
27 0143
AMPLIACIN Y MEJORAMIENTO DE LA
INFRAESTRUCTURA DE LA I.E ALMIRANTE
MIGUEL GRAU TABLAZO NORTE LA UNION (M.D.
LA UNION)
MANCORA
0065
EDUCACION
0196 SUPERVISION
LAS LOMAS
25
LA UNION
24
28
PROVINCIA
0155 SUPERVISION
AMPLIACIN Y MEJORAMIENTO DE LA
INFRAESTRUCTURA DE LA I.E. 15117 VICTOR
0094
RAUL HAYA DE LA TORRE - POTRERILLO - LAS
LOMAS - PIURA
26
PAITA
CONSTRUCCIN DE INFRAESTRUCTURA DE LA
INSTITUCIN EDUCATIVA NUESTRA SEORA DE
LAS MERCEDES DEL DISTRITO DE
PAITA(FONIPREL)
PIURA
23
0092
PIURA
22
CC
PIURA
TALARA
ITEM
77%
69%
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
OBSERVACIONES / INFORMES
AMPLIACIONES
N 01 - 36 dias - RGR N 049-2010 del 18.03.10 (Concedida)
N02 - 17 dias - RGR N 243-2010 del 01.10.10(denegada)
N 03 - 185 das - RGR N 013-2011 del 02.03.11 (Consentida)
N 04 - 116 das - RGR N 025-2011 del 21.03.11 (consentida)
ADICIONALES
El avance real de la Obra respecto a las estructuras estn practicamente en 95%, en N 01 - por S/. 116,169.42 con RER 098-2010/GRP del 18.02.2010
Arquitectura est en 68%, En Instalaciones Electricas estn en 50%, En
(inclusin de partida caseta de bombeo, guardiana, Ing. Supervisor, Ing.
Instalaciones Sanitarias se encuentran en 50%. Se estn ejecutando trabajos de
Residente, Vestuario, obreros y comedor. y Partida Cerco Provisional de
Arquitectura como en terrajeos a exteriores, instalacin de cermicos en baos,
esteras).
cobertura con plancha metlica. En el mes de Mayo tuvo un avance fsico de 5%,
N 02 - por S/. 409,281.29 con RER 898-2010/GRP-PR del 18.10.10 (por
siendo su avance acumulado de 77%.
inclusin de partida empalme de media tensin a la red ENOSA)
N 03 - por S/.47,075.45 con RER 915-2010/GRP-PR del 27.10.2010 (por
mayores metrados en el subpresupuesto de estructuras)
DEDUCTIVOS
N 01 =S/. 66,608..68 con RER N 897-2010/GRP-PR del 18.10.10 (por
modificacin del precio unitario de partida relleno con material de prstamo
dentro de la especialidad de estructuras.
23-Sep-10
21-Mar-11
90%
100%
97%
15-Sep-10
13-Jan-11
93%
100%
97%
210,000.00
1,474,413.00
120
24-Dec-10
22-Apr-11
120
+30
+28
24-Dec-10
19-Jun-11
87%
100%
91%
24,507.55
8,500.00
120
24-Dec-10
22-Apr-11
120
24-Dec-10
22-Apr-11
135%
80%
82%
0.00
474,342.28
150
24-Dec-10
22-May-11
150
23-Dec-10
21-May-11
32%
100%
20%
0.00
7,300.00
150
24-Dec-10
22-May-11
150
23-Dec-10
21-May-11
54%
20%
1,938,501
770,779
0.00
AMPLIACIONES
N 01 - 30 das - RGR N 026-2011/GRP-GRI del 22.03.11 Aprob.
N02 - 25 dias - RGR N 027-2011/GRP-GRI del 23.03.2011 Aprob.
N03 - 12 dias - RGR N 379-2011/GRP-GRI del 04.04.11 Aprob.
N 04 - 39 das - RGR N 047-2011/GRP-GRI del 03.05.11 Aprob.
ADICIONALES
N 01 -RGR N 343-2011/GRP por S/. 28,726.31 del 22.03.2011
N 02-RGR N 344-2011/GRP por S/. 27,090.89 del 23.03.2011
N 03 -RGR N 379-2011/GRP del 04.04.11 S/. 11,388.06
N 04 -RGR N XXX-2011/GRP del xx.xx.xx por S/. 36,466.98
N 05 -RGR N por S/. 7,968.16 est para Resolucin
AMPLIACIONES
N 01 - RGR N 18-2011 del 08.03.2011 por 15dias(aprobada)
N 02 - RGR 08-2011 del 14.02.2011 por 30dias (aprobada)
N 03 - RGR N 071-2011 del 31.05.2011 por 15 dias (aprobada)
ADICIONALES
N 01 - en trmite por S/. 4,125.98 (0.42%) por partida nueva , excavacin
en roca fija, mayormente en el rea del comedor cocina
N 02 - en trmite por S/. 54,463.40 (5.57%) por mayores metrados con
respedto a los establecidosen el valor referencial , en los planos y en el
replanteo topogrfico
DEDUCTIVOS
N 01 - en trmite por S/. 4,059.57 (0.41%) vinculado al adicional N 01 ,
relacionado por partidas que ya no se van a ejecutar por presencia de roca.
N 02 en trmite por S/. 4,320.47 (.44%) por modificacin del proyecto por
reubicacin de los dos tanques spticos y pozas de percolacin del
proyecto por presencia de roca fija y baja capacidad de percolacin.
Servicio en ejecucin
1,209,628.79
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
AMPLIACIONES
N 01 aprobar con RGR 049-2011/RGR-GRI parcial 30 das del 04.05.2011
N 02 aprobar con RGR 066-2011/RGR-GRI parcial por 28 das del
26.05.2011
ADICIONALES
N 01 -RER N 483-2011/GRP-PR del 11.05.2011 por S/. 26,338.46
N 02-RER N 505-2011/GRP-PR del 20.05.2011 por S/. 79,764.05
DEDUCTIVO
N 01 -RER N 482-2011/GRP-PR del 11.05.2011 por S/. 13,895.48
(0.71%) por menores metrados.
AMPLIACIONES
N 01 denegar 137 das con RGR 076-2011/RGR-GRI del 31.05.2011
ADICIONALES
DEDUCTIVO
38%
180
+24
27-Aug-09
18-Mar-10
180
+24
27-Aug-09
11-Jun-10
31%
100%
100%
C: CONSORCIO TAMBOGRANDE
Adm.: Homero manrique
#884875
R: Ing. Luis Antonio Santana Zarate
S: Ing Hector Benavides #583468
AMPLIACIONES
N 01 - 50 d. - Oficio N074-2010 (04.02.2010) Denegada
N 02 - 24 d. - RGR N 079-2010/GRP-GRI (26.04.10) Aprobada
N 03 - 10 d. - RGR N 144-2010/GRP-GRI (30.04.10) improcedente
ADICIONALES
N 01 por S/. 507,959.26 (12.9%)con RDG N 892-2009 (31.12.2009) por
mayores metrados y partidas nuevas correspondiente al mejoramiento de
la carga unitaria de los caseros, adicionar espigas normalizadas por el
MEM, adicionar partidas de declaracin jurada ambiental, ejecucin del
plan de monitoreo y la ejecucin de 110 nuevas conexiones domiciliarias.
DEDUCTIVOS
N 01 por S/. 367,550.78 (9.04%) con RDG N 891-2009 (31.12.2009)
generado por la diferencia entre el metrado contractual y el del replanteo
topogrfico de obra y de la Ingeniera de detalle
2010
PIURA
PIURA
LA LEGUA
2010
S/C
LEGUA.
40
PIURA
CURA MORI
2010
S/C
41
PIURA
TAMBOGRANDE
PROTECCION SOCIAL
2010
S/C
42
PIURA
CURA MORI
PROTECCION
SOCIAL
2010
S/C
PIURA
LA ARENA
PROTECCION SOCIAL
2010
13908
43
2007
SALUD
PIURA
44
PIURA
A8 SALUD
17204
343,004
351,244
100,429
100,429
142,001
142,001
90,234
90,234
30,386
30,386
240,299
240,299
130,966
130,966
5,306,666
5,250,294
491,579.86
491,579.86
755,028.65
210
3-Dec-10
30-Jun-11
210
3-Dec-10
30-Jun-11
0.00
15,750.00
210
3-Dec-10
30-Jun-11
210
3-Dec-10
30-Jun-11
1,677,598
2,298
1,504,439.09
2,297.83
180
29-May-10
24-Nov-10
180
+20
+28
+33
29-May-10
12-Feb-11
173,158.65
0.00
180
29-May-10
24-Nov-10
180
29-May-10
24-Nov-10
916,786
3,944
391,184.40
0.00
60
9-Aug-10
8-Oct-10
60
+31
10-Aug-10
8-Nov-10
343,003.00
0.00
90
27-Sep-10
26-Dec-10
90
24-Sep-10
21,113.41
0.00
70
24-Oct-10
1-Jan-11
70
61,551.00
3,944.00
20
22-Oct-10
10-Nov-10
61,276.00
0.00
70
9-Nov-10
0.00
0.00
30
1-Dec-10
38,657.71
0.00
60
0.00
0.00
60
8-Dec-10
5-Feb-11
60
8-Dec-10
269,333
982,675
269,333.17
0.00
60dc
1-Apr-09
30-May-09
363
1-Apr-09
37%
53%
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
100%
C: PROMACSA S.A.C.
Adm.: Homero manrique
#884875
R: Ing. Eudomiro Viale Bancayan
S: Ing Hector Benavides #583468
AMPLIACIONES
N 01-66 d- RGR N 084-2010/GRP-GRI (03.05.10) Aprob.
N 02-10 d- RGR N 085-2010/GRP-GRI denegada (03.05.10)
N 03-30 d- RGR N 300-2010/GRP-GRI (26.11.10) Aprob.
ADICIONALES
N 01 por S/. 178,566.16 con RER N 938-2010 (03,11.2010)
DEDUCTIVOS
N 01 por S/. 100,826.53 con Resolucin 159-2010 del 12.03.2010
88%
50%
AMPLIACIONES
N 01 - RGR 021-2011/GRP por 04 das del 15.03.11 denegada
N 02 - RGR 113-2011/GRP por 120 das del 24.06.11 denegada
ADICIONALES
N 01 S/. 94,384.24 mayores metrados en trmite y partidas nuevas
DEDUCTIVOS
N 01 por S/. 354,913.23 por menores metrados en trmite
31%
38%
% AVANCE FSICO
PROGRAMADO
% AVANCE FSICO
REAL
186,123.00
% AVANCE
FNANCIERO REAL
MODALIDAD DE
EJECUCIN
CONTRATA A P.U.
356,493
12-Dec-10
CONTRATA
A PRECIOS UNITARIOS
SECHURA
356,493
1-Oct-09
TERMINO
PROYECTO
REAL
CONTRATA
A PRECIOS
UNITARIOS
2010
SECHURA
S/C
1,442,052
150
INICIO
PROYECTO
REAL
CONTRATA
PROTECCION
SOCIAL
1,433,811
27-Feb-10
DIAS
CALEN
REAL
CONTRATA
CASTILLA
38
136,292
1-Oct-09
TERMINO
PROYECTO
PROG.
CONTRATA
2009
PIURA
S/C
136,292
150 DC
INICIO
PROYECTO
PROG.
DIRECTA
PROTECCION SOCIAL
1,712,210
DIAS
CALEN
PROG.
CONTRATA
A P.U.
TALARA
37
1,575,233
0.00
PROGRAMADO
DIRECTA
CONV.INTERINS.
TALARA
S/C
1,848,502
542,748.96
MONTO
EJECUTADO
2011
DIRECTA
ACONDICIONAMIENTO DE AMBIENTES EN EL
DISTRITO DE TALARA PARA EL NCPP EN EL
DISTRITO JUDICIAL DE PIURA - SEGUNDO PISO
36
1,711,525
CONTRATA
2009
2009
51621
A7 PROTECCION SOCIAL
39
1,766,980
EPD
0184 SUPERVISION
PLANEAM.
GESTION Y
RESERVA DE
CONTINGENCIA
35
PIURA
0179
PIURA
34
1,766,985
1,521,604.82
CONTRATA
104230
1,448,805
CONTRATA
A PRECIOS UNITARIOS
CODIGO SNIP
AO DE INICIO
FUNCION
ENERGIA
DISTRITO
TAMBO GRANDE
2009
2010
0181 SUPERVISION
ENERGIA
33
51971
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
ENERGIA
32
YAMANGO
31
PROVINCIA
PIURA
CC
MORROPON
ITEM
100%
OBSERVACIONES / INFORMES
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
AMPLIACIONES
N 01 - 20 d. aprobada RGR N 184-2010/GRP-GRI (09.08.2010)
N 02 - 28 d. aprobada RGR N 321-2010/GRP-GRI (14.12.2010)
N 03 - 33 d. consentida RGR N 030-2011/GRP (24.03.2011)
N 04 - 20 d. denegada R.G.R N 015-2011/GRP (04.03.2011)
N 05 - 20 d. denegada R.G.R N 023-2011/GRP (17.03.2011)
N 06 - 20 d. denegada R.G.R N 031-2011/GRP (04.04.2011)
N 07 - 20 d. denegada con Oficio N 177-2011/GRP (05/05/11)
N 08 - 20 d. denegada con Oficio N 219-2011/GRP (06/05/11)
N 09 - 20 d. denegada con RGR N 080-2011/GRP(02.06.2011)
ADICIONALES
N 01 aprobar por S/. 23,287.96 (1.36%)- RER 879-2010/GRP (14.10.10)
N 02 aprobar por S/. 49,703.87 -RER N 493-2011/GRP-PR (16.05.11)
DEDUCTIVOS
N 01 aprobar por S/. 60,730.08 (3.55%) RGR N 116-2011 (09.02.2011)
N 02 por S/. 26,936.42 vinculante del adicional N 02 en tramite
100%
87%
100%
85%
110%
100%
100%
AMPLIACIONES
Obra culminada al 100%, recepcionada, inaugurada y liquidada con Resolucin
N 01 - 31 d. - RGR N 267-2010/GPP (25.10.10)
Oficina Regional de Administracin N 025-2011/GRP-ORA del 23.02.2011. Valor de ADICIONALES
la Obra: S/. 405,630.23 con un saldo a favor del Contratista de S/. 14,445.81
Adic. 01 - por S/. 34,692.02 con RN 935-2010/GRP (02.11.10)
DEDUCTIVOS
22-Dec-10
98%
100%
100%
C: MATSER E.I.R.L.
R. OSCAR RAFAEL ONTANEDA NEYRA
Sup.:Wilmer Chorres Marquez
Pro: Lizeth I. Cueva Gmez
Res: Oscar R. Ontaneda Neyra
Rev.: Jessica Raquel Rodriguez Zegarra
24-Oct-10
1-Jan-11
21%
100%
100%
ENOSA
TERRA EQUIPOS Y CONSTRUCCIONES
GENERALES SAC
R: Meja Cabrejos Luis Alberto
S.Ing Hector Benavides Medina
20
22-Oct-10
22-Jan-11
46%
100%
100%
17-Jan-11
70
9-Nov-10
17-Jan-11
68%
100%
100%
30-Dec-10
30
1-Dec-10
30-Dec-10
0%
100%
70%
16%
0%
0%
5-Feb-11
0%
100%
100%
30-Mar-10
55%
100%
63%
60
88%
AMPLIACIONES
N 01 - RGR 009-2011 por 73 das del 21.02.11 aprobada
N 02 - RGR 010-2011 por 15 das del 21.02.11 aprobada
285,333.44
15,316,499
16,057,079
637,712
637,712
75
28-Jan-11
12-Apr-11
0.00
5,800.00
75
28-Jan-11
12-Apr-11
75
28-Jan-11
12-Apr-11
0.00
64,458.68
45
24-May-11
7-Jul-11
45
24-May-11
7-Jul-11
0.00
4,000.00
45
50%
20%
49%
83%
35%
5%
30%
0%
25%
AMPLIACIONES
N 03 aprobar con RGR N 054-2011/GRP-GRI 9 das de 09.05.2011
N 04 aprobar con RGR N 056-2011/GRP-GRI 10 das del 17.05.2011
N 01 aprobar con RGR N 052-2011/GRP-GRI 6 das del 04.05.2011
N 05 aprobar con RGR N 065-2011/GRP-GRI 10 das del 26.05.2011
ADICIONALES
N 01 aprobado con RER N 514-2011 S/. 11,984.33 (20.05.2011)
N 02 en trmite
CONTRATA
A SUMA ALZADA
90%
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
150
19-Feb-11
18-Jul-11
150
19-Feb-11
18-Jul-11
15%
55%
15%
CONTR
ATA
45
% AVANCE FSICO
REAL
21-Jun-11
367,483.34
% AVANCE FSICO
PROGRAMADO
28-Jan-11
0.00
75
+6
+9
+9
+10
+10
+7
+7
+12
OBSERVACIONES / INFORMES
540,933.20
0.00
0.00
150
19-Feb-11
19-Jul-11
150
19-Feb-11
19-Jul-11
0%
16%
4%
Servicio en ejecucin
44,960,688
141,911
10-Dec-09
120
+40
100%
E: YACKSETIG GUERRERO
S: Ing. Manuel Seclen Tantalian
R : Ing Vitilio Sierra Trujillo
AMPLIACIONES
N 01 - 13 d. - RGR N 135-2009/GRP (01.01.10) Aprob.
N 02 - 14 d. - RGR N 156-2009/GRP (01.01.10) Aprob.
N 03 - 14 d. - RGR N 158-2009/GRP (01.01.10) Aprob.
N 04- 20 d. - RGR N 170-2009/GRP (01.01.10) Aprob.
Obra culminada, recepcionada y liquidada con resolucin RORA N 037-2011/GRPN 05 - 20 d. - RGR N 187-2009/GRP (01.01.10) Aprob.
ORA del 16.03.2011. Valor de Obra: S/. 2'909,219.04 con Saldo a favor de
N 06 - 28 d. - RGR N 207-2009/GRP (01.01.10) Aprob.
Contratista de S/. 141,234.21
N 07 - 20 d. - RGR N 261-2009/GRP (01.01.10) Aprob.
ADICIONALES
N 01 por S/. 51,707.32 - RER N 227-2009/GRP del 24.06.2009
DEDUCTIVOS
N 01 por S/. 14,157.91 - RER N 183-2009/GRP del 10.05.09
CONTRATA
285,333.44
TERMINO
PROYECTO
REAL
1,521,071.62
2,755,329.41
0.00
0.00
150 DC
120 DC
11-Aug-09
21-Apr-09
14-Aug-09
120
+134
14-Jul-09
21-Apr-09
20-Dec-09
31-Dec-09
96%
100%
100%
100%
100%
CONTRATA
8,486,159.27
INICIO
PROYECTO
REAL
7,743,092.60
0.00
180 DC
8-Aug-08
3-Feb-09
180
+ 361
8-Aug-08
31-Jan-10
100%
100%
100%
CONTRATA
A SUMA ALZADA
1960
8,154,180.73
DIAS
CALEN
REAL
135,848.51
0.00
60
24-Aug-10
23-Oct-10
60
22-Aug-10
25-Aug-10
100%
100%
100%
CONTRATA
A P.U.
1960
72896
TERMINO
PROYECTO
PROG.
0.00
2,717,780
135,849
INICIO
PROYECTO
PROG.
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
2,688,310.34
93,748.22
300
10-Jun-10
6-Apr-11
300
+155
10-Jun-10
7-Sep-11
33%
100%
23%
CONTRATA
3,019,755.58
1,590,710
DIAS
CALEN
PROG.
231,129.34
48,163.12
300
10-Jun-10
6-Apr-11
300
10-Jun-10
6-Apr-11
98%
100%
23%
CONTRATA
CONCURSO
OFERTA
1,385,510.87
MONTO
EJECUTADO
2011
CONTRATA
50,289,669
MONTO
EJECUTADO
AL 2010
% AVANCE
FNANCIERO REAL
MODALIDAD DE
EJECUCIN
CONTRATA
A P.U.
2010
2007
48,569,840
2007
2008
149,460
135,849
2010
SUPERVISION
196,831
14653
VIABLE
2010
58
3,549,834
6,733,912.63
2007
0090
3,549,834
6,733,912.50
2007
57
322,293
2009
SANEAMIENTO
SANEAMIENTO
SANEAMIENTO
0180 SUPERVISION
322,293
749
SANEAMIENTO
56
25707
SANEAMIENTO
55
44815
SANEAMIENTO
CONTRATA
AO DE INICIO
2010
FUNCION
SALUD
CODIGO SNIP
60077
SANEAMIENT
O
SANEAMIENTO
PIURA
LAS
LOMAS
VICE
LETIRA - BECARA
LA ARENA
CHULUCANAS
LA ARENA
PIURA
PIURA
PIURA
SECHURA
54
PIURA
53
MORROPON
51
737,126
SALU
D
SALUD
129838
VIABLE
A9 SANEAMIENTO
746,127
14,791,895.56
0.00
240 DC
21-Feb-09
27-Oct-09
240
+195
21-Feb-09
1-May-10
92%
100%
78%
CONTRATA
0205 Supervisin
2009
50
2009
49
CASTILLA
121
OIURA
SUPERVISION
48
130134
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
SALUD
SALUD
CATACAOS
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD I
47
PIURA
SUPERVISION
SALUD
118
DISTRITO
46
LA ARENA
45
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD
CASA GRANDE, PERTENECIENTE A LA MICRORED
0117
CATACAOS DE LA RED DE SERVICIOS DE SALUD
BAJO PIURA, DE LA DIRECCION REGIONAL DE
SALUD PIURA.
PROVINCIA
CC
PIURA
ITEM
600,085.18
0.00
240 DC
21-Feb-09
27-Oct-09
240
+195
21-Feb-09
1-May-10
94%
100%
78%
AMPLIACIONES
N 01 por 40 das con RGR 204-2009/GRP-GRI (13.11.2009)
DEDUCTIVOS
N 01 se est viendo en la liquidacin de Obra.
AMPLIACIONES
N 01 - RGR N 582-2010/GRP-GRI (28.02.2009) deneg
N 02 - RGR N 144-2010/GRP-GRI (22/01/2009) deneg.
N 03 - RGR N 60 -2009/GRP-GRI (11/02/2009) Aprobada.
N 04 - RGR N 054-2009/GRP-GRI (20.05.2010) deneg.
ADICIONALES
N 01 por S/. 46,113.08 con RDG N 024-20097GRP-GRI-DGC (23.01.09)
MGG por S/. 376,664.40 con RGR N 117-2009/GRP-GGR-GR
AMPLIACIONES
N 01 - 155 d. RGR N 039-2011/GRP (15.04.2011) aprobada
ADICIONALES
Adic. 01 S/, 285,333.44 en trmite
DEDUCTIVO
N 01 RER N 491-2011/GRP-PR del 16.05.2011 por S/. 5'377,435.34
ADICIONALES
N 01 por S/. 42,440.35 en trmite
67
141 SUPERVISIN
2009
2009
6704
725
9,010,012
521,969
521,000
60,118,056
66,018,898
1,212,456
1,212,407
11,144,174.06
624,139
11,932,370
624,032
20-Aug-09
240
+222
TERMINO
PROYECTO
REAL
% AVANCE FSICO
REAL
INICIO
PROYECTO
REAL
% AVANCE FSICO
PROGRAMADO
DIAS
CALEN
REAL
% AVANCE
FNANCIERO REAL
MODALIDAD DE
EJECUCIN
CONTRATA
CONTRATA
A P.U.
8,589,144
24-Dec-08
TERMINO
PROYECTO
PROG.
23-Sep-09
100%
100%
97%
OBSERVACIONES / INFORMES
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
AMPLIACIONES
01 por 2 das RGR 013-2009 (02.04.09) concedida
02 por 32 das RGR 022-2009 (17.05.09) denegada
03 por 11 das RGR 051-2009 (15.05.09) concedida
04 por 21 das RGR 104-2009 (16.07.09) concedida
05 por 45 das RGR 131-2009 (19.09.09) denegada
06 por 45 das RGR 137-2009 (25.08.09) denegada
07 por 75 das RGR 216-2009 (26.11.09) denegada
5,022,510
0.00
60
19-Jun-10
18-Aug-10
60
+6
+8
+6
+8
+32
19-Jun-10
24-Oct-10
98%
100%
100%
AMPLIACIONES
N 01 - 6 d. - RGR N 208-2010-GRP-GRI del 31.08.10 Aprob.
N 02 - 8 d. - RGR N 209-2010-GRP-GRI del 31.08.10 Aprob.
N 03 - 6 d. - RGR N 213-2010-GRP-GRI del 03.09.10 Aprob.
N 04 - 8 d. - RGR N 214-2010-GRP-GRI del 03.09.10 Aprob.
Obra culminada, recepcionada y liquidada con resolucin RORA N 051-2011/GRP- N 05 - 8 d. - RGR N 231-2010-GRP-GRI del 17.09.10 Aprob.
ORA del 28.03.2011. Valor de Obra: S/, 399,381.73 con un saldo a favor del
N 06 - 8 d. - RGR N 264-2010-GRP-GRI del 19.10.10 Aprob.
Contratista de S/. 12,497.76
N 07 - 8 d. - RGR N 265-2010-GRP-GRI del 19.10.10 Aprob.
N 08 - 8 d. - RGR N 266-2010-GRP-GRI del 19.10.10 Aprob.
N 09 - 8 d - RGR N 271-2010-GRP-GRI del 03.11.10 Aprob.
ADICIONALES
N 01 - por S/. 7,410.20 con RER 750-2010/GRP del 08.09.10
N 02 - por S/. 8,770.70 con RER 886-2010/GRP del 15.10.10
La obra estuvo paralizada desde el 01 al 17 de mayo del 2011 debido a que la EPS
Grau no brindaba las garantas de cierre efectivo de vlvulas para efectuar el
empalme con esquina con el Jr. Las Lomas; recien mediante aviso periodstico del
15 de Mayo, comunic el corte del servicio para el 18 de Mayo, a fin de que se
efectue empalme de agua en el Jr. Las Lomas solictado por Contratista y reiterado
por Eentidad, lo cual se efectu el 18 de Mayo, culminandose los trabajos en dicha
zona el 24 de Mayo del 2011. el 24 de Mayo Contratista solicita nueva ampliacin de
plazo en demora de la Entidad en la emisin de la Resolucin del adicional de Obra
N 01.
AMPLIACIONES
N 01 por 02 das con RGR N 38-2011/GRP-GRI (12.04.2011) Denegada
N 02 por 20 das con RGR N 040-2011/RGR-GRI del 15/04/11 Aprobada.
N 03 por 20 das con RGR 050.2011(RGR-GRI del 04.05.2011 Aprobada
N 04 aprobar 14 das con RGR N 062-2011 del 25.05.2011
N 05 aprobar 15 das en trmite
ADICIONALES
N 01 en trmite por S/. 17, 182.46 (2%) por mayores metrados y partidas
nuevas necesarias para la buena culminacin de la Obra.
DEDUCTIVO
N 01 en trmite por S/. 15,877.14
516,371.00
301,415.13
90
31-Dec-10
30-Mar-11
90
+20
+20
+14
+15
31-Dec-10
7-Jun-11
95%
100%
98%
5,000.00
5,500.00
90
31-Dec-10
30-Mar-11
90
31-Dec-10
30-Mar-11
100%
100%
98%
AMPLIACIONES
Ampliacin N 01 por 132 das incluyendo gastos generales en trmite
(09.07.10)
13-Jan-10
22-Aug-10
77%
100%
55%
AMPLIACIONES
N 01-42 d- RGR N 2020-2010/GRP-GRI (27.08.10)
ADICIONALES
Adic. 01 - por S/.1'326,377.49 (14.72%) en trmite del 26.02.2010 (estuvo
mal tramitada por parte del Contratista ya que no adjunto planos)
25-Aug-10
6-Jan-11
66%
100%
55%
EPI A P.U.
2009
TRANSPORTE
TRANSPORTE
10563
240 DC
INICIO
PROYECTO
PROG.
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
10,500
0.00
DIAS
CALEN
PROG.
EPI A P.U.
860,619
874,797
386,883.97
MONTO
EJECUTADO
2011
6,911,135.88
0.00
180
13-Jan-10
13-Jul-10
180+
42
EPI A P.U.
TRANSPORTE
2010
2010
24825
14,493,925.70
50,910,232
395,653.77
421,637.52
TRANSP
ORTE
TRANSPORTE
PIURA
Castilla
(Ro Seco, Chapaira, Terela)
S/C
97,162,077
MONTO
EJECUTADO
AL 2010
345,663.32
0.00
135
25-Aug-10
6-Jan-11
135
CONTRATA
CHULUCANAS
TAMBO GRANDE
MEJORAMIENTO DE LA CARRETERA
66
PIURA
MORROPON
PIURA
65
2009
SOBERANOS DS 191-2009-EF)
2,009
MULTI
DISTRITAL
MULTI
PROVINCIAL
TRANSPORTE
0140
TRANSPORTE
63
TRANSPORTE
62
TRANSPORTE
0142 SUPERVISION
PIURA
62
PAITA
0146
PIURA
61
PAITA
MANTENIMIENTO DE LA CARRETERA DE
INTEGRACION DEL MEDIO PIURA,
META:BADENES(03) Y ALCANTARILLA(01)
60
90,003,143
13,645,135
31,197,023.64
0.00
270 dc
3-May-10
27-Jan-11
270
+137
3-May-10
13-Jun-11
47%
90%
35%
C: CONSORCIO VIAL DE
PIURA(Construcciones Civiles S.A., Sucursal
Per y Promacsa S.A.C)
Mon.: Ing Yoly Simbaez
Res.: Ing Hector Raul Mateus Romero
CONTRATA
A10 TRANSPORTE
12,901,087
1,382,035.74
9,250.00
270 dc
3-May-10
27-Jan-11
270 dc
20-Jul-10
16-Apr-11
100%
90%
35%
71%
CONTRATA
714
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
CONTRATA
CODIGO SNIP
AO DE INICIO
FUNCION
SANEAMIENTO
2007
DISTRITO
LA UNION
59
PROVINCIA
CC
PIURA
ITEM
8,029,475.36
531,570.24
3,766,804.95
270
28-Jul-10
23-Apr-11
270
+32
+45
+49
28-Jul-10
27-Aug-11
290,040.46
270
28-Jul-10
23-Apr-11
270
15-Jun-10
11-Mar-11
99%
100%
54%
57%
Supervisin ha estado cobrando mensualmente una cantidad fija sin embargo en los
trminos dice que es por avance. Se ha solicitado opinin legal y ver que acciones
tomar.
AMPLIACIONES
Ampliacin N 01 por 132 das incluyendo gastos generales en trmite
(09.07.10)
AMPLIACIONES
N 01 - 11 d. - RGR 150-2010/GRP-GRI (30.06.10) denegada
N 02 - 137 d.con RGR 278-2010/GRP.Piura (03.11.2010) Aprobada
N 03 - 60 d. con RGR 002-2011/GRP-GRI (28.01.11) denegada
ADICIONALES
N 01 - por S/. 14,205,651.99 con RER 1065-2010/GRP (13.12.2010) por
mayores metraqdos y generacin de partidas nuevas no consideradas en
el Expediente Tcnico.
N 02 por S/. 17,938,892.39(9'731,025.32) en trmite
DEDUCTIVOS
N 01 - por S/. 5,464,984.00 con RER 1064-2010/RER
N 02 por S/. 1'852,602.26 en trmite
AMPLIACIONES
N 01 - por 32 dias RGR N 045-2011/GRP-GRI del 29.04.2011
N 02 por 45 das en trmite
N 03 por 49 das en trmite
ADICIONALES
N 01 - por S/. 153,487.68 denegado por reformulacion del ET
N 02 - por S/. 630,347.08 denegado por reformulacion del ET
N 03 - por S/. 1'595.996.19 (13.38%) con RGR N 400-2011/GRP-PR del
15.04.2011 por errores en el Expediente Tcnico ya que no se consider
los trabajos y metrados necesarios para cumplir con las metas del
Proyecto.
1,400,000
1,508,043
3,054,969
3,054,969
3,054,969
3,054,969
46,253,693
18,506,321
2009
TRANSPORTE
SECHURA
01
PIURA
SECHURA
70878
VIABLE
1,453,806.10
0.00
120 DC
0.00
0.00
180
180
CONTRATA
90
862,883
42,979,870
614,677
34,744,138
31-Dec-10
26-Jun-11
150
24-Jun-09
6-Apr-10
120
+77
+89
24-Jun-09
6-Apr-10
180
30-Dec-99
% AVANCE FSICO
REAL
% AVANCE FSICO
PROGRAMADO
TERMINO
PROYECTO
REAL
OBSERVACIONES / INFORMES
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
AMPLIACIONES
N 01 - RGR N 020-2011/GRP-GRI x 12 das del 11.03.2011 aprobada
N 02- RGR N 058-2011/GRP-GRI x 53 das del 18.05.2011 consentida
N 03- RGR N 059-2011/GRP-GRI x 53 das del 18.05.2011 demora en
aprobar adicionales de obra.
En Obras provisionales se avanzado 92%, En Pavimentacin 100%, en movimiento
ADICIONALES
de tierras 61%, en obras de concreto % 36.45%, en bloquetas de concreto 48.96%.
N 01: aprobar con RER 530-2011 por S/. 91,503.45 (31.05.2011)
Como consecuencia de la no aprobacin de los adicionales de obra, el contratista ha
N 02: aprobar con RER N 511-2011 por S/. 8,750.86 (24.05.2011)
solicitado la ampliacin de plazo N 01 y N 02, quedando la causal abierta hasta
N 03: En trmite, por partidas existentes (excavacion de zanjas para
que se emitan las resoluciones que aprueban los adicionales de obra. Se han
sardineles sumergidos) y partidas nuevas: (encofrado de sardinel
efectuado las pruebas hidraulicas. A la fecha se han colocado bloquetas de concreto
sumergido y curado de sardineles), monto es de S/. 5,673.40 (0.41%).
entre la progresiva Km. 0+000 - Km. 0+180 y Km. 0+384.55 - Km. 0+421.30.
N 04: En trmite, por ejecucin de los trabajos de pavimentacin en el
tramo comprendido entre las progresivas Km. 0+00 - Km. 0+5.30, asi como
la ampliacin del tubo de concreto que sirve de pase de agua para el
regado de las chacras que cruza la pista. el monto es de S/. 12,048.55
(0.87%).
58%
90%
62%
0%
0%
0%
96%
100%
98%
0%
0%
0%
Proceso ADJUDICADO el 22/12/2010. Recurso de revision/apelacion ante el Tribunal Proceso ADJUDICADO el 22/12/2010. Recurso de revision/apelacion ante
OSCE por Consorcio AMAZONAS - Expediente 00011-2011-TC
el Tribunal OSCE por Consorcio AMAZONAS - Expediente 00011-2011-TC
90%
PROYECTISTAS:
ING. SANCHEZ NUEZ, BRENDA LORENA
ARQ. SERNAQUE , CECILIA
ING. CASTRO RAMIREZ, EDUARDO JOSE
REVISIN:
ING. SANTAMARIA LLONTOP, WALTHER
ARQ. CALLE GONZALES, RODER RAFAEL
ERNESTO
EN PROCESO DE SELECCIN
EN PROCESO DE SELECCIN
EN PROCESO DE SELECCIN
EN PROCESO DE SELECCIN
100%
180
PROYECTISTA:
ARQ. GUERRA RANGEL, EMIR FERNANDO
(COORDINADOR)
REVISION:
ING. FRANCO TORRES, ELISA
ING. VENEGAS VALLADOLID, NELSON
ING. ALDANA GUTIERREZ, WALTER
ING. LAZARTE BENGOA, MANUEL
90
AMPLIACIONES
01 por 78 das RGR 195-2009/GRP-GRI (09.11.2009) concedida
02 por 83 das RGR 015-2010/GRP-GRI (02.02.2010)concedida
Comit de Adjudicacin
90%
PROYECTISTA:
ING. BARRENO QUESQUEN LUIS ENRIQUE
(COORDINADOR)
REVISOR:
ING. CORDOVA CIENFUEGOS, GREGORIO GIL
100%
PROYECTISTA:
ING. CORREA JIMENEZ, VICTOR AUGUSTO
ARQ. SOTO ALBURQUEQUE, PIERO ALEXANDER
ING. CHILON MUOZ JOSE ALFONSO
DR VIGNOLO AYALA, HUGO ARNALDO
REVISOR:
ING. CALLE GONZALES, RODER RAFAEL ERNESTO
ING. GUEVARA GALLARDO, JOSE RAFAEL
ING. TACZA ELESCAN
100%
PROYECTISTA:
HIDALGO GUTIERREZ, LINDA MAGALY (M.P.
SECHURA)
REVISOR:
ING. CABRERA HUERTAS, JOSE MANUEL
ING. PHLUCKER ACARO, RUDY ALBERTO
283,495
750,972
60
+12
+53
+53
INICIO
PROYECTO
REAL
100%
23,438,064
5,343,489
90
28-Feb-11
DIAS
CALEN
REAL
% AVANCE
FNANCIERO REAL
MODALIDAD DE
EJECUCIN
150
CONTRATA
2009
129904
VIABLE
0.00
31-Dec-10
TERMINO
PROYECTO
PROG.
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
CONTRATA
2010
11
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD
TABLAZO NORTE, PERTENECIENTE A LA
MICRORED CATACAOS DE LA RED BAJO PIURA
DE LA DIRECCION REGIONAL DE SALUD PIURA.
20 SALUD
LA UNION
10
TABLAZO NORTE
LA UNION
PIURA
CONSTRUCCION DEL PUENTE SAN MIGUEL (EXPUENTE VIEJO), PROVINCIA DE PIURA - PIURA
0056
77176
VIABLE AUT.
SALTO
FACT.
196,831
0.00
CONTRATA
2009
2010
2010
2009
54263
VIABLE
2009
2009
22 EDUCACION
14 SALUD
14 SALUD
10
AGROPECUARIA
16 TRANSPORTE
07
04 AGRARIA
VARIOS
PIURA
PIURA
POECHOS
LANCONES
14583
PIURA
PIURA
04
BERNAL
PIURA
SECHURA
49913
PIURA
PIURA
PIURA
PIURA
03
09
1,889,244
149,641
A.H. MARA
GORETTI
CASTILLA
PIURA
SULLANA
02
SECHURA
BERNAL
01
MANTENIMIENTO DE INFRAESTRUCTURA Y
REHABILITACIN DE REDES DE AGUA POTABLE Y
ALCANTARILLADO EN EL MERCADO DE CASTILLA
C2 EN PROCESO DE CONVOCATORIA
60
INICIO
PROYECTO
PROG.
CONTRATA
79899
649,499.88
450
90%
PROYECTISTA:
INGENIERIA TECNOLOGIA Y DESARROLLO ITD
(UDEP)
REVISORES 2010:
ING. CHILON MUOZ CARMEN
ARQ. VILLACORATA ICOCHEA, LEOPOLDO
AUGUSTO
ING. CASTILLO ZAVALETA, PEDRO MARCELINO
ING. FLORES MERINO, JOSE FERNANDO
ING CHILON MUOZ JOSE ALFONSO
ING. SERNAQUE BARRANTES NASSER
90%
CONTRATA
2010
14 SALUD
0063
PIURA
01
PIURA
CONTRATA
A PRECIOS UNITARIOS
34540
151,266.55
CONTRATA
CONCURSO
OFERTA
3,685,409
DIAS
CALEN
PROG.
EPI/C.
Encargo
3,685,409
MONTO
EJECUTADO
2011
CONTRATA
S/C
MONTO
EJECUTADO
AL 2010
CONTRATA
1,383,134
CONTRATA
1,411,361
CONTRATA
CODIGO SNIP
FUNCION
AO DE INICIO
2010
120455
2009
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
2008
PIURA
70
TRANSPORTE
68
TRANSPO
TRANSPORTE
RTE
EL TALLAN
SINCHAO GRANDE
69
CASTILLA
DISTRITO
PROVINCIA
PIURA
PIURA
CC
PIURA
ITEM
25-Nov-10
180
8-Jun-10
100%
EPD
CONTRATA
CONTRATA
CONTRATA
CONTRATA
CONTRATA
100%
PROYECTISTA:
ARQ. ESPINOZA SANCHEZ, DAVID SMITH
MONITOREO/COORDINAC.:
ING. SANCHEZ NUEZ, BRENDA LORENA
26-Jan-10
100%
100%
PROYECTISTA:
ING. PINGO MAURIOLA PEDRO ALEMBER
REVISOR:
ING. AQUINO CARLIN, JUAN FRANCISCO
CONTRATA
12-May-10
100%
100%
CONTRATA
19-Jan-10
100%
100%
PROYECTISTAS:
ING. DEZA RODRIGUEZ CESAR GUILLERMO
ING. DA SILVA DIAZ JORGE ADEMYR
REVISIN:
ING. HO VALDIVIESO ANA PAOLA
REFORMULACIN 2011:
ING. DIAZ LLONTOP, BILLY GUSTAVO
APOYO: ARQ. MERINO ESPINOZA, JUAN ARMANDO
REVISIN 2011:
ING. PIDRA YOPLAC, ALVARO ABSALON
PROYECTISTAS 2010:
PROYECTISTA:
ING. RIVAS JIBAJA GUILLERMO EDUARDO
(COORDINADOR)
REVISION:
ING. PHLUCKER ACARO
CONTRATA
23-Apr-10
100%
100%
CONTRATA
45
24-Mar-10
100%
100%
CONTRATA
CONTRATA
100%
2009
26-Jan-10
2009
100%
2009
100%
2009
26-Jan-10
MONITOREO/COORDINAC.:
ING. ZEGARRA RODRIGUEZ, JESICA RAQUEL
PROYECTISTAS:
ARQ. DELGADO QUIROZ, CARLOS
ING. PHLUCKER ACARO, RUDY
ING. AGUIRRE SANCHEZ, ROBERTO
ING. GONZALES MEDIANERO, LUIS PASTOR
AUXILIARES:
ING. CASTILLO MAURICIO, FREDDY
TOP. GARCIA CALLE
2009
280,088
100%
19-Jan-10
100%
100%
EPD
22
EDUCACION
26-Jan-10
22-Mar-10
100%
8566
4,348,393
CONTRATA
23
PROTECCION
SOCIAL
SECHURA
100%
PROYECTISTAS:
ING. ZEGARRA RODRIGUEZ, JESICA RAQUEL
(JEFE PROYECTO)
ARQ. BERMEO BOBADILLA, HEBERT EDUARDO
ING. AGUIRRE SANCHEZ, ROBERTO
ING. GONZALES MEDIANERO, LUIS PASTOR
AUXILIARES:
ING. CORREA REYES, DARCY DEL CARMEN
TOP. MORE MARTINEZ, HENRY DAVID
41853
VIABLE
1,675,904
EPD
LA UNION
MEJORAMIENTO DE LA INFRAESTRUCTURA DE
LA INSTITUCION EDUCATIVA SAN MARTIN DEL
DISTRITO DE SECHURA, PROVINCIA DE
SECHURA - PIURA
120
68566
487,214
CONTRATA
22 EDUCACION
PIURA
###
86
41344
851,000
CONTRATA
20 SALUD
TODOS
29170
% AVANCE FSICO
REAL
2010
LA UNION
PIURA
###
PROYECTISTA:
ING. MOTTA LAGUNA, FELIPE
REVISOR:
ING. PIEDRA YOPLAC, ALVARO ABSALON
SUPERVISOR DEL ESTUDIO:
ING. MOTTA, LAGUNA, FELIPE
2,898,637
2009
PIURA
###
100%
129911
VIABLE
2009
EDUCACION
###
AMPLIACION DE INFRAESTRUCTURA Y
EQUIPAMIENTO PARA MEJORAR ACCIONES DE
PROMOCION, PREVENCION Y RECUPE-RACION
CON ENFASIS A LA MADRE Y EL NIO EN EL
CENTRO DE SALUD LA UNION
I ETAPA: AMPLIACIN DE INFRAESTRUCTURA Y
EQUIPAMIENTO PARA MEJORAR ACCIONES DE
PROMOCIN, PREVENCIN Y RECUPERACIN
CON ENFASIS A LA MADRE Y EL NIO EN EL
CENTRO DE SALUD DE LA UNION
22 EDUCACION
###
SECHURA
100%
240,277
2,811,626
22-Nov-10
134894
VIABLE
75
99,727
2009
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
96024
VIABLE
2009
OBSERVACIONES / INFORMES
2009
TERMINO
PROYECTO
REAL
PROYECTISTA:
ING. ZEGARRA RODRIGUEZ, JESSICA RAQUEL
REVISIN:
ARQ. CALLE GONZALES, RODER RAFAEL
ERNESTO
1,809,021
3,436,751
INICIO
PROYECTO
REAL
100%
47712
VIABLE
107120
VIABLE
DIAS
CALEN
REAL
100%
2009
TERMINO
PROYECTO
PROG.
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
29-Nov-10
2,761,143
1,596,227
INICIO
PROYECTO
PROG.
45
83529
VIABLE
119426
VIABLE
DIAS
CALEN
PROG.
2009
###
MEJORAMIENTO DE LA INFRAESTRUCTURA EN
LA INSTITUCION EDUCATIVA PNP. BACILIO
RAMIREZ PEA DE LA URB. LAS MERCEDES DISTRITO DE PIURA
1,379,497
MONTO
EJECUTADO
2011
2009
###
VARIOS
22 EDUCACION
VARIOS
PIURA
SECHURA
22 EDUCACION 22 EDUCACION
PIURA
HUARMACA
CIENEGUILLO
PIURA
SECHURA
VARIOS
VARIOS
PIURA
###
VARIOS
VARIOS
PIURA
MORROPON
###
PIURA
SECHURA
CONSTRUCCION DE INFRAESTRUCTURA Y
EQUIPAMIENTO DE LA I.E. SECUNDARIA SAN
MARTIN, CASERIO NUEVO SAN MARTIN,
DISTRTIO DE HUARMACA.
PIURA
SECHURA
###
PIURA
SECHURA
PIURA
SECHURA
###
107373
VIABLE
MONTO
EJECUTADO
AL 2010
% AVANCE FSICO
PROGRAMADO
SANEAMIENTO
###
281,196
% AVANCE
FNANCIERO REAL
CODIGO SNIP
2010
CASTILLA
412,244
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
MODALIDAD DE
EJECUCIN
AO DE INICIO
2011
EDUCACIN
AL MAR
2009
FUNCION
AGROPECUARIA
TAMBOGRANDE
01
EDUCACION
DISTRITO
SECHURA
PIURA
66,266
LA MATANZA
PROVINCIA
SECHURA
MEJORAMIENTO DE LA INFRAESTRUCTURA
EDUCATIVA N 20153 DEL CENTRO POBLADO
SANTA ANA - TAMBOGRANDE - MARQEN
IZQUIERDA
CC
MORROPON
01
ITEM
S/C
PIURA
75
26,875.48
PROYECTISTAS:
DR. MIO PALACIOS, ALDO ENZO (COORDINADOR)
REVISION:
ANAYA MORALES ROGER ANTONIO
PROYECTISTA:
ECON. ADRIANZEN FLORES, MYRIAM ANGELICA
(COORDINADOR)
REVISION:
ING. ANAYA MORALES ROGER ANTONIO
100%
PROYECTISTAS 2009:
ARQ. CUEVA GOMEZ, LIZET IRENE
REVISION:
ING. ZEGARRA RODRIGUEZ, JESSICA RAQUEL
100%
AO 2011:
REVISIN:
ING. PIEDRA YOPLAC, ALVARO ABSALON
AO 2010:
PROYECTITAS:
BENITES DAMIAN, CARLOS ALBERTO (JEFE DE
PROYECTO)
REVISION:
ING. PAIVA HUAYAMARES, RENATO GUSTAVO
ARQ. ACUA TROYES, CARLOS ANTONIO
COORD./MONITOR:
ING. SANTAMARIA LLONTOP, JOSE
100%
ACTUALIZACIN 2009:
ING. GALLO UBILLUS MARLON ARMANDO
REVISOR:
ING. MORE DURAN, JUAN ROBERTO
100%
100%
% AVANCE FSICO
REAL
100%
MONITOREO/COORDINAC.:
PROYECTISTA:
ING. SANCHEZ NUEZ, BRENDA LORENA
ARQ. QUEZADA CRISANTO, SARA ELVIRA
AUXILIARES:
ING. SAAVEDRA ORDINOLA, TEOBALDO
PROYECTISTAS:
ING. CIVIL NUEZ FLORES, ISIDRO GUILLERMO
ING. CIVIL DEZA RODRIGUEZ, CESAR GUILLERMO
ING. CIVIL UBILLUS LIMO, JUAN MARTIN
ING. CIVIL YAMPUFE MORALES, JOSE MERCEDES
ING. CIVIL RODRIGEZ MONTENEGRO, VALDEMAR
REVISIN:
PROVIAS NACIONAL
MONITOR:
MONITOR 2011:
ING. MOTTA LAGUNA, FELIPE
PROGRAMADO
DIAS
CALEN
PROG.
INICIO
PROYECTO
PROG.
TERMINO
PROYECTO
PROG.
INICIO
PROYECTO
REAL
TERMINO
PROYECTO
REAL
CONVENIO
EPD
MONTO
EJECUTADO
2011
% AVANCE FSICO
PROGRAMADO
CONTRATA
% AVANCE
FNANCIERO REAL
100%
P: UDEP
MONITOREO:
ING. MOTTA ALGUNA, FELIPE
MODALIDAD DE
EJECUCIN
CONTRATA
2010
2009
72659
VIABLE
2009
SC
71315
VIABLE
1,638,956
CONTRATA
1,253,273
CONTRATA
117665
VIABLE
586,400
CONTRATA
63161
VIABLE
4,009,471
CONTRATA
113676
VIABLE
CONTRATA
73722
VIABLE
54263
VIABLE
CONTRATA
2009
1,001,804
2009
88577
VIABLE
6,934,545
22-Oct-10
OBSERVACIONES / INFORMES
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
614,677
2009
2009
2009
22 EDUCACION
22 EDUCACION
2009
TRANSPORTE
SANEAMIENTO
22 EDUCACION 22 EDUCACION
VARIOS
08
SECHURA
BERNAL
07
22 EDUCACION
04 AGRARIA
VARIOS
06
22 EDUCACION
VARIOS
BAYOVAR
VARIOS
VARIOS
05
BERNAL
PIURA
SECHURA
VARIOS
VARIOS
PIURA
SECHURA
PIURA
SECHURA
04
PIURA
SECHURA
PIURA
SECHURA
03
PIURA
SECHURA
02
MEJORAMIENTO DE LA INFRAESTRUCTURA
EDUCATIVA EN LA INSTITUCION EDUCATIVA
MARIA GORETTI DEL AA.HH. MARIA GORETTI,
DISTRITO DE CASTILLA - PIURA - PIURA
PIURA
SECHURA
3,965,436
8,235,731
100%
MONTO
EJECUTADO
AL 2010
CONTRATA
45530
VIABLE
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
CONTRATA
FUNCION
CODIGO SNIP
AO DE INICIO
01
2009
###
11007
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
2009
2009
###
DISTRITO
PIURA
MULTIDIST.
BERNAL
09 EDUCACION
PROVINCIA
PIURA
PIURA
CC
LETIRA
VICE
SECHURA
ITEM
30-Dec-99
240
120
30-Dec-99
100%
100%
70%
70%
30-Dec-99
100%
70%
30-Dec-99
100%
70%
30-Dec-99
100%
70%
30-Dec-99
100%
0%
90%
MONITOREO 2011:
ARQ. HERRERA SOARES, SONIA GRACIELA
AO 2010:
PROYECTISTA:
ING. CORREA REYES, DARCY DEL CARMEN
(COORDINADOR)
REVISOR:
ING. VITE CALVO JULIO MIGUEL
ARQ. RUIZ GALLO, JULIO
PROYECTISTAS:
ING. SANCHEZ NUEZ, BRENDA LORENA
ARQ. QUEZADA CRISANTO, SARA
ING. YZQUIERDO VELASQUEZ, OSCAR
ING. MECHATO GARAY, CARLOS
ING. SAAVEDRA ORDINOLA, TEOBALDO
ING. HUAYAMA CHINGUEL, ING. EMILIO
LAZARTE BENGOA, MANUEL
REVISION:
ING. MERINO CHEVEZ, CESAR
ARQ. MELO HORNA, IRMA
MONITOREO/COORDINAC.:
ING. SANCHEZ NUEZ, BRENDA LORENA
PROYECTISTA:
ARQ. SANTAMARIA LLONTOP LUIS EDGARD
ING. DEZA RODRIGUEZ, CESAR GUILLERMO
ING. CHUMIOQUE SALAZAR, JOSE DEL CARMEN
ING. CHILON MUOZ, JOSE ALFONSO
AUXILIARES:
TOP. OSORIOSANCHEZ, LEONARDO BENJAMIN
PROYECTISTAS:
ING. CURAY ZAPATA NERY
ING. CASTRO RAMIREZ EDUARDO JOSE
PROYECTISTA:
ING. CAJIGAS CHACON, NERIO (COORDINADOR)
REVISION:
ARQ. MOROCHO GAGO, LAURA
ING. SAAVEDRA MORE, MARTIN
PROYECTISTA:
TAFUR GUIVIN, JOSE ALTIERE
SERRANO ZELADA, OVIDIO
CHILON MUOZ, JOSE ALFONSO
RIQUERO SALDARRIAGA, VICTOR SALOMON
MUICO OSORIO, EDGARDO RUBEN
TUME CHAPA, HIPOLITO
ANAYA MORALES, ROGER ANTONIO
REVISION:
BARRANTES URRELO, EDUARDO
ALIAGA ESCALANTE, JUAN
PROYECTISTA:
ING. BARRENO QUESQUEN LUIS ENRIQUE
(COORDINADOR)
REVISOR:
ING. CORDOVA CIENFUEGOS, GREGORIO GIL
E.T. CONCLUIDO
EN PROCESO REGISTRO DE VERIFICACIN DE VIABILIDA EN LA OPI DE LA
REGION DE SALUD
E.T. CONCLUIDO
EN PROCESO REGISTRO DE VERIFICACIN DE VIABILIDA EN LA OPI
DE LA REGION DE SALUD
01/03/11: SE INFORMA A GRI ESTADO SITUACIONAL DE CONVENIO N 1472010-FONIPREL, CUYO DESEMBOLSO A LA FECHA ES S/.147,000 PARA ELAB.
DEL EXP. TCO.
01/12/10: CON OFICION N 408-2010/GRP-440330 SE REMITE OBSERVACIONES
A PROYECTISTAS
03/01/11: COORDINADOR DEL
DIAS
CALEN
REAL
INICIO
PROYECTO
REAL
TERMINO
PROYECTO
REAL
% AVANCE FSICO
REAL
TERMINO
PROYECTO
PROG.
% AVANCE FSICO
PROGRAMADO
INICIO
PROYECTO
PROG.
% AVANCE
FNANCIERO REAL
MODALIDAD DE
EJECUCIN
DIAS
CALEN
PROG.
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
OBSERVACIONES / INFORMES
MONITOR 2011:
ARQ. MERINO ESPINOZA, JUAN ARMANDO
PROYECTISTA:
ITD-UDEP
REVISOR AO 2010:
ING. AVILES CORDOVA FELIX ALBERTO
ARQ. BERMEO BOBADILLA HEBERT EDUARDO
P: M.D. TAMBOGRANDE
ING. PINGO CARHUATOCTO, CESAR
REVISION 2009:
JIBAJA CHUMACERO, KARLA MARIBEL
COORD.:
ING. INFANTES LLUNCOR, JUAN RICARDO
E.T. CONCLUIDO
EXP. TCO. REQUIERE ACTUALIZACIN DEL VALOR REFERENCIAL
E.T. CONCLUIDO
EXP. TCO. REQUIERE ACTUALIZACIN DEL VALOR REFERENCIAL
CONTRATA
PROGRAMADO
0%
CONTRATA
MONTO
EJECUTADO
2011
0%
CONTRATA
CODIGO SNIP
2009
54561
95%
CONTRATA
AO DE INICIO
2009
2009
2009
2009
35074
EN
FORM.
EVAL
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
0%
CONTRATA
FUNCION
11 INDUSTRIA, COMERCIO Y SERVICIOS
07 SEGURIDAD
CIUDADANA
14 SALUD
16 TRANSPORTE
LA UNION
PIURA
56944
18 SANEAMIENTO
DISTRITO
13
CATACAOS
CASTILLA
12
80621
VIABLE
TAMBO GRANDE
61094
VIABLE
CASTILLA
CASTILLA
PIURA
11
LA UNION
PROVINCIA
CATACAOS
PIURA
FORTALECIMIENTO DE CAPACIDADES EN LA
SEGURIDAD CIUDADANA DE LAS
ORGANIZACIONES VECINALES PARA LA
SEGURIDAD INTERNA EN LA REGION PIURA-PLAN
PILOTO DISTRITO DE CASTILLA
CC
CASEROS DEL
MEDIO PIURA
CASTILLA
PIURA
10
ITEM
09
TAMBO GRANDE
PIURA
0%
Expediente Tcnico se encuentra en elaborqcin por la Municipalidad Distrital de la Expediente Tcnico se encuentra en elaborqcin por la Municipalidad
Unin.
Distrital de la Unin.
AO 2009
129992
VIABLE
130020
VIABLE
130285
VIABLE
CONTRATA
CONTRATA
CONTRATA
CONTRATA
130011
VIABLE
CONTRATA
129863
VIABLE
CONTRATA
2010
2010
2010
2010
2010
2010
20 SALUD
20 SALUD
20 SALUD
20 SALUD
20 SALUD
20 SALUD
CURA MORI
CATACAOS
LA ARENA
CATACAOS
CATACAOS
MONTE CASTILLO
CATACAOS
PIURA
CHATITO
LA ARENA
PIURA
129881
VIABLE
CONTRATA
2009
23
EL TALLAN
12
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD I2 NUEVO TALLAN, PERTENECIENTE A LA
MICRORED CATACAOS DE LA RED BAJO PIURA,
DE LA DIRECCION REGIONAL DE SALUD PIURA.
MULTIDISTRITAL
18
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD I2 SIMBILO, PERTENECIENTE A LA MICRO RED
CATACAOS DE LA RED DE SALUD BAJO PIURA,
DE LA DIRECCION REGIONAL DE SALUD PIURA
PEDREGAL GRANDE
CATACAOS
PIURA
17
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD.
I-2 PEDREGAL GRANDE, PERTENECIENTE A LA
MICRORED CATACAOS DE LA RED BAJO PIURA,
DE LA DIRECCION REGIONAL DE SALUD DE
PIURA
SIMBILA
CATACAOS
PIURA
16
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD
CHATITO, PERTENECIENTE A LA MICRORED
CATACAOS DE LA RED BAJO PIURA, DE LA
DIRECCION REGIONAL DE SALUD PIURA
NUEVO TALLAN
EL TALLAN
PIURA
15
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD I2 MONTE CASTILLO, PERTENECIENTE A LA
MICRORED CATACAOS DE LA RED BAJO PIURA,
DE LA DIRECCION REGIONAL DE SALUD PIURA
MULTI
PROVINCIAL
14
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD I2 POZO DE LOS RAMOS, MICRO RED, CATACAOS
RED BAJO PIURA, DIRECCION REGIONAL DE
SALUD DE PIURA
50%
50%
50%
50%
50%
50%
PROYECTISTA:
ING. PHLUCKER ACARO, RUDY ALBERTO
ARQ. CASTILLO GOMEZ, MISENO ROBINSON
ING. ANASTASIO LAMA, PEDRO
DR. LENGUA AQUIJE, JULIO DANIEL
REVISIN:
ING. GUEVARA GALLARDO, JOSE RAFAEL
ARQ. CALLE GONZALES, RODER RAFAEL
ERNESTO
% AVANCE FSICO
REAL
% AVANCE FSICO
PROGRAMADO
% AVANCE
FNANCIERO REAL
MODALIDAD DE
EJECUCIN
ENCARGO UNOPS CONTRATA CONSULTORA
SC
SC
EPD
CODIGO SNIP
6302
CONSULTOR EXTERNO
797,868
34896
S/C
CONTRATA
2009
2009
2009
2009
S/C
614,677
UNOPS
22 EDUCACION
SALUD
94617
2009
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
2009
27
03
PLANEAMIENTO,
GESTION Y
RESERVA DE
CONTINGENCIA
MULTISECTORIAL
MULTI
DISTRITAL
03 PLANEAMIENTO,
15 TRANSPORTE GESTION Y RESERVA 03 PLANEAMIENTO, GESTION Y RESERVA DE CONTINGENCIA
DE CONTINGENCIA
OBSERVACIONES / INFORMES
VARIOS
CATACAOS
26
TERMINO
PROYECTO
REAL
PROYECTISTA:
M.D. DE CASTILLA
REVISION:
ZEGARRA RODRIGUEZ, JESICA RAQUEL
SULLANA
LAS LOMAS
INICIO
PROYECTO
REAL
Financiado Por FONIPREL, la Municipalidad Provincial de Sullana, Elabora el Expediente Tecnico y esta
solicitando la transferencia,
PIURA
CATACAOS
25
24
DIAS
CALEN
REAL
Financiado Por FONIPREL, la Municipalidad Provincial de Sullana, Elabora el Expediente Tecnico y esta solicitando la
transferencia,
TERMINO
PROYECTO
PROG.
P: M.P. DE SULLANA
SULLANA
A NIVEL DE PREINVERSIN
PIURA
INICIO
PROYECTO
PROG.
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
9637
PIURA
DIAS
CALEN
PROG.
52192
VIABLE
PIURA
23
MONTO
EJECUTADO
2011
586,915
MULTI
PROVINCIAL
22
MONTO
EJECUTADO
AL 2010
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
EPD
AO DE INICIO
2008
2008
2009
2009
2007
03 PLANEAM.,
GESTION Y
03 PLANEAMIENTO, GESTION Y RESERVA DE CONTINGENCIA
RESERVA DE
CONTINGENCIA
15 TRANSPORTE
15 TRANSPORTE
PAIMAS
15 TRANSPORTE
###
PAIMAS
###
ESTUDIO DE PREINVERSION - DE LA
CARRETERA: PI-107 TRAMO CHULUCANAS0149 MORROPON BAJO EL METODO DE
CONTRATACION:SELECCION BASADA EN LA
CALIDAD Y COSTO
PAIMAS
AYABACA
0152
AYABACA
###
REHABILITACIN Y MEJORAMIENTO DE LA
CARRETERA SAJINOS - AYABACA SOCCHABAMBA
61081
2007
MEJORAMIENTO DE INFRAESTRUCTURA
EDUCATIVA EN CENTRO DE EDUCACION BASICA
ESPECIAL CASTILLA AA.HH. JUAN PABLO II,
DISTRITO DE CASTILLA - PIURA - PIURA (MD
CASTILLA)
2007
SULLANA
MALLARES,
SAMAN, LA
NORIA,
CAAS, SAN
JACINTO, EL
ANGOLO
MARCAVELICA
27
67847
FUNCION
AYABACA
27765
15
TRANSPORTE
AYABACA
26
10689
22 EDUCACION
DISTRITO
PAITA
CASTILLA
PROVINCIA
PAITA
25
CC
AYABACA
ITEM
24
PIURA
PROYECTISTA:
30-Dec-99
100%
0%
REVISOR:
LAS LOMAS
16 COMUNICACIONES
2009
30
MULTIDISTRITAL
MULTIDISTRITAL
15 TRANSPORTE
2005
27765
31
MULTIDIST.
15
TRANSPORTE
02
03
03
04
SUPERVISIN Y CONTROL
05
06
05
FORTALECIMIENTO REGIONAL
06
EPD
ADMINIST.
DIRECTA
CONSULTOR EXTERNO
INCORPORADO POR EL GRP CON RESOLUCIN EJECUTIVA REGIONAL 2992009/GRP BASADO EN EL DS DADO POR PVD-MTC. SE ESTA ELABORANDO
LOS TdR
0%
0%
no iniciado
no iniciado
0%
0%
no iniciado
no iniciado
EPD
EPD
EPD
EPD
03
PLANEAMIENTO,
GESTION Y
RESERVA DE
CONTIGENCIA
S/C
03
PLANEAMIENT
O, GESTION Y
RESERVA DE
CONTINGENCI
A
S/C
03
PLANEAMIENT
O, GESTION Y
RESERVA DE
CONTINGENCI
A
S/C
S/C
03 PLANEAM., 03 PLANEAM.,
GESTION Y
GESTION Y
RESERVA DE RESERVA DE
CONTINGENCI CONTINGENCI
A
A
ELABORACIN DE EXPEDIENTES TECNICOS REQUERIDOS PARA EJECUCION ELABORACIN DE EXPEDIENTES TECNICOS REQUERIDOS PARA
DE LAS OBRAS DEL PROGRAMA DE INVERSIONES
EJECUCION DE LAS OBRAS DEL PROGRAMA DE INVERSIONES
03
PLANEAMIENT
O, GESTION Y
RESERVA DE
CONTINGENCI
A
MULTIDIST.
MULTIDIST.
03
03
PLANEAM., PLANEAMIEN
03
GESTION Y TO, GESTION PLANEAMIENTO,
RESERVA Y RESERVA
GESTION Y
RESERVA DE
DE
DE
CONTINGE CONTINGENC CONTINGENCIA
NCIA
IA
FORMULADORES:
ESTUDIO DE PREFACTIBILIDAD : FORMULADORES
EXTERNOS
REVISORES: MONITOR ING HARLAN SOSA Y
ECON. DEISY SILVA JUARES
S/C
MULTI DIST.
PIURA
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
OBSERVACIONES / INFORMES
S/C
MULTI DIST.
MULTIDIST.
PIURA
TERMINO
PROYECTO
REAL
S/C
MULTI DIST.
MULTIPROV.
MULTIPROV.
PIURA
MULTIPROV. MULTI PROV. MULTI PROV. MULTI PROV.
PIURA
PIURA
INICIO
PROYECTO
REAL
CONTRAT
A
01
DIAS
CALEN
REAL
S/C
VER CUADRO IV
VER CUADRO IV
EPD
GESTIN DE PROYECTOS
18
18
SANEA
SANEAMI
MIENT
ENTO
O
TERMINO
PROYECTO
PROG.
EPD
MULTIDIST.
MULTIDIS MULTI
T.
DIST.
02
MULTIPR
PIURA
OV.
PIURA
INICIO
PROYECTO
PROG.
RESPONSABLES DIRECTOS
F:FORMULADOR(ES)
P: PROYECTISTA(S)
R: REVISOR(ES)
C: CONTRATISTA
S: SUPERVISOR(ES)
EPD
MULTI
DISTRITAL
2008
MULTIPROV.
03
2009
PIURA
S/C
2009
PIURA
02
23
23
23
PROTECCI
PROTECCI
PROTECCION
ON
ON
SOCIAL
SOCIAL
SOCIAL
PIURA
F2 OBRAS DE PREVENCION
01
DIAS
CALEN
PROG.
S/C
EPD
23
PROTE
CCION
SOCIAL
01
PROGRAMADO
10-Jul-09
F1
MULTI
PROV.
MONTO
EJECUTADO
2011
% AVANCE FSICO
REAL
CODIGO SNIP
2009
PIURA
72994
MONTO
EJECUTADO
AL 2010
% AVANCE FSICO
PROGRAMADO
AO DE INICIO
15
TRANSPO
RTE
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
% AVANCE
FNANCIERO REAL
FUNCION
CASTILLA
29
MODALIDAD DE
EJECUCIN
DISTRITO
PIURA
35074
CC
EPD (FACTIBILIDAD)
PROVINCIA
ITEM
28
MORROPON
VARIOS
#DIV/0!
#DIV/0!
DIAS
CALEN
PROG.
INICIO
PROYECTO
PROG.
TERMINO
PROYECTO
PROG.
INICIO
PROYECTO
REAL
TERMINO
PROYECTO
REAL
% AVANCE FSICO
REAL
MONTO
EJECUTADO
2011
% AVANCE FSICO
PROGRAMADO
MONTO
EJECUTADO
AL 2010
PROGRAMADO
% AVANCE
FNANCIERO REAL
MODALIDAD DE
EJECUCIN
CODIGO SNIP
AO DE INICIO
FUNCION
MONTO
VALOR
CONTRACTUA
REFERENCIAL
L
2008
2009
MULTIDIST.
DISTRITO
MULTIDIST.
03
PLANEAMIENT 03 PLANEAMIENTO,
O, GESTION Y
GESTION Y
RESERVA DE
RESERVA DE
CONTINGENCI
CONTINGENCIA
A
08
PROVINCIA
PIURA
CC
PIURA
ITEM
OBSERVACIONES / INFORMES
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
PROYECTISTA:
ING. TACZA ELESCANO, HECTOR ESTEBAN
METAS
Metas:
1.- Revestimiento de 6,280 m de seccin hidrulica de canal, construccin de 03 sub
laterales con sus compuertas, 01 sifn invertido,, 04 pases peatonales, 02 cruces
vehiculares, 02 estructuras de retencin tipo pico de pato, , 03 rpidas, 37 tomas
sublaterales, 03 alcantarillas
2.- Revestimiento con concreto de la seccin hidrauliaca del canal 52.8
3.- Construccin de 37 tomas sub laterales, 01 sifn invertido, 02 pases peatonales, 02
cruces vehiculares, 02 estructuras de retencin, 03 rpidas, 03 alcanatarillas, obras de
arte necesarias.
4.- El planteamiento es alternativa nica y toma cuenta de infraestructura d conduccin
principal que parte del canal Danbiel Escobar para el sector 52.8 I
FECHA DE
FIRMA DE
CONTRATO
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
11/26/2009
11/12/2009
5/7/2010
Pista
Atltica
de terreno
natural
Electrificacin integral, lneas
y redes
primarias,
redes
secundarias, alumbrado pblico
-Rehabilitacin
Malla Olmpica
y conexiones domiciliarias en
las 14 localidades,
Nuevo Progreso, Nueva Esperanza,
-Sembrado
Gras
incluyeRicardo
tratamiento
del La
terreno,
Campo
juego
San Francisco,
Paredes
Maceda,
Palma,
Cruza,
Sol dede
Oro,
Carrizal, San
-02 Arcos
deAlto,
tuboVctor
Metlico
y Red
malla Cabuyal,
de cocos y la Victoria (en
Miguel de Tamboya,
Piscn
Raul,
La Loma,
de Acceso
localidad de Yamango) en distrito -Veredas
de Yamango
y comprende la conexin a lnea en 22.9
-Rehabilitacin
de pequeo
Cerco Perimtrico
con muros
albailera.
Kv. del alimentador
N 99 del
sistema elctrico
de de
Santo
Domingo, Chalaco,
-Construccin
de Graderas
occidente.
Huancabamba
de propiedad
de ELECTRONOROESTE
S.A.
-Rehabilitacin de los 02 Ambientes para Vestidores
-Servicios Higinicos para el pblico (Hombres y Mujeres)
-Construccin de Tanque Sptico
-Pozo Percolador
-Cisterna
-Tanque Elevado
-Caseta para Electro bomba
-Colocacin de Confitillo en playa de estacionamiento
-Camerinos para rbitros
-Oficina Administrativa, de 26.00m2
-Construccin de Graderas oriente.
-Instalaciones domiciliaria de agua en interiores
-Instalaciones domiciliaria de desague (interior y exterior)
-Instalaciones elctricas interior y exterior en las tribunas oriente y occidente
-Equipamiento de las Instalaciones del Estadio de Sechura
DEDUCTIVOS
MONTO
MODIFICADO
RESPONSABLES
BENEFICIARIOS
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
372
6/1/2010
6/11/2010
ADICIONALES
5,893,541
8,014,580
L.P. N 007-2009
P: Ing. Chumioque Salazar Jos del Carmen
REVISOR:
Ing. Santamara Llontop Jos Walther
Revisor: Walther Santamara Llontop
229,453
L.P. N 007-2009
P: Ing. Chumioque Salazar Jos del Carmen
REVISOR:
Ing. Santamara Llontop Jos Walther
242,000.00
329,071.18
734,868.80
165,191.63
134475
3/1/2011
408,257
134475
3/1/2011
1,251,427
3/16/2011
1,496,163
134475
120
10/25/2010
11/8/2010
1,667,172
PROYECTISTA:
ING. MUOZ RAMIREZ, ENRIQUE
(COORDINADOR)
REVISOR:
ING. TIMANA FIESTAS, JUAN
1195
10/28/2010
2300
11/12/2009
11/16/2009
1195
10/28/2010
58155
#REF!
2,305,029
METAS
FECHA DE
FIRMA DE
CONTRATO
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
MONTO
MODIFICADO
RESPONSABLES
BENEFICIARIOS
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
23,909.47
1500
7/23/2010
9/6/2010
2/15/2010
2/19/2010
729,930.99
1000
Pavimentacion y asfaltado de 1,721.40
192.19 m2 de pavimento con adoquines
5000
En un primer tramo en dos cuadras se va a cambiar 330 ml de tubera de agua, 27
conexiones domiciliarias, cambio de sardineles y veredas y colocacin de 1,010 m2 de
bloques de concreto.
En el segundo tramo, cambio de sardineles y veredas, bacheo de 5 cuadras y recapeo
de las mismas de 1 pulg. y cambio de 35 cajas de agua.
7/13/2010
8/14/2009
9/10/2009
N 01 - 45 d. - RGR N 210-2009/Gob.Reg.Piura-GRI-Aprobada
N 02 - 3 d. - RGR N 011-2009/Gob.Reg.Piura-GRI
N 03 - 13 d. - Oficio N 079-2010-440310
N 04 - 36 d. - Oficio N 078-2010-440310
N 05 - 41 d. - Oficio N 080-2010-440310
Const. 01 aula tanto nivel primario y secundario; aula taller carpintera y de costura;
Biblioteca, ambiente de direccin, letrinas, patio, cerco perimtrico, plataforma
deportiva, mobiliario para alumnos, docentes y bibioteca.
Const. Aula nivel inicial y primaria; ambientes para direccin, comedor, cocina y
guardiana; mobiliario y equipamiento.
2-Nov-09
353,361
658
1,691,112
5401
695
METAS
44 aulas, de las cuales 9 sern para el nivel inicial, 24 para primaria y catorce para
secundaria, sala de profesores aulas de servicios mltiples, laboratorios de cmputo y
multifunciones, Talle-Biblioteca, ambientes administrativos, patios de formacin,
plataformas deportivas, veredas y cerco perimtrico.
FECHA DE
FIRMA DE
CONTRATO
12/17/2009
FECHA DE
ENTREGA
DE TERRENO
12/30/2009
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
MONTO
MODIFICADO
8,652,277
RESPONSABLES
BENEFICIARIOS
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
66739
F.C. el 10/02/2011
A.D. el 18/12/2010
A.M. el 18/12/2010
853,611.00
98,031.77
194,477.83
F.C. el 31/07/2010
390,943.36
500
8/31/2010
9/15/2010
PROYECTISTAS:
ARQ. MELO HORNA, IRMA
ING. PHLUCKER ACARO, RUDY ALBERTO
ING. ALDANA GUTIERREZ, WALTER
ING. MARTINEZ RUIZ, JUAN PABLO
REVISORES:
ARQ. CALLE GONZALES, RODER RAFAEL
ERNESTO
ING. PIEDRA YOPLAC, ALVARO ABSALON
PROYECTISTAS:
ARQ. MELO HORNA, IRMA
ING. PHLUCKER ACARO, RUDY ALBERTO
ING. ALDANA GUTIERREZ, WALTER
ING. MARTINEZ RUIZ, JUAN PABLO
REVISORES:
ARQ. CALLE GONZALES, RODER RAFAEL
ERNESTO
ING. PIEDRA YOPLAC, ALVARO ABSALON
11/3/2010
10/28/2010
12/7/2010
10/28/2010
11/11/2010
2,036,985
1210
335
P: M.D DE LA UNIN
REVISORES:
ING. INFANTES LLUNCOS, JUAN RICARDO
ING. PIEDRA YOPLAC, ALVARO ABSALON
ING. TACZA ELESCANO, HECTOR ESTEBAN
ARQ. CALLE GONZALES, RODER RAFAEL ERNESTO
1195
545
1195
5205
8/18/2010
4,049,842.16
METAS
FECHA DE
FIRMA DE
CONTRATO
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
MONTO
MODIFICADO
9/18/2009
9/24/2009
1,347,978.66
RESPONSABLES
BENEFICIARIOS
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
1325
F.C. el 16/05/2010
A.M. el 15/05/2010
144,880.52
BBVA CF N 0011-0268-9800019309-08.
FC
BBVA CF N 0011-0268-9800019317-01.
AD
176,697.95
F.C. 28/04/2011
A.D. 01 el 26/04/2011
A.M. 01 el 26/04/2011
171,221.03
BBVA N0011-278-9800031311-98
BBVA N0278-278-9800031281-93
642
1.99 km. de lneas primarias, 11.73 km. de redes secundarias, 51 cargas especiales y
613 conexiones domiciliarias, se dotar de energa elctrica a 591 lotes de vivienda
(14 localidades, Nuevo Progreso, Nueva Esperanza, San Francisco, Paredes Maceda,
Ricardo Palma, La Cruza, Sol de Oro, Carrizal, San Miguel de Tamboya, Piscn Alto,
Vctor Raul, La Loma, Cabuyal, y la Victoria (en localidad de Yamango) en distrito de
Yamango y comprende la conexin a lnea en 22.9 Kv. del alimentador N 99 del
pequeo sistema elctrico de Santo Domingo, Chalaco, Huancabamba de propiedad
de ELECTRONOROESTE S.A.
Electrificacin integral, lneas y redes primarias, redes secundarias, alumbrado pblico
y conexiones domiciliarias en las 14 localidades, Nuevo Progreso, Nueva Esperanza,
San Francisco, Paredes Maceda, Ricardo Palma, La Cruza, Sol de Oro, Carrizal, San
Miguel de Tamboya, Piscn Alto, Vctor Raul, La Loma, Cabuyal, y la Victoria (en
localidad de Yamango) en distrito de Yamango y comprende la conexin a lnea en 22.9
Kv. del alimentador N 99 del pequeo sistema elctrico de Santo Domingo, Chalaco,
Huancabamba de propiedad de ELECTRONOROESTE S.A.
10/28/2010
11/12/2010
1195
10/28/2010
5/11/2010
5/25/2010
1,674,768
SUPERVISOR DE ESTUDIO:
Arq. Melo Horna Irma *419992
Ing. Motta Laguna Felipe 969936936
Ing. Tacza Elescano Hector #625972
Ing. Sipion Montenegro Rosario *419992
CONTRATISTA:
Dextre Marimoto Eduardo Raul
C: Consorcio Grau
595
450
7/21/2010
8/9/2010
405,630
500
01 Saln comunal multiusos, 02 baos (hombres y mujeres) y 03 ambientes.
9/10/2010
9/23/2010
Desbroce y descolmatacin del dren Sechura, Tramo Laguna Azul - Puente Casero La
Legua.
348,991
C: MATSER E.I.R.L.
R. OSCAR RAFAEL ONTANEDA NEYRA
Sup.:Wilmer Chorres Marquez
Pro: Lizeth I. Cueva Gmez
Res: Oscar R. Ontaneda Neyra
Rev.: Jessica Raquel Rodriguez Zegarra
11/8/2010
11/9/2010
11/8/2010
11/9/2010
Perforaci+on del pozo hasta 250 mt. De profundidad, y de encontrar niveles de agua
aceptables se proceder al entubado definitivo, instalacin de filtros y e instalacin de
grava seleccionada de 1/4" a 1/8" de dimetro.
19481
METAS
FECHA DE
FIRMA DE
CONTRATO
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
1/12/2011
MONTO
MODIFICADO
RESPONSABLES
BENEFICIARIOS
4,835
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
F.C. N 010245912000-Scotiabank
7/13/2011
354,983.44
2/1/2011
4,835
1195
12/30/2010
2,294
2,293
1195
Construccin de infraestructura del nuevo Centro de Salud Mara Goretti con los
ambientes necesarios segn su nivel resolutivo de atencin, con techo aligerado con
ladrillo king Kong.
- Adquisicin de equipos mdicos para renovacin y equipos complementarios para los
servicios a brindar, incluye ambulancia.
- Capacitacin al personal, pasantas en emergencias y urgencias en establecimientos
de mayor capacidad resolutiva para los profesionales. - Elaborar y Ejecutar un Plan de
implementacin de estrategias en promocin y prevencin
2/3/2011
2/18/2011
PROYECTISTA:
ARQ. GUERRA RANGEL, EMIR FERNANDO
(COORDINADOR)
REVISION:
ING. FRANCO TORRES, ELISA
ING. VENEGAS VALLADOLID, NELSON
ING. ALDANA GUTIERREZ, WALTER
ING. LAZARTE BENGOA, MANUEL
1/11/2011
Metas:
Captacin y empalme en la lnea de cacatua de represa San Lorenzo con tubera PVC
C-7.5 D. 10" en una longitud de 6,658.82 mts.
Construccin d Planta de tratamiento: Decantadores-Roculadores para un caudal de
diseo de 30 l/s para dotacin de consumo humano
Construccin de casa dosificadora, laboratorio, almacn
Construccin de cisterna nueva de 250 m3
Redes vde distribucin con tubera PVC LIF clase 7.5 134 ml.
Ampliacin de cerco perimtrico, Planta de tratamiento
Programa de capacitacin de Educacin Sanitaria
40211
12/6/2007
1/24/2008
10747
1/22/2008
3/23/2009
2,909,219.04
6469
17656
10/29/2007
COMPONENTE ALCANTARILLADO
-RED COLECTORA ALCANTARILLADO LA ARENA
-CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
-CAMARA DE REJAS CAMARA DE BOMBEO AR N 01 AL DE LOS MORES
-CONSTRUCCION CMARA DE BOMBEO AR N 01 ALTO DE LOS MORE
-REBOSE DE CAMARA DE BOMBEO AR N 01 ALTO DE LOS MORES
-CERCO PERIMETRICO CAM. DE BOMBEO AR N 01 ALTO DE LOS MORES
-CAMARA DE REJAS CAMARA DE BOMBEO AR N 02 LA VICTORIA
-CONSTRUCCION CMARA DE BOMBEO AR N 02 (LA VICTORIA)
-REBOSE DE CAMARA DE BOMBEO AR N 02 LA VICTORIA
-CERCO PERIMETRICO CAM. DE BOMBEO AR N 02 LA VICTORIA
-CAMARA DE REJAS CAMARA DE BOMBEO AR N 03 NVO. MONTEGRANDE
-REBOSE DE CAMARA DE BOMBEO AR N 03 NVO. MONTEGRANDE
-POZOS PERCOLACION P/EFLUENTE DE REBOSE (3 UND) NVO. MONTEG.
-CERCO PERIMETRICO CAM. DE BOMBEO AR N 3 (NVO. MONTEGRANDE)
-CAMARA DE REJAS DE CBAR N 04 LAGUNA DE LOS PRADOS
-REBOSE DE CAMARA DE BOMBEO AR N 04 LAGUNA DE LOS PRADOS
-POZOS PERCOLACION P/EFLUENTE DE REBOSE (4 UND) LAGUNA PRADOS
-CERCO PERIMETRICO CAM. BOMBEO AR N 4 LAGUNA DE LOS PRADOS
-EQUIP. HIDRAULICO ELECTROMECANICO CAMARA DE BOMBEO AR N 01
-EQUIP. HIDRAULICO ELECTROMECANICO CAMARA DE BOMBEO AR N 02
-EQUIP. HIDRAULICO ELECTROMECANICO CAMARA DE BOMBEO AR N 03
-EQUIP. HIDRAULICO ELECTROMECANICO CAMARA DE BOMBEO AR N 04
-ELECTRIFICACION CAM. DE BOMBEO AR N 01 ALTO DE LOS MORES
-ELECTRIFICACION CAM. DE BOMBEO AR N 05 (LA VICTORIA)
-ELECTRIFICACION CAM. DE BOMBEO AR N 03 (NVO. MONTEGRANDE)
-ELECTRIFICACION CAM. DE BOMBEO AR N 04 (LAGUNA DE LOS PRADOS)
7/21/2008
5040
7/6/2010
CONSTRUCCION DE RESERVORIO ELEVADO N01 700 M3 (13 DE ABRIL)
-REHABILITACION DE RESERVORIO ELEVADO R2 LA ARENA
-CERCO PERIMETRICO RESERVORIO ELEVADO 700 M3 N 01 (13 DE
ABRIL)
-CERCO PERIMETRICO RESERVORIO ELEVADO 280 M3 N 02 (LA ARENA)
-CERCO PERIMETRICO RESERVORIO ELEVADO 200 M3 N 03 (LAS
MALVINAS)
-RED DE DISTRIBUCION LA ARENA CERCADO
-INSTALACION
CONEXIN
DOMICILIARIAS
ARENAy aduccin,
Ampliaicin
de casetas de DE
bombeo,
instalacin
de lineas de LA
impulsin
-RED
DE DISTRIBUCION
PUEBLOS
ARENA
rehabilitacin
de reservorios
de 100 m3
y 80 m3, JOVENES
Valvulas deLA
control,
instalacin de
-INSTALACION
CONEXIN
DOMICILIARIAS
PUEBLOS
JOVENES
LA ARENA
882 conexionesDE
domiciliarias,
construccin
de redes
colectoras
de alcanatarillado,
-RED
DE DISTRIBUCION
CENTROS
POBLADOS
LA ARENA
construccin
de lagunas
de estabilizacin,
construccin
de 4 casetas
de bombeo de
-INSTALACION DE CONEXIN
DOMICILIARIAS
aguas
servidas, etc. CENTROS POBLADOS LA
ARENA
-COSTOS AMBIENTALES
7,188
8/3/2010
76205
4/21/2010
6/10/2010
6/10/2010
17656
11/5/2007
11/16/2007
17656
FECHA DE
FIRMA DE
CONTRATO
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
12/28/2007
5/24/2010
ADICIONALES
DEDUCTIVOS
MONTO
MODIFICADO
RESPONSABLES
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
1/28/2011
1,393,500.00
86,061.87
2360
F.C. el 02/07/2010
A.M. el 26/05/2010
901,001.18
20,000
F.C.N 4410021400.02 de
Interamericana de Finanzas (I.F.)
A.D. N 4410024541.01 de I.F.
F.C. 13/06/2011
A.D. 01 el 05/02/2011
7,475,956.63
BENEFICIARIOS
9136
12/12/2007
5/13/2010
399,382
9758
2640
Agua: Suministro e instalacin de 42.00 mt de tuberia PVC 160 mm C-7.5, 500.00 mt
de tuberia PVC 110 mm C-7.5, 33 conexiones domiciliarias s/medidor.
Suministro e instalacin de 07 vlvulas de compuerta luflex y de 02 grifos
contraincendios.
Desague:Suministro e instalacin de 102.40 mt de tuberia PVC UF S-20 200 mm,
Construccin de 03 buzones: 02 de 1.20 m y 01 de 1.50 m profundidad, instalacin de
06 conexiones domiciliarias, Suministro e instalacin de 20 marcos y tapas para las
conexiones domiciliarias
PAVIMENTACION
Corte a nivel de subrasante 1,557.72 m3. Base granulada e=0.20 m 4,467.46 m2,
Adoquines de concreto 20x10x8 4,467.46 m2, Veredas concreto 1,053.96 m2, Sardinel
aislado 15x55 402.22 ml, Sardinel aislado 15x48 52.80 ml, Sardinel aislado 15x40
310.70 ml, Sardinel aislado 15x33 290.10 ml, rea verde en separador central 607.93
m2
Metas:
Construccin de 15.683 Km. de carrtera con sello e imprimacion. Se considera la base
imprimada y con sello asfltico y con una longitud de 15,683 para lo cual se est
considerando 1 base con sello asfltico, colocacin de base granular e=15 cm,
imprimacin asfaltica, colocacin de sello asfaltica sin considerar bermas, 02 obras de
arte: Alcantarillas de TMC, 3 obras de arte: construccin de 11 badenes con concreto, 4
Obras de arte: construccin de 7 cajas receptoras con concreto, 5 Obras de arte:
construccin de 7,033.99 ml de conformacin de cunetas, 6 Obras de arte:
construccin de gradas disipadoras en la progresiva, 7 Dispositivos de control de
trnsito, suministrar e instalar seales reglamentarias informativas y preventivas.
11/25/2010
12/17/2010
860,619
12/7/2009
1/12/2010
L.P. N 006-2009
Ampliacin N 01 por 132 das incluyendo gastos generales en trmite
(09.07.10)
3/26/2010
4/12/2010
3/26/2010
4/12/2010
PROYECTISTA:
ING. PIEDRA YOPLAC, ALVARO ABSALON
R: ING. ZEGARRA RODRIGUEZ, JESSICA RAQUEL
74,759,566
38000
6/16/2010
6/14/2010
7/2/2010
13,528,366
METAS
FECHA DE
FIRMA DE
CONTRATO
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
MONTO
MODIFICADO
RESPONSABLES
BENEFICIARIOS
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
138,313.36
3500
11/3/2010
11/10/2010
PROYECTISTAS:
ING. PALACIOS SAAVEDRA, WALTER ERNESTO
ARQ. SANTAMARIA LLONTOP, LUIS EDGARD
ING. CACHO BECERRA, NESTOR ALEJANDRO
ING. GAMERO HERRERA, OSCAR ABEL
REVISION:
ING. TAFUR GUIVIN JOSE ALTIERE
ARQ. VALDIVIEZO SILUPU, ROCIO
PROYECTISTA:
ING. PIEDRA YOPLAC, ALVARO ABSALON
R: ING. ZEGARRA RODRIGUEZ, JESSICA RAQUEL
10/7/2010
1/14/2009
9988
1508042.54
PROYECTISTA:
ARQ. GUERRA
RANGEL, EMIR
FERNANDO
(COORDINADOR)
REVISION:
ING. FRANCO
TORRES, ELISA
ING. VENEGAS
VALLADOLID,
NELSON
ING. ALDANA
GUTIERREZ,
WALTER
ING. LAZARTE
BENGOA, MANUEL
Construccion; en nuevo terreno de ambientes para Consultorios Externos, Laboratorio, Hospitalizacin, Procedimientos de Diagnstico;
con sistema confinado; Construccin de cerco perimtrico y reas exteriores con adquisicin de nuevos equipos, instrumental y
mobiliario, Eventos de capacitacin al personal,y campaas de sensibilizacin a la poblacin
INSTALACIN DE 2385M DE TUBERIA DE PVC DE 200MM SERIE 20 NTP ISO 4435 PARA DESAGUE;
CONSTRUCCIN DE 33 BUZONES E INSTALACIN DE 360 CONEX. DOMICIL DE DESAGUE CON SUS
RESPECTIVAS CAJAS
3500
378157
378157
METAS
FECHA DE
FIRMA DE
CONTRATO
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
MONTO
MODIFICADO
RESPONSABLES
BENEFICIARIOS
576728
963
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
METAS
FECHA DE
FIRMA DE
CONTRATO
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
MONTO
MODIFICADO
RESPONSABLES
BENEFICIARIOS
7610
3500
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
METAS
FECHA DE
FIRMA DE
CONTRATO
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
MONTO
MODIFICADO
RESPONSABLES
BENEFICIARIOS
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
FECHA DE
FIRMA DE
CONTRATO
METAS
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
ADICIONALES
MONTO
MODIFICADO
DEDUCTIVOS
RESPONSABLES
BENEFICIARIOS
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
CARTA FIANZA
FIEL
CUMPLIMIENTO
14610
CONSULTAR POR ESCRITO A GRPPYAT SOBRE
EJECUCION DE PROYECTO
GLB
50
50
38000
100
Obras
GLB
50
50
100
PROGRAMA DE CAPACITACION .
PROGRAMA DE DIFUSION Y SENSIBILIZACION .
Estudio
Definitivo Construccin de Infraestructura , Estudio Definitivo , Rehabilitacin Urbana y Rural
GLB
50
50
100
10
10
100
780,294
GLB
35
35
FECHA DE
FIRMA DE
CONTRATO
METAS
Colocar en 25.415 Km. un pavimento a nivel de Carpeta Asfltica de e=2, Alcantarillas TMC.D=12(02),Alcantarillas TMC
d=36; concreto muros FC=210Kg/cm2; concreto losas Fc=210Kg/cm2
Dotar a los pobladores de telefona fija, pblica y mvil con tecnologa GSM.
Desarrollar servicios de telecomunicaciones en reas rurales y lugares declarados de
preferente inters social.
Acuerdos con operadora del servicio para atraer inversin privada complementaria en
la prestacin de los servicios de telecomunicaciones en reas rurales y en lugares de
preferente inters social.-
Obras
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
ADICIONALES
MONTO
MODIFICADO
DEDUCTIVOS
RESPONSABLES
BENEFICIARIOS
GLB
35
GLB
1500
50,699
51,072.00
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
CARTA FIANZA
FIEL
CUMPLIMIENTO
10
10
100
50
50
100
METAS
FECHA DE
FIRMA DE
CONTRATO
FECHA DE
ENTREGA
DE TERRENO
AMPLIACIONES
ADICIONALES
DEDUCTIVOS
MONTO
MODIFICADO
RESPONSABLES
BENEFICIARIOS
CARTA FIANZA
FECHA DE
VENCIMIENTO DE CARTA
FIANZA
FIEL
CUMPLIMIENTO
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
1,142,142.35
401,251.13
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Impacto Econmico
y Social
12/16/2010
824,462.10
2/25/2011
L.P. 007-2009/GOB.REG.PIURA-GGR-GRI-DGC
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
47,818.94
95,637.87
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
03.08.2010
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Impacto Econmico
y Social
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
512,646.50
2,088,548.28
196,063.53
392,127.07
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
210,000.00
liberada
liberada
liberada
C: CONSORCIO TAMBOGRANDE
Adm.: Homero manrique
#884875
R: Ing. Gustavo Calmet Ajnelli
S: Ing Hector Benavides #583468
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Impacto Econmico
y Social
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
LICITACION PUBLICA
CENTROS POBLADOS
C: PROMACSA S.A.C.
Adm.: Homero manrique
#884875
R: Ing. Eudomiro Viale Bancayan
S: Ing Hector Benavides #583468
107,918.31
95,637.87
98,352.19
201,172.36
71,298.59
Liberada
142,597.17
Liberada
185,533.00
GASTOS GENERALES
12/13/2010
Interventores
Impacto Econmico
y Social
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
19.08.2010
03.03.2011
Consorcio Sechura
Res.: Pedro Pedro Moscol Fiestas #332182
Sup.: Ing Juan C. Custodio S. 968173260
818,749.00
Impacto Econmico
y Social
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
Consorcio Hidronorte
Res.: Pedro Moscol Fiestas #332182
Sup.: Ing Juan C. Custodio S. 968173260
11/12/2010
Amortizada
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Amortizada
1,802,002.34
5,281,511.86
GASTOS GENERALES
C:Consorcio TAMBO
Rep.Legal: Euclides Reyna Cavada
Res.: Fredy Palomino 990345897
Sup.: Francisco Aldana de los Ros 979166709
Mon. Robert Zambrano Torres 979586040
Impacto Econmico
y Social
ADELANTO
DIRECTO
47181,98
ADELANTO DE
MATERIALES
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Impacto Econmico
y Social
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Impacto Econmico
y Social
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Impacto Econmico
y Social
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Impacto Econmico
y Social
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Impacto Econmico
y Social
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Impacto Econmico
y Social
ADELANTO
DIRECTO
ADELANTO DE
MATERIALES
FECHA DE
FECHA DE
INAUGURACIO
RECEPCION
N
GASTOS GENERALES
LICITACION PUBLICA
CENTROS POBLADOS
Interventores
Impacto Econmico
y Social