Vous êtes sur la page 1sur 1

Operator

s/o
I
II
III
Total

A
10
10
12
32

B
8
12
10
30

C
12
14
11
37

D
13
15
14
42

Total
43
51
47
141

Adjustment Factor
T2 = 1412 = 1656.75
N
12
SST = 102 + 82 + 122 + 132 + 102 + 122 + 142 + 152 + 122 + 102 + 112 + 142 =
1656.75
SSC = 322 + 302 + 372 + 422 - 1656.75 = 28.91
3
3
3
3
SSR = 432 + 512 + 472 1656.75 = 8
4
4
4
Anova Table
Row
Column
Error
Total

SS
8
28.91
9.34
46.25

Ho : Operators equal
H1 : Not equal
= 5% 1 tail right
F = 5.8
C.V. 2.6 = 5.14
Deci : Accept HO
Result: Operators are equally
productive

df
2
3
6
11

MS
4
9.636
1.55

F
2.58
5.80

Ho : Independent on Shift
H1 : Dependent on Shift
= 5% 1 tail right
F=2.58
3.6 = **
Deci: Accept HO
Result: Production is independent of
shifts