Descripcin
Unidad
Cantidad
Costo Unitario
Monto
Materiales
MLT-ACE137
MLT-ACE140
MLT-ACE143
ALAMBRE RECOCIDO
MLT-AGL001
TON
1.39672
12,354.48
17,255.75
0.34
ML
1,835.91405
31.00
56,913.34
1.12
KG
204.15332
16.96
3,462.44
0.07
TON
852.55180
2,574.21
$ 2'194,647.37
43.09
MLT-AGL023
CAL HIDRATADA
TON
0.97188
1,903.62
1,850.09
0.04
MLT-AGR001
ARENA
M3
1,036.47156
220.95
$ 229,008.39
4.50
MLT-AGR008
GRAVA 3/4"
M3
1,295.10942
386.40
$ 500,430.28
9.83
MLT-AGR016
M3
1,964.12500
134.66
$ 264,489.07
5.19
MLT-CIM005
PT
465.57250
13.30
6,192.11
0.12
MLT-CIM034
PT
89.37271
10.92
975.95
0.02
MLT-CIM037
ML
2,327.86000
21.63
50,351.61
0.99
MLT-CIM154
M2
1,108.62900
43.26
47,959.29
0.94
MLT-COM002
DIESEL
LT
2,438.12510
13.89
33,865.56
0.66
MLT-IMP024
ASFALTO OXIDADO IV
37.30610
647.51
24,156.07
0.47
MLT-INS002
AGUA
1,150.38699
16.22
18,659.28
0.37
MLT-INS010
ROLL
19.86033
36.73
729.47
0.01
MLT-INS034
THINER ESTANDAR
LTO
186.36847
21.44
3,995.74
0.08
MLT-INS052
PZA
2.39911
3,263.45
7,829.38
0.15
MLT-INS058
CEPILLO DE ALAMBRE
PZA
58.19650
20.51
1,193.61
0.02
MLT-INS234
GRASA
KG
153.18796
32.45
4,970.95
0.10
MLT-PIN143
LT
283.76613
44.90
12,741.10
0.25
$ 3'481,676.85
68.37
CUETE
M3
Total de Materiales
ATENTAMENTE
ARQ. ALEJANDRO CORTS TLLEZ
DIR. DE OBRAS PBLICAS
PGINA
1 DE 1
Descripcin
Unidad
Cantidad
Costo Unitario
Monto
Mano de Obra
MLT-MO001
PEON
JOR
1,974.41110
234.63
$ 463,256.08
9.10
MLT-MO002
OFICIAL ALBAIL
JOR
773.01467
441.66
$ 341,409.66
6.70
MLT-MO003
CABO DE CUADRILLA
JOR
178.75664
563.76
$ 100,775.84
1.98
MLT-MO004
AYUDANTE GENERAL
JOR
601.08912
268.49
$ 161,386.42
3.17
MLT-MO007
CADENERO
JOR
86.30312
268.49
23,171.52
0.45
MLT-MO008
PINTOR
JOR
30.65792
441.66
13,540.38
0.27
MLT-MO014
ING TOPOGRAFO
JOR
21.57578
616.11
13,293.05
0.26
$ 1'116,832.95
21.93
HERRAMIENTA MENOR
(%)mo
0.03000
$ 1'116,834.37
Total de Herramienta
33,505.03
0.66
33,505.03
0.66
Equipo
MLT-EQ001
REVOLVEDORA DE CONCRETO
MIPSA KOHLER R-10 8 H.P. DE 1
SACO
HR
1,039.53075
111.97
$ 116,396.26
2.29
MLT-EQ002
HR
209.61686
454.68
95,308.59
1.87
MLT-EQ003
RETROEXCAVADORA 416 D, DE
80 HP, CAPACIDAD 6.9
TON,EQUIPADA CON MARTILLO
HIDRAULICO MCA ROCKBLASTER
HR
84.72812
582.43
49,348.20
0.97
MLT-EQ004
MOTOCONFORMADORAMCA.
CATERPILLAR MOD. 120H MOTOR
A DIESEL DE 140 HP PESO
BRUTO BASICO 12.65 TON Y MAX.
16 .92 HOJA DE 3.66 MX 0.61 VEL.
MAX. 42.6 KM/HR
HR
136.89539
647.29
88,611.02
1.74
MLT-EQ007
HR
455.27698
84.38
38,416.27
0.75
MLT-EQ013
HR
48.83940
382.27
18,669.84
0.37
ATENTAMENTE
ARQ. ALEJANDRO CORTS TLLEZ
DIR. DE OBRAS PBLICAS
PGINA
2 DE 2
Descripcin
Unidad
Cantidad
MLT-EQ024
CORTADORA DE CONCRETO
TARGET EC 200 18 H.P. DISCO DE
14"
HR
366.30350
Costo Unitario
139.51
51,103.00
Monto
%
1.00
MLT-EQ045
BAILARINA ,MOD-GV-51
,GASOLINA
HR
8.81007
108.28
953.95
0.02
MLT-EQ053
HR
242.97050
3.86
937.87
0.02
MLT-EQ056
HR
242.97050
3.98
967.02
0.02
Total de Equipo
$ 460,712.02
9.05
$ 5'092,726.85
100.00
ATENTAMENTE
ARQ. ALEJANDRO CORTS TLLEZ
DIR. DE OBRAS PBLICAS