Vous êtes sur la page 1sur 13

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN
MANILA, PHILIPPINES

VARIOUS DPWH PROPOSED PROJECTS


(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
STANDARD THREE-STOREY
SCHOOL BUILDING
(3 & 6 - CLASSROOMS)

REVIEWED:

RECOMMENDING APPROVAL:

APPROVED :

CONCURRED :

MARIANO C. DEL CASTILLO

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

ARMIN A. LUISTRO

OIC, BUILDINGS DIVISION, BOD

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

SECRETARY
DEPARTMENT OF EDUCATION

VARIOUS DPWH PROPOSED PROJECTS


(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)

STANDARD THREE-STOREY
SCHOOL BUILDING
(3 & 6 - CLASSROOMS)

JOINT VENTURE OF

BILL OF QUANTITIES
SIX-CLASSROOMS

A.
I.

Mobilization / Demobilization

II.

Temporary Facilities

III.

Safety and Health

IV.

VII.

Masonry Works

VIII.

Fabricated Materials and Hardwares

Earthworks

V.

Termite Control Works

VI.

Concrete Works

(SEE COVER SHEET)

QUANTITY ENGINEER

JOVEN T. SANTOS

DOMICIANO B. LUSICA

COST ENGINEER

PROJECT MANAGER

OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

BOD
BILL OF QUANTITIES

G-1

1
36

BILL OF QUANTITIES
XIV.

Plumbing / Sanitary Works

IX. Finishing Works

X. Carpentry Works

XI. Roof and Framing Works

XII. Painting Works

XIII. Electrical Works

(SEE COVER SHEET)

QUANTITY ENGINEER

JOVEN T. SANTOS

DOMICIANO B. LUSICA

COST ENGINEER

PROJECT MANAGER

OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

BOD
BILL OF QUANTITIES

G-2

2
36

BILL OF QUANTITIES
THREE-CLASSROOMS

A.
I.

Mobilization / Demobilization

II.

Temporary Facilities

III.

Safety and Health

IV.

VII.

Masonry Works

VIII.

Fabricated Materials and Hardwares

Earthworks

V.

Termite Control Works

VI.

Concrete Works

(SEE COVER SHEET)

QUANTITY ENGINEER

JOVEN T. SANTOS

DOMICIANO B. LUSICA

COST ENGINEER

PROJECT MANAGER

OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 3-CLASSROOMS )

BOD
BILL OF QUANTITIES

G-3

3
36

BILL OF QUANTITIES
XIV.

Plumbing / Sanitary Works

IX. Finishing Works

X. Carpentry Works

XI. Roof and Framing Works

XII. Painting Works

XIII. Electrical Works

(SEE COVER SHEET)

QUANTITY ENGINEER

JOVEN T. SANTOS

DOMICIANO B. LUSICA

COST ENGINEER

PROJECT MANAGER

OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 3-CLASSROOMS )

BOD
BILL OF QUANTITIES

G-4

4
36

TABLE OF CONTENTS
GENERAL
G-1
G-2
G-3
G-4

BILL OF QUANTITIES
BILL OF QUANTITIES
BILL OF QUANTITIES
BILL OF QUANTITIES

STRUCTURAL

ARCHITECTURAL

PLUMBING

A-1

PERSPECTIVE, TABLE OF CONTENTS

S-1

GENERAL NOTES

A-2

KEY PLAN

S-2

GENERAL NOTES

A-3

GROUND FLOOR PLAN, SECOND FLOOR & THIRD FLOOR PLAN,


FRONT ELEVATION, SCHEDULE OF FINISH

S-3

FOUNDATION PLAN, 2nd & 3rd FLOOR FRAMING PLAN

S-4

COLUMN SCHEDULE, SCHEDULE OF FOOTING,


SCHEDULE FOOTING BEAMS, TYPICAL FOOTING
DETAIL, ELEVATION OF COLUMN & DETAIL OF WALL
FOOTINGS

A-4

REAR ELEVATION, LEFT & RIGHT ELEVATION,


LONGITUDINAL SECTION & CROSS SECTION

A-5

GROUND FLOOR, SECOND FLOOR & THIRD FLOOR REFLECTED


CEILING PLAN, ROOF PLAN

A-6

SCHEDULE OF DOORS & WINDOWS, DETAIL PLAN,


ELEVATIONS & SECTION OF RAMP, SPOT DETAILS

A-7

SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING,


CONCRETE SUN BREAKER DETAIL, PERSPECTIVE, SECTION &
SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION

A-8

STAIR DETAILS

A-9

BAY SECTIONS, DOOR FRAME TYPICAL PLAN &


SECTION, JALOUSIE DETAILS & FIRE ESCAPE DETAILS

A - 10

DETAIL PLAN OF TOILET & SECTION,


DETAIL OF COUNTER SINK, URINAL SECTION & DETAIL

A - 11

S-5

PLAN FOOTING F-3, ELEVATION FOOTING F-3,


PLAN FOOTING CF-1 & TYPICAL ELEVATION OF
MICRO-PILE

S-6

SCHEDULE MAIN BEAMS, SCHEDULE OF SECONDARY


BEAMS, SCHEDULE OF SLABS, TYPICAL SLAB
ELEVATION, TYPICAL BEAM ELEVATION &
TYPE OF STIRRUPS

S-7

DETAIL OF STAIR, RAMP DETAIL,


DETAIL OF DC-1, DETAIL OF STAIR ON GRADE &
DETAIL OF WALL ON FTB

S-8

ROOF FRAMING PLAN

S-9

ELEVATION OF END WALL FRAME,


DETAIL SECTION OF PC-1,
CONNECTION OF PURLINS TO RG-4,
CONCRETE SUN BREAKER DETAIL

DETAILS OF BLACKBOARD

S - 10

ELECTRICAL

P-1

GROUND FLOOR, TYPICAL SECOND & THIRD


FLOOR PLUMBING LAYOUT,
GROUND FLOOR, TYPICAL SECOND & THIRD
FLOOR WATER LINE LAYOUT

EE - 1

GENERAL NOTES, LEGEND,


FLUORESCENT LIGHT FIXTURE MOUNTING
DETAIL, LOAD SCHEDULE, PANEL BOARD
DIAGRAM AND ELECTRICAL RISER DIAGRAM ( 3-CL )

P-2

ISOMETRIC DRAINAGE LINE LAYOUT,


ROOF DRAINAGE LAYOUT,
DETAIL SECTION OF DRAIN PIPE
AND SPOT DETAIL

EE - 2

POWER LAYOUT AND LIGHTING LAYOUT ( 3-CL )

EE - 1

GENERAL NOTES, LEGEND FLUORESCENT LIGHT


FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
PANEL BOARD DIAGRAM AND ELECTRICAL
RISER DIAGRAM ( 6-CL )

EE - 2

POWER LAYOUT AND LIGHTING LAYOUT ( 6-CL )

P-3

ISOMETRIC WATER LINE LAYOUT


AND SEWER LINE LAYOUT

P-4

PLAN OF SEPTIC TANK, LONGITUDINAL


SECTION, CROSS SECTION DETAIL,
MANHOLE COVER DETAIL, CATCH BASIN
DETAIL, LEGEND AND PLUMBING NOTES

TRUSS DETAILS & CONNECTION DETAILS

S - 11

BASE PLATE DETAILS, ANCHOR BOLT DETAIL, ROOF


PANEL SIDE LAP DETAIL, J-BOLT TO PURLIN CONN.
DETAIL, J-BOLT SPACING, PURLIN CONN. DETAIL,
SECTION, TRUSS DETAIL AT GUTTER END

S - 12

FIRE ESCAPE ELEVATION

S - 13

FIRE ESCAPE DETAILS

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

BOD
TABLE OF CONTENTS

A-1

5
36

( 3-CLASSROOMS )

THIRD FLOOR PLAN

( 3-CLASSROOMS )

( 3-CLASSROOMS )

GROUND FLOOR PLAN

K E Y

SECOND FLOOR PLAN

P L A N

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 3-CLASSROOMS )

BOD
KEY PLAN

A-2

6
36

SECOND FLOOR PLAN

FRONT ELEVATION

GROUND FLOOR PLAN

SCHEDULE OF FINISH

THIRD FLOOR PLAN

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

GROUND FLOOR PLAN,


SECOND FLOOR & THIRD FLOOR PLAN,
FRONT ELEVATION,
SCHEDULE OF FINISH

BOD

A-3

7
36

RIGHT SIDE ELEVATION

LEFT SIDE ELEVATION

CROSS SECTION

REAR ELEVATION

LONGITUDINAL SECTION

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

REAR ELEVATION, LEFT & RIGHT


ELEVATION, LONGITUDINAL SECTION
& CROSS SECTION

BOD

A-4

8
36

SECOND FLOOR REFLECTED CEILING PLAN

ROOF PLAN

GROUND FLOOR REFLECTED CEILING PLAN

THIRD FLOOR REFLECTED CEILING PLAN

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

GROUND FLOOR, SECOND FLOOR &


THIRD FLOOR REFLECTED CEILING
PLAN, ROOF PLAN

BOD

A-5

9
36

DETAIL ELEVATION OF RAMP

SPOT DETAIL
DETAIL SECTION OF RAMP
SPOT DETAIL

DETAIL SECTION

SCHEDULE OF DOORS AND WINDOWS

DETAIL PLAN OF RAMP

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

SCHEDULE OF DOORS & WINDOWS,


DETAIL PLAN, DETAIL PLAN, ELEVATION
& SECTION OF RAMP, SPOT DETAILS

BOD

A-6

10
36

SECTION ( CEILING )

SECTION DETAIL (VENT.)

SPOT DETAIL
PERSPECTIVE ( CEILING )
CONCRETE
SUNBREAKER DETAIL

SECTION DETAIL (EAVES)

SPOT DETAIL (EAVES)

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

DETAIL PLAN (VENT.)

SPOT DETAIL (CORNER CLG.)

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD THREE-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

SECTION DETAIL OF EAVES,


SPOT DETAIL CORNER CEILING,
CONCRETE SUNBREAKER DETAIL,
PERSPECTIVE, SECTION &
SPOT DETAIL OF CEILING,
PLAN & SECTION OF VENTILATION

BOD

A-7

11
36

Vous aimerez peut-être aussi