DESIGN OF CONCRETE STAIRS

. =
=

. +

( )

0.20.352 +0.502
0.50

(23.54)

= 5.747/
. = h
= 23.54(0.32)
= 7.53/
DL= 12.358+5.747+7.53
=25.635KN/m
LL=2KPa --- from the Design Criteria
= . + .
= 39.289 /
LOWER;

Considering 1m strip, (b=1000mm)

Given:

= 39.289(1)
= 39.289 /

r = 0.35mm.
t = 0.50mm.

fc = 28MPa
=

Fy = 414MPa

(39.289)(3.662)2)
8

= 65.859 .

Use:
12mm RSB main bars

Effective depth, d

10mm RSB temperature bars

= .

(. +
)

3662
20

414

(0.4 + 700 )

= 181.53. 200.
. =

0.35(0.50)
(6)(23.54)
=
2
= 12.358/

= 200 20 0.5(16)
= 172mm.
Solve for

=
=

65.859106
0.9(1000)(172)2 )

= 2.473

Solve for
=

( )

(( . )

= 0.00632
. =

Temperature bars
= .

= 0.0018

= 0.0034
= .
= 0.022

= 0.0018(1000)(200)
= 3602
Using 10mm RSB

Use = .

Required main bar spacing

= ( )
= 78.542
=

=
= 0.00632(1000)(172)
= 1087.042
Using 16mm main bars

= ( )
= 201.062
=

()

201.06

= 1087.04 (1000)
= 184.960. 170.
a.) 1 = 170
b.) 3 = 3(200) = 600.
c.) 450
Therefore, Use 16mm. main bars
SPCD. @ 170mm.

()

78.54
360

(1000)

= 218.167. 200
a.) 2 = 200
b.) 3 = 3(200) = 450.
c.) 450.
Therefore, use 10mm. temperature
RSB SPCD. @ 200mm. O.C

DESIGN OF CONCRETE STAIRS

. =
=

( )

0.130.372 +0.502
0.50

(23.54)

= 3.807/

. = h
= 23.54(0.32)
= 7.53/

DL= 8.71+3.807+7.53
=20.047KN/m
UPPER;

LL=2KPa --- from the Design Criteria

Given:

= . + .
= 31.466 /

r = 0.37mm.
t = 0.50mm.

Considering 1m strip, (b=1000mm)

fc = 28MPa

= 31.466(1)
= 31.466 /

Fy = 414MPa
Use:

=
12mm RSB main bars
10mm RSB temperature bars

20

(31.466)(2.1)2)
8

= 17.346 .

= (. + )
2100

Effective depth, d

414

(0.4 + 700)

= .

= 104.25. 130.
. =
=

0.37(0.50)
2

= 130 20 0.5(16)
= 102mm.

(4)(23.54)

= 8.71/

Solve for

=
17.346106

= 0.9(1000)(102)2 )
= 1.852

Solve for
=

Temperature bars
( )

(( . )

= 0.0034

= 0.022

=
= 2342
Using 10mm RSB

Use = .

Required main bar spacing

= ( )
= 78.542
=

=
= 0.00466(1000)(102)
= 475.322

()

78.54
234

(1000)

= 335.64. 300

Using 16mm main bars


= (

= 0.0018(1000)(130)

= .

= 0.0018

= 0.00466
. =

= .

d.) 2 = 300
e.) 5 = 5(200) = 650.
f.) 450.

= 201.062
=

()

201.06

= 475.32 (1000)
= 422.99. 400.
d.) 1 = 400
e.) 3 = 3(130) = 390.
f.) 450

Therefore, Use 16mm. main bars SPCD.


@ 390mm.

Therefore, use 10mm. temperature


RSB SPCD. @ 300mm. O.C

DESIGN OF CONCRETE STAIRS

. =

+
( )

0.070.42 +0.52
0.5

(23.54)

= 2.110/
DL= 7.062+2.110
=9.172KN/m
LL=2KPa --- from the Design Criteria

= . + .
= 16.241 /
UPPER

Considering 1m strip, (b=1000mm)

Given:

= 16.241(1)
= 16.241 /

r = 0.4mm.
t = 0.5mm.

fc = 28MPa

Fy = 414MPa

(16.241)(1.22 )
8

= 2.924 .

Use:
12mm RSB main bars

Effective depth, d

10mm RSB temperature bars

= .
= 70 20 0.5(16)

=
(. +
)

1200
20

(0.4 +

414
700

= 42mm.
)

= 59.486. 70.
. =

Solve for

=
2.924106

= 0.9(1000)(42)2)
= 1.842

0.4(0.5)
(3)(23.54)
=
2
= 7.062/

Solve for
=

Temperature bars
( )

(( . )

= 0.0018

= 0.00464
. =

= .

= 0.0018(1000)(70)

= 0.0034
= .
= 0.022

= 1262
Using 10mm RSB

Use = .

Required main bar spacing


=

= ( )
= 78.542
=
=

= 0.00464(1000)(72)
= 334.082

Using 16mm main bars

= 4 (162 )
= 201.062
=

()

201.06

= 334.08 (1000)
= 601.832. 580.
g.) 1 = 580
h.) 3 = 3(70) = 210.
i.) 450
Therefore, Use 16mm. main bars SPCD.
@ 210mm.

()

78.54
126

(1000)

= 623.33. 600
g.) 2 = 600
h.) 5 = 5(70) = 350.
i.) 450.
Therefore, use 10mm. temperature
RSB SPCD. @ 350mm. O.C

DESIGN OF CONCRETE STAIRS

. =
=

( )

0.220.352 +0.502
0.50

(23.54)

= 6.321/

DL= 9.416+14.418+6.321
=30.155KN/m
LL=2KPa --- from the Design Criteria
= . + .
= 45.617 /
Considering 1m strip, (b=1000mm)
= 45.617(1)
= 45.617 /

LOWER;
Given:

r = 0.35mm.
=

t = 0.50mm.

(45.617)(403)2)
8

= 105.425 .

fc = 28MPa

Effective depth, d

Fy = 414MPa

= .

Use:
12mm RSB main bars

= 220 20 0.5(16)

10mm RSB temperature bars

= 102mm.

= (. + )
=

4300
414
(0.4 +
)
20
700

=
213.157. 220.
. =

Solve for

0.35(0.5)
2

105.425106

= 0.9(1000)(192)2 )
= 3.178
Solve for
=

(7)(23.54)

= 14.418/

( )

(( . )

= 0.0083

. =

Using 10mm RSB

= ( )

= 0.0034

= 78.542

= .
= 0.022
Use = .

=
=

Required main bar spacing


=
= 0.0083(1000)(192)
= 1593.62
Using 16mm main bars

= (162 )

= 201.062

()

201.06

= 1593.6 (1000)
= 126.167. 120.
j.) 1 = 120
k.) 5 = 5(130) = 6600.
l.)

Therefore, Use 16mm. main bars SPCD.


@ 1200mm.
Temperature bars
= .

= 0.0018
=
= 0.0018(1000)(220)
= 3962

()

78.54
234

(1000)

= 198.33. 180
j.) 2 = 180
k.) 5 = 5(220) = 660.
l.) 450.
Therefore, use 10mm. temperature
RSB SPCD. @ 180mm. O.C

DESIGN OF CONCRETE STAIRS

. =

+
( )

0.120.32 + 0.32
(23.54)
0.3
= 3.995/

DL= 5.296+3.995
=9.291 KN/m
LL=2KPa --- from the Design Criteria
= 1.4 + 1.7
= 16.407 /
STAIRS IN THE BLEACHERS

Considering 1m strip, (b=1000mm)

Given:

= 16.407(1)

r = 0.3mm.

= 16.407/

t = 0.3mm.

fc = 28MPa

Fy = 414MPa

(16.407)(2.121)2)
8

= 9.226 .

Use:
12mm RSB main bars
10mm RSB temperature bars
=

(. +
)

2121
20

(0.4 +

414
700

= .
= 120 20 0.5(16)
)

= 105.141. 120.
. =

Effective depth, d

= 92mm.
Solve for

=
9.226106

= 0.9(1000)(92)2)
=

0.3(0.3)
(5)(23.54)
2
= 5.296/

= 1.211

Solve for
=

Temperature bars
( )

(( . )

= 0.0018(1000)(120)

= 0.0034

= 2162

= .

Using 10mm RSB

= 0.022

= ( )

Use = .

= 78.542

Required main bar spacing


=

=
= 0.0034(1000)(92)
= 312.82

= ( )
=

()

78.54
216

(1000)

= 363.611. 350

Using 16mm main bars

= 0.0018

= 0.0030
. =

= .

= 201.062
()

201.06
312.8

(1000)

= 642.774. 6000.
m.) 1 = 600
n.) 3 = 3(120) = 360.
o.) 450
Therefore, Use 16mm. main bars SPCD.
@ 360mm.

m.) 2 = 350
n.) 5 = 5(120) = 1600.
o.) 450.
Therefore, use 10mm. temperature
RSB SPCD. @ 160mm. O.C

DESIGN OF CONCRETE STAIRS

. =
=

( )

0.320.62 +0.752
0.75

(23.54)

= 9.647 /
. = h
= 23.54(0.4)
= 9.416/
DL= 37.075+9.416+9.647
=56.138 KN/m
LL=2KPa --- from the Design Criteria

= . + .
= 81.993 /

Given:
r = 0.6mm.

Considering 1m strip, (b=1000mm)

t = 0.75mm.

= 81.993(1)

fc = 28MPa

= 81.993 /

Fy = 414MPa

Use:
=

12mm RSB main bars


10mm RSB temperature bars
=

6000
20

(0.4 +

414
700

=
297.43. 320.
. =
=

0.6(0.75)
2

(81.993)(6)2)
8

= 368.968 .
Effective depth, d

(. +
)

= .
)

= 320 20 0.5(16)
= 102mm.
Solve for

=
(7)(23.54)

= 37.075 /

368.968106

= 0.9(1000)(102)2 )
= 4.808

Solve for
=

Temperature bars
( )

(( . )

= 0.0018

= 0.013
. =

= .

= 0.0018(1000)(320)

= 0.0034

= 5762

= .

Using 10mm RSB

= 0.022

= 4 (102 )

Use = .

= 78.542

Required main bar spacing


=

=
= 0.013(1000)(292) = 37962

()

78.54
576

(1000)

= 136.354. 120
Using 16mm main bars

= 4 (162 )
= 201.062
=
=

()

201.06
3796

(1000)

= 52.966. 50.
p.) 1 = 50
q.) 3 = 3(320) = 960.
r.) 450
Therefore, Use 16mm. main bars SPCD.
@ 50mm.

p.) 2 = 120
q.) 5 = 5(320) = 1600.
r.) 450.
Therefore, use 10mm. temperature
RSB SPCD. @ 120mm. O.C