NAME OF WORK:-
S
#
A
0
1
1
0
2
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
1
0
11
1
2
1
3
Description
Qty:
Unit
Rate
Amount
DOBANDO ROAD.
Excavation as in foundation
385.88
M3
105/10
Rs.40556/-
8.50
600
300
344.682
250
08
725.26
90
650
1.592
M3
Nos
Nos
M3
Nos
Nos
M3
Nos
Nos
Ton
2890/30
600/410/2211/61
300/4000/06/59
280/90/82234/55
Rs.24568/Rs.360000/Rs.123000/Rs.762302/Rs.75000/Rs.32000/Rs.222357/Rs.25200/Rs.58500/Rs.130917/-
300
9.552
110
Nos
M3
Nos
M3
60/5261/51
120/Total:4156/42
Rs.18000/Rs.50258/Rs.13200/Rs.11425455/Rs.12469/-
Stone/boulders filling .
Add: Cost
1.10
271.79
M3Factor
1246/36
RS.12568000/Rs.338748/-
167.32
2.51
13.283
M3
404/-
Rs.15.881
Rs.5366/- (M)
6137.46
M3
98/53
Rs.604724/-
1698.75
M3
163/55
Rs.277831/-
Misc: items
P:C:C: (1:4:8) as in foundation
iS/F of U/ clips 24mm
ii- (1:3:6)
S/F of
U/ 50
clips15mm
P:C:C:
with
% boulders
iiiS/F of U/ clips12mm
ivS/f of bearing
plates
Erecting/Removing
from work
vS/F of fisher plates
S/F
of nut
builtas12mm
10
Feb:vi-of Mild
steel
comp:
specified.
long
vii- (1:2:4)
S/F of
built 12mm 6 long
R:C:C:
asnut
in specified.
viii- Clips for railing
M3
SAY:3785/-
G;M3
TOTAL
A+B
3477/-
Rs.12.568
(M)
Rs.532914/Rs.1,58,81,000/Rs.8727/-
Rs.3011737/Rs.3312911/-.
Rs.33,13,000/Rs.3.313 (M)
287.23
M3
105/10
Rs.30188/-
P.C.C.(1:4:8) as in foundation
23.728
M3
2890/30
Rs.68583/-
240.40
M3
5261/51
Rs.1264878/-
16.60
Ton
82234/55
Rs.1365093/-
161.89
M3
2674/75
Rs.433015/-
298.70
M3
2211/-
Rs.660426/-
226.78
M3
1246/36
Rs.282650/-
3.04
M3
97840/-
Rs.301242/-
45.353
M3
112020/-
Rs.5080443/-
Painting 3 cots.
511.89
M2
78/-
Rs.39927/-
CONTRACTOR