Vous êtes sur la page 1sur 18

Quality Control - Homework 5

Madhava Reddy Yenimireddy - M07579553

CHAPTER 8

8-20. Health care facilities must conform to certain standards in submitting bills to Medicare/Medicaid for processing. The number of bills with errors and the number sampled
are shown in Table 8-17. Construct an appropriate control chart and comment on the
performance of the billing department. Revise the control limits, if necessary, assuming
special causes for out-of-control points. Comment on the capability of the department

From the data in the given table,


25
X

= 170

i=1

n = 9900
Centerline
p =

For observation 1-6:

170
= 0.0172
9900

(0.0172)(1 0.0172)
400
= 0.0172 + 0.0195 = 0.0367
r
(0.0172)(1 0.0172)
LCL = 0.0172 3
400
= 0.0172 0.0195 = 0

U CL = 0.0172 + 3

For observation 7-16:

(0.0172)(1 0.0172)
300
= 0.0172 + 0.0195 = 0.0397
r
(0.0172)(1 0.0172)
LCL = 0.0172 3
300
= 0.0172 0.0195 = 0

U CL = 0.0172 + 3

For observation 17-25:

(0.0172)(1 0.0172)
500
= 0.0172 + 0.0195 = 0.0367
r
(0.0172)(1 0.0172)
LCL = 0.0172 3
500
= 0.0172 0.0195 = 0

U CL = 0.0172 + 3

From the above data, we get the following p-chart. It can be observed that the 10th observation is above
the UCL.

Assuming special causes and deleting the 10th observation, the revised centerline is:
p =

155
= 0.0161
9600

Hence, the revised control limits are as follows: For observation 1-6:
r
(0.0161)(1 0.0161)
U CL = 0.0161 + 3
400
= 0.0161 + 0.0189 = 0.0350
r
(0.0161)(1 0.0161)
LCL = 0.0161 3
400
= 0.0161 0.0189 = 0

For observation 7-16:

(0.0161)(1 0.0161)
300
= 0.0161 + 0.0189 = 0.0379
r
(0.0161)(1 0.0161)
LCL = 0.0161 3
300
= 0.0161 0.0189 = 0

U CL = 0.0161 + 3

For observation 17-25:

(0.0161)(1 0.0161)
500
= 0.0161 + 0.0189 = 0.0330
r
(0.0161)(1 0.0161)
LCL = 0.0161 3
500
= 0.0161 0.0189 = 0

U CL = 0.0161 + 3

These calculated values can be used to calculate revised p-chart

Hence, it can be seen that, all the values are in between UCL and LCL. Also, it can been seen that
the proportion has been changed from 0.0172(before revision) to 0.0161(after revision).
To achieve target value of 0 error, the feasible limit =
0.01616
= 2.216
0.0073
.
It will be impossible to achieve an error free environment in every sample, but for a few samples error
free environment can be achieved.
8-24. A health care facility is interested in monitoring the primary C-section rate. Monthly
data on the number of primary C-sections collected over the last two and a half years is
shown in Table 8-20.
a. Is the process in control?

Centerline:
p =

1847
= 0.153
12032

With the above data, we get the following p-chart with UCL as 0.2058 and LCL as 0.1004. It can
be seen from the chart that the process is in control.

b. There is pressure to make these data public. Can we conclude that the C-section
rates had shifted to a higher level in the last six months relative to the previous six months?
From the graph, we can see that the C-sections rates had shifted to a higher level in the last six
months.
(Last few observations in the graph)

c. What is your prediction on the C-section rate if no changes are made in current
obstetrics practices?
If no changes are made, the C-section rate is expected to be
0.1531 100 = 15.31%

d. Based on benchmarking with comparable facilities in similar metropolitan areas, Is


it feasible currently to achieve a C section rate of 10 %

Given benchmark value = 10 %


Difference between the Center Line and the benchmark value is calculated as follows:
p =

U CL CL
0.2058 0.1531
=
= 0.0176
3
3

Calculating the standard deviation of the benchmark from the Center Line:
Z =

0.1531 0.10
= 3.017
0.0176

Hence, we can conclude that it is not feasible to achieve the benchmark value of 10 % if no changes are
made to the current system.

8-26. The number of processing errors per 100 purchase orders is monitored by a company with the objective of eliminating such errors totally. Table 8-21 shows samples that
were selected randomly from all purchase orders. The company is in the process of testing the effects of a new purchase order form that it has designed. The last five samples
were made using the new form. Construct a control chart that the company can use for
monitoring the quality characteristic selected. What is the effect of the newly designed
purchase order form? Is the company capable of achieving the desired goal?

From the data given,


N o. of observations, g = 25
c
101
=
= 4.04
g
25

Control Limits = c 3 c = 4.04 3 4.04 = (0, 10.07)


T he Center Line = c =

It can be observed from the c-chart that sample 9 lies above the UCL.
By assuming special causes and removing the 9t h sample, we have:
90
c
=
= 3.75
g
24

Control Limits = c 3 c = 3.75 3 3.75 = (0, 9.9559)


T he Center Line = c =

Effect of the new designed purchase form:


There is a downward trend for the observations using the new designed purchase form. However, the
number of processing errors has increased by 1 for the last sample. This, however, can be ignored and
the primary conclusion is that the new form is an improvement over the old one. Also, as the number of
samples are very few, we would require greater number of samples to decisively draw this conclusion.
An estimate of the standard deviation of the number of processing errors per 100 orders purchased
is,
c =

3.75 = 1.936

The revised Center Line, that is, 3.75 is removed from the goal value if 0 in the standard deviation
units as:
(3.750)
Z =
= 1.936
1.936

Therefore, it is quite possible for the company to achieve 0 errors on a consistent basis, but not
probable. However, if more samples are taken into consideration, we would be able to estimate about
the companys chances of meeting the goal.

8-28. A building contractor subcontracts to a local merchant a job involving hanging


wallpaper. To have an idea of the quality level of the merchants work, the contractor ran6

domly selects 300 m2 and counts the number of blemishes. The total number of blemishes
for 30 samples is 80. Construct the centerline and control limits for an appropriate chart.
Is it reasonable for the contractor to set a goal of an average of 0.5 blemish per 100 m2 ?
Given:
Number of blemishes (n) = 30
Sample size (s) = 80
80
s
=
= 2.667
center line =
n
30

Control Limits = c 3 c = 2.667 3 2.667 = (0, 7.565)

For the specified goal of 0.5 blemishes per 100 m2 ,

Control Limits = c 3 c = 0.5 3 0.5 = (0, 2.621)

Determining if the goal can be reached:


= 0.889 blemishes per 100 m2
P rocess average = 2.667
3

Process standard deviation = 0.889 = 0.943.


Therefore, Process average (0.889) > Goal Value (0.5)
Probability of the number of blemishes not exceeding the UCL for a process average of 0.889
Using Poisson distribution, we have
P (X < 2.621) = P (X = 2) = (e0.0889 )

(0.889)2
1.8778
=
= 0.9389
2!
2

Hence, From the Appendix, we see that about 6.11 % of the time, the process could go out of the
control, although a small value, the process cannot be deemed totally capable.

8-29. The number of imperfections in bond paper produced by a paper mill is observed
over a period of several days. Table 8-23 shows the area inspected and the number of
imperfections for 25 samples. Construct a control chart for the number of imperfections
per square meter. Revise the limits if necessary, assuming special causes for the out-ofcontrol points.
Given in the question,
Number of samples = 25.
From the table, sum of all imperfections, ci = 189
Sum of the area inspected,ni = 4850
With the given data, the center line of the u-chart, u
=

189
4850

= 0.039

The control limits are given by,


r
CL = baru 3

r
u

0.039
= 0.039 3
n
n

= (0, 0.0808)f romtheu chart

The following u-chart is constructed for the number of imperfections per m2 .

It can be seen from the u-chart that the samples 6 and 19 are out of control and are above the UCL.
Assuming special causes and revising the control limits by removing the 6th and the 19th observation,
we have:
The revised center line of the u-chart, u
=

164
4600

= 0.0356

The revised control limits for sub-group size 100,


r
r
u

0.0356
baru 3
= 0.0356 3
= (0, 0.0922)
n
100
The revised control limits for sub-group size 150,
r
r
u

0.0356
baru 3
= 0.0356 3
= (0, 0.0818)
n
150
8

The revised control limits for sub-group size 200,


r
r
u

0.0356
baru 3
= 0.0356 3
= (0, 0.0756)
n
200

The revised control limits for sub-group size 250,


r
r
u

0.0356
baru 3
= 0.0356 3
= (0, 0.0714)
n
250

The revised control limits for sub-group size 3000,


r
r
u

0.0356
baru 3
= 0.0356 3
= (0, 0.0683)
n
300

8-37 Refer to Exercise 8-36. Set up 2s control limits. What is the probability of detecting a change in the process average number of dietary errors per 100 trays to 8 on the first
sample drawn after the change? Explain under what conditions you would prefer to have
these 2s control limits over the traditional 3s limits.
From the data in the questions 36 and 27, we have
Sample size = 100
The center line is calculated from the data in the Table 8-22 as
181
CL =
= 7.24
25

Control Limits = c 3 c = 7.24 3 7.24 = (0, 15.312)

It can be observed from the c-chart constructed that sample 7 lies above the UCL.

Assuming special causes are identified and removing the 7th sample.
The Center Line,
CL = c =

164
= 6.875
24

Revised Control Limits = c 3 c = 6.875 3 6.875 = (0, 14.741)

The 2 control limits are:

c 2 c = 6.875 2 6.875 = (1.631, 12.119)

Probability of detecting a change in the process average number of dietary errors per
100 trays to 8 on the first sample drawn after the change:
The probability of a Type II error when a process average changes is
= P [X < 12.119 | c] P [X = 1.63 | c] = P [X < 12 | c] P [X < 1 | c]

Given, c = 8
= P [X < 12 | c = 8] P [X < 1 | c = 8] = 0.936 0.03(F romAppendixA 2)

hence, = 0.933 Therefore, the probability of detecting a change in the process average number of
dietary errors per 100 trays to 8 on the first sample drawn after the change is 1 0.933 = 0.067.
Conditions under which the 2 control limits are preferred over the traditional 3 control limits:
We would prefer the 2 control limits for detecting small changes in the process average as quickly
as possible neglecting the increase in Type I error it would cause.

8-43. Consider Exercise 8-38. However, now assume that the interval between complications follows an exponential distribution. Construct an appropriate control chart and
comment on the process assuming a type I error rate of 0.005.
From the data of this question and the exercise 8-38, we have,
Sample size = 25
Complication rate = 0.1%
Interval between complications follows an exponential distribution Type I error rate of 0.005
Using an exponential distribution with parameter = 0.001 and = 0.005, we get

10

Center line,
CL =

0.6931
0.6931
=
= 693.1

0.001

The control limits are given by,


LCL =

1
0.005
ln(1 ) =
ln(1
) = 1000 ln(0.9975) = 2.50

2
0.001
2

U CL =

1
0.005
ln( ) =
ln(
) = 1000 ln(0.0025) = 5991.46

2
0.001
2

Hence, with the above data, we get the following with UCL as 5991.46 and LCL as 2.50.

Comment: It can be seen from the chart that the process is in control and all the observations are within control limits.

11

CHAPTER 9

9-13. A pharmaceutical company producing vitamin capsules desires a proportion of calcium content between 40 and 55 ppm. A random sample of 20 capsules chosen from the
output yields a sample mean calcium content of 44 ppm with a standard deviation of 3
ppm. Find the natural tolerance limits of the process. If the process is in control at the
present values of its parameters, what proportion of the output will be nonconforming,
assuming a normal distribution of the characteristic?
Given,
Proportion of Calcium content = 40 to 55 ppm
Random sample size = 20
Mean, = 44 ppm
Standard deviation, = 3 ppm
Tolerance limits:
U pper N atural T olerance Limit = + 3 = 44 + 3(3) = 53
Lower N atural T olerance Limit = + 3 = 44 3(3) = 35
The standard normal values at UNTL and LNTL are:
(4044)
= 1.33
3
(5544)
=
= 3.67
3

Z1 =
Z2

Using the standard normal tables, the proportion below the lower specification limits is 0.0918, while
the specification above the upper specification limit is 0.0000.

9-15. The emergency service unit in a hospital has a goal of 3.5 minutes for the waiting
time of patients before being treated. A random sample of 20 patients is chosen and the
sample average waiting time is found to be 2.3 minutes with a sample standard deviation
of 0.5 minutes. Find an appropriate process capability index. Comment on the ability of
the emergency service unit to meet the desirable goal, assuming normality. What are some
possible actions to consider?
Given,
Upper specification limit = 3.5 mins
Average waiting time = = 2.3 mins
Standard deviation = = 0.5 mins

12

(U SL )
(3.5 2.3)
=
= 0.8
(3 )
(3 0.5)

U ppercapabilityindex =

As CPU is less than 1, the emergency unit will not fully meet the desirable goal.
Assuming a normal distribution of waiting time, we can determine the proportion of patients who
will have to wait longer than the specified goal as,
Z =

(3.5 2.3)
= 2.4
0.5

Using the standard normal tables, the proportion of patients who will have to wait longer than 3.5
minutes is 0.0082.
To prevent this, the following steps can be taken:
Expanding the facilities provision at the unit.
Increasing the quantity of experienced staff.
Decreasing the time between each treatment.
9-17. The diameter of a forged part has specifications of 120 5mm. A sample of 25 parts
chosen from the process gives a sample mean of 122 mm with a sample standard deviation
of 2 mm. (a) Find the Cpk index for the process, and comment on its value. What is the
proportion of nonconforming parts assuming normality? If the target value is 120 mm, find
the Cpm and Cpmk indices and comment on their values. If the process mean is to be set
at the target value, how much of a reduction would occur in the proportion nonconforming?
Given, Specifications of the diameter of a forged part = 120 5 mm
Sample size = 25
Sample mean, = 122 mm
Sample standard deviation, s = 2 mm
We know,
Cpk = min

Cpk = min

U SL LSL
,
3
3s

125 122 122 115


,
= min0.5, 1.167 = 0.5
3(2)
3(2)

As Cpk is less than 1, an undesirable solution exists. The standard normal values at the specification
limits are:

Z1 =

Z2 =

115112
= 3.5
2
125122
= 1.5
2
13

From the standard normal tables, the proportion below the LSL is 0.0000, while the proportion above
the USL is 0.0668.
Since the target value is 120, we have

2 = 2 + ( )2 = 22 + (122 120)2 = 8

Cpm =

8 = 2.8284

U SL LSL
125 115
=
6(2.8284) = 0.589
6
/

Comment: The process mean is off from the target value by 1 standard deviation.

Cpmk =

min(125 122), (122 115)


min(125 122), (122 115)
=
= 0.353
3
3(2.8284)

Comment: Cpmk, being the smallest indicates that the process mean is close to one of the
specification limits in standardized units and also is deviating from the target value.

(b) Parts with a diameter below the lower specification limit cost $ 1.00 per part to
be used in another assembly; those with a diameter above the upper specification limit
cost $ 0.50 per part for rework. If the daily production rate is 30,000 parts, what is the
daily total cost of non conformance if the process is maintained at its current setting? If
the process mean is set at the target value, what is the daily total cost of non conformance?
Given,
Cost of parts with a diameter lower than the specification limits = $ 1.00
Cost of parts with a diameter higher than the specification limits = $ 0.50
Number of parts produced daily = 30,000
Process mean is set at a target value of 120 which means the standard normal value would be 2.5
at the specification limits. Therefore, total proportion non-confirming would be 2(0.0062) = 0.0124.
As a result, reduction in the proportion non-confirming = 0.0668 0.0124 = 0.0544
With the process mean at 122, the daily costs are calculated as follows:
Costs of parts below LSL = 0.0000 30,000 1.00 = $ 0.00
Costs of parts above USL = 0.0668 30,000 0.50 = $ 1002.00

14

Therefore, the total daily cost of non-conformance = $ 1002.00


With the process mean at 120, the daily costs are calculated as follows:
Costs of parts below LSL = 0.0062 30,000 1.00 = $ 186.00
Costs of parts above USL = 0.0062 30,000 0.50 = $ 93.00
Therefore, the total daily cost of non-conformance = $ 279.00

9-19. A major automobile company is interested in reducing the time that customers
have to wait while having their car serviced with one of the dealers. They select four
customers randomly each day and find the total time that each of those customers has to
wait (in minutes) while having his or her car serviced. Next, from these four observations,
the sample average and range are found. This process is repeated for 25 days.
Given,
25
X

Xi = 1000

i=1
25
X

Ri = 250

i=1

(a) Find the X and R-chart control limits.


=

X
Center Line on the X-chart,
=
Center Line on the R-chart, R

1000
25
250
25

= 40

= 10

+ A2R
= 40 + (0.729 10) = 47.29
U pper control limit = U CL = X

A2R
= 40 (0.729 10) = 32.71
Limit control limit = LCL = X

For R-chart,

= 2.282 10 = 22.82(V aluesf romAppendixA 7)


U pper control limit = U CL = D4R
= 0 0.4 = 0(V aluesf romAppendixA 7)
Lowercontrollimit = LCL = D3R

b.Assuming that the process is in control and that a desirable value on the upper bound
of the waiting time is 50 minutes, calculate a process capability index, and comment on its

15

value.
Upper bound on the waiting time = 50 minutes
Lower specification limit = = centerline = 40 minutes
10
An estimate of the process standard deviation = = 2.059
= 4.857
The upper capability can be calculated as:

CP U =

50 40
(U SL )
=
= 0.686
3
3(4.857

Comment: Since CPU is less than 1, an undesirable situation exists.


c. Assuming a normal distribution of waiting times, find the proportion of customers
that will have to wait more than 5O minutes.
Assuming a normal distribution of waiting time,
we can determine the proportion of customers who will have to wait more than 50 minutes as,
Z =

(U SL )
50 40
=
= 2.058

4.857

Using the standard normal tables, the proportion of customers who will have to wait more than 50
minutes is 0.0197.

To reduce the waiting time of customers, the service manager hires some additional
mechanics, which reduces the average waiting time to 35 minutes. What proportion of the
customers will still have to wait more than 50 minutes if the variability in service times is
the same as before?
Given, new average waiting time = 35 minutes
Therefore, new standard normal value,
Z =

(U SL )
(50 35)
=
= 3.088

4.857

From standard normal tables, the proportion of customers who will have to wait more than 50 minutes after the hiring is 0.0010.

9-23 In Exercise 9-22, suppose that the specifications for the gap are 1.05 0.15 cm. An
assembly with a gap exceeding the upper specification limit is scrapped, whereas that with
a gap less than the lower specification limit can be reworked to increase the gap dimension.
The unit cost of rework is $ 0.15 and that for scrap is $ 0.40. If the daily production rate
is 2000, calculate the daily total cost of scrap and rework. How can this cost be reduced?

16

Given question,
Specifications for the gap = 1.05 0.15 cm
Unit cost of rework = $ 0.15
Unit cost of scrap = $ 0.40
Daily production rate = 2000
From the previous question,
The standard deviation of the components are calculated as follows:

F orComponentA, 1 =

(U SL LSL)
10.5 9.5
=
= 0.167
6
6

ComponentB : 2 =

4.2 3.8
(U SL LSL)
=
= 0.067
6
6

ComponentC : 3 =

(U SL LSL)
5.1 4.9
=
= 0.03
6
6

The variance of the gap length = (0.167)2 + (0.067)2 + (0.033)2 = 0.03347


Therefore, the standard deviation, =

0.03347 = 0.183

The standard normal values at the specification limits are:

Z1 =

Z2 =

(LSL )
0.9 1
=
= 0.55

0.183

(U SL )
1.2 1
=
= 1.09

0.183

From the standard normal tables, the proportion below the LSL is 0.2912, while the proportion above
the USL is 0.1379.
Therefore, daily cost of rework = 2000 0.15 0.2912 = $ 87.36
Daily cost of scrap = 2000 0.40 0.1379 = $110.32
Daily total cost of rework and scrap = $ 87.36 + $ 110.32 = $ 197.68
To reduce the total cost:
17

The mean dimensions of B and C can be decreased so as to bring the mean value of gap to the
target value of 1.05.
The variability of the operations can be reduced and the measures for the same should be thought
over.

18

Vous aimerez peut-être aussi