Description

Qty:

Unit

Rate

Amount

DOBANDO ROAD.
Excavation as in foundation

385.88

M3

105/10

Rs.40556/-

8.50
600
300
344.682
250
08
725.26
90
650
1.592

M3
Nos
Nos
M3
Nos
Nos
M3
Nos
Nos
Ton

2890/30
600/410/2211/61
300/4000/06/59
280/90/82234/55

Rs.24568/Rs.360000/Rs.123000/Rs.762302/Rs.75000/Rs.32000/Rs.222357/Rs.25200/Rs.58500/Rs.130917/-

300
9.552
110

Nos
M3
Nos

P:C:C: (1:2:4) as specified.

M3

60/5261/51
120/Total:4156/42

Rs.18000/Rs.50258/Rs.13200/Rs.11425455/Rs.12469/-

Stone/boulders filling .

Add: Cost
1.10
271.79
M3Factor
1246/36

RS.12568000/Rs.338748/-

R:R masonry (1:6) as specified.

167.32

P:C:C: (1:3:6) in specified

2.51

Formation of embankment from barrow


pit excavation in common material
Re-handling of gravel work

13.283

M3

404/-

Rs.15.881
Rs.5366/- (M)

6137.46

M3

98/53

Rs.604724/-

Transportation of earth all type upto 1Km

1698.75

M3

163/55

Rs.277831/-

Misc: items
P:C:C: (1:4:8) as in foundation
iS/F of U/ clips 24mm
ii- (1:3:6)
S/F of
U/ 50
clips15mm
P:C:C:
with
% boulders
iiiS/F of U/ clips12mm
ivS/f of bearing
plates
Erecting/Removing
from work
vS/F of fisher plates
S/F
of nut
builtas12mm
10
Feb:vi-of Mild
steel
comp:
specified.
long
vii- (1:2:4)
S/F of
built 12mm 6 long
R:C:C:
asnut
in specified.
viii- Clips for railing

M3

SAY:3785/-

G;M3
TOTAL
A+B
3477/-

Total:Add: Cost Factor 1.10


Say:B
0
1
0
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
1
0
11

Rs.12.568
(M)
Rs.532914/Rs.1,58,81,000/Rs.8727/-

Rs.3011737/Rs.3312911/-.
Rs.33,13,000/Rs.3.313 (M)

JEEPQBLE SUSPENSION BRIDGE


DOBANDO BARIKOT
Excavation as in foundation

287.23

M3

105/10

Rs.30188/-

P.C.C.(1:4:8) as in foundation

23.728

M3

2890/30

Rs.68583/-

R.C.C (1:2:4) slab beam girder ect.

240.40

M3

5261/51

Rs.1264878/-

S/ feb: of mild steel.

16.60

Ton

82234/55

Rs.1365093/-

P.C.C(1:3:6) mass concrete with 30%


boulder.
P.C.C(1:3:6) mass concrete with 50%
boulder.
Stone filling hard peaked.

161.89

M3

2674/75

Rs.433015/-

298.70

M3

2211/-

Rs.660426/-

226.78

M3

1246/36

Rs.282650/-

S/F of steel girder.

3.04

M3

97840/-

Rs.301242/-

S/F of decoder wood as in decking fully.

45.353

M3

112020/-

Rs.5080443/-

Painting 3 cots.

511.89

M2

78/-

Rs.39927/-

S/F of wire ropes.

SUB DIVISIONAL OFFICER


C&W SUB DIVISION PF - 91
UPPER DIR
Add:___________% Above/Below/AT PAR
On CSR 2009.

CONTRACTOR