Vous êtes sur la page 1sur 18

CRONOGRAMA DE AVANCE FISICO FINANCIERO

M1

MEJORAMIENTO Y AMPLIACION DEL SAP Y ALCANTARILLADO TEMBLADERA


01.00.00 CARTEL DE OBRA CON GIGANTOGRAFA DIGITAL
01.01.00 CARTEL DE OBRA CON GIGANTOGRAFA DIGITAL
02.00.00 CAJA DE CAPTACIN DE FONDO
02.01.00 TRABAJOS PRELIMINARES
02.01.01 DEMOLICION DE CONCRETO ARMADO EN TECHO DE CAPTACION
02.01.02 LIMPIEZA DE TERRENO, CAPTACIN
02.01.03 TRAZO Y REPLANTEO
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACIN MANUAL CAJA DE VALVULAS
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE
02.02.03 NIVELACION INTERIOR APISONADO MANUAL
02.03.00 OBRAS DE CONCRETO SIMPLE
02.03.01 CONCRETO FC=140 KG/CM2 (CAJA VLVULAS)
02.03.02 PIEDRA 4" ASENTADA CON MORTERO 1:8 EN CAPTACION
02.03.03 ENCOFRADO Y DESENCOFRADO
02.04.00 OBRAS DE CONCRETO ARMADO
02.04.01 CONCRETO F'C=175 KG/CM2
02.04.02 ACERO FY = 4200 KG/CM2.
02.04.03 ENCOFRADO Y DESENCOFRADO
02.05.00 REVOQUES Y ENLUCIDOS
02.05.01 TARRAJEO EXTERIOR
02.05.02 TARRAJEO INTERIOR
02.06.00 VALVULAS Y ACCESORIOS
02.06.01 VALVULAS Y ACCESORIOS 8"
02.07.00 VARIOS
02.07.01 PINTADO DE ESTRUCTURAS
02.07.02 TAPA SANITARIA 0.60X0.60
03.00.00 LINEA DE CONDUCCIN A R1
03.01.00 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO
03.02.00 EXCAVACIN DE ZANJAS
03.02.01 EXCAVACION DE ZANJAS EN TERRENO CONGLOMERADO
03.02.02 EXCAVACION DE ZANJAS EN ROCA FISURADA
03.02.03 REFINE, NIVELACIN Y COMPACTACIN DE FONDOS.
03.02.04 CAMA DE APOYO PARA TUBERA
03.02.05 RELLENO Y COMPACTACIN DE ZANJAS
03.03.00 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.01 SUMINISTRO E INSTALACION DE TUBERIA U.F. =200 MM. C-5
03.04.00 PRUEBA HIDRAULICA
03.04.01 PRUEBA HIDRULICA + DESINFECCIN
04.00.00 LINEA DE CONDUCCIN A R2
04.01.00 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO
04.02.00 EXCAVACIN DE ZANJAS
04.02.01 EXCAVACION DE ZANJAS EN TERRENO CONGLOMERADO
04.02.02 EXCAVACION DE ZANJAS EN ROCA FISURADA
04.02.03 REFINE, NIVELACIN Y COMPACTACIN DE FONDOS.
04.02.04 CAMA DE APOYO PARA TUBERA
04.02.05 RELLENO Y COMPACTACIN DE ZANJAS
04.03.00 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
04.03.01 SUMINISTRO E INSTALACION DE TUBERIA U.F. =200 MM. C-5
04.04.00 PRUEBA HIDRAULICA
04.04.01 PRUEBA HIDRULICA + DESINFECCIN
05.00.00 RESERVORIO CIRCULAR APOYADO: 100 M3
05.01.00 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL
05.01.02 TRAZO Y REPLANTEO
05.02.00 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL
05.02.02 ELIMINACION DE MATERIAL EXCEDENTE
05.02.03 NIVELACION Y COMPACTACION MANUAL
05.02.04 AFIRMADO

M2

M3

S/. 1,279.38

S/. 3,840.41
S/. 109.20
S/. 6.85
S/. 28.81
S/. 21.36
S/. 1.62
S/. 9,893.62
S/. 572.48
S/. 43.43
S/. 4,968.85
S/. 331.64
S/. 1,787.14
S/. 1,015.11
S/. 1,695.04
S/. 768.53
S/. 534.32
S/. 271.72

S/. 2,132.47
S/. 15,376.10
S/. 88,011.78
S/. 5,764.59
S/. 472.99

S/. 155,742.47

S/. 236.50
S/. 65,036.40
S/. 155,742.47
S/. 3,153.28

S/. 2,270.89
S/. 15,376.10
S/. 95,293.49
S/. 6,142.50
S/. 504.00

S/. 165,952.50

S/. 252.00
S/. 69,300.00
S/. 165,952.50
S/. 3,360.00

S/. 58.83
S/. 115.96
S/. 499.90
S/. 464.77
S/. 91.74
S/. 244.65
Pgina 1

M4

M5

M6

M7

M8

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M1

05.03.00 OBRAS DE CONCRETO SIMPLE


05.03.01 SOLADO DE CONCRETO FC=100 KG/CM2
05.03.02 EMBOQUILLADO PERIMETRAL RESERVORIO
05.03.03 OBRAS DE CONCRETO ARMADO
05.03.04 CONCRETO F'C = 210 KG/CM2
05.03.05 ENCOFRADO Y DESENCOFRADO
05.03.06 ACERO FY = 4200 KG/CM2.
05.04.00 REVOQUES Y ENLUCIDOS
05.04.01 TARRAJEO EXTERIOR
05.04.02 TARRAJEO INTERIOR
05.04.03 PENDIENTE DE FONDO, MORTERO 1:5
05.05.00 VALVULAS Y ACCESORIOS
05.06.01 ACCESORIOS PARA VENTILACIN
05.07.00 VARIOS
05.07.01 PINTURA EN EXTERIORES
05.07.02 SUMINISTRO Y COLOCACIN DE DOSIFICADOR
05.07.03 TAPA SANITARIA METLICA
06.00.00 RESERVORIO CIRCULAR APOYADO: 75 M3
06.01.00 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL
06.01.02 TRAZO Y REPLANTEO
06.02.00 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE
06.02.03 NIVELACION Y COMPACTACION MANUAL
06.02.04 AFIRMADO
06.03.00 OBRAS DE CONCRETO SIMPLE
06.03.01 SOLADO DE CONCRETO FC=100 KG/CM2
06.03.02 EMBOQUILLADO PERIMETRAL RESERVORIO
06.03.03 OBRAS DE CONCRETO ARMADO
06.03.04 CONCRETO F'C = 210 KG/CM2
06.03.05 ENCOFRADO Y DESENCOFRADO
06.03.06 ACERO FY = 4200 KG/CM2.
06.04.00 REVOQUES Y ENLUCIDOS
06.04.01 TARRAJEO EXTERIOR
06.04.02 TARRAJEO INTERIOR
06.04.03 PENDIENTE DE FONDO, MORTERO 1:5
06.05.00 VALVULAS Y ACCESORIOS
06.06.00 ACCESORIOS PARA VENTILACIN
06.07.00 VARIOS
06.07.01 PINTURA EN EXTERIORES
06.07.02 SUMINISTRO Y COLOCACIN DE DOSIFICADOR
06.07.03 TAPA SANITARIA METLICA
07.00.00 CASETA DE VALVULAS
07.01.00 TRABAJOS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL
07.01.02 TRAZO Y REPLANTEO
07.02.00 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION MANUAL
07.02.02 ELIMINACION DE MATERIAL EXCEDENTE
07.02.03 NIVELACION Y COMPACTACION MANUAL
07.02.04 LECHO DE GRAVA
07.03.00 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO F'C=175 KG/CM2
07.03.02 ENCOFRADO Y DESENCOFRADO
07.04.00 OBRAS DE CONCRETO ARMADO
07.04.01 CONCRETO F'C=175 KG/CM2
07.04.02 ACERO FY = 4200 KG/CM2.
07.04.03 ENCOFRADO Y DESENCOFRADO DE LOSA
07.05.00 REVOQUES Y ENLUCIDOS
07.05.01 TARRAJEO EXTERIOR
07.05.02 TARRAJEO INTERIOR
07.06.03 VALVULAS Y ACCESORIOS DE 8" (INGRESO CASETA)

M2

M3

S/. 131.78
S/. 364.54

S/. 568.45
S/. 1,388.62

S/. 42,636.38
S/. 3,410.68
S/. 8,331.71
S/. 3,332.14
S/. 2,850.49
S/. 1,385.27
S/. 625.92
S/. 1,047.95
S/. 3,543.03
S/. 165.86

S/. 52.80
S/. 101.39
S/. 437.09
S/. 406.39
S/. 80.22
S/. 427.96
S/. 115.36
S/. 12,794.25

S/. 525.61
S/. 1,231.30

S/. 17,578.49
S/. 3,153.66
S/. 7,387.79
S/. 3,183.93
S/. 2,575.35
S/. 1,180.27
S/. 625.92
S/. 652.63
S/. 3,543.03
S/. 165.86

S/. 23.39
S/. 37.65
S/. 188.69
S/. 175.45
S/. 29.79
S/. 132.91
S/. 1,293.78
S/. 738.82
S/. 406.70
S/. 381.62
S/. 328.02
S/. 743.74
S/. 506.09

Pgina 2

M4

M5

M6

M7

M8

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M1

07.06.03.1 VALVULAS Y ACCESORIOS 8" (INGRESO CAS. VALVULAS)


07.07.00 VARIOS
07.07.01 TAPA SANITARIA METLICA
07.07.02 PINTURA EN EXTERIORES
08.00.00 RED DE DISTRIBUCIN R1 Y R2
08.01.00 TRABAJOS PRELIMINARES
08.01.01 TRAZO Y REPLANTEO
08.02.00 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION DE ZANJAS EN TERRENO CONGLOMERADO
08.02.02 CORTE DE PAVIMENTO CON MOLADORA
08.02.03 REFINE Y CONFORMACIN DE FONDOS
08.02.04 CAMA DE APOYO PARA TUBERA
08.02.05 RELLENO Y COMPACTACIN DE ZANJAS
08.02.06 OBRAS DE CONCRETO SIMPLE
08.02.06.1 REPOSICION DE CONCRETO EN PAVIMENTO F'C=210KG/CM2
08.03.00 TUBERA Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERA U.F. 160 MM. C-7.5
08.03.02 SUMINISTRO TUBERA U.F. 110 MM. C-7.5
08.03.03 SUMINISTRO TUBERA U.F. 90 MM. C-7.5
08.03.04 SUMINISTRO TUBERA U.F. 63 MM. C-7.5
08.03.05 TUBERA PVC SAP 1/2" C-7.5
08.05.00 ACCESORIOS DE RED DE DISTRIBUCION
08.05.01 TEE PVC 6"X6"
08.05.02 TEE PVC 6"X4"
08.05.03 TEE PVC 4"X4"
08.05.04 TEE PVC 2"X2"
08.05.05 TEE PVC 6"X2"
08.05.06 REDUC. PVC 6"-2"
08.05.07 CODO. PVC 4"X 90
08.05.08 CODO. PVC 6"X 90
08.05.09 CRUZ PVC 6"X6"
08.05.10 CRUZ PVC 6"X4"
08.05.11 CRUZ PVC 6"X2"
08.05.12 CRUZ PVC 4"X4"
08.05.13 CRUZ PVC 4"X2"
08.06.00 PRUEBA HIDRAULICA
08.06.01 PRUEBA HIDRAULICA+DESINFECCION
09.00.00 CAJA DE VALVULAS DE CONTROL
09.01.00 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE TERRENO MANUAL
09.01.02 TRAZO Y REPLANTEO
09.02.00 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION MANUAL
09.02.02 ELIMINACION DE MATERIAL EXCEDENTE
09.02.03 NIVELACION INTERIOR APISONADO MANUAL
09.03.00 CONCRETO SIMPLE
09.03.01 CONCRETO F'C=140 KG/CM2
09.03.02 ENCOFRADO Y DESENCOFRADO
09.04.00 TARRAJEO
09.04.01 TARRAJEO EXTERIOR
09.05.00 VALVULAS Y ACCESORIOS
09.05.01 VALVULAS Y ACCESORIOS 4"
09.05.02 VALVULAS Y ACCESORIOS 6"
09.05.03 VALVULAS Y ACCESORIOS 2"
09.06.00 VARIOS
09.06.01 TAPA SANITARIA METLICA
10.00.00 CAJA DE VALVULAS DE PURGA
10.01.00 TRABAJOS PRELIMIINARES
10.01.01 LIMPIEZA DE TERRENO MANUAL
10.01.02 TRAZO Y REPLANTEO
10.02.00 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION MANUAL
10.02.02 ELIMINACION DE MATERIAL EXCEDENTE

M2

M3

M4

M5

M6

M7

M8

S/. 768.53
S/. 331.72
S/. 364.74

S/. 91.18

S/. 651.95

S/. 630.92

S/. 651.95

S/. 630.92

S/. 651.95

S/. 651.95

S/. 609.89

S/. 22,988.74
S/. 805.48
S/. 1,656.56
S/. 1,057.18
S/. 1,868.94

S/. 22,247.17
S/. 779.50
S/. 1,656.56
S/. 1,132.69
S/. 18,689.36

S/. 22,988.74
S/. 805.48
S/. 1,711.78
S/. 1,170.44
S/. 19,312.34

S/. 22,247.17
S/. 779.50
S/. 1,656.56
S/. 1,132.69
S/. 18,689.36

S/. 22,988.74
S/. 805.48
S/. 1,711.78
S/. 1,170.44
S/. 19,312.34

S/. 22,988.74
S/. 805.48
S/. 1,711.78
S/. 1,170.44
S/. 19,312.34

S/. 21,505.60
S/. 753.51
S/. 1,601.34
S/. 1,094.93
S/. 18,066.38

S/. 9,318.58

S/. 12,559.83

S/. 12,154.67

S/. 12,559.83

S/. 12,559.83

S/. 11,749.52

S/. 6,180.54
S/. 4,187.31
S/. 86.49
S/. 665.18
S/. 8,235.13

S/. 10,300.89
S/. 6,978.84
S/. 144.16
S/. 1,108.63
S/. 13,725.21

S/. 10,644.26
S/. 7,211.47
S/. 148.96
S/. 1,145.58
S/. 14,182.72

S/. 10,300.89
S/. 6,978.84
S/. 144.16
S/. 1,108.63
S/. 13,725.21

S/. 10,644.26
S/. 7,211.47
S/. 148.96
S/. 1,145.58
S/. 14,182.72

S/. 10,644.26
S/. 7,211.47
S/. 148.96
S/. 1,145.58
S/. 14,182.72

S/. 9,957.53
S/. 6,746.21
S/. 139.35
S/. 1,071.67
S/. 13,267.70

S/. 1.53
S/. 1.53
S/. 0.59
S/. 0.12
S/. 1.06
S/. 1.06
S/. 0.12
S/. 0.35
S/. 1.30
S/. 2.24
S/. 0.35
S/. 0.47
S/. 0.12

S/. 2.55
S/. 2.55
S/. 0.98
S/. 0.20
S/. 1.77
S/. 1.77
S/. 0.20
S/. 0.59
S/. 2.16
S/. 3.73
S/. 0.59
S/. 0.79
S/. 0.20

S/. 2.64
S/. 2.64
S/. 1.02
S/. 0.20
S/. 1.83
S/. 1.83
S/. 0.20
S/. 0.61
S/. 2.23
S/. 3.86
S/. 0.61
S/. 0.81
S/. 0.20

S/. 2.55
S/. 2.55
S/. 0.98
S/. 0.20
S/. 1.77
S/. 1.77
S/. 0.20
S/. 0.59
S/. 2.16
S/. 3.73
S/. 0.59
S/. 0.79
S/. 0.20

S/. 2.64
S/. 2.64
S/. 1.02
S/. 0.20
S/. 1.83
S/. 1.83
S/. 0.20
S/. 0.61
S/. 2.23
S/. 3.86
S/. 0.61
S/. 0.81
S/. 0.20

S/. 2.64
S/. 2.64
S/. 1.02
S/. 0.20
S/. 1.83
S/. 1.83
S/. 0.20
S/. 0.61
S/. 2.23
S/. 3.86
S/. 0.61
S/. 0.81
S/. 0.20

S/. 2.47
S/. 2.47
S/. 0.95
S/. 0.19
S/. 1.71
S/. 1.71
S/. 0.19
S/. 0.57
S/. 2.09
S/. 3.61
S/. 0.57
S/. 0.76
S/. 0.19

S/. 549.02

S/. 915.03

S/. 945.54

S/. 915.03

S/. 945.54

S/. 945.54

S/. 884.53

S/. 7.05
S/. 3,555.05

S/. 6.82
S/. 3,555.05

S/. 7.05
S/. 3,673.55

S/. 6.82
S/. 3,555.05

S/. 7.05
S/. 3,673.55

S/. 7.05
S/. 3,673.55

S/. 6.59
S/. 3,436.55

S/. 320.50
S/. 577.85
S/. 14.44

S/. 384.60
S/. 559.21
S/. 13.97

S/. 397.42
S/. 577.85
S/. 14.44

S/. 384.60
S/. 559.21
S/. 13.97

S/. 397.42
S/. 577.85
S/. 14.44

S/. 397.42
S/. 577.85
S/. 14.44

S/. 371.78
S/. 540.57
S/. 13.51

S/. 218.47
S/. 269.74

S/. 211.43
S/. 261.04

S/. 218.47
S/. 269.74

S/. 211.43
S/. 261.04

S/. 218.47
S/. 269.74

S/. 218.47
S/. 269.74

S/. 204.38
S/. 252.33

S/. 91.39

S/. 88.44

S/. 91.39

S/. 88.44

S/. 91.39

S/. 91.39

S/. 85.49

S/. 1.62
S/. 1.62
S/. 2.03

S/. 1.57
S/. 1.57
S/. 1.96

S/. 1.62
S/. 1.62
S/. 2.03

S/. 1.57
S/. 1.57
S/. 1.96

S/. 1.62
S/. 1.62
S/. 2.03

S/. 1.62
S/. 1.62
S/. 2.03

S/. 1.52
S/. 1.52
S/. 1.90

Pgina 3

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M1

10.03.00 OBRAS DE CONCRETO SIMPLE


10.03.01 CONCRETO F'C=140 KG/CM2
10.03.02 ENCOFRADO Y DESENCOFRADO
10.04.00 TARRAJEO
10.04.01 TARRAJEO EXTERIOR
10.05.00 VALVULAS Y ACCESORIOS PURGA
10.06.00 VARIOS
10.06.01 TAPA SANITARIA METLICA
11.00.00 CONEXIONES DOMICILIARIAS
11.01.00 TRABAJOS PRELIMIINARES
11.01.01 LIMPIEZA DE TERRENO MANUAL
11.01.02 TRAZO Y REPLANTEO
11.02.00 MOVIMIENTO DE TIERRAS
11.02.01 EXCAVACION MANUAL
11.02.02 CORTE DE PAVIMENTO CON MOLADORA
11.02.03 RELLENO Y COMPACTACIN DE ZANJAS
11.03.00 OBRAS DE CONCRETO SIMPLE
11.03.01 REPOSICION DE CONCRETO EN PAVIMENTO F'C=210KG/CM2
11.03.02 CONCRETO F'C=140 KG/CM2
11.03.03 ENCOFRADO Y DESENCOFRADO
11.04.00 OBRAS DE CONCRETO ARMADO
11.04.01 CONCRETO F'C=175 KG/CM2
11.04.02 ACERO FY = 4200 KG/CM2.
11.04.03 ENCOFRADO Y DESENCOFRADO
11.05.00 CONEXIONES DOMICILIARIAS
11.05.01 CONEXIN DOMICILIARIA DE AGUA 6"
11.05.02 CONEXIN DOMICILIARIA DE AGUA 4"
11.05.03 CONEXIN DOMICILIARIA DE AGUA 3"
11.05.04 CONEXIN DOMICILIARIA DE AGUA 2"
11.05.05 SUMINISTRO E INSTALACION DE MEDIDORES
12.00.00 CASETA DE CLORACIN
12.01.00 MUROS DE LADRILLOS DE SOGA
12.02.00 COBERTURA DE CALAMINA
12.03.00 CARPINTERIA METALICA
12.04.00 TARRAJEO EM MUROS
12.05.00 CERRAJERIA
12.06.00 PINTURA EN MUROS
12.07.00 VIDRIOS
13.00.00 EDUCACIN SANITARIA Y CAPACITACION EN AOM.
13.01.00 EDUCACIN SANITARIA
13.03.00 CAPACITACIN EN A+O+M
14.00.00 FLETE
14.01.00 FLETE TERRESTRE
14.02.00 FLETE RURAL
15.00.00 CONTROL DE CALIDAD
15.01.00 DISEO DE MEZCLAS DE CONCRETO
15.02.00 ENSAYO A LA COMPRESIN DE PROBETAS DE CONCRETO
16.00.00 DESAGE
16.01.00 OBRAS PRELIMINARES
16.01.01 LIMPIEZA DE TERRENO MANUAL
16.01.02 TRAZO Y REPLANTEO
16.01.03 CINTA DE PELIGRO
16.02.00 MOVIMIENTO DE TIERRAS
16.02.01 EXCAVACION MANUAL DE ZANJAS EN TERRENO CONGLOMERADO
16.02.02 CORTE DE PAVIMENTO CON MOLADORA
16.02.03 EXCAVACION C/MAQ EN TERRENO CONGLOMERADO HASTA 2.40 MPROF.
16.02.04 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO SELECCIONADO
16.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
16.03.00 OBRAS DE CONCRETO SIMPLE
16.03.01 REPOSICION DE CONCRETO EN PAVIMENTO F'C=210KG/CM2
16.04.00 SUMINISTRO E INSTALACION DE TUBERIA
16.04.01 SUMINISTRO E INSTALACION TUBERIA PVC 200 mm.x 6m S26
16.04.02 REFINE, NIVELACION Y CONF. DE FONDO T.C.

M2

M3

M4

M5

M6

M7

M8

S/. 406.11
S/. 700.73

S/. 393.01
S/. 724.89

S/. 406.11
S/. 749.05

S/. 393.01
S/. 724.89

S/. 406.11
S/. 749.05

S/. 406.11
S/. 749.05

S/. 379.91
S/. 700.73

S/. 1,875.28
S/. 194.51
S/. 160,116.00

S/. 2,344.10
S/. 243.14

S/. 2,422.23
S/. 251.25

S/. 2,344.10
S/. 243.14

S/. 2,422.23
S/. 251.25

S/. 2,422.23
S/. 251.25

S/. 2,265.96
S/. 235.04

S/. 1,186.06
S/. 120.97
S/. 186.02

S/. 3,953.52
S/. 403.23
S/. 620.07

S/. 4,085.31
S/. 416.67
S/. 640.74

S/. 3,953.52
S/. 403.23
S/. 620.07

S/. 4,085.31
S/. 416.67
S/. 640.74

S/. 4,085.31
S/. 416.67
S/. 640.74

S/. 3,821.74
S/. 389.79
S/. 599.40

S/. 38.62
S/. 25.62
S/. 28.34

S/. 128.73
S/. 85.41
S/. 94.46

S/. 133.02
S/. 88.26
S/. 97.61

S/. 128.73
S/. 85.41
S/. 94.46

S/. 133.02
S/. 88.26
S/. 97.61

S/. 133.02
S/. 88.26
S/. 97.61

S/. 124.44
S/. 82.56
S/. 91.31

S/. 39.28
S/. 44.89
S/. 3.09
S/. 26.19
S/. 4,593.97

S/. 84.17
S/. 96.19
S/. 6.61
S/. 56.11
S/. 9,844.22

S/. 86.97
S/. 99.40
S/. 6.83
S/. 57.98
S/. 10,172.36

S/. 84.17
S/. 96.19
S/. 6.61
S/. 56.11
S/. 9,844.22

S/. 86.97
S/. 99.40
S/. 6.83
S/. 57.98
S/. 10,172.36

S/. 86.97
S/. 99.40
S/. 6.83
S/. 57.98
S/. 10,172.36

S/. 81.36
S/. 92.99
S/. 6.39
S/. 54.24
S/. 9,516.08

S/. 177.99

S/. 489.47
S/. 16.35
S/. 1,305.21
S/. 215.03
S/. 13.20
S/. 169.07

S/. 5.66
S/. 72.46
S/. 163.62

S/. 4,960.00
S/. 26,401.15

S/. 4,800.00
S/. 25,549.50

S/. 4,960.00
S/. 26,401.15

S/. 4,800.00
S/. 25,549.50

S/. 4,960.00
S/. 26,401.15

S/. 4,320.00
S/. 22,994.55

S/. 238.46
S/. 238.46

S/. 230.77
S/. 230.77

S/. 238.46
S/. 238.46

S/. 230.77
S/. 230.77

S/. 238.46
S/. 238.46

S/. 238.46
S/. 238.46

S/. 223.08
S/. 223.08

S/. 31.30
S/. 10.78

S/. 30.29
S/. 10.43

S/. 31.30
S/. 10.78

S/. 30.29
S/. 10.43

S/. 31.30
S/. 10.78

S/. 31.30
S/. 10.78

S/. 29.28
S/. 10.08

S/. 8,950.41
S/. 10,393.63
S/. 17,333.58

S/. 20,000.28

S/. 2,666.70

S/. 45,728.75

S/. 53,045.35

S/. 41,487.95

S/. 80,210.05

S/. 69,399.49
S/. 11,056.75

S/. 10,676.84
S/. 1,701.04
S/. 2,756.37
S/. 3,334.95

S/. 186,671.20
S/. 37,283.41
Pgina 4

S/. 251,600.32
S/. 50,251.55

S/. 48,696.84
S/. 9,726.11

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M1

16.04.03 PREPARACION DE CAMA DE APOYO P/TUBERIA


16.04.04 INSTALACION TUBERIA PVC 200 MM.X 6M S25
16.04.05 CONEXION DE TUBERIA PVC A CONCRETO DE BUZON
16.04.06 PRUEBA HIDRAULICA EN TUBERIA PVC
16.05.00 CONSTRUCCION DE BUZONES
16.05.01 BUZON ESTANDAR HASTA 0.70M DE PROF.
16.05.02 BUZON ESTANDAR HASTA 0.80M DE PROF.
16.05.03 BUZON ESTANDAR HASTA 0.90M DE PROF.
16.05.04 BUZON ESTANDAR HASTA 1.20M DE PROF.
16.05.05 BUZON ESTANDAR HASTA 2.40M DE PROF.
16.06.00 CONEXIONES DOMICILIARIAS
16.06.01 MOVIMIENTO DE TIERRAS
16.06.01.1 EXCAVACION MANUAL DE ZANJAS EN TERRENO CONGLOMERADO
16.06.01.2 CORTE DE PAVIMENTO CON MOLADORA
16.06.01.3 RELLENO CON MATERIAL PROPIO
16.06.01.4 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO SELECCIONADO
16.06.02 TENDIDO E INSTALACION DE TUBERIAS
16.06.02.1 CONEXION DOMICILIARIA 200M T. CONGLOMERADO
16.06.02.2 CONEXION DOMICILIARIA 160M T. CONGLOMERADO
16.06.03 FLETE
16.06.03.1 FLETE TERRESTRE ALCANTARILLADO
16.06.04 CONTROL DE CALIDAD
16.06.04.1 DISEO DE MEZCLAS DE CONCRETO
16.06.04.2 ENSAYO A LA COMPRESIN DE PROBETAS DE CONCRETO
16.06.05 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
16.06.05.1 CONSTRUCCION DE 2 LAGUNAS FACULTATIVAS EN PARALELO. AREA TOTAL=2.2HA
16.06.05.2 CONSTRUCCION DE CERCO PERIMETRICO
17.00.00 TANQUE IMHOFF - CAMARAS DE REJAS Y DESARENADOR
17.01.00 OBRAS PRELIMINARES
17.01.01 TRAZO Y REPLANTEO
17.01.02 LIMPIEZA DE TERRENO MANUAL
17.02.00 MOVIMIENTO DE TIERRAS
17.02.01 EXCAVACION DE ZANJAS MANUAL PARA CAMARA Y DESARENADOR H=1.8 M
17.02.02 NIVELACION INT. Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
17.03.00 OBRAS DE CONCRETO SIMPLE
17.03.01 CONCRETO F'C=140 KG/CM2
17.03.02 ACERO FY = 4200 KG/CM2.
17.03.03 ENCOFRADO Y DESENCOFRADO
17.04.00 REVOQUES Y ENLUCIDOS
17.04.01 TARRAJEO CON IMPERMEBILIZANTES INTERIOR
17.04.02 TARRAJEO EN EXTERIORES CON CEMENTO Y ARENA
17.05.00 EQUIPAMIENTO
17.05.01 COMPUERTA METALICA DE 0.30X0.50 E=3/16''
17.05.02 PLANCHA METALICA 0.65X0.4 DE E=1/2''
17.05.03 REJA P/RETENCION DE SOLIDOS PLAT. 11/2''X3/8'' MARCO L 11/2''X11/2''X1/4''
18.00.00 TANQUE IMHOFF
18.01.00 OBRAS PRELIMINARES
18.01.01 TRAZO Y REPLANTEO
18.01.02 LIMPIEZA DE TERRENO MANUAL
18.02.00 MOVIMIENTO DE TIERRAS
18.02.01 EXCAVACION DE ZANJAS MANUAL PARA CAMARA Y DESARENADOR H=1.8 M
18.02.02 NIVELACION INT. Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
18.03.00 OBRAS DE CONCRETO SIMPLE
18.03.01 FALSO PISO DE CONCRETO F'C = 140 KG/CM2
18.04.00 OBRAS DE CONCRETO ARMADO
18.04.01 CONCRETO EN LOSA DE CIMENTACION F'C = 175 KG/CM2
18.04.02 ACERO FY = 4200 KG/CM2.
18.04.03 ENCOFRADO Y DESENCOFRADO
18.05.00 REVOQUES Y ENLUCIDOS
18.05.01 TARRAJEO CON IMPERMEBILIZANTES INTERIOR
18.05.02 TARRAJEO EN EXTERIORES CON CEMENTO Y ARENA
19.00.00 LECHO DE SECADO
19.01.00 OBRAS PRELIMINARES

M2

M3

S/. 5,480.40
S/. 18,662.81
S/. 634.57

M4

S/. 7,386.62
S/. 44,503.63
S/. 6,557.22

M5

S/. 1,429.67
S/. 43,068.03
S/. 6,345.70

M6

M7

S/. 1,435.60
S/. 2,326.76
S/. 4,281.04

S/. 3,210.78

M8

S/. 900.37
S/. 1,350.55
S/. 450.18
S/. 65,561.50
S/. 1,098.56

S/. 2,147.03
S/. 3,220.54
S/. 1,073.51
S/. 156,338.95
S/. 2,619.64

S/. 1,108.14
S/. 1,662.22
S/. 554.07
S/. 80,691.07
S/. 1,352.07

S/. 9,875.60
S/. 914.60

S/. 11,774.75
S/. 1,090.49
S/. 5,658.65
S/. 64,583.15

S/. 11,394.92
S/. 1,055.31
S/. 6,287.38
S/. 71,759.06

S/. 11,774.75
S/. 1,090.49
S/. 6,496.96
S/. 74,151.03

S/. 11,774.75
S/. 1,090.49
S/. 6,496.96
S/. 74,151.03

S/. 11,015.09
S/. 1,020.13
S/. 6,077.80
S/. 69,367.09

S/. 25,765.74
S/. 818.77

S/. 72,612.54
S/. 2,307.43

S/. 70,270.20
S/. 2,233.00

S/. 72,612.54
S/. 2,307.43

S/. 72,612.54
S/. 2,307.43

S/. 67,927.86
S/. 2,158.57

S/. 86.67

S/. 103.33

S/. 100.00

S/. 103.33

S/. 103.33

S/. 96.67

S/. 6.42
S/. 1.88

S/. 16.92
S/. 54.62

S/. 38,082.32

S/. 35,625.40

S/. 17,198.47

S/. 38,082.32

S/. 39.84
S/. 21.06
S/. 61.42
S/. 104.86
S/. 1,203.44
S/. 680.24
S/. 877.93
S/. 1,113.16
S/. 102.71
S/. 470.84
S/. 840.21
S/. 73.54

S/. 91.68
S/. 43.88
S/. 1,858.83
S/. 4,293.94
S/. 44.34
S/. 13,039.81
S/. 14,438.31
S/. 5,391.86
S/. 3,421.12
S/. 220.89

Pgina 5

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M1

19.01.01 TRAZO Y REPLANTEO


19.01.02 LIMPIEZA DE TERRENO MANUAL
19.02.00 MOVIMIENTO DE TIERRAS
19.02.01 EXCAVACION DE ZANJAS MANUAL PARA CAMARA Y DESARENADOR H=1.8 M
19.02.02 NIVELACION INT. Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
19.03.00 OBRAS DE CONCRETO SIMPLE
19.03.01 FALSO PISO DE CONCRETO F'C = 140 KG/CM2
19.04.00 OBRAS DE CONCRETO ARMADO
19.04.01 CONCRETO EN LOSA DE CIMENTACION F'C = 175 KG/CM2
19.04.02 ACERO FY = 4200 KG/CM2.
19.04.03 ENCOFRADO Y DESENCOFRADO
19.05.00 MUROS DE MAMPOSTERIA
19.05.01 MURO DE SOGA LADRILLO PANDERETA CON CEMENTO - CAL - ARENA
19.05.02 CUBIERTA DE LADRILLO PASTELERO ASENTADO Y FRAGUADO
19.06.00 REVOQUES Y ENLUCIDOS
19.06.01 TARRAJEO CON IMPERMEBILIZANTES INTERIOR
19.07.00 SUMINISTRO Y COLOCACION
19.07.01 ARENA GRUESA SELECCIONADA
19.07.02 PIEDRA CLASIFICADA DE 3/4'' - 2''
19.07.03 PIEDRA CLASIFICADA DE 1/4'' - 3/4'''
19.07.04 PIEDRA CLASIFICADA DE 1/16'' - 1/4'''
20.00.00 MITIGACION AMBIENTAL
20.01.00 MITIGACION AMBIENTAL
Total

M2

M3

M4

M5

M6

M7

M8

S/. 249.00
S/. 135.00
S/. 671.90
S/. 11,176.38
S/. 149.04
S/. 4,213.07
S/. 97.30
S/. 7,365.86
S/. 646.24
S/. 8,856.95

S/. 11,809.27

S/. 2,292.86
S/. 998.25
S/. 1,250.85
S/. 312.48
S/. 468.72
S/. 563.64

S/. 545.45

S/. 563.64

S/. 545.45

S/. 563.64

S/. 563.64

S/. 527.27

S/. 969,370.72

S/. 1,120,584.96

S/. 837,739.50

S/. 525,314.92

S/. 448,550.37

S/. 455,727.83

S/. 438,452.06

Pgina 6

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M8

M9

MEJORAMIENTO Y AMPLIACION DEL SAP Y ALCANTARILLADO TEMBLADERA


01.00.00 CARTEL DE OBRA CON GIGANTOGRAFA DIGITAL
01.01.00 CARTEL DE OBRA CON GIGANTOGRAFA DIGITAL
02.00.00 CAJA DE CAPTACIN DE FONDO
02.01.00 TRABAJOS PRELIMINARES
02.01.01 DEMOLICION DE CONCRETO ARMADO EN TECHO DE CAPTACION
02.01.02 LIMPIEZA DE TERRENO, CAPTACIN
02.01.03 TRAZO Y REPLANTEO
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACIN MANUAL CAJA DE VALVULAS
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE
02.02.03 NIVELACION INTERIOR APISONADO MANUAL
02.03.00 OBRAS DE CONCRETO SIMPLE
02.03.01 CONCRETO FC=140 KG/CM2 (CAJA VLVULAS)
02.03.02 PIEDRA 4" ASENTADA CON MORTERO 1:8 EN CAPTACION
02.03.03 ENCOFRADO Y DESENCOFRADO
02.04.00 OBRAS DE CONCRETO ARMADO
02.04.01 CONCRETO F'C=175 KG/CM2
02.04.02 ACERO FY = 4200 KG/CM2.
02.04.03 ENCOFRADO Y DESENCOFRADO
02.05.00 REVOQUES Y ENLUCIDOS
02.05.01 TARRAJEO EXTERIOR
02.05.02 TARRAJEO INTERIOR
02.06.00 VALVULAS Y ACCESORIOS
02.06.01 VALVULAS Y ACCESORIOS 8"
02.07.00 VARIOS
02.07.01 PINTADO DE ESTRUCTURAS
02.07.02 TAPA SANITARIA 0.60X0.60
03.00.00 LINEA DE CONDUCCIN A R1
03.01.00 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO
03.02.00 EXCAVACIN DE ZANJAS
03.02.01 EXCAVACION DE ZANJAS EN TERRENO CONGLOMERADO
03.02.02 EXCAVACION DE ZANJAS EN ROCA FISURADA
03.02.03 REFINE, NIVELACIN Y COMPACTACIN DE FONDOS.
03.02.04 CAMA DE APOYO PARA TUBERA
03.02.05 RELLENO Y COMPACTACIN DE ZANJAS
03.03.00 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.01 SUMINISTRO E INSTALACION DE TUBERIA U.F. =200 MM. C-5
03.04.00 PRUEBA HIDRAULICA
03.04.01 PRUEBA HIDRULICA + DESINFECCIN
04.00.00 LINEA DE CONDUCCIN A R2
04.01.00 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO
04.02.00 EXCAVACIN DE ZANJAS
04.02.01 EXCAVACION DE ZANJAS EN TERRENO CONGLOMERADO
04.02.02 EXCAVACION DE ZANJAS EN ROCA FISURADA
04.02.03 REFINE, NIVELACIN Y COMPACTACIN DE FONDOS.
04.02.04 CAMA DE APOYO PARA TUBERA
04.02.05 RELLENO Y COMPACTACIN DE ZANJAS
04.03.00 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
04.03.01 SUMINISTRO E INSTALACION DE TUBERIA U.F. =200 MM. C-5
04.04.00 PRUEBA HIDRAULICA
04.04.01 PRUEBA HIDRULICA + DESINFECCIN
05.00.00 RESERVORIO CIRCULAR APOYADO: 100 M3
05.01.00 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL
05.01.02 TRAZO Y REPLANTEO
05.02.00 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL
05.02.02 ELIMINACION DE MATERIAL EXCEDENTE
05.02.03 NIVELACION Y COMPACTACION MANUAL
05.02.04 AFIRMADO
Pgina 7

M10

M11

M12

M13

M14

M15

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M8

M9

05.03.00 OBRAS DE CONCRETO SIMPLE


05.03.01 SOLADO DE CONCRETO FC=100 KG/CM2
05.03.02 EMBOQUILLADO PERIMETRAL RESERVORIO
05.03.03 OBRAS DE CONCRETO ARMADO
05.03.04 CONCRETO F'C = 210 KG/CM2
05.03.05 ENCOFRADO Y DESENCOFRADO
05.03.06 ACERO FY = 4200 KG/CM2.
05.04.00 REVOQUES Y ENLUCIDOS
05.04.01 TARRAJEO EXTERIOR
05.04.02 TARRAJEO INTERIOR
05.04.03 PENDIENTE DE FONDO, MORTERO 1:5
05.05.00 VALVULAS Y ACCESORIOS
05.06.01 ACCESORIOS PARA VENTILACIN
05.07.00 VARIOS
05.07.01 PINTURA EN EXTERIORES
05.07.02 SUMINISTRO Y COLOCACIN DE DOSIFICADOR
05.07.03 TAPA SANITARIA METLICA
06.00.00 RESERVORIO CIRCULAR APOYADO: 75 M3
06.01.00 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL
06.01.02 TRAZO Y REPLANTEO
06.02.00 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE
06.02.03 NIVELACION Y COMPACTACION MANUAL
06.02.04 AFIRMADO
06.03.00 OBRAS DE CONCRETO SIMPLE
06.03.01 SOLADO DE CONCRETO FC=100 KG/CM2
06.03.02 EMBOQUILLADO PERIMETRAL RESERVORIO
06.03.03 OBRAS DE CONCRETO ARMADO
06.03.04 CONCRETO F'C = 210 KG/CM2
06.03.05 ENCOFRADO Y DESENCOFRADO
06.03.06 ACERO FY = 4200 KG/CM2.
06.04.00 REVOQUES Y ENLUCIDOS
06.04.01 TARRAJEO EXTERIOR
06.04.02 TARRAJEO INTERIOR
06.04.03 PENDIENTE DE FONDO, MORTERO 1:5
06.05.00 VALVULAS Y ACCESORIOS
06.06.00 ACCESORIOS PARA VENTILACIN
06.07.00 VARIOS
06.07.01 PINTURA EN EXTERIORES
06.07.02 SUMINISTRO Y COLOCACIN DE DOSIFICADOR
06.07.03 TAPA SANITARIA METLICA
07.00.00 CASETA DE VALVULAS
07.01.00 TRABAJOS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL
07.01.02 TRAZO Y REPLANTEO
07.02.00 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION MANUAL
07.02.02 ELIMINACION DE MATERIAL EXCEDENTE
07.02.03 NIVELACION Y COMPACTACION MANUAL
07.02.04 LECHO DE GRAVA
07.03.00 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO F'C=175 KG/CM2
07.03.02 ENCOFRADO Y DESENCOFRADO
07.04.00 OBRAS DE CONCRETO ARMADO
07.04.01 CONCRETO F'C=175 KG/CM2
07.04.02 ACERO FY = 4200 KG/CM2.
07.04.03 ENCOFRADO Y DESENCOFRADO DE LOSA
07.05.00 REVOQUES Y ENLUCIDOS
07.05.01 TARRAJEO EXTERIOR
07.05.02 TARRAJEO INTERIOR
07.06.03 VALVULAS Y ACCESORIOS DE 8" (INGRESO CASETA)
Pgina 8

M10

M11

M12

M13

M14

M15

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M8

07.06.03.1 VALVULAS Y ACCESORIOS 8" (INGRESO CAS. VALVULAS)


07.07.00 VARIOS
07.07.01 TAPA SANITARIA METLICA
07.07.02 PINTURA EN EXTERIORES
08.00.00 RED DE DISTRIBUCIN R1 Y R2
08.01.00 TRABAJOS PRELIMINARES
08.01.01 TRAZO Y REPLANTEO
08.02.00 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION DE ZANJAS EN TERRENO CONGLOMERADO
08.02.02 CORTE DE PAVIMENTO CON MOLADORA
08.02.03 REFINE Y CONFORMACIN DE FONDOS
08.02.04 CAMA DE APOYO PARA TUBERA
08.02.05 RELLENO Y COMPACTACIN DE ZANJAS
08.02.06 OBRAS DE CONCRETO SIMPLE
08.02.06.1 REPOSICION DE CONCRETO EN PAVIMENTO F'C=210KG/CM2
08.03.00 TUBERA Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERA U.F. 160 MM. C-7.5
08.03.02 SUMINISTRO TUBERA U.F. 110 MM. C-7.5
08.03.03 SUMINISTRO TUBERA U.F. 90 MM. C-7.5
08.03.04 SUMINISTRO TUBERA U.F. 63 MM. C-7.5
08.03.05 TUBERA PVC SAP 1/2" C-7.5
08.05.00 ACCESORIOS DE RED DE DISTRIBUCION
08.05.01 TEE PVC 6"X6"
08.05.02 TEE PVC 6"X4"
08.05.03 TEE PVC 4"X4"
08.05.04 TEE PVC 2"X2"
08.05.05 TEE PVC 6"X2"
08.05.06 REDUC. PVC 6"-2"
08.05.07 CODO. PVC 4"X 90
08.05.08 CODO. PVC 6"X 90
08.05.09 CRUZ PVC 6"X6"
08.05.10 CRUZ PVC 6"X4"
08.05.11 CRUZ PVC 6"X2"
08.05.12 CRUZ PVC 4"X4"
08.05.13 CRUZ PVC 4"X2"
08.06.00 PRUEBA HIDRAULICA
08.06.01 PRUEBA HIDRAULICA+DESINFECCION
09.00.00 CAJA DE VALVULAS DE CONTROL
09.01.00 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE TERRENO MANUAL
09.01.02 TRAZO Y REPLANTEO
09.02.00 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION MANUAL
09.02.02 ELIMINACION DE MATERIAL EXCEDENTE
09.02.03 NIVELACION INTERIOR APISONADO MANUAL
09.03.00 CONCRETO SIMPLE
09.03.01 CONCRETO F'C=140 KG/CM2
09.03.02 ENCOFRADO Y DESENCOFRADO
09.04.00 TARRAJEO
09.04.01 TARRAJEO EXTERIOR
09.05.00 VALVULAS Y ACCESORIOS
09.05.01 VALVULAS Y ACCESORIOS 4"
09.05.02 VALVULAS Y ACCESORIOS 6"
09.05.03 VALVULAS Y ACCESORIOS 2"
09.06.00 VARIOS
09.06.01 TAPA SANITARIA METLICA
10.00.00 CAJA DE VALVULAS DE PURGA
10.01.00 TRABAJOS PRELIMIINARES
10.01.01 LIMPIEZA DE TERRENO MANUAL
10.01.02 TRAZO Y REPLANTEO
10.02.00 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION MANUAL
10.02.02 ELIMINACION DE MATERIAL EXCEDENTE

M9

M10

M11

M12

M13

M14

M15

S/. 651.95

S/. 630.92

S/. 651.95

S/. 630.92

S/. 651.95

S/. 651.95

S/. 630.92

S/. 22,988.74
S/. 805.48
S/. 1,711.78
S/. 1,170.44
S/. 19,312.34

S/. 22,247.17
S/. 779.50
S/. 1,656.56
S/. 1,132.69
S/. 18,689.36

S/. 22,988.74
S/. 805.48
S/. 1,711.78
S/. 1,170.44
S/. 19,312.34

S/. 22,247.17
S/. 779.50
S/. 1,656.56
S/. 1,132.69
S/. 18,689.36

S/. 22,988.74
S/. 805.48
S/. 1,711.78
S/. 1,170.44
S/. 19,312.34

S/. 22,988.74
S/. 805.48
S/. 1,711.78
S/. 1,170.44
S/. 19,312.34

S/. 22,247.17
S/. 779.50
S/. 1,656.56
S/. 1,132.69
S/. 18,689.36

S/. 12,559.83

S/. 12,154.67

S/. 12,559.83

S/. 12,154.67

S/. 12,559.83

S/. 12,559.83

S/. 12,154.67

S/. 10,644.26
S/. 7,211.47
S/. 148.96
S/. 1,145.58
S/. 14,182.72

S/. 10,300.89
S/. 6,978.84
S/. 144.16
S/. 1,108.63
S/. 13,725.21

S/. 10,644.26
S/. 7,211.47
S/. 148.96
S/. 1,145.58
S/. 14,182.72

S/. 10,300.89
S/. 6,978.84
S/. 144.16
S/. 1,108.63
S/. 13,725.21

S/. 10,644.26
S/. 7,211.47
S/. 148.96
S/. 1,145.58
S/. 14,182.72

S/. 10,644.26
S/. 7,211.47
S/. 148.96
S/. 1,145.58
S/. 14,182.72

S/. 10,300.89
S/. 6,978.84
S/. 144.16
S/. 1,108.63
S/. 13,725.21

S/. 2.64
S/. 2.64
S/. 1.02
S/. 0.20
S/. 1.83
S/. 1.83
S/. 0.20
S/. 0.61
S/. 2.23
S/. 3.86
S/. 0.61
S/. 0.81
S/. 0.20

S/. 2.55
S/. 2.55
S/. 0.98
S/. 0.20
S/. 1.77
S/. 1.77
S/. 0.20
S/. 0.59
S/. 2.16
S/. 3.73
S/. 0.59
S/. 0.79
S/. 0.20

S/. 2.64
S/. 2.64
S/. 1.02
S/. 0.20
S/. 1.83
S/. 1.83
S/. 0.20
S/. 0.61
S/. 2.23
S/. 3.86
S/. 0.61
S/. 0.81
S/. 0.20

S/. 2.55
S/. 2.55
S/. 0.98
S/. 0.20
S/. 1.77
S/. 1.77
S/. 0.20
S/. 0.59
S/. 2.16
S/. 3.73
S/. 0.59
S/. 0.79
S/. 0.20

S/. 2.64
S/. 2.64
S/. 1.02
S/. 0.20
S/. 1.83
S/. 1.83
S/. 0.20
S/. 0.61
S/. 2.23
S/. 3.86
S/. 0.61
S/. 0.81
S/. 0.20

S/. 2.64
S/. 2.64
S/. 1.02
S/. 0.20
S/. 1.83
S/. 1.83
S/. 0.20
S/. 0.61
S/. 2.23
S/. 3.86
S/. 0.61
S/. 0.81
S/. 0.20

S/. 2.55
S/. 2.55
S/. 0.98
S/. 0.20
S/. 1.77
S/. 1.77
S/. 0.20
S/. 0.59
S/. 2.16
S/. 3.73
S/. 0.59
S/. 0.79
S/. 0.20

S/. 945.54

S/. 915.03

S/. 945.54

S/. 915.03

S/. 945.54

S/. 945.54

S/. 915.03

S/. 7.05
S/. 3,673.55

S/. 6.82
S/. 3,555.05

S/. 7.05
S/. 3,673.55

S/. 6.82
S/. 3,555.05

S/. 7.05
S/. 3,673.55

S/. 7.05
S/. 3,673.55

S/. 6.82
S/. 3,555.05

S/. 397.42
S/. 577.85
S/. 14.44

S/. 384.60
S/. 559.21
S/. 13.97

S/. 397.42
S/. 577.85
S/. 14.44

S/. 384.60
S/. 559.21
S/. 13.97

S/. 397.42
S/. 577.85
S/. 14.44

S/. 397.42
S/. 577.85
S/. 14.44

S/. 384.60
S/. 559.21
S/. 13.97

S/. 218.47
S/. 269.74

S/. 211.43
S/. 261.04

S/. 218.47
S/. 269.74

S/. 211.43
S/. 261.04

S/. 218.47
S/. 269.74

S/. 218.47
S/. 269.74

S/. 211.43
S/. 261.04

S/. 91.39

S/. 88.44

S/. 91.39

S/. 88.44

S/. 91.39

S/. 91.39

S/. 88.44

S/. 1.62
S/. 1.62
S/. 2.03

S/. 1.57
S/. 1.57
S/. 1.96

S/. 1.62
S/. 1.62
S/. 2.03

S/. 1.57
S/. 1.57
S/. 1.96

S/. 1.62
S/. 1.62
S/. 2.03

S/. 1.62
S/. 1.62
S/. 2.03

S/. 1.57
S/. 1.57
S/. 1.96

Pgina 9

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M8

10.03.00 OBRAS DE CONCRETO SIMPLE


10.03.01 CONCRETO F'C=140 KG/CM2
10.03.02 ENCOFRADO Y DESENCOFRADO
10.04.00 TARRAJEO
10.04.01 TARRAJEO EXTERIOR
10.05.00 VALVULAS Y ACCESORIOS PURGA
10.06.00 VARIOS
10.06.01 TAPA SANITARIA METLICA
11.00.00 CONEXIONES DOMICILIARIAS
11.01.00 TRABAJOS PRELIMIINARES
11.01.01 LIMPIEZA DE TERRENO MANUAL
11.01.02 TRAZO Y REPLANTEO
11.02.00 MOVIMIENTO DE TIERRAS
11.02.01 EXCAVACION MANUAL
11.02.02 CORTE DE PAVIMENTO CON MOLADORA
11.02.03 RELLENO Y COMPACTACIN DE ZANJAS
11.03.00 OBRAS DE CONCRETO SIMPLE
11.03.01 REPOSICION DE CONCRETO EN PAVIMENTO F'C=210KG/CM2
11.03.02 CONCRETO F'C=140 KG/CM2
11.03.03 ENCOFRADO Y DESENCOFRADO
11.04.00 OBRAS DE CONCRETO ARMADO
11.04.01 CONCRETO F'C=175 KG/CM2
11.04.02 ACERO FY = 4200 KG/CM2.
11.04.03 ENCOFRADO Y DESENCOFRADO
11.05.00 CONEXIONES DOMICILIARIAS
11.05.01 CONEXIN DOMICILIARIA DE AGUA 6"
11.05.02 CONEXIN DOMICILIARIA DE AGUA 4"
11.05.03 CONEXIN DOMICILIARIA DE AGUA 3"
11.05.04 CONEXIN DOMICILIARIA DE AGUA 2"
11.05.05 SUMINISTRO E INSTALACION DE MEDIDORES
12.00.00 CASETA DE CLORACIN
12.01.00 MUROS DE LADRILLOS DE SOGA
12.02.00 COBERTURA DE CALAMINA
12.03.00 CARPINTERIA METALICA
12.04.00 TARRAJEO EM MUROS
12.05.00 CERRAJERIA
12.06.00 PINTURA EN MUROS
12.07.00 VIDRIOS
13.00.00 EDUCACIN SANITARIA Y CAPACITACION EN AOM.
13.01.00 EDUCACIN SANITARIA
13.03.00 CAPACITACIN EN A+O+M
14.00.00 FLETE
14.01.00 FLETE TERRESTRE
14.02.00 FLETE RURAL
15.00.00 CONTROL DE CALIDAD
15.01.00 DISEO DE MEZCLAS DE CONCRETO
15.02.00 ENSAYO A LA COMPRESIN DE PROBETAS DE CONCRETO
16.00.00 DESAGE
16.01.00 OBRAS PRELIMINARES
16.01.01 LIMPIEZA DE TERRENO MANUAL
16.01.02 TRAZO Y REPLANTEO
16.01.03 CINTA DE PELIGRO
16.02.00 MOVIMIENTO DE TIERRAS
16.02.01 EXCAVACION MANUAL DE ZANJAS EN TERRENO CONGLOMERADO
16.02.02 CORTE DE PAVIMENTO CON MOLADORA
16.02.03 EXCAVACION C/MAQ EN TERRENO CONGLOMERADO HASTA 2.40 MPROF.
16.02.04 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO SELECCIONADO
16.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
16.03.00 OBRAS DE CONCRETO SIMPLE
16.03.01 REPOSICION DE CONCRETO EN PAVIMENTO F'C=210KG/CM2
16.04.00 SUMINISTRO E INSTALACION DE TUBERIA
16.04.01 SUMINISTRO E INSTALACION TUBERIA PVC 200 mm.x 6m S26
16.04.02 REFINE, NIVELACION Y CONF. DE FONDO T.C.

M9

M10

M11

M12

M13

M14

M15

S/. 406.11
S/. 749.05

S/. 393.01
S/. 724.89

S/. 406.11
S/. 749.05

S/. 393.01
S/. 724.89

S/. 406.11
S/. 749.05

S/. 406.11
S/. 749.05

S/. 393.01
S/. 724.89

S/. 2,422.23
S/. 251.25

S/. 2,344.10
S/. 243.14

S/. 2,422.23
S/. 251.25

S/. 2,344.10
S/. 243.14

S/. 2,422.23
S/. 251.25

S/. 2,422.23
S/. 251.25

S/. 2,344.10
S/. 243.14

S/. 4,085.31
S/. 416.67
S/. 640.74

S/. 3,953.52
S/. 403.23
S/. 620.07

S/. 4,085.31
S/. 416.67
S/. 640.74

S/. 3,953.52
S/. 403.23
S/. 620.07

S/. 4,085.31
S/. 416.67
S/. 640.74

S/. 4,085.31
S/. 416.67
S/. 640.74

S/. 3,953.52
S/. 403.23
S/. 620.07

S/. 133.02
S/. 88.26
S/. 97.61

S/. 128.73
S/. 85.41
S/. 94.46

S/. 133.02
S/. 88.26
S/. 97.61

S/. 128.73
S/. 85.41
S/. 94.46

S/. 133.02
S/. 88.26
S/. 97.61

S/. 133.02
S/. 88.26
S/. 97.61

S/. 128.73
S/. 85.41
S/. 94.46

S/. 86.97
S/. 99.40
S/. 6.83
S/. 57.98
S/. 10,172.36

S/. 84.17
S/. 96.19
S/. 6.61
S/. 56.11
S/. 9,844.22

S/. 86.97
S/. 99.40
S/. 6.83
S/. 57.98
S/. 10,172.36

S/. 84.17
S/. 96.19
S/. 6.61
S/. 56.11
S/. 9,844.22

S/. 86.97
S/. 99.40
S/. 6.83
S/. 57.98
S/. 10,172.36

S/. 86.97
S/. 99.40
S/. 6.83
S/. 57.98
S/. 10,172.36

S/. 84.17
S/. 96.19
S/. 6.61
S/. 56.11
S/. 9,844.22

S/. 238.46
S/. 238.46

S/. 230.77
S/. 230.77

S/. 238.46
S/. 238.46

S/. 230.77
S/. 230.77

S/. 238.46
S/. 238.46

S/. 238.46
S/. 238.46

S/. 230.77
S/. 230.77

S/. 31.30
S/. 10.78

S/. 30.29
S/. 10.43

S/. 31.30
S/. 10.78

S/. 30.29
S/. 10.43

S/. 31.30
S/. 10.78

S/. 31.30
S/. 10.78

S/. 30.29
S/. 10.43

S/. 10,974.90

S/. 85,741.77

Pgina 10

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M8

16.04.03 PREPARACION DE CAMA DE APOYO P/TUBERIA


16.04.04 INSTALACION TUBERIA PVC 200 MM.X 6M S25
16.04.05 CONEXION DE TUBERIA PVC A CONCRETO DE BUZON
16.04.06 PRUEBA HIDRAULICA EN TUBERIA PVC
16.05.00 CONSTRUCCION DE BUZONES
16.05.01 BUZON ESTANDAR HASTA 0.70M DE PROF.
16.05.02 BUZON ESTANDAR HASTA 0.80M DE PROF.
16.05.03 BUZON ESTANDAR HASTA 0.90M DE PROF.
16.05.04 BUZON ESTANDAR HASTA 1.20M DE PROF.
16.05.05 BUZON ESTANDAR HASTA 2.40M DE PROF.
16.06.00 CONEXIONES DOMICILIARIAS
16.06.01 MOVIMIENTO DE TIERRAS
16.06.01.1 EXCAVACION MANUAL DE ZANJAS EN TERRENO CONGLOMERADO
16.06.01.2 CORTE DE PAVIMENTO CON MOLADORA
16.06.01.3 RELLENO CON MATERIAL PROPIO
16.06.01.4 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO SELECCIONADO
16.06.02 TENDIDO E INSTALACION DE TUBERIAS
16.06.02.1 CONEXION DOMICILIARIA 200M T. CONGLOMERADO
16.06.02.2 CONEXION DOMICILIARIA 160M T. CONGLOMERADO
16.06.03 FLETE
16.06.03.1 FLETE TERRESTRE ALCANTARILLADO
16.06.04 CONTROL DE CALIDAD
16.06.04.1 DISEO DE MEZCLAS DE CONCRETO
16.06.04.2 ENSAYO A LA COMPRESIN DE PROBETAS DE CONCRETO
16.06.05 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
16.06.05.1 CONSTRUCCION DE 2 LAGUNAS FACULTATIVAS EN PARALELO. AREA TOTAL=2.2HA
16.06.05.2 CONSTRUCCION DE CERCO PERIMETRICO
17.00.00 TANQUE IMHOFF - CAMARAS DE REJAS Y DESARENADOR
17.01.00 OBRAS PRELIMINARES
17.01.01 TRAZO Y REPLANTEO
17.01.02 LIMPIEZA DE TERRENO MANUAL
17.02.00 MOVIMIENTO DE TIERRAS
17.02.01 EXCAVACION DE ZANJAS MANUAL PARA CAMARA Y DESARENADOR H=1.8 M
17.02.02 NIVELACION INT. Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
17.03.00 OBRAS DE CONCRETO SIMPLE
17.03.01 CONCRETO F'C=140 KG/CM2
17.03.02 ACERO FY = 4200 KG/CM2.
17.03.03 ENCOFRADO Y DESENCOFRADO
17.04.00 REVOQUES Y ENLUCIDOS
17.04.01 TARRAJEO CON IMPERMEBILIZANTES INTERIOR
17.04.02 TARRAJEO EN EXTERIORES CON CEMENTO Y ARENA
17.05.00 EQUIPAMIENTO
17.05.01 COMPUERTA METALICA DE 0.30X0.50 E=3/16''
17.05.02 PLANCHA METALICA 0.65X0.4 DE E=1/2''
17.05.03 REJA P/RETENCION DE SOLIDOS PLAT. 11/2''X3/8'' MARCO L 11/2''X11/2''X1/4''
18.00.00 TANQUE IMHOFF
18.01.00 OBRAS PRELIMINARES
18.01.01 TRAZO Y REPLANTEO
18.01.02 LIMPIEZA DE TERRENO MANUAL
18.02.00 MOVIMIENTO DE TIERRAS
18.02.01 EXCAVACION DE ZANJAS MANUAL PARA CAMARA Y DESARENADOR H=1.8 M
18.02.02 NIVELACION INT. Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
18.03.00 OBRAS DE CONCRETO SIMPLE
18.03.01 FALSO PISO DE CONCRETO F'C = 140 KG/CM2
18.04.00 OBRAS DE CONCRETO ARMADO
18.04.01 CONCRETO EN LOSA DE CIMENTACION F'C = 175 KG/CM2
18.04.02 ACERO FY = 4200 KG/CM2.
18.04.03 ENCOFRADO Y DESENCOFRADO
18.05.00 REVOQUES Y ENLUCIDOS
18.05.01 TARRAJEO CON IMPERMEBILIZANTES INTERIOR
18.05.02 TARRAJEO EN EXTERIORES CON CEMENTO Y ARENA
19.00.00 LECHO DE SECADO
19.01.00 OBRAS PRELIMINARES

M9

S/. 759.66
S/. 70.35
S/. 6,496.96
S/. 74,151.03

M10

M11

M12

M13

S/. 209.58
S/. 2,391.97

S/. 39,819.78
S/. 1,265.37
S/. 6.67
S/. 18.08
S/. 58.38

S/. 17.50
S/. 56.50

S/. 18,426.93
S/. 2,513.13

Pgina 11

S/. 18.08
S/. 58.38

S/. 17.50
S/. 56.50

S/. 10.50
S/. 52.73

M14

M15

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M8

19.01.01 TRAZO Y REPLANTEO


19.01.02 LIMPIEZA DE TERRENO MANUAL
19.02.00 MOVIMIENTO DE TIERRAS
19.02.01 EXCAVACION DE ZANJAS MANUAL PARA CAMARA Y DESARENADOR H=1.8 M
19.02.02 NIVELACION INT. Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
19.03.00 OBRAS DE CONCRETO SIMPLE
19.03.01 FALSO PISO DE CONCRETO F'C = 140 KG/CM2
19.04.00 OBRAS DE CONCRETO ARMADO
19.04.01 CONCRETO EN LOSA DE CIMENTACION F'C = 175 KG/CM2
19.04.02 ACERO FY = 4200 KG/CM2.
19.04.03 ENCOFRADO Y DESENCOFRADO
19.05.00 MUROS DE MAMPOSTERIA
19.05.01 MURO DE SOGA LADRILLO PANDERETA CON CEMENTO - CAL - ARENA
19.05.02 CUBIERTA DE LADRILLO PASTELERO ASENTADO Y FRAGUADO
19.06.00 REVOQUES Y ENLUCIDOS
19.06.01 TARRAJEO CON IMPERMEBILIZANTES INTERIOR
19.07.00 SUMINISTRO Y COLOCACION
19.07.01 ARENA GRUESA SELECCIONADA
19.07.02 PIEDRA CLASIFICADA DE 3/4'' - 2''
19.07.03 PIEDRA CLASIFICADA DE 1/4'' - 3/4'''
19.07.04 PIEDRA CLASIFICADA DE 1/16'' - 1/4'''
20.00.00 MITIGACION AMBIENTAL
20.01.00 MITIGACION AMBIENTAL
Total

M9

M10

M11

M12

M13

M14

M15

S/. 563.64

S/. 545.45

S/. 563.64

S/. 545.45

S/. 563.64

S/. 563.64

S/. 545.45

S/. 359,852.39

S/. 118,368.49

S/. 119,625.84

S/. 115,766.94

S/. 119,612.61

S/. 119,549.38

S/. 115,692.94

Pgina 12

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M15

M16

MEJORAMIENTO Y AMPLIACION DEL SAP Y ALCANTARILLADO TEMBLADERA


01.00.00 CARTEL DE OBRA CON GIGANTOGRAFA DIGITAL
01.01.00 CARTEL DE OBRA CON GIGANTOGRAFA DIGITAL
02.00.00 CAJA DE CAPTACIN DE FONDO
02.01.00 TRABAJOS PRELIMINARES
02.01.01 DEMOLICION DE CONCRETO ARMADO EN TECHO DE CAPTACION
02.01.02 LIMPIEZA DE TERRENO, CAPTACIN
02.01.03 TRAZO Y REPLANTEO
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACIN MANUAL CAJA DE VALVULAS
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE
02.02.03 NIVELACION INTERIOR APISONADO MANUAL
02.03.00 OBRAS DE CONCRETO SIMPLE
02.03.01 CONCRETO FC=140 KG/CM2 (CAJA VLVULAS)
02.03.02 PIEDRA 4" ASENTADA CON MORTERO 1:8 EN CAPTACION
02.03.03 ENCOFRADO Y DESENCOFRADO
02.04.00 OBRAS DE CONCRETO ARMADO
02.04.01 CONCRETO F'C=175 KG/CM2
02.04.02 ACERO FY = 4200 KG/CM2.
02.04.03 ENCOFRADO Y DESENCOFRADO
02.05.00 REVOQUES Y ENLUCIDOS
02.05.01 TARRAJEO EXTERIOR
02.05.02 TARRAJEO INTERIOR
02.06.00 VALVULAS Y ACCESORIOS
02.06.01 VALVULAS Y ACCESORIOS 8"
02.07.00 VARIOS
02.07.01 PINTADO DE ESTRUCTURAS
02.07.02 TAPA SANITARIA 0.60X0.60
03.00.00 LINEA DE CONDUCCIN A R1
03.01.00 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO
03.02.00 EXCAVACIN DE ZANJAS
03.02.01 EXCAVACION DE ZANJAS EN TERRENO CONGLOMERADO
03.02.02 EXCAVACION DE ZANJAS EN ROCA FISURADA
03.02.03 REFINE, NIVELACIN Y COMPACTACIN DE FONDOS.
03.02.04 CAMA DE APOYO PARA TUBERA
03.02.05 RELLENO Y COMPACTACIN DE ZANJAS
03.03.00 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.01 SUMINISTRO E INSTALACION DE TUBERIA U.F. =200 MM. C-5
03.04.00 PRUEBA HIDRAULICA
03.04.01 PRUEBA HIDRULICA + DESINFECCIN
04.00.00 LINEA DE CONDUCCIN A R2
04.01.00 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO
04.02.00 EXCAVACIN DE ZANJAS
04.02.01 EXCAVACION DE ZANJAS EN TERRENO CONGLOMERADO
04.02.02 EXCAVACION DE ZANJAS EN ROCA FISURADA
04.02.03 REFINE, NIVELACIN Y COMPACTACIN DE FONDOS.
04.02.04 CAMA DE APOYO PARA TUBERA
04.02.05 RELLENO Y COMPACTACIN DE ZANJAS
04.03.00 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
04.03.01 SUMINISTRO E INSTALACION DE TUBERIA U.F. =200 MM. C-5
04.04.00 PRUEBA HIDRAULICA
04.04.01 PRUEBA HIDRULICA + DESINFECCIN
05.00.00 RESERVORIO CIRCULAR APOYADO: 100 M3
05.01.00 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL
05.01.02 TRAZO Y REPLANTEO
05.02.00 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL
05.02.02 ELIMINACION DE MATERIAL EXCEDENTE
05.02.03 NIVELACION Y COMPACTACION MANUAL
05.02.04 AFIRMADO

M17

M18

M19

M20

Total

S/. 1,279.38

S/. 3,840.41
S/. 109.20
S/. 6.85
S/. 28.81
S/. 21.36
S/. 1.62
S/. 9,893.62
S/. 572.48
S/. 43.43
S/. 4,968.85
S/. 331.64
S/. 1,787.14
S/. 1,015.11
S/. 1,695.04
S/. 768.53
S/. 534.32
S/. 271.72

S/. 2,132.47
S/. 15,376.10
S/. 88,011.78
S/. 5,764.59
S/. 709.49
S/. 65,036.40
S/. 311,484.94
S/. 3,153.28

S/. 2,270.89
S/. 15,376.10
S/. 95,293.49
S/. 6,142.50
S/. 756.00
S/. 69,300.00
S/. 331,905.00
S/. 3,360.00

S/. 58.83
S/. 115.96
S/. 499.90
S/. 464.77
S/. 91.74
S/. 244.65
Pgina 13

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M15

M16

05.03.00 OBRAS DE CONCRETO SIMPLE


05.03.01 SOLADO DE CONCRETO FC=100 KG/CM2
05.03.02 EMBOQUILLADO PERIMETRAL RESERVORIO
05.03.03 OBRAS DE CONCRETO ARMADO
05.03.04 CONCRETO F'C = 210 KG/CM2
05.03.05 ENCOFRADO Y DESENCOFRADO
05.03.06 ACERO FY = 4200 KG/CM2.
05.04.00 REVOQUES Y ENLUCIDOS
05.04.01 TARRAJEO EXTERIOR
05.04.02 TARRAJEO INTERIOR
05.04.03 PENDIENTE DE FONDO, MORTERO 1:5
05.05.00 VALVULAS Y ACCESORIOS
05.06.01 ACCESORIOS PARA VENTILACIN
05.07.00 VARIOS
05.07.01 PINTURA EN EXTERIORES
05.07.02 SUMINISTRO Y COLOCACIN DE DOSIFICADOR
05.07.03 TAPA SANITARIA METLICA
06.00.00 RESERVORIO CIRCULAR APOYADO: 75 M3
06.01.00 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL
06.01.02 TRAZO Y REPLANTEO
06.02.00 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE
06.02.03 NIVELACION Y COMPACTACION MANUAL
06.02.04 AFIRMADO
06.03.00 OBRAS DE CONCRETO SIMPLE
06.03.01 SOLADO DE CONCRETO FC=100 KG/CM2
06.03.02 EMBOQUILLADO PERIMETRAL RESERVORIO
06.03.03 OBRAS DE CONCRETO ARMADO
06.03.04 CONCRETO F'C = 210 KG/CM2
06.03.05 ENCOFRADO Y DESENCOFRADO
06.03.06 ACERO FY = 4200 KG/CM2.
06.04.00 REVOQUES Y ENLUCIDOS
06.04.01 TARRAJEO EXTERIOR
06.04.02 TARRAJEO INTERIOR
06.04.03 PENDIENTE DE FONDO, MORTERO 1:5
06.05.00 VALVULAS Y ACCESORIOS
06.06.00 ACCESORIOS PARA VENTILACIN
06.07.00 VARIOS
06.07.01 PINTURA EN EXTERIORES
06.07.02 SUMINISTRO Y COLOCACIN DE DOSIFICADOR
06.07.03 TAPA SANITARIA METLICA
07.00.00 CASETA DE VALVULAS
07.01.00 TRABAJOS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL
07.01.02 TRAZO Y REPLANTEO
07.02.00 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION MANUAL
07.02.02 ELIMINACION DE MATERIAL EXCEDENTE
07.02.03 NIVELACION Y COMPACTACION MANUAL
07.02.04 LECHO DE GRAVA
07.03.00 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO F'C=175 KG/CM2
07.03.02 ENCOFRADO Y DESENCOFRADO
07.04.00 OBRAS DE CONCRETO ARMADO
07.04.01 CONCRETO F'C=175 KG/CM2
07.04.02 ACERO FY = 4200 KG/CM2.
07.04.03 ENCOFRADO Y DESENCOFRADO DE LOSA
07.05.00 REVOQUES Y ENLUCIDOS
07.05.01 TARRAJEO EXTERIOR
07.05.02 TARRAJEO INTERIOR
07.06.03 VALVULAS Y ACCESORIOS DE 8" (INGRESO CASETA)

M17

M18

M19

M20

Total

S/. 131.78
S/. 364.54
S/. 42,636.38
S/. 3,979.13
S/. 9,720.33
S/. 3,332.14
S/. 2,850.49
S/. 1,385.27
S/. 625.92
S/. 1,047.95
S/. 3,543.03
S/. 165.86

S/. 52.80
S/. 101.39
S/. 437.09
S/. 406.39
S/. 80.22
S/. 427.96
S/. 115.36
S/. 12,794.25
S/. 17,578.49
S/. 3,679.27
S/. 8,619.09
S/. 3,183.93
S/. 2,575.35
S/. 1,180.27
S/. 625.92
S/. 652.63
S/. 3,543.03
S/. 165.86

S/. 23.39
S/. 37.65
S/. 188.69
S/. 175.45
S/. 29.79
S/. 132.91
S/. 1,293.78
S/. 738.82
S/. 406.70
S/. 381.62
S/. 328.02
S/. 743.74
S/. 506.09

Pgina 14

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M15

07.06.03.1 VALVULAS Y ACCESORIOS 8" (INGRESO CAS. VALVULAS)


07.07.00 VARIOS
07.07.01 TAPA SANITARIA METLICA
07.07.02 PINTURA EN EXTERIORES
08.00.00 RED DE DISTRIBUCIN R1 Y R2
08.01.00 TRABAJOS PRELIMINARES
08.01.01 TRAZO Y REPLANTEO
08.02.00 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION DE ZANJAS EN TERRENO CONGLOMERADO
08.02.02 CORTE DE PAVIMENTO CON MOLADORA
08.02.03 REFINE Y CONFORMACIN DE FONDOS
08.02.04 CAMA DE APOYO PARA TUBERA
08.02.05 RELLENO Y COMPACTACIN DE ZANJAS
08.02.06 OBRAS DE CONCRETO SIMPLE
08.02.06.1 REPOSICION DE CONCRETO EN PAVIMENTO F'C=210KG/CM2
08.03.00 TUBERA Y ACCESORIOS
08.03.01 SUMINISTRO E INSTALACION TUBERA U.F. 160 MM. C-7.5
08.03.02 SUMINISTRO TUBERA U.F. 110 MM. C-7.5
08.03.03 SUMINISTRO TUBERA U.F. 90 MM. C-7.5
08.03.04 SUMINISTRO TUBERA U.F. 63 MM. C-7.5
08.03.05 TUBERA PVC SAP 1/2" C-7.5
08.05.00 ACCESORIOS DE RED DE DISTRIBUCION
08.05.01 TEE PVC 6"X6"
08.05.02 TEE PVC 6"X4"
08.05.03 TEE PVC 4"X4"
08.05.04 TEE PVC 2"X2"
08.05.05 TEE PVC 6"X2"
08.05.06 REDUC. PVC 6"-2"
08.05.07 CODO. PVC 4"X 90
08.05.08 CODO. PVC 6"X 90
08.05.09 CRUZ PVC 6"X6"
08.05.10 CRUZ PVC 6"X4"
08.05.11 CRUZ PVC 6"X2"
08.05.12 CRUZ PVC 4"X4"
08.05.13 CRUZ PVC 4"X2"
08.06.00 PRUEBA HIDRAULICA
08.06.01 PRUEBA HIDRAULICA+DESINFECCION
09.00.00 CAJA DE VALVULAS DE CONTROL
09.01.00 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE TERRENO MANUAL
09.01.02 TRAZO Y REPLANTEO
09.02.00 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION MANUAL
09.02.02 ELIMINACION DE MATERIAL EXCEDENTE
09.02.03 NIVELACION INTERIOR APISONADO MANUAL
09.03.00 CONCRETO SIMPLE
09.03.01 CONCRETO F'C=140 KG/CM2
09.03.02 ENCOFRADO Y DESENCOFRADO
09.04.00 TARRAJEO
09.04.01 TARRAJEO EXTERIOR
09.05.00 VALVULAS Y ACCESORIOS
09.05.01 VALVULAS Y ACCESORIOS 4"
09.05.02 VALVULAS Y ACCESORIOS 6"
09.05.03 VALVULAS Y ACCESORIOS 2"
09.06.00 VARIOS
09.06.01 TAPA SANITARIA METLICA
10.00.00 CAJA DE VALVULAS DE PURGA
10.01.00 TRABAJOS PRELIMIINARES
10.01.01 LIMPIEZA DE TERRENO MANUAL
10.01.02 TRAZO Y REPLANTEO
10.02.00 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION MANUAL
10.02.02 ELIMINACION DE MATERIAL EXCEDENTE

M16

M17

M18

M19

M20

Total

S/. 768.53
S/. 331.72
S/. 455.92

S/. 651.95

S/. 630.92

S/. 252.37

S/. 10,515.33

S/. 22,988.74
S/. 805.48
S/. 1,711.78
S/. 1,170.44
S/. 19,312.34

S/. 22,247.17
S/. 779.50
S/. 1,656.56
S/. 1,132.69
S/. 18,689.36

S/. 2,966.29
S/. 77.95
S/. 1,546.12
S/. 1,132.69
S/. 19,312.34

S/. 14,951.49

S/. 364,853.57
S/. 12,757.78
S/. 28,437.62
S/. 19,444.46
S/. 320,834.03

S/. 12,559.83

S/. 12,154.67

S/. 12,559.83

S/. 12,559.83

S/. 207,439.75

S/. 10,644.26
S/. 7,211.47
S/. 148.96
S/. 1,145.58
S/. 14,182.72

S/. 10,300.89
S/. 6,978.84
S/. 144.16
S/. 1,108.63
S/. 13,725.21

S/. 10,644.26
S/. 7,211.47
S/. 148.96
S/. 1,145.58
S/. 14,182.72

S/. 8,240.71
S/. 5,583.07
S/. 115.32
S/. 886.90
S/. 10,980.17

S/. 181,982.46
S/. 123,292.86
S/. 2,546.76
S/. 19,585.75
S/. 242,478.74

S/. 2.64
S/. 2.64
S/. 1.02
S/. 0.20
S/. 1.83
S/. 1.83
S/. 0.20
S/. 0.61
S/. 2.23
S/. 3.86
S/. 0.61
S/. 0.81
S/. 0.20

S/. 2.55
S/. 2.55
S/. 0.98
S/. 0.20
S/. 1.77
S/. 1.77
S/. 0.20
S/. 0.59
S/. 2.16
S/. 3.73
S/. 0.59
S/. 0.79
S/. 0.20

S/. 2.64
S/. 2.64
S/. 1.02
S/. 0.20
S/. 1.83
S/. 1.83
S/. 0.20
S/. 0.61
S/. 2.23
S/. 3.86
S/. 0.61
S/. 0.81
S/. 0.20

S/. 0.34
S/. 0.34
S/. 0.13
S/. 0.03
S/. 0.24
S/. 0.24
S/. 0.03
S/. 0.08
S/. 0.29
S/. 0.50
S/. 0.08
S/. 0.10
S/. 0.03

S/. 43.40
S/. 43.40
S/. 16.73
S/. 3.34
S/. 30.10
S/. 30.10
S/. 3.34
S/. 10.03
S/. 36.71
S/. 63.47
S/. 10.03
S/. 13.36
S/. 3.34

S/. 945.54

S/. 915.03

S/. 945.54

S/. 122.00

S/. 15,555.59

S/. 7.05
S/. 3,673.55

S/. 6.82
S/. 3,555.05

S/. 5.00
S/. 2,725.54

S/. 115.96
S/. 60,435.84

S/. 397.42
S/. 577.85
S/. 14.44

S/. 384.60
S/. 559.21
S/. 13.97

S/. 358.96
S/. 410.08
S/. 10.25

S/. 6,538.20
S/. 9,506.56
S/. 237.54

S/. 218.47
S/. 269.74

S/. 211.43
S/. 261.04

S/. 155.05
S/. 191.43

S/. 3,594.24
S/. 4,437.66

S/. 91.39

S/. 88.44

S/. 64.85

S/. 1,503.49

S/. 1.62
S/. 1.62
S/. 2.03

S/. 1.57
S/. 1.57
S/. 1.96

S/. 1.15
S/. 1.15
S/. 1.44

S/. 26.67
S/. 26.67
S/. 33.37

S/. 165.86

S/. 165.86

S/. 20.50

S/. 17.94
S/. 70.89
S/. 479.36
S/. 133.71
Pgina 15

S/. 38.44
S/. 70.89

S/. 311.99

S/. 479.36
S/. 445.70

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M15

10.03.00 OBRAS DE CONCRETO SIMPLE


10.03.01 CONCRETO F'C=140 KG/CM2
10.03.02 ENCOFRADO Y DESENCOFRADO
10.04.00 TARRAJEO
10.04.01 TARRAJEO EXTERIOR
10.05.00 VALVULAS Y ACCESORIOS PURGA
10.06.00 VARIOS
10.06.01 TAPA SANITARIA METLICA
11.00.00 CONEXIONES DOMICILIARIAS
11.01.00 TRABAJOS PRELIMIINARES
11.01.01 LIMPIEZA DE TERRENO MANUAL
11.01.02 TRAZO Y REPLANTEO
11.02.00 MOVIMIENTO DE TIERRAS
11.02.01 EXCAVACION MANUAL
11.02.02 CORTE DE PAVIMENTO CON MOLADORA
11.02.03 RELLENO Y COMPACTACIN DE ZANJAS
11.03.00 OBRAS DE CONCRETO SIMPLE
11.03.01 REPOSICION DE CONCRETO EN PAVIMENTO F'C=210KG/CM2
11.03.02 CONCRETO F'C=140 KG/CM2
11.03.03 ENCOFRADO Y DESENCOFRADO
11.04.00 OBRAS DE CONCRETO ARMADO
11.04.01 CONCRETO F'C=175 KG/CM2
11.04.02 ACERO FY = 4200 KG/CM2.
11.04.03 ENCOFRADO Y DESENCOFRADO
11.05.00 CONEXIONES DOMICILIARIAS
11.05.01 CONEXIN DOMICILIARIA DE AGUA 6"
11.05.02 CONEXIN DOMICILIARIA DE AGUA 4"
11.05.03 CONEXIN DOMICILIARIA DE AGUA 3"
11.05.04 CONEXIN DOMICILIARIA DE AGUA 2"
11.05.05 SUMINISTRO E INSTALACION DE MEDIDORES
12.00.00 CASETA DE CLORACIN
12.01.00 MUROS DE LADRILLOS DE SOGA
12.02.00 COBERTURA DE CALAMINA
12.03.00 CARPINTERIA METALICA
12.04.00 TARRAJEO EM MUROS
12.05.00 CERRAJERIA
12.06.00 PINTURA EN MUROS
12.07.00 VIDRIOS
13.00.00 EDUCACIN SANITARIA Y CAPACITACION EN AOM.
13.01.00 EDUCACIN SANITARIA
13.03.00 CAPACITACIN EN A+O+M
14.00.00 FLETE
14.01.00 FLETE TERRESTRE
14.02.00 FLETE RURAL
15.00.00 CONTROL DE CALIDAD
15.01.00 DISEO DE MEZCLAS DE CONCRETO
15.02.00 ENSAYO A LA COMPRESIN DE PROBETAS DE CONCRETO
16.00.00 DESAGE
16.01.00 OBRAS PRELIMINARES
16.01.01 LIMPIEZA DE TERRENO MANUAL
16.01.02 TRAZO Y REPLANTEO
16.01.03 CINTA DE PELIGRO
16.02.00 MOVIMIENTO DE TIERRAS
16.02.01 EXCAVACION MANUAL DE ZANJAS EN TERRENO CONGLOMERADO
16.02.02 CORTE DE PAVIMENTO CON MOLADORA
16.02.03 EXCAVACION C/MAQ EN TERRENO CONGLOMERADO HASTA 2.40 MPROF.
16.02.04 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO SELECCIONADO
16.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
16.03.00 OBRAS DE CONCRETO SIMPLE
16.03.01 REPOSICION DE CONCRETO EN PAVIMENTO F'C=210KG/CM2
16.04.00 SUMINISTRO E INSTALACION DE TUBERIA
16.04.01 SUMINISTRO E INSTALACION TUBERIA PVC 200 mm.x 6m S26
16.04.02 REFINE, NIVELACION Y CONF. DE FONDO T.C.

M16

M17

M18

M19

S/. 1,208.78
S/. 1,104.90

M20

Total

S/. 1,208.78
S/. 1,104.90

S/. 698.03
S/. 10.69

S/. 16.03

S/. 698.03
S/. 26.72

S/. 431.24

S/. 1,724.94

S/. 2,156.18

S/. 406.11
S/. 749.05

S/. 393.01
S/. 724.89

S/. 157.20
S/. 338.28

S/. 6,550.16
S/. 12,081.48

S/. 2,422.23
S/. 251.25

S/. 2,344.10
S/. 243.14

S/. 1,484.60
S/. 153.99

S/. 39,068.28
S/. 4,052.38
S/. 160,116.00

S/. 4,085.31
S/. 416.67
S/. 640.74

S/. 3,953.52
S/. 403.23
S/. 620.07

S/. 4,085.31
S/. 416.67
S/. 640.74

S/. 395.35
S/. 40.32
S/. 62.01

S/. 65,892.06
S/. 6,720.49
S/. 10,334.51

S/. 133.02
S/. 88.26
S/. 97.61

S/. 128.73
S/. 85.41
S/. 94.46

S/. 133.02
S/. 88.26
S/. 97.61

S/. 12.87
S/. 8.54
S/. 9.45

S/. 2,145.49
S/. 1,423.52
S/. 1,574.35

S/. 86.97
S/. 99.40
S/. 6.83
S/. 57.98
S/. 10,172.36

S/. 84.17
S/. 96.19
S/. 6.61
S/. 56.11
S/. 9,844.22

S/. 81.36
S/. 92.99
S/. 6.39
S/. 54.24
S/. 9,516.08

S/. 1,402.78
S/. 1,603.21
S/. 110.17
S/. 935.17
S/. 164,070.33
S/. 667.46
S/. 16.35
S/. 1,305.21
S/. 215.03
S/. 18.86
S/. 241.53
S/. 163.62
S/. 28,800.00
S/. 153,297.00

S/. 238.46
S/. 238.46

S/. 230.77
S/. 230.77

S/. 238.46
S/. 238.46

S/. 7.69
S/. 7.69

S/. 3,999.99
S/. 3,999.99

S/. 31.30
S/. 10.78

S/. 30.29
S/. 10.43

S/. 31.30
S/. 10.78

S/. 1.01
S/. 0.35

S/. 525.03
S/. 180.81

S/. 8,950.41
S/. 10,393.63
S/. 40,000.56
S/. 80,076.33
S/. 12,757.79
S/. 2,756.37
S/. 109,749.00
S/. 3,334.95
S/. 207,439.77
S/. 486,968.36
S/. 97,261.07
Pgina 16

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M15

M16

16.04.03 PREPARACION DE CAMA DE APOYO P/TUBERIA


16.04.04 INSTALACION TUBERIA PVC 200 MM.X 6M S25
16.04.05 CONEXION DE TUBERIA PVC A CONCRETO DE BUZON
16.04.06 PRUEBA HIDRAULICA EN TUBERIA PVC
16.05.00 CONSTRUCCION DE BUZONES
16.05.01 BUZON ESTANDAR HASTA 0.70M DE PROF.
16.05.02 BUZON ESTANDAR HASTA 0.80M DE PROF.
16.05.03 BUZON ESTANDAR HASTA 0.90M DE PROF.
16.05.04 BUZON ESTANDAR HASTA 1.20M DE PROF.
16.05.05 BUZON ESTANDAR HASTA 2.40M DE PROF.
16.06.00 CONEXIONES DOMICILIARIAS
16.06.01 MOVIMIENTO DE TIERRAS
16.06.01.1 EXCAVACION MANUAL DE ZANJAS EN TERRENO CONGLOMERADO
16.06.01.2 CORTE DE PAVIMENTO CON MOLADORA
16.06.01.3 RELLENO CON MATERIAL PROPIO
16.06.01.4 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO SELECCIONADO
16.06.02 TENDIDO E INSTALACION DE TUBERIAS
16.06.02.1 CONEXION DOMICILIARIA 200M T. CONGLOMERADO
16.06.02.2 CONEXION DOMICILIARIA 160M T. CONGLOMERADO
16.06.03 FLETE
16.06.03.1 FLETE TERRESTRE ALCANTARILLADO
16.06.04 CONTROL DE CALIDAD
16.06.04.1 DISEO DE MEZCLAS DE CONCRETO
16.06.04.2 ENSAYO A LA COMPRESIN DE PROBETAS DE CONCRETO
16.06.05 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
16.06.05.1 CONSTRUCCION DE 2 LAGUNAS FACULTATIVAS EN PARALELO. AREA TOTAL=2.2HA
16.06.05.2 CONSTRUCCION DE CERCO PERIMETRICO
17.00.00 TANQUE IMHOFF - CAMARAS DE REJAS Y DESARENADOR
17.01.00 OBRAS PRELIMINARES
17.01.01 TRAZO Y REPLANTEO
17.01.02 LIMPIEZA DE TERRENO MANUAL
17.02.00 MOVIMIENTO DE TIERRAS
17.02.01 EXCAVACION DE ZANJAS MANUAL PARA CAMARA Y DESARENADOR H=1.8 M
17.02.02 NIVELACION INT. Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
17.03.00 OBRAS DE CONCRETO SIMPLE
17.03.01 CONCRETO F'C=140 KG/CM2
17.03.02 ACERO FY = 4200 KG/CM2.
17.03.03 ENCOFRADO Y DESENCOFRADO
17.04.00 REVOQUES Y ENLUCIDOS
17.04.01 TARRAJEO CON IMPERMEBILIZANTES INTERIOR
17.04.02 TARRAJEO EN EXTERIORES CON CEMENTO Y ARENA
17.05.00 EQUIPAMIENTO
17.05.01 COMPUERTA METALICA DE 0.30X0.50 E=3/16''
17.05.02 PLANCHA METALICA 0.65X0.4 DE E=1/2''
17.05.03 REJA P/RETENCION DE SOLIDOS PLAT. 11/2''X3/8'' MARCO L 11/2''X11/2''X1/4''
18.00.00 TANQUE IMHOFF
18.01.00 OBRAS PRELIMINARES
18.01.01 TRAZO Y REPLANTEO
18.01.02 LIMPIEZA DE TERRENO MANUAL
18.02.00 MOVIMIENTO DE TIERRAS
18.02.01 EXCAVACION DE ZANJAS MANUAL PARA CAMARA Y DESARENADOR H=1.8 M
18.02.02 NIVELACION INT. Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
18.03.00 OBRAS DE CONCRETO SIMPLE
18.03.01 FALSO PISO DE CONCRETO F'C = 140 KG/CM2
18.04.00 OBRAS DE CONCRETO ARMADO
18.04.01 CONCRETO EN LOSA DE CIMENTACION F'C = 175 KG/CM2
18.04.02 ACERO FY = 4200 KG/CM2.
18.04.03 ENCOFRADO Y DESENCOFRADO
18.05.00 REVOQUES Y ENLUCIDOS
18.05.01 TARRAJEO CON IMPERMEBILIZANTES INTERIOR
18.05.02 TARRAJEO EN EXTERIORES CON CEMENTO Y ARENA
19.00.00 LECHO DE SECADO
19.01.00 OBRAS PRELIMINARES

M17

M18

M19

M20

Total

S/. 14,296.69
S/. 107,670.07
S/. 15,864.25
S/. 7,491.82
S/. 4,155.54
S/. 6,233.31
S/. 2,077.76
S/. 302,591.52
S/. 5,070.27

S/. 68,369.52
S/. 6,331.86
S/. 37,724.29
S/. 430,554.36
S/. 421,621.20
S/. 13,398.00
S/. 600.00
S/. 105.00
S/. 338.99
S/. 147,415.44
S/. 2,513.13

S/. 39.84
S/. 21.06
S/. 61.42
S/. 104.86
S/. 1,203.44
S/. 680.24
S/. 877.93
S/. 1,113.16
S/. 102.71
S/. 470.84
S/. 840.21
S/. 73.54

S/. 91.68
S/. 43.88
S/. 1,858.83
S/. 4,293.94
S/. 44.34
S/. 13,039.81
S/. 14,438.31
S/. 5,391.86
S/. 3,421.12
S/. 220.89

Pgina 17

CRONOGRAMA DE AVANCE FISICO FINANCIERO


M15

19.01.01 TRAZO Y REPLANTEO


19.01.02 LIMPIEZA DE TERRENO MANUAL
19.02.00 MOVIMIENTO DE TIERRAS
19.02.01 EXCAVACION DE ZANJAS MANUAL PARA CAMARA Y DESARENADOR H=1.8 M
19.02.02 NIVELACION INT. Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
19.03.00 OBRAS DE CONCRETO SIMPLE
19.03.01 FALSO PISO DE CONCRETO F'C = 140 KG/CM2
19.04.00 OBRAS DE CONCRETO ARMADO
19.04.01 CONCRETO EN LOSA DE CIMENTACION F'C = 175 KG/CM2
19.04.02 ACERO FY = 4200 KG/CM2.
19.04.03 ENCOFRADO Y DESENCOFRADO
19.05.00 MUROS DE MAMPOSTERIA
19.05.01 MURO DE SOGA LADRILLO PANDERETA CON CEMENTO - CAL - ARENA
19.05.02 CUBIERTA DE LADRILLO PASTELERO ASENTADO Y FRAGUADO
19.06.00 REVOQUES Y ENLUCIDOS
19.06.01 TARRAJEO CON IMPERMEBILIZANTES INTERIOR
19.07.00 SUMINISTRO Y COLOCACION
19.07.01 ARENA GRUESA SELECCIONADA
19.07.02 PIEDRA CLASIFICADA DE 3/4'' - 2''
19.07.03 PIEDRA CLASIFICADA DE 1/4'' - 3/4'''
19.07.04 PIEDRA CLASIFICADA DE 1/16'' - 1/4'''
20.00.00 MITIGACION AMBIENTAL
20.01.00 MITIGACION AMBIENTAL
Total

M16

M17

M18

M19

M20

Total

S/. 249.00
S/. 135.00
S/. 671.90
S/. 11,176.38
S/. 149.04
S/. 4,213.07
S/. 97.30
S/. 7,365.86
S/. 646.24
S/. 20,666.22
S/. 2,292.86
S/. 998.25
S/. 1,250.85
S/. 312.48
S/. 468.72
S/. 563.64

S/. 545.45

S/. 563.64

S/. 563.64

S/. 10,000.01

S/. 119,569.88

S/. 116,394.84

S/. 98,430.57

S/. 56,291.81

S/. 6,254,896.05

Pgina 18