Vous êtes sur la page 1sur 97

Also

Less material sorting


Allow subcontractors access sooner
Less bracing required
Less waste

There'

Graettinger, Iowa

Se
800.9

Residential Construction
Details and Manual
Using Structural Insulated Panels (SIPs)

Table of Contents-Construction Details

Splines

Blockspline ...............................................................................................................................SP1 ..........56


Surfacespline ...........................................................................................................................SP2 ..........57
Double2x4spline ..................................................................................................................SP3 ..........58
Lumberspline
2ply .....................................................................................................................................SP4 ..........59
3ply .....................................................................................................................................SP5 ..........60
Foundationspline ...................................................................................................................SP6 ..........61

WallAssemblies
TypicalWalldoubletopplate.................................................................................................WA1 ..........62
TypicalWalldoublebeveledtopplate ...............................................................................WA2 ..........63
Typicalfoundation ......................................................................................................................WA3 ..........64
WallCorner
ButtCorner
3D.............................................................................................................................................CD1 ..........65
2D.............................................................................................................................................CD2 ..........66
FlyByCorner
3D.............................................................................................................................................CD3 ..........67
2D.............................................................................................................................................CD4 ..........68

Residential Construction Details

Page 39

Construction Details

Description
Detail # Page #
WallBaseDetail
Panelspast
Panelspastonconcretefoundation/floorperpendicular ..................................... .PP1 ..........41
Panelspastonconcretefoundation/floorparallel .................................................... PP2 ..........42
Panelspastonwoodfoundation/floorperpendicular ........................................... .PP3 ..........43
Panelspastonwoodfoundation/floorparallel ......................................................... PP4 ..........44
UpperPanelsonsubfloor/Hangingfloorperpendicular/LowerPanels ......... PHF1 ..........45
UpperPanelsonsubfloor/Hangingfloorparallel/LowerPanels ....................... PHF2 ..........46
Conventionalframed
Panelsonsubfloor/floorperpendicularonconcretefoundation..........................PF1 ..........47
Panelsonsubfloor/floorparallelonconcretefoundation .......................................PF2 ..........48
Panelsonsubfloor/floorperpendicularonwoodfoundation........................................PF3 ..........49
Panelsonsubfloor/floorparallelonwoodfoundation .............................................PF4 ..........50
UpperPanelsonsubfloor/floorperpendicular/LowerPanels ............................ PSF1 ..........51
UpperPanelsonsubfloor/floorparallel/LowerPanels ......................................... PSF2 ..........52
Slab
Panelonslab/singletreatedplate ...................................................................................PC1 ..........53
SIPfloor
Wallpanelonfloorpanel/concretefoundation ..........................................................FP1 ..........54
Wallpanelonfloorpanel/Beam .......................................................................................FP2 ..........55

Table of Contents-Construction Details


Description

Detail # Page #

RoofPanelEavedetails
Doubletopplate/squarecuteave/Rafterpast.................................................................. RP1 ..........69
Doubletopplate/Beveledblocking/squarecuteave ...................................................... RP2 ..........70
Beveledtopplate/squarecuteave ......................................................................................... RP3 ..........71
Doubletopplate/plumbcuteave.......................................................................................... RP4 ..........72
Doubletopplate/squarecuteave/Framedoverhang .................................................... RP5 ..........73
Doubletopplate/squarecuteave/Fasciablocking .......................................................... RP6 ..........74

Construction Details

RoofPanelRakeextension
SingleTopplate/Roofpaneloverhang ................................................................................. .RP7 ..........75
SingleTopplate/CRoofpanel/Ladderframedoverhang .......................................... RP8 ..........76
SingleTopplate/Roofpanel/2x4outlookeroverhang .................................................. RP9 ..........77
RoofPaneltoRidge
RoofPanelRidge/RidgeBeam/RidgeVoid..........................................................................RB1 ..........78
RoofPanelCantileveredRidge/DoubleBeveledLumberRidge ..................................RB2 ..........79
RoofPanelRidge/RidgeBeam/Paneloverlay ......................................................................RB3 ..........80
RoofPaneltoMidspanBeam
Surfacespline. .................................................................................................................................RB4 ..........81
Nospline ..........................................................................................................................................RB5 ..........82
RoofTrusses
Typicaleave .....................................................................................................................................RT1 ..........83
Typicalendwall..............................................................................................................................RT2 ..........84
LadderFramerakeextension .....................................................................................................RT3 ..........85
Droppedgablew/outlooker ...................................................................................................RT4 ..........86
Electrical
WireChaselocations ................................................................................................................. WC1 ..........87
MarkingWireChases................................................................................................................. WC2 ..........88
ElectricalBox................................................................................................................................. WC3 ..........89
Plumbing
Ventstackindivisionwall .............................................................................................................PL1 ..........90
PlumbingChase...............................................................................................................................PL1 ..........90
Ventstack/Roofpenetration ......................................................................................................PL2 ..........91
DivisionWalls
PanelstoDivisionwalls .............................................................................................................. DW1 ..........92
RoofTrusstoDivisionwalls ..................................................................................................... DW2 ..........93

Page 40

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

EPS STANDARD
11 2" HORIZONTAL WIRE
CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL

1'-4"
3 " T&G
4
SUBFLOOR

FASTEN PANEL TO EACH TRUSS


W/ (1) 8" TRUFAST SIP PANEL
SCREW
SPF#2 2x BASE PLATE

FLOOR TRUSS

FASTEN BASE PLATE TO SILL


PLATE W/ USP WS3 SCREWS

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN
SUBFLOOR & TRUSS

2x4 RIBBON

MINIMAL EXPANDING FOAM

TREATED 2X W/ SILL
SEALER BENEATH

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN ALL PLATES

ANCHOR BOLTS DESIGNED


AND SUPPLIED BY OTHERS.

CONCRETE FOUNDATION DESIGNED


AND SUPPLIED BY OTHERS

NOTE: MINIMUM FOUNDATION THICKNESS OF 10" FOR R-26 PANEL

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL PAST/FLOOR TRUSS/CONRETE

SCALE:

N.T.S.

UPDATED:

2/26/09

DETAIL#

PP1

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 41

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL

1'-4"
3 " T&G
4
SUBFLOOR

FASTEN PANEL TO TRUSS W/


8" TRUFAST SIP PANEL SCREW
16" O.C.

CONSTRUCTION
ADHESIVE (SF-450)
BETWEEN SUBFLOOR
& TRUSS

ENDWALL
FLOOR TRUSS,
FASTEN
THROUGH SKIN
INTO BOTTOM
PLATE W/ 16d,
6" O.C.

.
SPF#2 2x BASE PLATE
FASTEN BASE PLATE TO SILL
PLATE W/ USP WS3 SCREWS
MINIMAL EXPANDING FOAM

TREATED 2X W/ SILL
SEALER BENEATH

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN ALL PLATES

ANCHOR BOLTS DESIGNED


AND SUPPLIED BY OTHERS.

CONCRETE FOUNDATION DESIGNED


AND SUPPLIED BY OTHERS

NOTE: FLOOR BLOCKING WILL BE REQUIRED WITH THIS DETAIL.


SPECIFICATIONS WILL BE PER JOB.
NOTE: MINIMUM FOUNDATION THICKNESS OF 10" FOR R-26 PANEL

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL PAST/FLOOR TRUSS PARALLEL/CONCRETE

SCALE:

N.T.S.

UPDATED:

DETAIL#

PP2

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 42

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL

1'-4"
3 " T&G
4
SUBFLOOR

FASTEN PANEL TO EACH TRUSS


W/ (1) 8" TRUFAST SIP PANEL
SCREW
SPF#2 2x BASE PLATE

FLOOR TRUSS
2x4 RIBBON

FASTEN BASE PLATE TO TOP


PLATE W/ USP WS3 SCREWS
MINIMAL EXPANDING FOAM

2X CAP PLATE
RIPPED TO WIDTH
OF PANEL

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN ALL PLATES
CONSTRUCTION
ADHESIVE (QB-300)

SPF#2 2x8 TOP PLATES, SEE


FOUNDATION PANEL DETAIL FOR
FASTENING

EPS FOUNDATION
WALL PANEL

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL PAST/FLOOR TRUSS/FOUNDATION PANEL

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

PP3

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 43

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL

1'-4"
3 " T&G
4
SUBFLOOR

FASTEN PANEL TO TRUSS W/ 9"


TRUFAST SIP PANEL SCREW 16"
O.C.

CONSTRUCTION
ADHESIVE (SF-450)
BETWEEN SUBFLOOR
& TRUSS

ENDWALL
FLOOR TRUSS,
FASTEN
THROUGH SKIN
INTO BOTTOM
PLATE W/ 16d,
6" O.C.

SPF#2 2x BASE PLATE


FASTEN BASE PLATE TO
TOP PLATE W/ USP WS3
SCREWS
MINIMAL EXPANDING FOAM
CONSTRUCTION ADHESIVE
(SF-450) BETWEEN ALL
PLATES

2X CAP PLATE
RIPPED TO WIDTH
OF PANEL

CONSTRUCTION
ADHESIVE (QB-300)

SPF#2 2x8 TOP PLATES, SEE


FOUNDATION PANEL DETAIL FOR
FASTENING

EPS
FOUNDATION
WALL PANEL

NOTE: FLOOR BLOCKING WILL BE REQUIRED WITH THIS DETAIL.


SPECIFICATIONS WILL BE PER JOB.

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL PAST/FL. TRUSS PAR./FOUNDATION PANEL

SCALE:

N.T.S.

UPDATED:

DETAIL#

PP4

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 44

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

EPS STANDARD

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
EPS WALL PANEL

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

SPF#2 2x BASE PLATE


1'-4"

FASTEN BASE PLATE TO


TOP PLATE W/ USP WS3
SCREWS

3 " T&G
4
SUBFLOOR

MINIMAL EXPANDING FOAM


CONSTRUCTION ADHESIVE
(SF-450) BETWEEN ALL PLATES

FLOOR TRUSS

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN
SUBFLOOR & TRUSS

2X CAP PLATE RIPPED


TO WIDTH OF PANEL
SPF#2 2x TOP PLATE
FLOOR TRUSS HANGER, SEE FLOOR
TRUSS MFG. DRAWINGS FOR SPECS.

EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

DETAIL:

PANEL/HANGING FLOOR TRUSS/PANEL

SCALE:

N.T.S.

UPDATED:

2/26/09

DETAIL#

PHF1

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 45

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
EPS WALL PANEL

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

SPF#2 2x BASE PLATE


1'-4"

FASTEN BASE PLATE TO


TOP PLATE W/ USP WS3
SCREWS

3 " T&G
4
SUBFLOOR

MINIMAL EXPANDING FOAM


CONSTRUCTION ADHESIVE
(SF-450) BETWEEN ALL PLATES

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN
SUBFLOOR & TRUSS

FLOOR TRUSS

2X CAP PLATE RIPPED


TO WIDTH OF PANEL
SPF#2 2x TOP PLATE

EPS WALL PANEL

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

NOTE: FLOOR BLOCKING WILL BE REQUIRED WITH THIS DETAIL.


SPECIFICATIONS WILL BE PER JOB.

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL/FLOOR TRUSS PARALLEL/PANEL

SCALE:

N.T.S.

UPDATED:

DETAIL#

PHF2

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 46

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL


SPF#2 2x BASE PLATE
1'-4"

FASTEN BASE PLATE TO TRUSS


W/ USP WS3 SCREWS

3 " T&G
4
SUBFLOOR

MINIMAL EXPANDING FOAM


CONSTRUCTION ADHESIVE (SF-450)
BETWEEN PLATES & SUBFLOOR

FLOOR TRUSS

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN
SUBFLOOR & TRUSS

USP JUS46
HANGER

PRE-CUT7 16" OSB RIM,


FIELD SHEATH
SPF#2 2X4 RIBBON
CONSTRUCTION ADHESIVE (SF-450)
BETWEEN TRUSS AND PLATE

ANCHOR BOLTS DESIGNED


AND SUPPLIED BY OTHERS.

TREATED 2X W/ SILL
SEALER BENEATH

CONCRETE FOUNDATION DESIGNED


AND SUPPLIED BY OTHERS

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL/TYPICAL FLOOR TRUSS/CONCRETE

SCALE:

N.T.S.

UPDATED:

4/13/09

DETAIL#

PF1

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 47

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL


SPF#2 2x BASE PLATE
1'-4"

FASTEN BASE PLATE


TO TRUSS W/ USP WS3
SCREWS

3 " T&G
4
SUBFLOOR

MINIMAL EXPANDING FOAM


CONSTRUCTION ADHESIVE (SF-450)
BETWEEN PLATES & SUBFLOOR

FLOOR TRUSS

CONSTRUCTION
ADHESIVE (SF-450)
BETWEEN SUBFLOOR
& TRUSS

PRE-CUT7 16" OSB RIM,


FIELD SHEATH
CONSTRUCTION ADHESIVE (SF-450)
BETWEEN TRUSS AND PLATE

TREATED 2X W/ SILL
SEALER BENEATH

TREATED 2X W/ SILL
SEALER BENEATH

ANCHOR BOLTS DESIGNED


AND SUPPLIED BY OTHERS.

CONCRETE FOUNDATION DESIGNED


AND SUPPLIED BY OTHERS

NOTE: FLOOR BLOCKING WILL BE REQUIRED WITH THIS DETAIL.


SPECIFICATIONS WILL BE PER JOB.

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL/TYPICAL FLOOR TRUSS PAR./CONCRETE

SCALE:

N.T.S.

UPDATED:

DETAIL#

PF2

4/13/09

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 48

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL


SPF#2 2x BASE PLATE, FASTEN
SKINS TO BASE PLATE W/ 8d
NAILS 6" O.C.

1'-4"

FASTEN BASE PLATE TO TRUSS W/


USP WS3 SCREWS, 2 PER TRUSS

3 " T&G
4
SUBFLOOR

MINIMAL EXPANDING FOAM


CONSTRUCTION ADHESIVE (SF-450)
BETWEEN PLATES & SUBFLOOR

USP
JUS46
HANGER

PRE-CUT7 16" OSB RIM,


FIELD SHEATH

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN
FLOOR TRUSS SUBFLOOR & TRUSS

SPF#2 2X4 RIBBON


2X CAP PLATE
RIPPED TO WIDTH
OF PANEL

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN ALL PLATES
CONSTRUCTION
ADHESIVE (QB-300)

SPF#2 2x8 TOP PLATES, SEE


FOUNDATION PANEL DETAIL FOR
FASTENING

EPS
FOUNDATION
WALL PANEL

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL/TYPICAL FLOOR TRUSS/FOUNDATION PANEL

SCALE:

N.T.S.

UPDATED:

4/13/09

DETAIL#

PF3

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 49

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL


SPF#2 2x BASE PLATE, FASTEN
SKINS TO BASE PLATE W/ 8d
NAILS 6" O.C.

1'-4"

FASTEN BASE PLATE TO TRUSS W/ USP


WS3 SCREWS, 1 ROWS 12" O.C. EA ROW

3 " T&G
4
SUBFLOOR

MINIMAL EXPANDING FOAM

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN
SUBFLOOR & TRUSS

CONSTRUCTION ADHESIVE (SF-450)


BETWEEN PLATES & SUBFLOOR
PRE-CUT7 16" OSB RIM,
FIELD SHEATH

FLOOR TRUSS

2X CAP PLATE
RIPPED TO WIDTH
OF PANEL

CONSTRUCTION ADHESIVE
(SW-450) BETWEEN ALL PLATES
CONSTRUCTION
ADHESIVE (QB-300)

SPF#2 2x8 TOP PLATES, SEE


FOUNDATION PANEL DETAIL FOR
FASTENING

EPS FOUNDATION
WALL PANEL

NOTE: FLOOR BLOCKING WILL BE REQUIRED WITH THIS DETAIL.


SPECIFICATIONS WILL BE PER JOB.

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL/TYPICAL FL. TRUSS PAR./FOUNDATION PAN.

SCALE:

N.T.S.

UPDATED:

DETAIL#

PF4

4/13/09

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 50

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
EPS WALL PANEL

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

SPF#2 2x BASE PLATE


1'-4"

FASTEN BASE PLATE TO


TOP PLATE W/ USP WS3
SCREWS

3 " T&G
4
SUBFLOOR

MINIMAL EXPANDING FOAM


CONSTRUCTION ADHESIVE (SF-450)
BETWEEN PLATES & SUBFLOOR

FLOOR TRUSS

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN
SUBFLOOR & TRUSS

PRE-CUT7 16" OSB RIM,


FIELD SHEATH
SPF#2 2X4 RIBBON
CONSTRUCTION ADHESIVE (SF-450)
BETWEEN PLATES & SUBFLOOR

MINIMAL EXPANDING
FOAM

2X CAP PLATE RIPPED


TO WIDTH OF PANEL

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

SPF#2 2x TOP PLATE


EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL/TYPICAL FLOOR TRUSS/PANEL

SCALE:

N.T.S.

UPDATED:

4/13/09

DETAIL#

PSF1

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 51

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
EPS WALL PANEL

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

SPF#2 2x BASE PLATE


1'-4"

FASTEN BASE PLATE TO TRUSS W/ USP


WS3 SCREWS, 1 ROWS 12" O.C. EA ROW

3 " T&G
4
SUBFLOOR

MINIMAL EXPANDING FOAM

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN
SUBFLOOR & TRUSS

CONSTRUCTION ADHESIVE (SF-450)


BETWEEN PLATES & SUBFLOOR
FASTEN TO
SILL PLATE W/
(2) ROWS 16d, 6"
O.C.

PRE-CUT7 16" OSB RIM,


FIELD SHEATH
CONSTRUCTION ADHESIVE (SF-450)
BETWEEN PLATES & SUBFLOOR

MINIMAL EXPANDING
FOAM

2X CAP PLATE RIPPED TO


WIDTH OF PANEL
SPF#2 2x TOP PLATE

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL

NOTE: FLOOR BLOCKING WILL BE REQUIRED WITH THIS DETAIL.


SPECIFICATIONS WILL BE PER JOB.

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL/TYPICAL FLOOR TRUSS PARALLEL/PANEL

SCALE:

N.T.S.

UPDATED:

DETAIL#

PSF2

4/13/09

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 52

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

EPS STANDARD

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL

TREATED BASE PLATE, FASTEN TO


CONCRETE W/ ANCHOR BOLTS

1'-4"
ANCHOR BOLTS DESIGNED
AND SUPPLIED BY OTHERS.

MINIMAL EXPANDING FOAM


SILL SEALER AND "PEEL &
SEAL" UNDERNEATH

CONCRETE FOUNDATION DESIGNED


AND SUPPLIED BY OTHERS

NOTE: "PEAL & SEAL" IS USED UNDER PANEL TO PREVENT PANELS FROM
WICKING MOISTURE.

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PANEL/CONCRETE

SCALE:

N.T.S.

UPDATED:

2/26/09

DETAIL#

PC1

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 53

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL


SPF#2 2x BASE PLATE
1'-4"

FASTEN BASE PLATE TO FLOOR


PANEL W/ USP WS3 SCREWS

FASTEN FLOOR PANEL TO SILL PLATE


W/ TRUFAST SIP PANEL SCREW

MINIMAL EXPANDING FOAM


CONSTRUCTION ADHESIVE (SF-450)
BETWEEN PLATES & FLOOR PANEL

EPS FLOOR PANEL

2x8 RIM BOARD


CONSTRUCTION ADHESIVE (SF-450)
FLOOR PANEL AND PLATE

TREATED 2X W/ SILL
SEALER BENEATH
ANCHOR BOLTS DESIGNED
AND SUPPLIED BY OTHERS.
CONCRETE FOUNDATION DESIGNED
AND SUPPLIED BY OTHERS

AN EMPLOYEE-OWNED COMPANY

DETAIL:

FLOOR PANEL / CONCRETE

SCALE:

N.T.S.

UPDATED:

DETAIL#

FP1

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 54

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL


SPF#2 2x BASE PLATE
1'-4"

FASTEN BASE PLATE TO FLOOR


PANEL W/ USP WS3 SCREWS

FASTEN FLOOR PANEL TO SILL PLATE


W/ TRUFAST SIP PANEL SCREW

MINIMAL EXPANDING FOAM


CONSTRUCTION ADHESIVE (SF-450)
BETWEEN PLATES & FLOOR PANEL

EPS FLOOR PANEL

2x8 RIM BOARD


CONSTRUCTION ADHESIVE (SF-450)
FLOOR PANEL AND BEAM

AN EMPLOYEE-OWNED COMPANY

BEAM

DETAIL:

FLOOR PANEL / BEAM

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

FP2

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 55

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

BLOCK
SPLINE

2' +/-

MINIMAL EXPANDING
FOAM

FACTORY INSTALLED
WIRECHASE

1"
8

FASTEN PANEL SKINS TO


3 "
SPLINE W/ 8d OR .113x2
8
R.S. NAILS 6" O.C.

NOTE: WALL PANELS ONLY (10' TALL MAX)

AN EMPLOYEE-OWNED COMPANY

DETAIL:

BLOCK SPLINE ASSEMBLY

SCALE:

N.T.S.

UPDATED:

DETAIL#

SP1

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 56

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

3 " PLYWOOD SURFACE


4
SPLINE

MINIMAL
EXPANDING FOAM

FACTORY INSTALLED
WIRE CHASE

SILICONE SEALANT ON
EXTERIOR (ROOF PANEL ONLY)

FASTEN PANEL SKINS TO


3 "
SPLINE W/ 8d OR .113x2
8
R.S. NAILS 6" O.C.

1"
8

4" PEEL & SEAL ON INTERIOR


(ROOF PANEL ONLY)

NOTE: ROOF PANELS ONLY (SHORT SPANS)

AN EMPLOYEE-OWNED COMPANY

DETAIL:

SURFACE SPLINE ASSEMBLY

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

SP2

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 57

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

DOUBLE SPF#2
2X4 SPLINE

2' +/-

MINIMAL
EXPANDING FOAM

FACTORY INSTALLED
WIRECHASE

1"
8

FASTEN PANEL SKINS TO


3 "
SPLINE W/ 8d OR .113x2
8
R.S. NAILS 6" O.C.

NOTE: WALL PANELS ONLY

AN EMPLOYEE-OWNED COMPANY

DETAIL:

DOUBLE 2X4 SPLINE ASSEMBLY

SCALE:

N.T.S.

UPDATED:

DETAIL#

SP3

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 58

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

FACTORY INSTALLED
WIRECHASE

MINIMAL
EXPANDING
FOAM

2' +/-

(2) BEADS OF MINIMAL


EXPANDING FOAM AND (2)
ROWS 16d NAILS 12" O.C.
SILICONE SEALANT ON
EXTERIOR (ROOF PANEL ONLY)

FASTEN PANEL SKINS TO


3 "
SPLINE W/ 8d OR .113x2
8
R.S. NAILS 6" O.C.

ALTERNATIVE WIRE
CHASE

DOUBLE 2X
LUMBER SPLINE

1"
8

4" PEEL & SEAL ON INTERIOR


(ROOF PANEL ONLY)

NOTE: OPTIONAL WIRE CHASE IS USED IN ROOF & FOUNDATION PANELS


NOTE: WALL PANELS, ROOF PANELS & FOUNDATION PANELS

AN EMPLOYEE-OWNED COMPANY

DETAIL:

DOUBLE LUMBER SPLINE ASSEMBLY

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

SP4

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 59

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

FACTORY INSTALLED
WIRECHASE

MINIMAL
EXPANDING
FOAM

2' +/-

(2) BEADS OF MINIMAL


EXPANDING FOAM AND (2)
ROWS 16d NAILS 12" O.C.
SILICONE SEALANT ON
EXTERIOR (ROOF PANEL ONLY)

FASTEN PANEL SKINS TO


3 "
SPLINE W/ 8d OR .113x2
8
R.S. NAILS 6" O.C.

ALTERNATIVE WIRE
CHASE

TRIPLE 2X
LUMBER SPLINE

1"
8

4" PEEL & SEAL ON INTERIOR


(ROOF PANEL ONLY)

NOTE: WALL PANELS, ROOF PANELS & FOUNDATION PANELS

AN EMPLOYEE-OWNED COMPANY

DETAIL:

TRIPLE LUMBER SPLINE ASSEMBLY

SCALE:

N.T.S.

UPDATED:

DETAIL#

SP5

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 60

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

OPTIONAL VERTICAL
WIRE CHASE

INTERIOR

SINGLE TREATED 2X8


LUMBER STUD

QB-300 ADHESIVE

EXTERIOR

QB-300 ADHESIVE

TREATED 2X8
LAMINATED STUD

FASTEN EXT. PANEL


SKINS TO STUDS W/ 1
3 " S.S NAILS 6" O.C.
4

SILICONE
SEALANT

SILICONE
SEALANT

AN EMPLOYEE-OWNED COMPANY

TREATED 2X8
LAMINATED STUD

FASTEN INT. PANEL


SKINS TO STUDS W/
10d GALV. NAILS 6" O.C.

DETAIL:

FOUNDATION SPLINE ASSEMBLY

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

SP6

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 61

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

EPS STANDARD

2X8 CAP PLATE


RIPPED TO 6 12"
2X6 TOP PLATE
PLANED TO 5 12"

16"

OSB SKINS
INT. & EXT.
(STANDARD)

(2) CONTINUOUS BEADS


OF CONSTRUCTION
ADHESIVE (SF-450)

FASTEN CAP PLATE TO TOP


PLATE W/ 16d R.S. OR .131x3 1 4"
R.S. NAILS 6" O.C.

MINIMAL
EXPANDING FOAM
RECESSES CAVITY

FASTEN PANEL SKINS TO


TOP PLATE W/ 8d OR .113x2
3 " R.S. NAILS 6" O.C.
8

55 8" EPS
RECESSES CAVITY
2X6 BASE PLATE
PLANED TO 5 12"

AN EMPLOYEE-OWNED COMPANY

MINIMAL
EXPANDING FOAM

DETAIL:

TYPICAL WALL/DOUBLE TOP PLATE

SCALE:

N.T.S.

UPDATED:

FASTEN PANEL SKINS TO


BASE PLATE W/ 8d OR
.113x238" R.S. NAILS 6" O.C.

DETAIL#

WA1

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 62

Energy Panel Structures, Inc.

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

DOUBLE BEVELED
TOP PLATE
MINIMAL
EXPANDING FOAM
RECESSES CAVITY
7

16"

FASTEN PANEL SKINS TO


TOP PLATE W/ 8d OR .113x2
3 " R.S. NAILS 6" O.C.
8

OSB SKINS INT. &


EXT. (STANDARD)

55 8" EPS
RECESSES CAVITY
2X6 BASE PLATE
PLANED TO 5 12"

AN EMPLOYEE-OWNED COMPANY

MINIMAL
EXPANDING FOAM

FASTEN PANEL SKINS TO


BASE PLATE W/ 8d OR .113x2
3 " R.S. NAILS 6" O.C.
8

DETAIL:

TYPICAL WALL/DOUBLE BEVELED TOP PLATE

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

WA2

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 63

Construction Details
WALLS

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

2X10 CAP PLATE


RIPPED TO 8 34"
2X8 TOP PLATE
PLANED TO 7 1 4"

4" FOUNDATION
GRADE TREATED
PLYWOOD

(2) CONTINUOUS BEADS


OF CONSTRUCTION
ADHESIVE (SF-450)

FASTEN CAP PLATE TO TOP


PLATE W/ 16d R.S. OR .131x3 1 4"
R.S. NAILS 6" O.C.
FASTEN TOP PLATE TO STUDS
W/ (3) 20d NAILS PER STUD

ADHESIVE QB-300
FASTEN EXTERIOR SKIN TO
TOP PLATE W/ 1 34" S.S NAILS

RECESSES CAVITY
5

8" CDX
PLYWOOD

FASTEN INTERIOR
SKIN TO TOP PLATE
W/ 10d GALV. NAILS

7 38" EPS
ADHESIVE QB-300
TREATED 2X8 BASE
PLATE PLANED TO 7 1 4"

AN EMPLOYEE-OWNED COMPANY

FASTEN BOTH SKIN TO BASE


PLATE W/ 1 34" S.S NAILS

RECESSES CAVITY

DETAIL:

TYPICAL FOUNDATION PANEL

SCALE:

N.T.S.

UPDATED:

DETAIL#

WA3

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 64

Energy Panel Structures, Inc.

Construction Details
WALLS

DOUBLE SPF#2 2x TOP PLATES, (1) PLATE ROUTED INTO


PANEL, (1) OVER TOP OF PANEL, FASTEN PANELS TO
PLATES 8d OR .113x23 8" R.S. NAILS 6" O.C., & MINIMAL
EXPANDING BOTH SIDES. NAIL 1ST PLATE TO STUDS
W/ (3) 16d OR 3 1 4"x.131 R.S. EA STUD AND PLATES
TOGETHER W/ 16d OR 3 14 "x.131 R.S. 2 ROWS 12" O.C. EA

8d OR .113x2 3 8" R.S. NAILS 6"


O.C., & MINIMAL EXPANDING
BOTH SIDES
8d OR .113x23 8" R.S. NAILS 6"
O.C., & MINIMAL EXPANDING
BOTH SIDES

CUT 1 1 2"xPLATE WIDTH NOTCH ON INTERIOR


1
SHEETING ON 1 2 " EPS RECESSION SIDE
PLACE STUD IN 1 916" FOAM RECESSION
STUD MUST BE FLUSH WITH BOTTOM OF EPS

1 9 16" EPS
RECESSION

FASTEN 2nd STUD TO


INTERIOR FACE OF
PANEL TO STUD W/ 16d
OR 31 4"x.131 R.S. 8" O.C.

AN EMPLOYEE-OWNED COMPANY

DETAIL:

CORNER DETAIL

SCALE:

N.T.S.

UPDATED:

4/13/09

DETAIL#

CD1

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 65

Construction Details
WALLS
FASTEN PANEL
SKINS TO STUDS
W/ 8d OR .113x2 3 8"
R.S. NAILS 6" O.C.

TRU-FAST LD-9000(9")
SIP SCREW 12" O.C.

MINIMAL EXPANDING
FOAM
MINIMAL
EXPANDING FOAM

1/2" SET BACK FOR PANEL SKIN


FASTEN STUD TO PANEL
W/ 16d OR .131x3 1 4" R.S.
NAILS 12" O.C.

FASTEN PANEL
SKINS TO SPLINE
W/ 8d OR .113x2 3 8"
R.S. NAILS 6" O.C.

MINIMAL EXPANDING
FOAM

AN EMPLOYEE-OWNED COMPANY

DETAIL:

CORNER DETAIL (STANDARD)

SCALE:

N.T.S.

UPDATED:

DETAIL#

CD2

4/13/09

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 66

Energy Panel Structures, Inc.

Construction Details
WALLS

DOUBLE SPF#2 2x8 TOP PLATES, FASTEN PANELS TO


WITH 13 4" S.S. NAILS 4" O.C. EXT, 10d GALV NAILS 4"
O.C. INT. ADHESIVE 300 BOTH SIDES NAIL 1ST PANEL
TO STUD W/ (3) 20d GALV NAILS EA STUD AND PLATES
TOGETHER W/ (2) ROWS 16d GALV 4" O.C. & (3) 3 8" ROWS
ADHESIVE PL-450

"C" PANEL

"A" PANEL

NAIL WITH 10d GLAV NAILS, 4"


O.C. INT, 1 3 4" S.S. NAILS 4" O.C.
EXT, ADHESIVE 300 BOTH SIDES
NAIL WITH 10D GALV 6" O.C. INT,
13 4" S.S. NAILS 6" O.C. EXT, &
ADHESIVE 300 BOTH SIDES

CUT 1 2"xPLATE WIDTH NOTCH ON INTERIOR


SHEETING ON 1 1 2" EPS RECESSION SIDE
PLACE STUD IN 1 9 16" FOAM RECESSION STUD
MUST BE FLUSH WITH BOTTOM OF EPS

19 16" EPS
RECESSION

"C" PANEL
"A" PANEL

FASTEN 2nd STUD TO


INTERIOR FACE OF
PANEL TO STUD W/ 16d
cc NAILS 12" 0.C.

AN EMPLOYEE-OWNED COMPANY

DETAIL:

FOUNDATION CORNER DETAIL

SCALE:

N.T.S.

UPDATED:

4/13/09

DETAIL#

CD3

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 67

Construction Details
WALLS
FASTEN EXT. PANEL SKINS
TO STUDS W/ 1 34" S.S
NAILS 6" O.C.

SILICONE SEALANT

QB-300 ADHESIVE

FASTEN EXT. PANEL


SKINS TO STUDS W/ 1
3 " S.S NAILS 6" O.C.
4

FASTEN INT. PANEL


SKINS TO STUDS W/
10d GALV. NAILS 6" O.C.

QB-300 ADHESIVE

QB-300 ADHESIVE

AN EMPLOYEE-OWNED COMPANY

FASTEN STUD TO PANEL


W/ 20d NAILS 12" O.C.

SILICONE SEALANT

FASTEN INT. PANEL SKINS


TO STUDS W/ 10d GALV.
NAILS 6" O.C.

QB-300 ADHESIVE

DETAIL:

FOUNDATION CORNER DETAIL (STANDARD)

SCALE:

N.T.S.

UPDATED:

DETAIL#

CD4

4/13/09

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 68

Energy Panel Structures, Inc.

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

EPS STANDARD

Construction Details
ROOF

EPS ROOF PANEL

FASTEN ROOF PANEL TO TOP PLATE W/


14" TRUFAST SIP PANEL SCREW
MINIMAL EXPANDING FOAM
SPF#2 2x10 FASCIA
SHEATH RAFTER TAIL
TO MATCH PANEL SKIN

SEAL WALL/ROOF PANEL CONNECTION


W/ 9" WIDE "PEEL & SEAL"

SPF#2 2x6 FASCIA


BOARD

FILL VOID WITH


SPRAY FOAM

ROOF SPLINE EXTENDED OUT


PAST PANEL, FIELD CUT.
MINIMAL
EXPANDING FOAM

2X CAP PLATE RIPPED TO


WIDTH OF PANEL
CONSTRUCTION ADHESIVE
(PL-450) BETWEEN ALL PLATES

SPF#2 2x TOP PLATE


EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

DETAIL:

DOUBLE TOP PLATE/SQ CUT EAVE/RAFTER PAST

SCALE:

N.T.S.

UPDATED:

2/26/09

DETAIL#

RP1

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 69

Construction Details
ROOF

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

EPS ROOF PANEL

FASTEN ROOF PANEL TO TOP


PLATE W/ 14" TRUFAST SIP
PANEL SCREW

MINIMAL EXPANDING
FOAM
SEAL WALL/ROOF PANEL CONNECTION
W/ 9" WIDE "PEEL & SEAL"
FILL VOID WITH
SPRAY FOAM

SPF#2 2x10 FASCIA


MINIMAL EXPANDING
FOAM

2X CAP PLATE RIPPED TO


WIDTH OF PANEL
CONSTRUCTION ADHESIVE
(PL-450) BETWEEN ALL PLATES

SPF#2 2x TOP PLATE


EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

DETAIL:

DBL. TOP PLATE W/BEVELD BLOCK/SQ CUT EAVE

SCALE:

N.T.S.

UPDATED:

DETAIL#

RP2

2/26/09

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 70

Energy Panel Structures, Inc.

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

Construction Details
ROOF

FASTEN ROOF PANEL TO TOP


PLATE W/ 12" TRUFAST SIP
PANEL SCREW

EPS ROOF PANEL

MINIMAL EXPANDING
FOAM
SEAL WALL/ROOF PANEL CONNECTION
W/ 9" WIDE "PEEL & SEAL"
SPF#2 2x10 FASCIA

SPF#2 2x8 DOUBLE


BEVELED TOP PLATE

MINIMAL EXPANDING
FOAM

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

DETAIL:

BEVELED TOP PLATE/SQ CUT EAVE

SCALE:

N.T.S.

UPDATED:

2/26/09

DETAIL#

RP3

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 71

Construction Details
ROOF

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

EPS ROOF PANEL

FASTEN ROOF PANEL TO TOP


PLATE W/ 14" TRUFAST SIP
PANEL SCREW
MINIMAL EXPANDING
FOAM

SEAL WALL/ROOF PANEL CONNECTION


W/ 9" WIDE "PEEL & SEAL"

DOUBLE
BEVELED LVL
FASCIA BOARD

FILL VOID WITH


SPRAY FOAM
2X CAP PLATE RIPPED TO
WIDTH OF PANEL

MINIMAL
EXPANDING FOAM

CONSTRUCTION ADHESIVE
(PL-450) BETWEEN ALL PLATES

SPF#2 2x TOP PLATE


EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

DETAIL:

DOUBLE TOP PLATE/PLUMB CUT EAVE

SCALE:

N.T.S.

UPDATED:

DETAIL#

RP4

2/26/09

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 72

Energy Panel Structures, Inc.

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

Construction Details
ROOF

FASTEN ROOF PANEL TO TOP PLATE W/


14" TRUFAST SIP PANEL SCREW

EPS ROOF PANEL

MINIMAL EXPANDING FOAM


2x4 NAILER
USP WS3 SCREW
SHEATH OVERHANG TO
MATCH PANEL SKIN
SEAL WALL/ROOF PANEL CONNECTION
W/ 9" WIDE "PEEL & SEAL"
FILL VOID WITH
SPRAY FOAM

2x BEVELED @
ROOF PITCH

2X CAP PLATE RIPPED TO


WIDTH OF PANEL

2x4 FRAMING MEMBER


7

16"

OSB SHEATHING
MINIMAL
EXPANDING FOAM
SPF#2 2x TOP PLATE
EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

CONSTRUCTION ADHESIVE
(PL-450) BETWEEN ALL PLATES
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

DETAIL:

DOUBLE TOP PLATE/SQ CUT EAVE/RAFTER PAST

SCALE:

N.T.S.

UPDATED:

2/26/09

DETAIL#

RP5

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 73

Construction Details
ROOF

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

FASTEN ROOF PANEL TO TOP


PLATE W/ 14" TRUFAST SIP
PANEL SCREW

EPS ROOF PANEL

MINIMAL EXPANDING
FOAM
SPF#2 2x10 FASCIA

SEAL WALL/ROOF PANEL CONNECTION


W/ 9" WIDE "PEEL & SEAL"

1x FASCIA SIZE
MAY VARY

FILL VOID WITH


SPRAY FOAM
MINIMAL
EXPANDING FOAM

FASCIA BLOCKING

SPF#2 2x TOP PLATE


EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

2X CAP PLATE RIPPED TO


WIDTH OF PANEL
CONSTRUCTION ADHESIVE
(PL-450) BETWEEN ALL PLATES
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

DETAIL:

DOUBLE TOP PLATE/SQ CUT EAVE

SCALE:

N.T.S.

UPDATED:

DETAIL#

RP6

2/26/09

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 74

Energy Panel Structures, Inc.

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

Construction Details
ROOF

FASTEN ROOF PANEL TO TOP


PLATE W/ 12" TRUFAST SIP
PANEL SCREW

MINIMAL EXPANDING
FOAM
SPF#2 2x10 FASCIA

MINIMAL EXPANDING
FOAM

SEAL WALL/ROOF PANEL CONNECTION


W/ 9" WIDE "PEEL & SEAL"

SPF#2 2x TOP PLATE

EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

DETAIL:

WALL PANEL/ROOF PANEL RAKE EXT.

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

RP7

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 75

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

Construction Details
ROOF

EPS STANDARD

MINIMAL EXPANDING
FOAM
SPF#2 2x6 FASTEN TO
PANEL FASCIA

FASTEN ROOF PANEL TO TOP


PLATE W/ 12" TRUFAST SIP
PANEL SCREW

SPF#2 2x6 FASCIA


SPF#2 2x6 RAKE
NAILER
SPF#2 2x10 FASCIA
MINIMAL EXPANDING
FOAM

SEAL WALL/ROOF PANEL CONNECTION


W/ 9" WIDE "PEEL & SEAL"

SPF#2 2x TOP PLATE

EPS WALL PANEL

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

NOTE: 2'-0" MAXIMUM RAKE EXTENSION

AN EMPLOYEE-OWNED COMPANY

DETAIL:

WALL PANEL/ROOF "C" PANEL W/ LADDER RAKE

SCALE:

N.T.S.

UPDATED:

DETAIL#

RP8

2/26/09

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 76

Energy Panel Structures, Inc.

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

Construction Details
ROOF

SPF#2 2x4 OUTLOOKER TOP BLOCKING,


BETWEEN EVERY OUTLOOKER
FASTEN ROOF PANEL TO TOP
PLATE W/ 12" TRUFAST SIP
PANEL SCREW

SPF#2 2x6 BLOCKING BETWEEN


EVERY OTHER OUTLOOKER
SPF#2 2x4 OUTLOOKER

MINIMAL EXPANDING
FOAM TO FILL VOIDS
IN CAVITY

SPF#2 2x6 FASCIA

SPF #2 2x8 (RIPPED)


OUTLOOKER BASE
BLOCKING
MINIMAL EXPANDING
FOAM

SEAL WALL/ROOF PANEL CONNECTION


W/ 9" WIDE "PEEL & SEAL"

SPF#2 2x TOP PLATE

EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

DETAIL:

WALL PANEL/ROOF PANEL W/ OUTLOOKER

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

RP9

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 77

Construction Details
ROOF

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

FOAM SEAL VOID IN PANEL


CONNECTION @ RIDGE
USP MSTA24 STRAP AT
ALL SPLINES

FASTEN ROOF PANEL TO


GLU-LAM W/ 12" TRUFAST SIP
PANEL SCREW
EPS ROOF PANEL

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

BEVELED BLOCKING
OR BEVELED CUT
GLU-LAM

18" PEAL &


SEAL

RIDGE BEAM

NOTE: CHECK WITH EPS ON BEVELED GLU-LAM AVAILABILITY

AN EMPLOYEE-OWNED COMPANY

DETAIL:

ROOF PANEL/RIDGE BEAM

SCALE:

N.T.S.

UPDATED:

DETAIL#

RB1

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 78

Energy Panel Structures, Inc.

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

Construction Details
ROOF

DOUBLE BEVELED LVL

MINIMAL EXPANDING
FOAM
TRU-FAST LD-9000
(9") SIP SCREW

USP MSTA24 STRAP


AT ALL SPLINES

EPS ROOF PANEL

18" PEAL
AND SEAL
GYPSUM BOARD OR OTHER
APPROVED THERMAL
BARRIER (BY OTHERS).

RIDGE BEAM

4' MAX

NOTE: CHECK WITH EPS ON BEVELED GLU-LAM AVAILABILITY

AN EMPLOYEE-OWNED COMPANY

DETAIL:

ROOF PANEL W/ LUMBER/RIDGE BEAM

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

RB2

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 79

Construction Details
ROOF

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

MINIMAL
EXPANDING FOAM
FASTEN ROOF PANEL TO
GLU-LAM W/ 12" TRUFAST SIP
PANEL SCREW

12
12

EPS ROOF PANEL

18" PEAL
AND SEAL

BEVELED
BLOCKING
OR BEVELED
CUT GLU-LAM

RIDGE BEAM

GYPSUM WALL BOARD


OR OTHER APPROVED
THERMAL BARRIER (BY
OTHERS).

NOTE: CHECK WITH EPS ON BEVELED GLU-LAM AVAILABILITY

AN EMPLOYEE-OWNED COMPANY

DETAIL:

ROOF PANEL OVERLAY/RIDGE BEAM

SCALE:

N.T.S.

UPDATED:

DETAIL#

RB3

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 80

Energy Panel Structures, Inc.

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

Construction Details
ROOF

FASTEN ROOF PANEL TO


GLU-LAM W/ 12" TRUFAST SIP
PANEL SCREW

EPS ROOF PANEL

9" PEEL & SEAL


BEVELED BLOCKING OR
BEVELED CUT GLU-LAM
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).
ROOF BEAM

NOTE: CHECK WITH EPS ON BEVELED GLU-LAM AVAILABILITY

AN EMPLOYEE-OWNED COMPANY

DETAIL:

ROOF PANEL SPLINE AT MIDSPAN BEAM

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

RB4

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 81

Construction Details
ROOF

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

FASTEN ROOF PANEL TO


GLU-LAM W/ 12" TRUFAST SIP
PANEL SCREW

EPS ROOF PANEL

BEVELED BLOCKING
OR BEVELED CUT
GLU-LAM

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).
ROOF BEAM

NOTE: CHECK WITH EPS ON BEVELED GLU-LAM AVAILABILITY

AN EMPLOYEE-OWNED COMPANY

DETAIL:

ROOF PANEL/MIDSPAN BEAM

SCALE:

N.T.S.

UPDATED:

DETAIL#

RB5

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 82

Energy Panel Structures, Inc.

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

EPS STANDARD

Construction Details
ROOF

ROOF SHEATHING NAILED USE USP PLYWOOD


CLIPS AT ALL UNSUPPORTED EDGES, SEE FULL
CROSS SECTION FOR SHEATHING TYPE

TRUSS HELD BACK7 16" FROM OUTSIDE


7 "
WALL. SHEATH TRUSS TAILS WITH
16
OSB, FIELD CUT FROM 4'x8' SHEETS
1'

FIELD CUT OVERHANG


PLUMB FROM WALL

SPF#2 2X6
FASCIA
BOARD

MINIMAL EXPANDING
FOAM

SPF#2 2x TOP PLATE

(1) USP RT-16 UPLIFT


CLIP PER END PER
TRUSS

2X CAP PLATE
RIPPED TO WIDTH
OF PANEL
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

DETAIL:

DBL. TOP PLATE/TYPICAL ROOF TRUSS

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

RT1

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 83

Construction Details
ROOF

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

SPF 2x4 ENDWALL


T-BRACING @
APPROXIMATELY 45
ANGLE
7 " OSB GABLE
16
END SHEATHING

ENGINEERED WOOD
TRUSS 24" O.C.
USP JUS26
JOIST HANGER
2X8 ENDWALL
BLOCKING, CUT
FROM 16' PCS

2X CAP PLATE
RIPPED TO WIDTH
OF PANEL

MINIMAL EXPANDING
FOAM

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

SPF#2 2x TOP PLATE


EPS WALL PANEL

AN EMPLOYEE-OWNED COMPANY

DETAIL:

DBL. TOP PLATE/TYPICAL ENDWALL ROOF TRUSS

SCALE:

N.T.S.

UPDATED:

DETAIL#

RT2

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 84

Energy Panel Structures, Inc.

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

EPS STANDARD

ROOF SHEATHING NAILED USE USP PLYWOOD


CLIPS AT ALL UNSUPPORTED EDGES, SEE FULL
CROSS SECTION FOR SHEATHING TYPE

SPF#2 2x6 FASTEN TO


TOP CHORD OF TRUSS

SPF#2 2x6 FASCIA


SPF#2 2x6 RAKE NAILER, 24"
O.C., CUT FROM 12' PCS

ENGINEERED
WOOD TRUSS 24"
O.C.

16"

OSB GABLE
END SHEATHING

AN EMPLOYEE-OWNED COMPANY

DETAIL:

TYPICAL ROOF TRUSS RAKE

SCALE:

N.T.S.

UPDATED:

2/26/09

DETAIL#

RT3

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 85

Construction Details
ROOF

SHEATHING MUST OVERLAP RAKE, PANEL SEAM


MUST NOT OCCUR @ TRUSS/RAKE INTERSECTION

Construction Details
ROOF

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

SHEATHING MUST OVERLAP RAKE,


PANEL SEAM MUST NOT OCCUR @
TRUSS/RAKE INTERSECTION
SPF#2 2x4 OUTLOOKER
24" O.C., CUT FROM 16'
PCS

ROOF SHEATHING NAILED USE USP PLYWOOD


CLIPS AT ALL UNSUPPORTED EDGES, SEE FULL
CROSS SECTION FOR SHEATHING TYPE

SPF#2 2x6 FASCIA


(1) USP RT-15 UPLIFT
CLIP PER OUTLOOKER

SPF#2 2x4 BLOCKING


BETWEEN ALL OUTLOOKER
GABLE END TRUSS
DROPPED 3 1 2"

ENGINEERED
WOOD TRUSS 24"
O.C.

16" OSB GABLE


END SHEATHING

AN EMPLOYEE-OWNED COMPANY

DETAIL:

TYPICAL ROOF DROPPED TRUSS

SCALE:

N.T.S.

UPDATED:

DETAIL#

RT4

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 86

Energy Panel Structures, Inc.

NOTE: HOLES MUST BE DRILLED INTO TOP AND BOTTOM PLATES TO GIVE ACCESS
TO CHASES AFTER PANELS ARE SET.

2'

11 2" VERTICAL WIRE


CHASE FACTORY
INSTALLED

2'

VARIES

Construction Details
ELECTRICAL

VARIES
OPTIONAL
HORIZONTAL
WIRE CHASE
FACTORY
INSTALLED

44"

OPTIONAL HORIZONTAL
WIRE CHASE FACTORY
INSTALLED

16"

AN EMPLOYEE-OWNED COMPANY

DETAIL:

VERTICAL WIRE CHASE ALIGNMENT

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

WC1

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 87

NOTE: HOLES MUST BE DRILLED INTO TOP AND BOTTOM PLATES TO GIVE ACCESS
TO CHASES AFTER PANELS ARE SET.

11 2" VERTICAL WIRE


CHASE FACTORY
INSTALLED

Construction Details
ELECTRICAL

DOUBLE 2X4
SPLINE

11 2" VERTICAL WIRE


CHASE FACTORY
INSTALLED

MEASURE TO INSURE PROPER


ALIGNMENT, THEN DRILL1 21" HOLE
THROUGH PLATE AND SUBFLOOR.

2X6 BASE PLATE


PLANED TO 51 2"
MARK LOCATIONS ON
SUBFLOOR FOR LATER
REFERENCE.

NOTE: IF PANELS RUN PAST FLOOR YOU MAY NEED TO MARK THE SILL PLATE FOR
LATER REFERENCE

AN EMPLOYEE-OWNED COMPANY

DETAIL:

VERTICAL WIRE CHASE ALIGNMENT

SCALE:

N.T.S.

UPDATED:

DETAIL#

WC2

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 88

Energy Panel Structures, Inc.

NOTE: HOLES MUST BE DRILLED INTO TOP AND BOTTOM PLATES TO GIVE ACCESS
TO CHASES AFTER PANELS ARE SET.

VERTICAL
WIRE CHASE

ELECTRICAL
BOX
HORIZONTAL
WIRE CHASE

HORIZONTAL
WIRE CHASE

VERTICAL
WIRE CHASE

FIELD CUT ACCESS HOLE THROUGH


BASE PLATE AND SUBFLOOR

RIM
BOARD
FLOOR
TRUSS

RIM
BOARD
FLOOR TRUSS

Construction Details
ELECTRICAL

VERTICAL
WIRE CHASE

HORIZONTAL
WIRE CHASE

HORIZONTAL
WIRE CHASE

ELECTRICAL
BOX

VERTICAL
WIRE CHASE

2X4 RIBBON

FIELD CUT
ACCESS HOLE
FLOOR
TRUSS

2X4
RIBBON
FIELD CUT
ACCESS HOLE

AN EMPLOYEE-OWNED COMPANY

FLOOR
TRUSS

DETAIL:

VERTICAL WIRE CHASE ALIGNMENT

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

WC3

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 89

NOTE: RUNNING PLUMBING LINES IN SIP WALLS IS NOT RECOMMENDED

INTERIOR
DIVISION WALL

EPS WALL PANEL

VENT STACK

RIM BOARD

Construction Details
PLUMBING

FLOOR TRUSS

PLUMBING CHASE

EPS WALL PANEL

VERTICAL
PLUMBING RUNS

AN EMPLOYEE-OWNED COMPANY

DETAIL:

PLUMBING DETAIL

SCALE:

N.T.S.

UPDATED:

DETAIL#

PL1

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 90

Energy Panel Structures, Inc.

ROOF FLASHING
(BY OTHERS)

VENT STACK

EPS ROOF PANEL


12" MAX

FILL REMAINING CAVITY WITH


APPROVED INSULATION
FIELD CUT
OPENING

Construction Details
PLUMBING

NOTE: HIGH TEMPERATURE INSULATION IS REQUIRED IN ANY


APPLICATION WERE TEMPERATURES EXCEED 160 F.

AN EMPLOYEE-OWNED COMPANY

DETAIL:

ROOF PENETRATION

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

PL2

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 91

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL

Construction Details
DIVISION WALLS

FASTEN EXTERIOR WALL TO


DIVISION WALL WITH 9" TRU-FAST
SCREWS AT 12" O.C.

AN EMPLOYEE-OWNED COMPANY

INTERIOR STUD FRAMED


DIVISION WALL

DETAIL:

PANEL TO DIVISON WALL

SCALE:

N.T.S.

UPDATED:

DETAIL#

DW1

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 92

Energy Panel Structures, Inc.

2X4 BLOCKING
24" O.C.
USP TR1
TRUSS TIE

TRUSS BOTTOM CORD

GYPSUM BOARD W/ POLYFILM


BEHIND (BY OTHERS).
INTERIOR STUD FRAMED
DIVISION WALL
USP TR1 TRUSS TIE

TRUSS BOTTOM CORD

GYPSUM BOARD W/ POLYFILM


BEHIND (BY OTHERS).
INTERIOR STUD FRAMED
DIVISION WALL

DRYWALL CLIPS

NOTE: DO NOT FASTEN DRYWALL TO BLOCKING OR TRUSS WITHIN 16" OF WALL.


ROOF TRUSS TO DIVISON WALL

SCALE:

N.T.S.

UPDATED:

12/16/08

DETAIL#

DW2

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Details

Page 93

Construction Details
DIVISION WALLS

AN EMPLOYEE-OWNED COMPANY

DETAIL:

Construction Details begin on Page 39

Table of Contents-Construction Manual

Description Page #
I. General Info

a. Panel makeup.............................................................................................................................................. 1

b. Fabrication.................................................................................................................................................... 1

c. Thermal Barrier............................................................................................................................................ 2

d. Bracing and Shoring................................................................................................................................... 2

e. Before a project can start......................................................................................................................... 2

f. Delivery........................................................................................................................................................... 2
i. Unloading................................................................................................................................................ 3
ii. Handling................................................................................................................................................. 3
iii. Storage................................................................................................................................................... 3

g. Material List
i. Wall Panels.............................................................................................................................................. 3
ii. Roof Panels............................................................................................................................................. 3
iii. Foundation Panels.............................................................................................................................. 4
iv. Floor trusses.......................................................................................................................................... 4
v. Roof trusses............................................................................................................................................ 4

h. Tools
i. General tools.......................................................................................................................................... 5
ii. SIP Specific tools.................................................................................................................................. 5
iii. Equipment............................................................................................................................................. 5

i. Structural loading......................................................................................................................................... 5

j. Design Consideration................................................................................................................................. 6
II. Connections

a. Splines............................................................................................................................................................. 7
i. Block.......................................................................................................................................................... 7
ii. Surface..................................................................................................................................................... 7
iii. Double 2x4........................................................................................................................................... 8
iv. Lumber................................................................................................................................................... 8
III. Foundation Panels

a. General Assembly....................................................................................................................................... 9

b. Plate Assembly..........................................................................................................................................10

c. Base Assembly............................................................................................................................................10

d. Water Proofing..........................................................................................................................................11

e. Backfilling.....................................................................................................................................................11
IV. Wall Panels

a. Double top plate.......................................................................................................................................12

b. Double Beveled top plate.....................................................................................................................12

c. Panels on subfloor.....................................................................................................................................13

d. Panels past..................................................................................................................................................14

e. Panels on concrete....................................................................................................................................14
V. Base Plate . ............................................................................................................................................................15
Residential Construction Manual

Energy Panel Structures, Inc.

P.O. Box 238 Graettinger, IA 51342

VI. Corners

a. Butt Corner.................................................................................................................................................16

b. FlyBy Corner.............................................................................................................................................17
VII. Headers

a. Header only................................................................................................................................................18

b. Header with panel....................................................................................................................................19
VIII. Upper Floors

a. Hanging Floor.............................................................................................................................................20

b. Conventional Floor..................................................................................................................................20
IX. Roof Panels

a. Parallel panels.............................................................................................................................................21

b. Perpendicular panels...............................................................................................................................21

c. Wall to roof details
i. Beveled top plate..............................................................................................................................22
ii. Double top plate...............................................................................................................................23

d. Ridge
i. Beam w/ at void...................................................................................................................................23
ii. Cantilevered w/ lumber ridge.......................................................................................................24
iii. Ridge overlay.....................................................................................................................................24

e. Eave
i. Fascia Blocking......................................................................................................................................25
ii. Rafter tail.............................................................................................................................................25

f. Rake
i. Panel Rake.............................................................................................................................................26
ii. Ladder Frame Rake...........................................................................................................................26
X. Roof Trusses

a. Eave detail...................................................................................................................................................27

b. Rake detail..................................................................................................................................................28

c. BCSI ..............................................................................................................................................................28
XI. Floor panels

a. Floor panel on foundation.....................................................................................................................29

b. Floor Panel on beam................................................................................................................................29
XII. Wiring & plumbing

a. Wire Chases................................................................................................................................................30

b. Boxes.............................................................................................................................................................31

c. Plumbing......................................................................................................................................................32

d. Roof Penetrations.....................................................................................................................................33
XIII. Division Walls........................................................................................................................................................33
XIV. Sealant, Tape, Adhesive & Fasteners

a. Onecomponent.......................................................................................................................................35

b. TwoComponent......................................................................................................................................35

c. Tape ..............................................................................................................................................................35

d. Adhesive......................................................................................................................................................36
XV. Ventilation ..............................................................................................................................................................36
XVI. MSDS . ............................................................................................................................................................36
XVII. General Recommendations............................................................................................................................37
CONSTRUCTION DETAILS.....................................................................................................................................39
Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc. 800-282-3219 www.epsbuildings.com
PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 4
Date: 1/14/09
Replaces: N/A

1. GeneralInformation

Theinformationprovidedinthismanualistobeusedasageneralguide.Referto
detaileddrawingsprovidedbyEPSforjobspecificinformation.Besuretofollowlocal
andstatebuildingcodes.

a. Panelmakeup
Structuralinsulatedpanels(SIPs)arehighperformancebuildingpanelsusedin
floors,walls,androofs.Thepanelsaremadebysandwichingacoreofexpanded
polystyrene(EPS),betweentwostructuralskinsoforientedstrandboard(OSB),
orplywood.EPSpanelshavestandardoverallthicknessesof41/2,61/2,8
1/4and101/4.Foundationpanelswillhaveathicknessof83/4.

Wall
Type
R18
R26
R33
R40

Core
Thickness
35/8
55/8
73/8
93/8

Overall
Thickness
41/2
61/2
81/4
101/4

WholeWallRValue

Panel
atexteriortempof Weight
MakeUp
7540
PSF
7/16OSB,35/8EPS,7/16OSB
18.0
20.6
3.3
7/16OSB,55/8EPS,7/16OSB
22.8
24.1
3.5
7/16OSB,73/8EPS,7/16OSB
30.1
31.8
3.6
7/16OSB,93/8EPS,7/16OSB
38.5
40.0
3.9

b. Fabricatedpanels
Fabricatedpanelsarecuttofiteachprojectandreadytoassemble.Thepanel
edgesarefactoryroutedtoacceptplatesandsplines.Windowanddoorrough
openingsarecutoutandrouted.Alongwithhavingpanelscuttofit,verticaland
horizontalwirechasesareinstalledinthepanelstomaketheelectriciansjob
easier.Panelsaretypicallycutfroman8X24masterpanel.Afterapanel
comesofftheCNCmachineitcouldbeaslargeas711wideXtheheightofthe
ceiling(jumbos).Thepanelsizewillbedeterminedbytheengineer.Because
eachprojectisuniquepanelsizeswillvary.

Residential Construction Manual

Page 1

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc. P.O. Box 238 Graettinger,
IA 51342
PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 5
Date: 1/14/09
Replaces: N/A

c. ThermalBarrier
Section26ofthe2006InternationalBuildingCoderequiresallfoamplastic
insulationtobecoveredwithanapprovedminimum15minutethermalbarrier.
7/16OSBitselfdoesnotconstitutea15minutethermalbarrier.Allinterior
panelsurfacesmustbecoveredwithaminimumoftypeXsheetrockto
provideanadequatethermalbarrier.

d. BracingandShoring
Alltheshoringandbracingistheresponsibilityofthegeneralcontractor.AnEPS
buildingpackagehaslittleornowaste.Extrabracingmaterialcanbesentupon
request.

e. Beforeaprojectcanstart
Beforeanengineercangetstartedtheyneedagoodsetofdetaileddrawings.
Thesedrawingsneedtohaveafloorplan,foundationplan,elevationsandadoor
andwindowroughopeningschedule.Theopeninglocationswillalsoneedtobe
dimensionedontheplanview.EPSengineersprovidedetailedstructural
drawingsandpanelshopdrawingstoensureastructurallysoundbuilding.

Aftertheengineerhasalltheinformationadetailedsetofpreliminaryof
drawingswilldrafted.Thesedrawingswillthenbesenttothedealerfor
approval.Anapprovalletterwillaccompanythedrawings.Oncetheapproval
letterisreturnedtotheengineertheprojectwillbecompletedandturnedinto
production.Anychangestothepreliminarydrawingsoverandabovewhatwas
orderedwillberequiredandsubsequentchangeorderwillbesenttothedealer.
Ifthedrawingsneedengineeringsealsadditionalleadtimesmayapply.

f. Delivery
Jobpackageswillbedeliveredwithatypicaltractortrailerandflatbed.Thejob
sitewillneedtobetractortraileraccessible.Ifjobsiteaccessisnotpermitted
bepreparedtoshuttlepanelsfromanalternatelocationusingasmallervehicle
atthecontractorsexpense.

Page 2

Energy Panel Structures, Inc.

Energy
Inc. www.epsbuildings.com
Energy Panel Structures,
Inc.Panel
Structures,
800-282-3219
PO Box 238; 102 E. Industrial Park
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

SEC: (Residential)
Page: 6
Date: 1/14/09
Replaces: N/A

Properunloadingandhandlingequipmentneedstobeonsitebeforethepanels
arrive.EPSdoesnotprovideunloadingserviceswithjobsthathavejumbo
panels.EPSpackagesthepanelsforoptimalefficiencyforshippingthereforethe
panelsarerarelyinorder.Besuretoleaveroomtosortthepanels.Refertothe
ToolsandEquipmentsectionforrecommendedunloadingandhandling
equipment.

Oncethepanelshavebeendeliveredproperstorageisimportant.Thepanels
mustbekeptdryandstackedonlevelblocking.EPSwillbundleandshrinkwrap
allpanels.Aslitismadeatthebottomoftheshrinkwraptoallowanymoisture
withinthebundletoescape.Theshrinkwrapisfortransportationonlyand
shouldberemovedatthejobsite.Thepanelsaretobetarptheloadoncethey
havebeenunloaded.Itisalsorecommendedtokeepallthelumberandspline
materialcoveredtokeepanyexcessmoistureoutofthepanels.

g. MaterialsList
EPSoffersacompletestructuralframingpackage.Thefollowingitemsare
providedinastandardEPSpanelpackage.
WallPanels:
2xBaseplate(treatedifrequired)
Precutwallpanelswithdoorandwindowcutouts
Headers(ifrequired)
Splineandstudmaterial
2xmaterialfordoorandwindowbucks
1horizontalwirechase16&44offfloor(optional)
1Verticalwirechasesapproximately4O.C.
Double2xtopplate/Singledoublebeveledw/roofpanels
Expandingfoamwithdisposablegun(2partoptional)
Sealants&caulk,constructionadhesive
2xfoundationsillplate(optional)
HanddriveorPaslodenails
Seamtape(ifrequired)
RoofPanels:
Precutroofpanels
2xpaneledging
Splinematerial(2x,LVL,surfaceasrequiredbyspan&loading)

Residential Construction Manual

Page 3

Energy Panel Structures, Inc.


Energy Panel Structures,
Inc. P.O. Box 238 Graettinger, IA 51342
PO Box 238; 102 E. Industrial Park
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page 4

SEC: (Residential)
Page: 7
Date: 1/14/09
Replaces: N/A

RoofPanelscont:
Expandingfoamwithdisposablegun(2partoptional)
Wirechaseatspline
RidgeorMidspanbeams(ifrequired)
Outlooker&rakematerial(ifrequired)
Handdriveorpaslodenails
FoundationPanel:
Precutfoundationpanel
2x8treatedsillplate
2x8treatedstuds
Double2xtopplate
1xtreatedscreedboard
6milpolyfilm
Sealants&constructionadhesive
Treatedplywoodstrips
Handdrivenails
FloorSystem:
2xtreatedsillplate
11/8Rimboard
Trussesorjoist
Floorbeams(ifrequired)
Hangers(ifrequired)
Handdriveorpaslodenails
Sealants&caulk,constructionadhesive
T&GSubfloor(Advantech,plywood,OSB)
2x6Strongbackbracing
RoofTrussSystem:
Rooftrusseswith12energyheel
Roofsheathing(OSBorCDX)
Trussbracing
Hangers&Ties
Handdriveorpaslodenails
Plywoodclipsandspacers
SPF#22xFasciaBoard
Porchheadersandcolumns

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.238;
102
800-282-3219
www.epsbuildings.com
PO Box
E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 8
Date: 1/14/09
Replaces: N/A

h. ToolsandEquipment
Builderswillutilizethesametoolsthatareusedtobuildstickframedstructures
andotherconventionallyframedbuildings.Inaddition,someadditionalSIP
specifictoolswillbenecessary.Panelsarelargeandheavysospeciallifting
equipmentisrecommended.

Generaltools:
Hammer
TapeMeasure
4Level
HandSaw
CaulkingGun/QT
Square
Electricdrill
Sledgehammer

1WoodBit
Circularsaw
Reciprocatingsaw
Prybars
Ladders
Stringline
Chalkline
Comealong

SIPspecific:
FoamScoop
Chainsaw&guide

Equipment:
Forkliftorcrane
Forkextensions

FoamGun
Hotwireassembly(optional)

Liftingplates
Ratchetstraps

i. Structuralloading
Thebasebuildingisdesignedforthenecessarytopchordliveload,10psfdead
loadonthetopchord,and10psfdeadloadonthebottomchord.Inthecaseof
SIProofpanelsthepanelisdesignedforthenecessaryliveloadinadditionto15
psfoftotaldeadload.
Theliveloadiscalculatedbythecountyorelevationinwhichthebuildingships
toandthebuildinguseandconditions.EPScanengineerabuildingaboveand
beyondthelocalloadingsuponrequest.Thestructureisassumedtobelocated
inanareadefinedasExposureCandhaveanimportancefactorof1.0.
ExposureCisdefinedasanopen,unobstructedarea.

Residential Construction Manual

Page 5

Energy Panel Structures, Inc.

Energy Panel Structures,


Box 238 Park
Graettinger,
IA (Residential)
51342
PO BoxInc.
238; 102P.O.
E. Industrial
SEC:
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 9
Date: 1/14/09
Replaces: N/A

ThewindloadisdesignedforanIBC200690mphwind,ExposureC,1.0
importancefactor.ContactEPSfordesignrequirementswhichexceedwhatis
statedhere.
Floorsystemswillbedesignedwithastandardloadingof40psfliveload,10psf
deadloadonthetopchord,and5psfdeadloadonthebottomchord.

j. DesignConsideration
Thefollowingarefeaturesofresidentialstructuresthatmayaffectthestructure.
TheseitemsneedtobediscussedwithEPSpersonnelpriortoplacingtheorder.
Roofingmaterials.Thestandardloadingassumesstandardroof
sheathingandasphaltshingles.Roofingmaterialssuchasclaytileand
slatearemuchheavierandmustbeaddressed.
Floorcoverings.Areaswithheavyflooringmaterialssuchasslate,
granite,stoneorgypcretecoveringmustbeaccountedfor.
Architecturalfeaturessuchasstonefireplaces,glassblockwalls,ect.can
imposelargeloadsonthefloorsystemandneedtobenoted.
DecksthatareattachedtotheEPSstructureneedtobenotedtoensure
thatapropersurfaceisprovidedforattachment.
Windowwalls.Wallswithalargenumberofopeningsmaynotbe
feasibletobuildwithSIPs.Thiswillbenotedonthepreliminary
drawings.Materialswillbeprovidedtostickbuildtheseareas.
Windowanddoorroughopeningsandlocations.DuetothenatureofSIP
panelsallwindowanddoorroughopeningsandlocationsarenecessary
forthebuildingdesign.TheorderWILLNOTbestartedinengineering
untilallroughopeningsandlocationsaredetermined.
Specificationsbeyondthestandardloadingaresubjecttoanincreaseinprice
upuntilthetimethepreliminarydrawingsaresent.

Page 6

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.238;
102
800-282-3219
www.epsbuildings.com
PO Box
E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 10
Date: 1/14/09
Replaces: N/A

II. PanelConnections
AllpanelsmustbefastenedatthejointsusingnailsorotherEPSapprovedfasteners.
Minimalexpandingfoamisusedtopreventairandmoisturefrompenetratingthe
panels.Belowarethemostcommonlyusedpanelconnections.

a. Splines
Splinesareusedtoconnecttwobuttingpanels.Therearefourtypicalspines
used:Blocksplines,surfacesplines,double2x4splinesanddoublelumber
splines.
BlockSpline:Thesesplinescanbeusedinwallsupto10tall.

Surfacespline:Thesesplinesareusedinroofpanelswithshortspans.

Residential Construction Manual

Page 7

Energy Panel Structures,


Inc.
P.O. Box 238
Energy
Panel Structures,
Inc. Graettinger, IA 51342
PO Box 238; 102 E. Industrial Park
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

SEC: (Residential)
Page: 11
Date: 1/14/09
Replaces: N/A

Double2x4spline:Thesesplinesareusedinwallpanels.

LumberSpline:Thesesplinescanbeusedinallpaneltypes.Lumber
splinesareusedtotransferloadswhenthepanelisunabletocarrythe
load.ThenumberofplieswillbedeterminedbyanEPSengineer.
Lumberspinesaretobefieldassembled.

Page 8

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.


PO Box
E. Industrial Park
SEC: (Residential)
Energy Panel Structures,
Inc.238;
102
800-282-3219
www.epsbuildings.com
Graettinger, IA 51342
Page: 12
(800) 282-3219 * Fax (712) 859-3275
Date: 1/14/09
Web Site: www.epsbuildings.com
Replaces: N/A

III. FoundationPanels
Foundationpanelsareslightlydifferentthanthestandardwallpanels.Becausethe
panelsarebelowgrade,theexteriorskinneedstobepressuretreatedfoundation
gradeplywood.Thepanelalsoneedstotakehorizontalloadthatthesoilpressureis
puttingonthepanel.Thereforetreated2x8studsarelaminatedintothecenterofa
panel.Horizontalwirechasesarenotallowedinfoundationpanels.Verticalscan
stillbeinstalledatthesplinelocations.Foundationpanelsarelimitedto8or9tall.

a. GeneralAssembly(FoundationPanel)

Allsplinesinafoundationpanelaretreated2x8lumbersplines.QB300
adhesiveisusedinsteadoftheminimalexpandingfoam.Allfastenersare
stainlesssteelandgalvanized.Refertofasteningscheduleandconstruction
detailsforexactlocationsandspacing.

Residential Construction Manual

Page 9

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS


Energy Panel Structures, Inc.
PO Box 238; 102 E. Industrial Park
Energy Panel Structures,
Inc.
P.O. Box 238
Graettinger,
IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

SEC: (Residential)

Graettinger,
Page: 13IA 51342
Date: 1/14/09
Replaces: N/A

b. FoundationPlateAssembly

2X10 CAP PLATE


RIPPED TO 8 34"
2X8 TOP PLATE
PLANED TO 7 1 4"

4"

FOUNDATION
GRADE TREATED
PLYWOOD

(2) CONTINUOUS BEADS


OF CONSTRUCTION
ADHESIVE (SF-450)

FASTEN CAP PLATE TO TOP


PLATE W/ 16d R.S. OR .131x3 1 4"
R.S. NAILS 6" O.C.
FASTEN TOP PLATE TO STUDS
W/ (3) 20d NAILS PER STUD

ADHESIVE QB-300

FASTEN INTERIOR
SKIN TO TOP PLATE
W/ 10d GALV. NAILS

FASTEN EXTERIOR SKIN TO


TOP PLATE W/ 1 34" S.S NAILS

RECESSES CAVITY
5

8" CDX
PLYWOOD

7 38" EPS
ADHESIVE QB-300
TREATED 2X8 BASE
PLATE PLANED TO 7 1 4"

FASTEN BOTH SKIN TO BASE


PLATE W/ 1 34" S.S NAILS

RECESSES CAVITY

c. FoundationBaseAssembly

AN EMPLOYEE-OWNED COMPANY

DETAIL:

TYPICAL FOUNDATION PANEL

SCALE:

N.T.S.

UPDATED:

DETAIL#

WA3

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Page 10

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc. 800-282-3219 www.epsbuildings.com
PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 14
Date: 1/14/09
Replaces: N/A

d. WaterproofingFoundationPanel
Waterproofingisextremelyimportantwhenusingawoodfoundation.EPS
provides6milpolyfilmandDegasealsealant.Thetopofthepolyisfastened
withx12stripsoffoundationgradetreatedplywood.Sealthetopandbehind
theplywoodstripwiththeDegasealsealantprovided.

e. Backfilling
Backfillwithcrushedstoneorgravel12deepforgroupIsoilsandhalfthe
backfillforgroupsII&IIIsoils.Covertopofgravelw/asphaltorpolyethylene
stripspriortoremainingbackfill.Soilconditionsplayanimportantrolein
determiningthedesignofawoodfoundation.Refertothesoilsurveys
publishedbytheU.S.DepartmentofAgriculturesSoilConservationServiceto
determinesoilconditionsatsitelocation.Asoilsurveymaybeneededto
determineifthesoilisadequateforanEPSwoodfoundation.

Residential Construction Manual

Page 11

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.
Box 238 Park
Graettinger,
IA (Residential)
51342
PO Box
238; 102P.O.
E. Industrial
SEC:
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 15
Date: 1/14/09
Replaces: N/A

IV. WallPanelInstallation
Beforestartingmakesurethefoundationissquareandlevel.Ifthereareanyissues,
correctionsneedtobedoneaheadoftime.Ifframingonafoundationthatisnot
squareorlevelthiswillcausemorecorrectionsandpanelmodificationsdownthe
NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS
road.Makesurethepanelshavefullbearingsoloadscanbetransferredthrough
bothskins.AnEPSwallwillhaveeitheradoubletopplateorasingledouble
beveledtopplate.Thedoubletopplatecanbeusedwithrooftrussesorroof
EPS STANDARD
panels.Thesingledoublebeveledtopplateisusedwithroofpanelsonly.

a. DoubleTopPlate:
2X8 CAP PLATE
RIPPED TO 6 12"
2X6 TOP PLATE
PLANED TO 5 12"

16"

OSB SKINS
INT. & EXT.
(STANDARD)

(2) CONTINUOUS BEADS


OF CONSTRUCTION
ADHESIVE (SF-450)

FASTEN CAP PLATE TO TOP


PLATE W/ 16d R.S. OR .131x3 1 4"
R.S. NAILS 6" O.C.

MINIMAL
EXPANDING FOAM
RECESSES CAVITY

FASTEN PANEL SKINS TO


TOP PLATE W/ 8d OR .113x2
3 " R.S. NAILS 6" O.C.
8

55 8" EPS
RECESSES CAVITY

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS


2X6 BASE PLATE
PLANED TO 5 12"

MINIMAL
EXPANDING FOAM

FASTEN PANEL SKINS TO


BASE PLATE W/ 8d OR
.113x238" R.S. NAILS 6" O.C.

b. DoubleBeveledPlate:

DOUBLE BEVELED
TOP PLATE
MINIMAL
EXPANDING FOAM

DETAIL:

TYPICAL WALL/DOUBLE TOP PLATE

RECESSES CAVITY

SCALE:
7

OSB
SKINS INT. & COMPANY
EMPLOYEE-OWNED
16"AN
EXT. (STANDARD)

UPDATED:

N.T.S.

FASTEN PANEL SKINS TO


TOP PLATE W/ 8d OR DETAIL#
.113x2
3 " R.S. NAILS 6" O.C.
8

WA1

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

55 8" EPS
RECESSES CAVITY

Page 12

2X6 BASE PLATE


PLANED TO 5 12"

MINIMAL
EXPANDING FOAM

FASTEN PANEL SKINS TO


BASE PLATE W/ 8d OR .113x2
3 " R.S. NAILS 6" O.C.
8

Energy Panel Structures, Inc.

Panel Structures, Inc.


Energy Panel Energy
Structures,
Inc. 800-282-3219
PO Box 238; 102 E. Industrial Park
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

www.epsbuildings.com
SEC: (Residential)
Page: 16
Date: 1/14/09
Replaces: N/A

Wallpanelsaregoingtobeinstalledtothebaseinoneofthreebasicways:Ontop
ofthesubfloor,runningthepanelspasttosetontopoffoundation,ordirectlyon
concreteslab.Whenusingpanelspast,thefoundationwallsneedstobeaminimum
of10thick.

NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

c. Panelsonsubfloor:(PricingOptionA)

11 2" HORIZONTAL WIRE


CHASE FACTORY INSTALLED
GYPSUM WALL BOARD OR
OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

EPS WALL PANEL


SPF#2 2x BASE PLATE
1'-4"

FASTEN BASE PLATE TO TRUSS


W/ USP WS3 SCREWS

3 " T&G
4
SUBFLOOR

MINIMAL EXPANDING FOAM


CONSTRUCTION ADHESIVE (SF-450)
BETWEEN PLATES & SUBFLOOR

FLOOR TRUSS

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN
SUBFLOOR & TRUSS

USP JUS46
HANGER

PRE-CUT7 16" OSB RIM,


FIELD SHEATH
SPF#2 2X4 RIBBON
CONSTRUCTION ADHESIVE (SF-450)
BETWEEN TRUSS AND PLATE

ANCHOR BOLTS DESIGNED


AND SUPPLIED BY OTHERS.

TREATED 2X W/ SILL
SEALER BENEATH

AN EMPLOYEE-OWNED COMPANY

CONCRETE FOUNDATION DESIGNED


AND SUPPLIED BY OTHERS

DETAIL:

PANEL/TYPICAL FLOOR TRUSS/CONCRETE

SCALE:

N.T.S.

UPDATED:

4/13/09

Residential Construction Manual


ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342
PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

DETAIL#

PF1
Page 13

Energy Panel Structures, Inc.


PO Box
238; 102
E. Industrial
(Residential)
Energy Panel Structures,
Inc.
P.O.
Box 238 Park
Graettinger,SEC:
IA 51342
Graettinger, IA 51342
Page: 17
(800) 282-3219 * Fax (712) 859-3275
Date: 1/14/09
Web Site: www.epsbuildings.com
Replaces: N/A

d. PanelsPast:(PricingOptionB)

e. PanelsonSlab:

Page 14

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.238;
102
800-282-3219
www.epsbuildings.com
PO Box
E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 18
Date: 1/14/09
Replaces: N/A

V. Baseplate
Wheninstallingthebaseplatetothesubfloorfirstchecktoseeifyouflooris
square.Ifthefloorissquare,measureinfromtheedgeandchalkaline.
BaseplatesneedtobefastenedtothesubfloorusingUSPWS3screwsandtwo
continuousbeadsofSF450constructionadhesive.Firstapplytworowsof
constructionadhesivetotheareaonwhichtheplatewillbesetting.Thenattach
(1)USPWS3screws12O.C.intoparallelfloortruss/joistandtwoWSCscrews
pertruss/joistthatrunperpendicular(seebelow).Verifyscrewspacingperplan.

Residential Construction Manual

Page 15

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.
Box 238 Park
Graettinger,
IA (Residential)
51342
PO Box
238; 102P.O.
E. Industrial
SEC:
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 19
Date: 1/14/09
Replaces: N/A

VI. Corners
TherearetwobasiccornerdetailsthatareusedButtcorners&Flybycorners.
Thebuttcornersaremostcommonlyusedwithstandardwallpanelswhilethe
flybycornersareusedwithfoundationpanelsandtallwalls.

ButtCorner:
FASTEN PANEL
SKINS TO STUDS
W/ 8d OR .113x2 3 8"
R.S. NAILS 6" O.C.

TRU-FAST LD-9000(9")
SIP SCREW 12" O.C.

MINIMAL EXPANDING
FOAM
FASTEN PANEL
SKINS TO SPLINE
W/ 8d OR .113x2 3 8"
R.S. NAILS 6" O.C.

1/2" SET BACK FOR PANEL SKIN

MINIMAL
EXPANDING FOAM

FASTEN STUD TO PANEL


W/ 16d OR .131x3 1 4" R.S.
NAILS 12" O.C.
MINIMAL EXPANDING
FOAM

DOUBLE SPF#2 2x TOP PLATES, (1) PLATE ROUTED INTO


PANEL, (1) OVER TOP OF PANEL, FASTEN PANELS TO
PLATES 8d OR .113x23 8" R.S. NAILS 6" O.C., & MINIMAL
EXPANDING BOTH SIDES. NAIL 1ST PLATE TO STUDS
W/ (3) 16d OR 3 1 4"x.131 R.S. EA STUD AND PLATES
TOGETHER W/ 16d OR 3 14 "x.131 R.S. 2 ROWS 12" O.C. EA

DETAIL:

8d OR .113x2 3 8" R.S. NAILS 6"


O.C., & MINIMAL EXPANDING
BOTH
SIDESDETAIL (STANDARD)
CORNER

8d OR .113x23 8" R.S. NAILS 6"


N.T.S.
O.C., &SCALE:
MINIMAL EXPANDING
BOTH SIDES
AN EMPLOYEE-OWNED COMPANY

UPDATED:

4/13/09

CUT 1 1 2"xPLATE WIDTH NOTCH ON INTERIOR


1
SHEETING ON 1 2 " EPS RECESSION SIDE

DETAIL#

CD2

IN 1 16" FOAM
RECESSION
ENERGY PANEL STRUCTURES,102 EAST INDUSTRIALPLACE
PARK,STUD
GRAETTINGER,
IA 51342
1 9 16" EPS
STUD MUST BE FLUSH WITH BOTTOM OF EPS
PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

RECESSION

FASTEN 2nd STUD TO


INTERIOR FACE OF
PANEL TO STUD W/ 16d
OR 31 4"x.131 R.S. 8" O.C.

Page 16

Energy Panel Structures, Inc.


DETAIL:

CORNER DETAIL

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc. 800-282-3219 www.epsbuildings.com
PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 20
Date: 1/14/09
Replaces: N/A

FlyByCorner(Foundationpanelcornershown):

FASTEN EXT. PANEL SKINS


TO STUDS W/ 1 34" S.S
NAILS 6" O.C.

SILICONE SEALANT

QB-300 ADHESIVE

FASTEN EXT. PANEL


SKINS TO STUDS W/ 1
3 " S.S NAILS 6" O.C.
4

FASTEN INT. PANEL


SKINS TO STUDS W/
10d GALV. NAILS 6" O.C.

FASTEN STUD TO PANEL


W/ 20d NAILS 12" O.C.

QB-300 ADHESIVE

FASTEN INT. PANEL SKINS


TO STUDS W/ 10d GALV.
NAILS 6" O.C.

QB-300 ADHESIVE

QB-300 ADHESIVE

SILICONE SEALANT

DOUBLE SPF#2 2x8 TOP PLATES, FASTEN PANELS TO


WITH 13 4" S.S. NAILS 4" O.C. EXT, 10d GALV NAILS 4"
O.C. INT. ADHESIVE 300 BOTH SIDES NAIL 1ST PANEL
TO STUD W/ (3) 20d GALV NAILS EA STUD AND PLATES
TOGETHER W/ (2) ROWS 16d GALV 4" O.C. & (3) 3 8" ROWS
ADHESIVE PL-450

"C" PANEL

"A" PANEL

DETAIL:
SCALE:

FOUNDATION CORNER DETAIL (STANDARD)


NAIL WITH 10d GLAV NAILS, 4"
N.T.S.
O.C. INT, 1 3 4" S.S. NAILS 4" O.C.
EXT, ADHESIVE 300 BOTH SIDES

UPDATED:

AN EMPLOYEE-OWNED COMPANY
NAIL WITH 10D GALV 6" O.C. INT,

DETAIL#

CD4

4/13/09

CUT 1 2"xPLATE WIDTH NOTCH ON INTERIOR


6" O.C. EXT,
& STRUCTURES,102
13 4" S.S. NAILS
ENERGY
PANEL
EAST INDUSTRIAL
PARK, GRAETTINGER, IA 51342
RECESSION SIDE
SHEETING
1 1 2" EPSWWW.EPSBUILDINGS.COM
ADHESIVE 300 BOTH PHONE:
SIDES (712) 859-3219
FAX: (712)ON
859-3275
PLACE STUD IN 1 9 16" FOAM RECESSION STUD
MUST BE FLUSH WITH BOTTOM OF EPS

19 16" EPS
RECESSION

"C" PANEL
"A" PANEL

FASTEN 2nd STUD TO


INTERIOR FACE OF
PANEL TO STUD W/ 16d
cc NAILS 12" 0.C.

Residential Construction Manual


AN EMPLOYEE-OWNED COMPANY

DETAIL:

FOUNDATION CORNER DETAIL

SCALE:

N.T.S.

UPDATED:

4/13/09

DETAIL#

CD3

Page 17

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc. P.O. Box 238 Graettinger,
IA 51342
PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 21
Date: 1/14/09
Replaces: N/A

VII. Headers
Manyfactorsgointofiguringifaheaderisneeded.Windowsize,headerpanel
height,snowload,buildingsizeandtrusspointloads.Ageneralruleofthumbis
noheadersareneededongableendwalls.Ifaheaderisrequired,thesizewill
bedeterminedbyanEPSengineer.Mostboxheadersareprebuiltandreadyto
assemble.Longerheaderswillbesentinpieces.ThetypicalEPSheaderisa
2plyMSR24002X10boxheaderwithaSPF#22x6aboveanda1x6belowwith
foambetween.Windowsanddoorswillhave1or2bearingstuds.Openings
over6mayneedfulllengthstudstopreventdeflection.Theheaderwill
typicallyfilltheentiredistancebetweentheopeningandthetopplates.On
tallerwallstherewillneedtobeafillerpanelundertheheader.Belowarethe
twoexamples.
Headeronly:

1)StartbyerectingpanelA
2)Preassembleallbearingandfillerstudsintothepanel.
3)SlidepanelBintopanelA.
4)PreassembleallbearingandfillerstudsintopanelC.
5)SlidepanelCintopanelB.Checkhorizontalroughopeningdimension.
6)Installloweropeningframing.
7)DropheaderHintoopeningandsheathbothsidesofheaderwithlooseOSB.
8)Continuewithwallandinstalltopplates.

Page 18

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.238;
102
800-282-3219
www.epsbuildings.com
PO Box
E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 22
Date: 1/14/09
Replaces: N/A

Headerandpanel:

1)StartbyerectingpanelA
2)Preassembleallbearingandfillerstudsintothepanel.
3)SlidepanelBintopanelA.
4)PreassembleallbearingandfillerstudsintopanelC.
5)SlidepanelCintopanelB.Checkhorizontalroughopeningdimension.
6)Installloweropeningframing.
7)Installfillerpanelblocking.
8)Slideupperpanelintoplaceandverifyroughopeningdimension.
9)Installupperopeningframing.
10)DropheaderHintoopeningandsheathbothsidesofheaderwithlooseOSB.
11)Continuewithwallandinstalltopplates.

Residential Construction Manual

Page 19

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc. P.O. Box 238 Graettinger,
IA 51342
PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 23
Date: 1/14/09
Replaces: N/A

VIII.

Upperfloors
NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS
Manytimesahousewillhavemorethanonefloor.Whenframingthosewalls
EPS STANDARD
youtypicallyhavetwooptions:Hangingthefloorsystemorconventionally
framingthefloor.
Option#1(HangingFloor):(PricingoptionC)
11 2" HORIZONTAL WIRE
CHASE FACTORY INSTALLED
EPS WALL PANEL

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

SPF#2 2x BASE PLATE


1'-4"

FASTEN BASE PLATE TO


TOP PLATE W/ USP WS3
SCREWS

3 " T&G
4
SUBFLOOR

MINIMAL EXPANDING FOAM


CONSTRUCTION ADHESIVE
(SF-450) BETWEEN ALL PLATES

FLOOR TRUSS

CONSTRUCTION ADHESIVE
(SF-450) BETWEEN
SUBFLOOR & TRUSS

2X CAP PLATE RIPPED


TO WIDTH OF PANEL
SPF#2 2x TOP PLATE
FLOOR TRUSS HANGER, SEE FLOOR
TRUSS MFG. DRAWINGS FOR SPECS.

EPS WALL PANEL

GYPSUM WALL BOARD OR


NOTE: SEE FASTEN SCHEDULE FOR ALL CONNECTIONS

OTHER APPROVED THERMAL


BARRIER (BY OTHERS).

Option#2(ConventionalFloor):
11 2" HORIZONTAL WIRE
CHASE FACTORY INSTALLED
EPS WALL PANEL

SPF#2 2x BASE PLATE

DETAIL:

FASTEN BASE PLATE TO


TOP PLATE W/ USP WS3
SCALE:
SCREWS

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

PANEL/HANGING
1'-4"FLOOR TRUSS/PANEL
N.T.S.

3 " T&G
4
SUBFLOOR

DETAIL#

UPDATED:
2/26/09
PHF1
MINIMAL EXPANDING
FOAM
CONSTRUCTION ADHESIVE
PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER,
IA 51342BETWEEN
(SF-450)
CONSTRUCTION ADHESIVE ENERGY
(SF-450)
PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM
SUBFLOOR & TRUSS
BETWEEN PLATES & SUBFLOOR
FLOOR TRUSS

AN EMPLOYEE-OWNED COMPANY

PRE-CUT7 16" OSB RIM,


FIELD SHEATH
SPF#2 2X4 RIBBON
CONSTRUCTION ADHESIVE (SF-450)
BETWEEN PLATES & SUBFLOOR
2X CAP PLATE RIPPED
TO WIDTH OF PANEL
SPF#2 2x TOP PLATE

Page 20

EPS WALL PANEL

MINIMAL EXPANDING
FOAM

GYPSUM WALL BOARD OR


OTHER APPROVED THERMAL
BARRIER (BY OTHERS).

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc. 800-282-3219 www.epsbuildings.com
PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 24
Date: 1/14/09
Replaces: N/A

IX. RoofPanelInstallation

Roofpanelsrangeinoverallthicknessfrom61/2to101/4.Therearetwobasic
waystosetroofpanels:ParalleltotheridgeorPerpendiculartotheridge.When
panelsrunparalleltotheridgetheytypicallyhavesupportsraftersortrussesunder
themthatrunperpendiculartotheridge.Surfacesplinesareusedtoconnectthe
panelsinthissituation.Whenpanelsrunperpendiculartotheridgeamidspan
beammaybeneeded.Lumberandsurfacesplinesareusedtoconnectthepanels.
Thespanandsnowloadingwilldeterminewhichsplineisused.Checkwithshingle
manufacturepriortoinstalling.

ParalleltoRidge:

PerpendiculartoRidge:

Residential Construction Manual

Page 21

EnergyInc.
Panel Structures,
Inc. Graettinger, IA 51342
Energy Panel Structures,
P.O. Box 238
PO Box 238; 102 E. Industrial Park
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

SEC: (Residential)
Page: 25
Date: 1/14/09
Replaces: N/A

Assembleasmuchofthepanelaspossibleontheground.Thiswillreducethetimein
theair.Somepanelsmightfittogethersnuggerthanothers.Byusingratchetstrapsthe
panelscanbepulledtogether.Dependingonthesizeandtypeoflift,theroofcanbe
puttogetheronthegroundandsetinlargesections.Groupingpanelsontheground
willalsodecreasethenumberoflifts.Roofpanelsectionsarelargeandheavysobe
suretohaveacraneoperatorthathasdonethistypeofliftingbefore.

a. Walltoroofconnections

Whenusingroofpanelsthewallwillbebeveledorsquare.Thebeveledtop
platematchesthepitchoftheroofpanelsandisthemostenergyefficient.A
standarddoubletopplatecanalsobeused,withabearingblockinstalledafter
thepanelsareset.

BeveledTopPlate:

Page 22

Energy Panel Structures, Inc.

Energy
Inc. www.epsbuildings.com
Energy Panel Structures,
Inc.Panel
Structures,
800-282-3219
PO Box 238; 102 E. Industrial Park
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

SEC: (Residential)
Page: 26
Date: 1/14/09
Replaces: N/A

DoubleTopPlate:

b. Ridgeconnections
Thetypeofridgeconnectionisdeterminedbythedirectionofthepanelsand
thetypeofsupportunderthepanels.RidgebeamscanbeeitherLVLorGlu
Lams.LVLbeamsareBoiseCascade3100fb.GluLamsbeamsare24FV4
Architecturalappearance.Peel&Sealmaynotstickincoldtemperatures.

Ridgewithvoid:

Residential Construction Manual

Page 23

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.
Box 238 Park
Graettinger,
IA (Residential)
51342
PO Box
238; 102P.O.
E. Industrial
SEC:
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 27
Date: 1/14/09
Replaces: N/A

CantileveredRidgewithdoublelumber:

Ridgeoverlay(12/12PitchOnly):

Page 24

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.238;
102
800-282-3219
www.epsbuildings.com
PO Box
E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 28
Date: 1/14/09
Replaces: N/A

c. Eavedetails

Theeavedetailisgoingtodependonthestyleofthehouseandcustomers
personalpreference.Refertothedetailmanualforalleavestyles.

Residential Construction Manual

Page 25

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.
Box 238 Park
Graettinger,
IA (Residential)
51342
PO Box
238; 102P.O.
E. Industrial
SEC:
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 29
Date: 1/14/09
Replaces: N/A

d. RakeExtensiondetail

Typicallygableendwallswillextenduptotheundersideofaroofpanel.When
thewallisextendedthedoubletopplateisnolongerneeded.Refertothe
constructiondetailsforallrakeoptions.

PanelOverhang:

LadderOverhang:

Page 26

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.238;
102
800-282-3219
www.epsbuildings.com
PO Box
E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 30
Date: 1/14/09
Replaces: N/A

X. RoofTrusses

AlongwithroofpanelsEPSalsomanufacturesrooftrusses.Inmanycasesrooftrusses
mightbemorefeasiblethenroofpanels.EPSoffersrooftrusseswithastandard12
energyheelforoptimalenergyefficiency.Trussesareheldback7/16toallowfor
sheathing.RoofsheathingoptionsareOSBandCDXwiththicknessesof1/2and5/8.
Therearetwooptionsforthegableendrakeextension,eitheraladderframed
overhangoranoutlookerframedoverhang.

EaveOverhangDetail:

Residential Construction Manual

Page 27

Energy Panel Structures, Inc.


Energy Panel Structures,
Inc. P.O. Box 238 Graettinger, IA 51342
PO Box 238; 102 E. Industrial Park
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

SEC: (Residential)
Page: 31
Date: 1/14/09
Replaces: N/A

LadderFramedRakeDetail:

OutLookerFramedRakeDetail:

ItisimportanttobefamiliarwiththeBuildingComponentSafetyInformation(BCSI)
manual.ABCSImanualisavailablefromEPSuponrequest.SectionsB1andB3willbe
providedwithallconstructionprints.Itisthecontractorsresponsibilitytoreadand
understandthismanual.EPSwillprovideallpermanentbracingmaterial.Itisthe
contractorsresponsibilityforalltemporaryshoringandbracing.

Page 28

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

PO Box
E. Industrial Park
SEC: (Residential)
Energy Panel Structures,
Inc.238;
102
800-282-3219
www.epsbuildings.com
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 32
Date: 1/14/09
Replaces: N/A

XI. Floorpanels

EPSoffersfloorpanelstobeusedovercrawlspacesorwithapierandbeamfoundation.
Thesepanelscanbemadeoutofavarietyofpanelthicknessesandskinmakeups.

Residential Construction Manual

Page 29

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.
Box 238 Park
Graettinger,
IA (Residential)
51342
PO Box
238; 102P.O.
E. Industrial
SEC:
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 33
Date: 1/14/09
Replaces: N/A

XII. Wiring&plumbing
a. WireChases
WirechasesarefactoryinstalledintoeveryEPSpanelunlessotherwisenoted.
Verticalwirechasesareinstalledapproximately4O.C.withanoptional
horizontalwirechaseat16andor44offthefloor.

Thewirechaseswillbemarkedontheinteriorskinwithadarkredmarkerat
bothverticalandhorizontallocations.Ifthechaseisnotmarkedbesuretomark
itbeforethepanelisinstalled.

Beforethepanelsareinstalledtakeafewminutestomarkthesubflooranddrill
a1accessholesthroughthebaseplatesandsubfloor.Thesefewminutes
maysavehourslateron.Oncethepanelsareinstalleda1holewillalsoneed
tobedrilledthroughthetopplates.

Page 30

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.


PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Energy Panel Structures,
Inc. IA800-282-3219
www.epsbuildings.com
Graettinger,
51342
Page: 34
(800) 282-3219 * Fax (712) 859-3275
Date: 1/14/09
Web Site: www.epsbuildings.com
Replaces: N/A

b. Boxes
Electricalboxesmaybecutintotheinteriorskinbyusingarouter,oraholesaw.
Aretrofitelectricboxmaybeusedtofastentheboxinthecenterofapanel.If
theboxisnexttoastudor2x4splinethentheboxcanbefastentothelumber.

Residential Construction Manual

Page 31

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc.
Box 238 Park
Graettinger,
IA (Residential)
51342
PO Box
238; 102P.O.
E. Industrial
SEC:
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 35
Date: 1/14/09
Replaces: N/A

c. Plumbing
RunningplumbinglinesthroughSIPwallsisnotrecommended.Plumbinglines
andverticalventsshouldberunthroughinteriorwallsorthroughplumbing
chases.

Page 32

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

PO Box
E. Industrial Park
SEC: (Residential)
Energy Panel Structures,
Inc.238;
102
800-282-3219
www.epsbuildings.com
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 36
Date: 1/14/09
Replaces: N/A

WhenusingEPSroofpanelsverticalventstackswillneedtobecutthroughthe
roofpanel.Unsupportedroofpenetrationsareallowedupto12.Anything
largerwillrequire2xsupportswithinthepanel.

ROOF FLASHING
(BY OTHERS)

VENT STACK

EPS ROOF PANEL


12" MAX

FILL REMAINING CAVITY WITH


APPROVED INSULATION
FIELD CUT
OPENING

XIII.

DivisionWalls
Divisionwallsareapartofalmosteveryproject.EPSrecommendsfastening
interiordivisionwallstothepanelswithSIPscrews.Thiswillhelpprevent
drywallseparationandcrackinginthecorners.

NOTE: HIGH TEMPERATURE INSULATION IS REQUIRED IN ANY


APPLICATION WERE TEMPERATURES EXCEED 160 F.

AN EMPLOYEE-OWNED COMPANY

DETAIL:

ROOF PENETRATION

SCALE:

N.T.S.

UPDATED:

DETAIL#

PL2

12/16/08

ENERGY PANEL STRUCTURES,102 EAST INDUSTRIAL PARK, GRAETTINGER, IA 51342


PHONE: (712) 859-3219 FAX: (712) 859-3275 WWW.EPSBUILDINGS.COM

Residential Construction Manual

Page 33

Energy Panel Structures, Inc.


Energy Panel Structures,
Inc. P.O. Box 238 Graettinger, IA 51342
PO Box 238; 102 E. Industrial Park
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

SEC: (Residential)
Page: 37
Date: 1/14/09
Replaces: N/A

DivisionwallsthatareconnectedtorooftrussesshouldUSPTR1trusstietohelp
preventdrywallcrackingduringtrussrise.Inadditiondrywallclipsshouldbe
usedwithin16ofthedivisionwalls.

Page 34

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.


Energy Panel Structures,
Inc. 800-282-3219 www.epsbuildings.com
PO Box 238; 102 E. Industrial Park
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

XIV.

SEC: (Residential)
Page: 38
Date: 1/14/09
Replaces: N/A

Sealant,Tape,Adhesive&Fasteners
EPSprovidesallnecessarysealants,tapes,adhesivesandfastenerswitheach
buildingpackage.Refertocrosssectionsandconstructiondetailsforexact
placementofeach.Refertofasteningandadhesivescheduleforproperquantities.
Fasteningschedulesmaychangedependingonlocationandconditions.

a. Onecomponent(Gunfoam)
EPSusesAllSeasonspolyurethanefoamgunsealantmadebyTouchnSeal.
Thisfoamiscalledonecomponentexpandinglowpressurefoamsealant.Itis
idealforfillingsmallgapsandcracks,providingairtightinsulationthatstopsair
infiltration.One24oz.canoftheAllSeasonswillyieldabeadx2,150.The
shelflifeofacanwilllastaslongas12months.Oncethecanisstarted,donot
removethegununtilthecanisempty;thenpurgegunandremovecan.Clean
gunthoroughlywithacetoneorpolyurethanefoamcleaner.Donotallowfoam
tohardeninthegun.Formoreinformationonfoamsealantsgoto
www.touchnseal.com.

b. TwoComponent(optional)
Forlargevoidsandcavitiesthatneedfilledatwocomponentfoammaybe
required.Twocomponentfoamkitsarenotapartofastandardpackage,but
canbesentuponrequest.Formoreinformationonfoamsealantsgoto
www.touchnseal.com.

c. Tape
EPSusestapeasalastlineofdefense.GraceVycorPlus(Peel&Seal)isusedat
allroofseamstopreventairinfiltration.Makesureallsurfacesareclearofany
debrisbeforeapplying.Tapemaynotstickaswellifsurfacesaretoocold.Peel&
Sealcomesinavarietyofwidths:4,7,9,&18.Peel&Sealisalsoused
underpanelsthatrestdirectlyonconcretetopreventmoisturefrombeing
wickedupintothepanelskin.Refertoconstructiondetailsforexactplacement.
FormoreinformationonGraceVycorPlusgotowww.graceathome.com.

Residential Construction Manual

Page 35

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc. P.O. Box 238 Graettinger,
IA 51342
PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 39
Date: 1/14/09
Replaces: N/A

d. Adhesive
SF450
EPSusesOSIProSeriesSF450VOCSubFloor&ConstructionAdhesiveforall
woodtowoodconnectionsandforallsubfloor.DONOTuseiftheSF450
adhesivewillbeindirectcontactwiththeEPSfoamcore.Directcontact
betweentheSF450andtheEPSfoamwillcauseareactionandthefoamwill
disintegrate.

QB300
EPSusesOSIProSeriesQB300MultiPurposeConstructionAdhesivefor
applyingsplinesandplatesintofoundationpanels.TheQB300doesnotcausea
reactionsodirectcontactwiththeEPSfoamcoreisallowed.

XV.Ventilation
SIPbuildingsareextremelyairtightandrequiremechanicalventilation.Ventilation
systemsbringfreshairintothebuildingincontrolledamountsandexhaustmoisture
ladenandstaleairtotheoutside.Bylimitingairexchangetocontrolledventilation
systems,SIPhomesallowforallincomingairtobefilteredforallergensand
dehumidified,amountingtobetterindoorairquality.Ventilationsystemscanbe
designedtoincorporateheatrecoveryventilators(HRVs).Theseadvancedsystems
harnessheatbeingexhaustedfromthehomeandutilizeittoheatthefreshaircoming
intothehomeforanevenmoreefficientuseofenergy.Insomecasesitcanbeas
simpleasexhaustonlyfans.Properventilationisimportantinallhomestopreserve
indoorairquality.

XVI. MSDS
SomeareasofthecountrymayrequireMSDSsheetsontheproductsgoingintothe
project.Thisinformationislengthyandnotneededbyeveryone.EPScanprovidea
completeMSDSpacketuponrequest.

Page 36

Energy Panel Structures, Inc.

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc. 800-282-3219 www.epsbuildings.com
PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 40
Date: 1/14/09
Replaces: N/A

GeneralRecommendations

EPSStructuralInsulatedPanels(SIPs)mustbedesignedandinstalledinaccordancewith:
AllApplicablecodes
LoadCharts&ConstructionDetails
InformationwithinQuotations&Drawings
FollowingItems

ThermalBarriers
AllinteriorsurfacesofSIPpanelsmustbefinishedwithaminimum15minutethermalbarrier,
typicallygypsumboardor1Xwoodpaneling.Onehourfireratedsystemscanbeachieved
usinghighperformancethermalbarrierssuchastypeX&Cgypsumboard.Buildingswith
sprinklersystemsmaynotrequireathermalbarrier.Consultapplicablecodesregarding
compliancerequirements.

MechanicalVentilation
ProperlyinstalledEPSSIPpanelswillgreatlyreduceairmovementthroughwallsandroofs.
Whilefewerairexchangessavesenergy,airqualityisaffectedandhumidityisincreased
possiblycausingmoldandmildewproblems.Aprofessional,familiarwithtightconstruction
suchasSIPs,shoulddesignandinstallaHVACsystemthatincludesanadequatefreshair
ventilationsystem.

VaporRetarders
EPSrecommendstheuseofvaporretarderswhenmandatedbycodeorrequiredbyclimate
conditions.Sealantsappliedtoallconnections(foamtofoam,foamtowood,woodtowood)
arerequired.Inaddition,a6milpolyethylenevaporretardermustbeinstalledatallroofpanel
connectionsincludingridge.

WeatherResistiveBarriers
Properusageofsealantsatpanelconnectionsisnecessary.Flashingandsealantsaroundall
roughopeningsandpenetrationsisrequired.Properlyinstalledhousewrapwillhelpprotect
theexteriorOSBskinfromdamageduetomoistureintrusion.

Residential Construction Manual

Page 37

Energy Panel Structures, Inc.

Energy Panel Structures,


Inc. P.O. Box 238 Graettinger,
IA 51342
PO Box 238; 102 E. Industrial Park
SEC: (Residential)
Graettinger, IA 51342
(800) 282-3219 * Fax (712) 859-3275
Web Site: www.epsbuildings.com

Page: 41
Date: 1/14/09
Replaces: N/A

Storage,HandlingandProtection
Storeallpanelsinalevel,wellsupportedmanner,fullycoveredwithtarpsorotherprotective
wraps.Wheninstallingpanelswithacrane,strapsoranIBoltshouldbeused.Underno
circumstanceshouldpanelsbeliftedbyasingleOSBface.Roofpanelsmusthavetemporary
waterresistantpaperappliedafterinstallation.EPSusesexposureIratedOSBskinswhich
withstandlimitedweathering.Theweatherproofexteriorcladdingsystemmustbeinstalled
promptly.WhileSIPsaretreatedtoresisttermiteandcarpenterantintrusion,standard
deterrentssuchasinsectclips,flashingortarpsshouldbeinstalled.

OtherResources
APATheEngineeredWoodAssociationseriesBuildaBetterHomewww.apawood.org
NAHBNationalAssociationofHomebuilderswww.nahb.com

Page 38

Energy Panel Structures, Inc.

ENERGY PANEL STRUCTURES, INC.


Graettinger, IA 51342
Phone 712-859-3219 or 800-967-2130
Fax: 712-859-3275
www.epsbuildings.com
An Employee-owned Company
Pre-engineered buildings and tilt-up panel systems

Vous aimerez peut-être aussi