Vous êtes sur la page 1sur 5
Prepared by WRTS, POWERGRID REF-STABILITY 1) 2) 3) 4) 5) 6) i) 8) Page | ofS CHAPTER-XXV STABILITY TEST FOR RES’ TESTING PROCEDURE OF iCTED EARTH FAULT PROTECTION (TRANSFORMERS & REACTORS ) REF STABILTY TEST FOR TRANSFORMER After opening the C.B. and isolators at both side (H.V and LV. side) of transformer apply 440 V three phase voltage at Three Phase bushings of H.V. side with the help of three phase variac. Earth the R phase of the LV side (through isolator earth switch or discharge rod) Measure the spill phase current in REF relay which should be nearly zero. ‘Switch off 440V supply. Reverse the polarity of R phase Bushing CT and again switch on 440V supply. Appreciable spill current will appear in REF relay. Normalise the CT circuit which was revered in step no. (5) after switching off 440V supply. Repeat the same procedure for Y and B phases and note down the resuits in given table. Normalise the connections of CT and remove feeding of three phase supply. DOC NO. D-2-03-20-02-00 Prepared by WRTS, POWERGRID REF-STABILITY ‘APPLY THREE PHASE 440 V VOLTAGE $$ /\ Hvsibe 8 si sz — 3 Sh = J [e s rc jb, | _ waive Station: Circuit Date of Test: Details of Transformer / Reactor Under Test Make Rating : ‘SI. No. = Bay Loc: Details of Instruments required 1) 440V/11Kv three phase transformer (For reactor) 2) Three phase variac 3) Digital Multimeter 4) Connecting Leads 5) Discharge rod Page 2 of 5 CHAPTER-XXV DOC NO. D-2-03-20-02-00 Prepared by WRTS, POWERGRID REF-STABILITY Details of Instruments used: 4) Three phase Variac ( 15 A) SI. No. Range : Make 2) Multimeter SI. No. Range : Make : SL.NO. PHASE ‘SPILL CURRENT MEASURED. Ot R 02 Y 03 B Signature of Testing Engineer Signature of Substation-In-Charg REF STABILTY TEST FOR REACTOR 1) After opening the C.B. and isolators remove the jumpers of three phase bushings. Neutral will remain grounded, 2) Apply 11 KV voltage at Three Phase bushings with 440V/11 KV transformer. 3) Measure the spill phase current in REF relay which should be nearly zero. 4) Switch off 40V supply to 440V/11KV transformer. 5) Reverse the polarity of R phase bushing CT. 6) Switch on 440V power supply to 440 V/11KV transformer. 7) — Appreciable spill current will appear in REF coil. Measure this current 8) _ Now normalize the polarity of the Bushing CT which was reversed in step (5) 9) Repeat the same procedure for Y and B phase and note down the spill current in given table. 10) After completing the test for all three phases normalize the reactor CT connection and jumpers. Page 3 of 5 CHAPTER-XXV DOC NO. D-2-03-20-02-00 Prepared by WRTS, POWERGRID REF-STABILITY Station: Circuit: Date of Test: Details of Transformer / Reactor Under Test Make : Rating SI. No. Bay Loc : Page 4 of 5 CHAPTER-XXV DOC NO. D-2-03-20-02-00 Prepared by WRTS, POWERGRID REF-STABILITY Details of Instruments required: 1) 440V/11Kv three phase transformer (For reactor) 2) Three phase variac 3) Digital Multimeter 4) Connecting Leads 5) Discharge rod Details of Instruments used: 1) Three phase 440V/11KV Step up transformer SI. No. Range Make 2) Multimeter SI. No. Make Range ‘SL.NO. PHASE ‘SPILL CURRENT MEASURED ot R 02, v2 03 8 ‘Signature of Testing Engineer ‘Signature of Substation-In-Charg Page 5 of S CHAPTER-XXV DOC NO. D-2-03-20-02-00

Vous aimerez peut-être aussi