Vous êtes sur la page 1sur 4
PREPARED BY Surapong | 03.Mer.2008 z, CHECKED BY ESJeong 03.Mar.2008 CHEM approver ay | ESieong | os.a.2093 | PLANT! DEBOTTLENECK PROJECT cernepay | esieong | canarzos| Sheddenuhde REV. DATE CHECKED | APPROVED DESCRIPTION A 12.Feb.2008 ESJeong ESJeong Issued for approve. o o3.Mar.2008_| ESueong | ESJeong Issued for Construction PTT CHEMICAL PUBLIC COMPANY LIMITED METHOD STATEMENT FOR POURING CONCRETE WORK (8004-S-11-A2-4S- 005) AREA CODE ‘TWRE JOB NO. Li) PLANT 2 a CONTRACT NO. PTT CHEM JOB NO. ‘THAI WOO REE ENGINEERING CO., LTD 80040 - 4 MAR 2008 1of4 BY: Kantitat N. > Method Statement for Pouring Concrete Work Rev.0 20 3.0 4.0 5.0 TABLE OF CONTENTS General Main Equipment Survey Work Pouring Concrete Work Safety eS Method Statement for tae 7 Pouring Concrete Work eee Page: 3of 4 1. GENERAL This method statement describes the construction sequence, procedure for the Pouring concrete work for the Plant 2 Debottleneck Project. The purpose of this method statement is herein preformed for all equipment Foundation and structure work. The method statement is to give a general guide line for the construction. The details of the procedures may be modified base upon actual site requirements. The concrete work shall be follow PTTCH specification no, PS-J-024. 2. MAIN EQUIPMENT Mobile crane Concrete dump truck Bucket Vibrator machine Temporary gutter 3. SURVEY WORK ‘The construction drawing with clarification of line and elevation shall be provided by contractor. Location and elevation checked for work should be performed by contractor surveyor according to specification and shail be approved before pouring concrete. 4. POURING CONCRET WORK Before pouring concrete should be checked by contractor and witness by Consultant. Condition checked. a. Area pouring concrete should be clear and cleaning. b. Concrete coverage checked. c. Reinforcing bar and formwork checked. 4d. Concrete should be checked the slump and make the concrete sample for the SS Method Statement for nee Date : 03.Mar. 2008 Pouring Concrete Work Page: dof 4 compressive strength test. Preparation trafficked for the concrete transportation to pouring location. Preparation all equipment for pouring concrete. 5. SAFETY All equipment will be checked prior to use. All electrical cables will be Undamaged , with proper connectors. PPE will be issued to all personnel. All equipment and too! operators will be used the leather gloves and the rubber gloves and face protection.

Vous aimerez peut-être aussi