PREPARED BY
Surapong | 03.Mer.2008
z,
CHECKED BY ESJeong 03.Mar.2008 CHEM
approver ay | ESieong | os.a.2093 | PLANT! DEBOTTLENECK PROJECT
cernepay | esieong | canarzos| Sheddenuhde
REV. DATE CHECKED | APPROVED DESCRIPTION
A 12.Feb.2008 ESJeong ESJeong Issued for approve.
o o3.Mar.2008_| ESueong | ESJeong Issued for Construction
PTT CHEMICAL PUBLIC COMPANY LIMITED
METHOD STATEMENT FOR POURING CONCRETE WORK
(8004-S-11-A2-4S- 005)
AREA CODE ‘TWRE JOB NO.
Li) PLANT 2
a CONTRACT NO. PTT CHEM JOB NO.
‘THAI WOO REE ENGINEERING CO., LTD 80040
- 4 MAR 2008
1of4
BY: Kantitat N.>
Method Statement for
Pouring Concrete Work
Rev.0
20
3.0
4.0
5.0
TABLE OF CONTENTS
General
Main Equipment
Survey Work
Pouring Concrete Work
SafetyeS Method Statement for tae 7
Pouring Concrete Work eee
Page: 3of 4
1. GENERAL
This method statement describes the construction sequence, procedure for the
Pouring concrete work for the Plant 2 Debottleneck Project.
The purpose of this method statement is herein preformed for all equipment
Foundation and structure work. The method statement is to give a general guide line
for the construction. The details of the procedures may be modified base upon
actual site requirements.
The concrete work shall be follow PTTCH specification no, PS-J-024.
2. MAIN EQUIPMENT
Mobile crane
Concrete dump truck
Bucket
Vibrator machine
Temporary gutter
3. SURVEY WORK
‘The construction drawing with clarification of line and elevation shall be
provided by contractor.
Location and elevation checked for work should be performed by contractor
surveyor according to specification and shail be approved before pouring
concrete.
4. POURING CONCRET WORK
Before pouring concrete should be checked by contractor and witness by
Consultant. Condition checked.
a. Area pouring concrete should be clear and cleaning.
b. Concrete coverage checked.
c. Reinforcing bar and formwork checked.
4d. Concrete should be checked the slump and make the concrete sample for theSS Method Statement for nee
Date : 03.Mar. 2008
Pouring Concrete Work
Page: dof 4
compressive strength test.
Preparation trafficked for the concrete transportation to pouring location.
Preparation all equipment for pouring concrete.
5. SAFETY
All equipment will be checked prior to use. All electrical cables will be
Undamaged , with proper connectors.
PPE will be issued to all personnel. All equipment and too! operators
will be used the leather gloves and the rubber gloves and face protection.