1. ARCH. & BLDG.

STANDARD M-H

Code

Description

Unit

N/A

Total
150
180
180
150

SECL
150
180
80
150

S/C
0
0
100
0

Total
180
N/A
180
250

SECL
180
N/A
180
250

N/A

M-H/Item

20

20

30

30

Cal.+Dwg.+B/M
Cal.
Dwg

M-H/dwg
M-H/dwg
M-H/dwg

47
13
30

8
2
5

39
11
25

53
17
32

10
3
6

43
14
26

Design Control
Government Permit
Government Permit
Engs's Spec.

N/A

2614

Construction Spec. Review

2631
2632
2638

Equip. Support Structure


Structure for Misc.
Pipe Rack for Process

2639

Pipe Rack for Utility

2640
2650
2660

General Building
Utility Building
Process Building

2691
2692

Standard Dwg.
Shop Dwg.

2693
2697
2698

Bar Bending
As-Built Dwg.
B/M for Inquiry

Note 1
Note 2

M-H/dwg

M-H/dwg
M-H/dwg
M-H/dwg

44
11
29

8
2
5

36
9
24

79
14
31

10
3
6

39
11
25

B/M
N/A
Dwg. (make up)
Dwg. Check
Schedule Dwg.
As-Built Dwg.
B/M

M-H/dwg
M-H/dwg
M/H/Ton.
M-H/Ton.
M-H/dwg
M-H/dwg
M-H/dwg

4
15
4.5
0.5
30
3
4

1
15
0
0
3
1
2

3
0
4.5
0.5
27
2
2

4
25
4.5
1
30
3
4

1
25
0
0
3
1
2

3
0
4.5
1
27
2
2

Modeling control
Modeling catalogue
Modeling for Steel Structure
Modeling for R.C. Structure
Modeling for Steel P/R
Modeling for P.C Pipe Rack
Modeling for Shelter

Dwg.
N/A
N/A
3D Modeling
3D Modeling
3D Modeling
3D Modeling
3D Modeling

M-H/dwg
M-H/
M-H/Job
M-H/dwg
M-H/dwg
M-H/dwg
M-H/dwg
M-H/dwg

25
45
100
9
9
8
8
5

5
45
100
2
2
2
2
1

20
0
0
7
7
6
6
4

25
45
100
9
9
8
8
5

5
45
100
2
2
2
2
1

20
0
0
7
7
6
6
4

Modeling for R.C Building

3D Modeling

M-H/dwg

2699

B/M

S/C
0
N/A

Cal.+Dwg.+B/M
Cal.
Dwg
M-H

2699

Standard M-H (Abroad)

M-H/
M-H/Job
M-H/Job
M-H/Job

2611
2612
2612
2613

M-H

Standard M-H (Domestic)

Note 3
Note 4
Note 5

2. CIVIL STANDARD M-H

Code

Description

2511
2512
2513
2514
2521
2522

Design Control
Government Permit
Engs's Spec.
Construction Spec. Review
Geotech. Analysis
Layout/Boring Location

2523

Pile/Fdn. Location

2524

Drainage Plan

Unit

M-H
Road & Paving
Detail of Drainage

U/G piping/Cable Trench/


Pipe Trench

2526

Pit & Pond /Dike


1) Valve Box

Total
150
180
150
20
150
38

SECL
150
180
150
20
150
38

S/C
0
0
0
0
0
0

Total
180
N/A
250
30
150
38

SECL
180
N/A
250
30
150
38

S/C
0
N/A
0
0
0
0

Dwg.

M-H/dwg

172

48

124

172

48

124

Cal.+Dwg.+B/M
Cal.
Dwg.

M-H/dwg
M-H/dwg
M-H/dwg

72
14
54

13
4
8

59
10
46

82
20
58

17
6
10

65
14
48

M-H/dwg

M-H/dwg
M-H/dwg
M-H/dwg

38
7
27

7
2
4

31
5
23

43
10
29

9
3
5

34
7
24

M-H/dwg

M-H/dwg
M-H/dwg
M-H/dwg

38
7
27

7
2
4

31
5
23

43
10
29

9
3
5

34
7
24

M-H/dwg

M-H/dwg
M-H/dwg
M-H/dwg

38
7
27

7
2
4

31
5
23

43
10
29

9
3
5

34
7
24

M-H/dwg

M-H/dwg
M-H/dwg
M-H/dwg

38
7
27

7
2
4

31
5
23

43
10
29

9
3
5

34
7
24

B/M

B/M

B/M
Cal.+Dwg.+B/M
Cal.
Dwg.

M-H
2) Conc. Type Cooling Tower

B/M
Cal.+Dwg.+B/M
Cal.
Dwg.

M-H
3) Pit Type Cooling Tower &
Equip. Pit

B/M
Cal.+Dwg.+B/M
Cal.
Dwg.

M-H
4) R.W.T & W.W.T

M-H/
M-H/Job
M-H/Job
M-H/Item
M-H/Month
M-H/Item

Cal.+Dwg.+B/M
Cal.
Dwg.
M-H

Standard M-H (Abroad)

N/A
(SECL)
N/A
N/A
N/A
N/A

Cal.+Dwg.+B/M
Cal.
Dwg.
M-H

2525

Standard M-H (Domestic)

B/M
Cal.+Dwg.+B/M

M-H/dwg

M-H/Item
M-H/Item
M-H/Item

114
21
81

21
6
12

93
15
69

129
30
87

27
9
15

102
21
72

M-H/Item

12

12

M-H/Item

190

35

155

215

45

170

M-H
5) Dike

Jetty Facilities

2527

Contour/Site Preparation

2529

Gate & Fence

10
20

25
115

50
145

15
25

35
120

B/M

M-H/Item

20

15

20

15

M-H/Item
M-H/Item
M-H/Item

38
7
27

7
2
4

31
5
23

43
10
29

9
3
5

34
7
24

M-H/Item

M-H/dwg
M-H/dwg
M-H/dwg

38
7
27

7
2
4

31
5
23

43
10
29

9
3
5

34
7
24

M-H/dwg

M-H/dwg
M-H/dwg
M-H/dwg

38
7
27

7
2
4

31
5
23

43
10
29

9
3
5

34
7
24

M-H/dwg

M-H/Item
M-H/Item
M-H/Item

21
5
14

3.5
1
2

17.5
4
12

23
6.5
14.5

4.5
1.5
2.5

18.5
5
12

M-H/Item

0.5

1.5

0.5

1.5

M-H/Item
M-H/Item
M-H/Item

117
71
34

21
13
6

96
58
28

132
79
40

27
16
8

105
63
32

M-H/Item

12

10

13

10

M-H/Item
M-H/Item
M-H/Item

21
5
14

3.5
1
2

17.5
4
12

23
6.5
14.5

4.5
1.5
2.5

18.5
5
12

M-H/Item

0.5

1.5

0.5

1.5

M-H/Item
M-H/Item
M-H/Item

78
14
56

14
4
8

64
10
48

88
20
60

18
6
10

70
14
50

M-H/Item

M-H/Item
M-H/Item
M-H/Item

378
133
217

70
28
35

308
105
182

420
154
238

84
35
42

336
119
196

B/M

B/M
Cal.+Dwg.+B/M
Cal.
Dwg.

M-H

B/M

Vert. Vesel/Tank Fdn.


1) Vert. Vessel & Storage Tank

Cal.+Dwg.+B/M
Cal.
Dwg.
M-H

2) Tower ( h > 30 m)
& Double wall Tank

Hori. Vessel/H-EX. Fdn

Heater & Boiler Fdn

2534

Compressor

B/M
Cal.+Dwg.+B/M
Cal.
Dwg.

M-H
1) Rigid Block

B/M
Cal.+Dwg.+B/M
Cal.
Dwg.

M-H
2) Elevated Structure

B/M
Cal.+Dwg.+B/M
Cal.
Dwg.

M-H
2533

B/M
Cal.+Dwg.+B/M
Cal.
Dwg.

M-H
2532

35
135

Cal.+Dwg.+B/M
Cal.
Dwg.
M-H

2531

M-H/Item
M-H/Item

Cal.+Dwg.+B/M
Cal.
Dwg.
M-H

2528

Cal.
Dwg.

B/M
Cal.+Dwg.+B/M

M-H/Item

28

21

28

21

M-H/Item

702

130

572

780

156

624

Cal.
Dwg.

M-H/Item
M-H/Item

247
403

B/M

M-H/Item

52

M-H/Item
M-H/Item
M-H/Item

13
2.5
9

M-H/Item

1.5

M-H/Item
M-H/Item
M-H/Item

78
14
56

M-H/Item

M-H/dwg
M-H/dwg
M-H/dwg

39
7
28

7
2
4

M-H/dwg

Cal.+Dwg.+B/M
Cal.
Dwg.

M-H/Item
M-H/Item
M-H/Item

21
5
14

B/M
N/A
Schedule Dwg.
As Built Dwg.
B/M
N/A
N/A

M-H/Item
M-H/dwg
M-H/dwg
M-H/dwg
M-H/dwg
M-H/dwg
M-H/dwg

N/A

M-H/dwg

M-H
2535

Blower & Pump Fdn

2536

Package Fdn

2537

Local Fdn

Cal.+Dwg.+B/M
Cal.
Dwg.
M-H

B/M
Cal.+Dwg.+B/M
Cal.
Dwg.

M-H

B/M
Cal.+Dwg.+B/M
Cal.
Dwg.

M-H
2538

Misc. Fdn

2591
2593
2597
2598
2599
2599

Standard Dwg.
Bar Bending Schedule
As Built
B/M for Inquiry
Govt. Permit Dwgs.
Modeling for U/G Structure

M-H

Modeling for Equip. Fdn.

B/M

52
65

195
338

286
442

65
78

221
364

13

39

52

13

39

2.5
1
1

10.5
1.5
8

15
4.5
9

3
1.5
1

12
3
8

0.5

1.5

0.5

14
4
8

64
10
48

88
20
60

18
6
10

70
14
50

32
5
24

44
10
30

9
3
5

35
7
25

3.5
1
2

17.5
4
12

23
6.5
14.5

4.5
1.5
2.5

18.5
5
12

2
10
30
3
2
25
6

0.5
10
3
1
1
5
2

1.5
0
27
2
1
20
4

2
15
30
3
2
25
6

0.5
15
3
1
1
5
2

1.5
0
27
2
1
20
4

Note 4
Note 5

3. NOTES FOR STANDARD M-H


1

Government Permit SECL


1) Local
- Approval document draft & submission
- Expense control for binding
- Draft basic diagram for approval
2) Abroad : Not applicable

Government Permit Outside Vendor


1) SECL check when the vendor work scope is same as Domestic Job.
- Approval document draft & submission Twice
- Expense control for binding
- Draft basic diagram for approval
2) Consider & discuss as per M-H in Job condition & site vendor work scope in case of Abroad Job
SECL work : Data survey / maintenance related to site approval documents support for vendor survey/preparation in case of site approval.

Steel Shop Dwg. Per sheet calculation


1) PROPOSAL:
- SHOP DWG Draft : 4.5 M-H Ton (as is Unit M-H Unit Price 13500 won
In case Unit M-H price is changed, the Unit M-H can be increased with 0.5 M-H unit.
- SHOP DWG. CHECK : 1.0 M-H Ton (consider site M-H, OT allowance & wages)
expensed site food expense is paid from site expense.
2) PROJECT:
- SHOP DWG. Draft : 4.37 M-H Ton (outside unit price 13,500 won/M-H Standard)
59,000 won/ton is standard (In case of unit M-H, unit price change the re-calculation is as per applied unit M-H note).

Bar Bending Schedule Dwg. Per sheet calculation


1) Concrete Dwg.
2) Bar Bending Schedule Dwg. Per sheet
- For R.C Structure, R.C Building : Concrete Dwg. Per sheet x 3 sheet
- For Equip. Structure, Pipe Rack, Shelter etc ; Concrete Dwg. Per sheet x 2 sheet
- For Civil Dwg.; Concrete Dwg. Per sheet x 1 sheet
3) Concrete Dwg. Per sheet approx. calculation
- R.C Structure ; Complete Dwg. Per sheet x 1.0
- R.C Building ; Complete Dwg. Per sheet x 0.4
- Equip. Structure, Pipe Rack, Shelter ; Complete Dwg. Per sheet x 0.2
- Civil Dwg. ; Target Re-Bar Dwg. X 1.0

When As-Built Dwg. Is out-sourced, the additional drawing is considered for each M-H/sheet

Modeling M-H of Shelter & Building uses drawing related to the exclusive or excluded framework.