Vous êtes sur la page 1sur 4

EDP CONSULTING GROUP SDN BHD

PIPE PRESSURE TEST RECORDS


PROJECT: Pangsapuri Jalan Damai
[Note: This Testing Form is Meant for Underground, External and Common Area Pipework]

Service: ACMV
Block No: 6 -1 (TYPE D2)

M&E RFI Ref No. :


Dwg Ref.: IJSB/GTE/M/SD/AC/007

GL Ref :

Description : *Underground/Basement/External Landscaping/Riser/Lift Lobby/Roof/Others


Approved Type of Pipe :
S/N

Pre-Insulated Copper Pipe

LOCATION
Pipe
(Attached Drawing) Size
Living Area
5/8",3/8"
Master Bedroom
1/2",1/4"
Bedroom 2
3/8",1/4"
Outdoor
5/8"3/8"

Date
2-Jul
2-Jul
2-Jul
2-Jul

Specified Test Pressure :

Start
Time Pressure
0230pm 550psi
0230pm 550psi
0230pm 550psi
0230pm 550psi

Date
3-Jul
3-Jul
3-Jul
3-Jul

End
Time
0300pm
0300pm
0300pm
0300pm

*Delete where necessary

Performed by NSC/DSC :

Witnessed by Main Con. :

Name : AZIZUDDIN

Name :

RASHIDI

Witnessed by M&E R.E/C


M&E Resident Engineer's

Name :

Sign :
Date :

P. ENG

Sign :
Date :

M&E SUPERVISOR

Sign :
Date :

D
TEST-SPG-2

Date :

7/2/2014

M&E RFI Ref No. :

obby/Roof/Others AC Liq/Gas Pipe


550psi
End

Pressure
550psi
550psi
550psi
550psi

Remarks

Witnessed by M&E R.E/C.O.W :


M&E Resident Engineer's Office

KHAIRUL HAFSHAM

C.O.W.

Vous aimerez peut-être aussi