EPIC FOR POWER SUPPLY PROJECT

THROUGH SUBMARINE CABLES FROM RAS


LAFFAN TO HALUL

SITE ACCEPTANCE TEST FOR 132kV GIS


Client
Contractor
Location
Equipment Tag

Qatar Petroleum
LSC / L&T

Document No.
Date / Rev.
Page No
Test Date

3433-HW08-2-05-0003-F01
05/03/2015 / Rev. - 1
1 of 2

Make
Name / Type of Equipment
Serial Number
Power
Current

Rating

Voltage

DESIGN AND VISUAL CHECKS


1. Check List
Sr. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Particulars
Check each name plate according to drawing
Check space heater for wire continuity
Check setting of thermostat for space heater
Check door closing properly
Check earthing state door and frame
Check all signal / indication lamps
Check all limit switches of door, DS / ES etc.
Check Phase marking as per approved drawing
Check interlock lever for operation
Check number mark on cables
Check CT lugs / wires are connected as per
approved drawing
Check for conformity of control cable connection
and identification label.
Check all components labels are placed
Check for pad locks are placed where as required
Check earthing is connected as per approved
drawing
Check for paint condition wherever applicable

Status / Remarks

2. Test Equipments used


Sr. No.

Equipment / Instrument

Make

Equip. Sr. No.

Calibration due
date

Remarks:

L&T
Signature
Name
Designatio
n
Date

Vendor

LSC

QP

EPIC FOR POWER SUPPLY PROJECT


THROUGH SUBMARINE CABLES FROM RAS
LAFFAN TO HALUL

SITE ACCEPTANCE TEST FOR 132kV GIS


Client
Contractor
Location
Equipment Tag

Qatar Petroleum
LSC / L&T

Document No.
Date / Rev.
Page No
Test Date

3433-HW08-2-05-0003-F01
05/03/2015 / Rev. - 1
2 of 2

L&T
Signature
Name
Designatio
n
Date

Vendor

LSC

QP