Nuestras Operaciones

Perforacin y rehabilitacin de pozos (workover)


Las actividades del mantenimiento se realizan a travs de la vida del bien
para asegurar el pozo producen en los niveles ptimos. Estos servicios
consisten en las reparaciones mecnicas necesarias para mantener la
produccin del bien, por ejemplo la reparacin de las barras de lechn
divididas, substituir las bombas defectuosas del downhole en un pozo de
petrleo o substituir la tubera defectuosa en un pozo de gas.
Adems de mantenimiento peridico, produciendo el aceite y de gas los
pozos requieren de vez en cuando las reparaciones o las modificaciones
importantes, llamadas los workovers. El uso de workovers puede
aumentar a menudo substancialmente reservas econmicamente
recuperables del aceite y del gas.
Para los pozos del problema, la accin remediadora es generalmente
aumentar productividad, abrir nuevas zonas que producen, para eliminar la
produccin excesiva del agua o del gas, o para reparar una falta mecnica.
Para los pozos del no-problema, las acciones se pueden hacer para
aumentar la produccin con el estmulo o el recompletion bien.
Tpicamente, un workover puede durar a partir de algunos das a varias
semanas. Estas operaciones extensas del workover son realizadas
normalmente por un aparejo de mantenimiento del orgullo con el equipo
accesorio especializado adicional, que puede incluir el equipo, las bombas
del fango, los tanques del fango y los impedimentos de escape que perforan
rotatorios.
El orgullo proporciona a los aparejos, al equipo y a equipos para estos
servicios de mantenimiento, que se realizan en pozos del aceite y de gas.
Tpicamente, los trabajos del mantenimiento se realizan en una serie de
pozos en proximidad geogrfica el uno al otro. Orgullo los aparejos se
disean y se equipan para manejar incluso las operaciones ms complejas
del workover.

Slickline o Wireline
El trmino slickline se refiere la la tecnologa de alambre utilizada por
operadores de pozos de gas y petrleo para bajar equipamiento dentro del
pozo a los propsitos de una intervencin en el mismo, comnmente
denominada well intervention. Se utiliza para ello un alambre de metal,
comnmente de entre 0,092 y 0,125 pulgadas de dimetro. En casos en los
que se requiera contacto elctrico con la superficie, se utiliza un cable
trenzado que puede contener uno o ms conductores aislados los que
proveen comunicacin entre la herramienta y la superficie (telemetra).
Por similitud con el alambre en el mercado de telecomunicaciones se
emplea la palabra Wireline para hablar de telefona fija.

Nuestras Operaciones
Coiled Tubing Solutions
Algunos de los factores que influyen en la toma de decisiones del da a da
de la industria de petrleo y gas son, entre otros: eficiencia, flexibilidad y
performance, pero consideramos que el factor ms crtico es el econmico.
Teniendo esto en cuenta Coapetrol ha logrado que el servicio de Coiled
Tubing sea efectivo en su costo, porque no se requiere de un equipo de
"workover". Nuestro servicio es rpido y eficiente, permitiendo que el pozo
pueda volver a ser puesto en produccin con el mnimo tiempo de
inactividad. Los equipos se utilizan regularmente para operaciones de
perforacin, cementacin, estimulacin, terminacin y produccin por su
rapidez y bajo costo.
Las unidades de Coiled Tubing son unidades autnomas de reparacin de
workover, fcilmente transportables e hidrulicas, que inyectan y recuperan
una tubera flexible y continua dentro de una lnea ms grande de tubing o
casing. Estn equipadas con tuberas de varios dimetros que varan entre
1.25" y 3.5", pudiendo operar hasta 4000 mts. Este sistema no requiere de
un equipo adicional de workover. Las unidades pueden ser utilizadas en
pozos vivos y permiten la continua inyeccin de fluidos o nitrgeno mientras
se contina moviendo la tubera flexible.

Workover
From Wikipedia, the free encyclopedia

A workover rig.

The term workover is used to refer to any kind of oil


well intervention involving invasive techniques, such as wireline, coiled
tubing or snubbing. More specifically though, it will refer to the expensive
process of pulling and replacing a completion.
Contents
[hide]

1 Reason to perform a workover

2 Operation

3 Workovers on casing

4 See also

5 External links

[edit]Reason to perform a workover


Workovers rank among the most complex, difficult and expensive types of
wellwork there is. They are only performed if the completion of a well is
terminally unsuitable for the job at hand. The production tubing may have
become damaged due to operational factors like corrosion to the point
where well integrity is threatened. Downhole components such as tubing
retrievable downhole safety valves or electrical submersible pumps may
have malfunctioned, needing replacement.
In other circumstances, the reason for a workover may not that the
completion itself is in a bad condition, but that changing reservoir conditions
make it unsuitable. For example, a high productivity well may have been
completed with 5" tubing to allow high flow rates (a narrower tubing would
have unnecessarily choked the flow). Some years on, declining productivity
means the reservoir can no longer support stable flow through this wide
bore. This may lead to a workover to replace the 5" tubing with 4"
tubing. The narrower bore makes for a more stable flow.
[edit]Operation
Before any workover, the well must first be killed. Since workovers are long
planned in advance, there would be much time to plan the well kill and so
the reverse circulation would be common. The intense nature of this
operation often requires no less than the capabilities of a drilling rig.
The workover begins by removing the Xmas tree and lifting the tubing
hanger from the wellhead and thus beginning to pull the completion out of
the well. The string will almost always be fixed in place by at least
one production packer. If the packer is retrievable it can be released easily
enough and pulled out with the completion string. If it is permanent, then it
is common to cut the tubing just above it and pull out the upper portion of

the string. If necessary, the packer and the tubing left in hole can be milled
out, though more commonly, the new completion will make use of it by
setting a new packer just above it and running new tubing down to the top
of the old.
[edit]Workovers on casing
Although less exposed to wellbore fluids, casing strings too have been
known to lose integrity. On occasion, it may be deemed economical to pull
and replace it. Because casing strings are cemented in place, this is
significantly more difficult and expensive than replacing the completion
string. If in some instances the casing cannot be removed from the well, it
may be necessary to sidetrack the offending area and recomplete, also an
expensive process. For all but the most productive well, replacing casing
would never be economical.
1. n. [Drilling]

ID: 1666

The repair or stimulation of an existing production well for the purpose of


restoring, prolonging or enhancing the production of hydrocarbons.
See: hydrocarbon
2. n. [Well Workover and Intervention]

ID: 4835

The process of performing major maintenance or remedial treatments on an


oil or gas well. In many cases, workover implies the removal and
replacement of the production tubing string after the well has been killed
and a workover rig has been placed on location. Through-tubing workover
operations, usingcoiled tubing, snubbing or slickline equipment, are
routinely conducted to complete treatments or well service activities that
avoid a full workover where the tubing is removed. This operation saves
considerable time and expense.
Los servicios de slickline se han especializado ampliamente desde
aquellos das en que se utilizaba este servicio para bajar y recuperar
sensores de presin y temperatura, ahora operaciones complejas pueden
ser realizadas con una gran variedad de herramientas y personal
experimentado. En el rea de registros de presin y temperatura,
contamos con ingenieros que realizan estudios y anlisis de la informacin
obtenida para la optimizacin de produccin de los pozos, esto se realiza
con herramientas y software de ltima generacin.
Equipetrol S.A. ha estado operando unidades de slickline por mas de 30
aos, en varios pases de sur Amrica. Entendemos la importancia que
tiene en este servicio la experiencia de los operadores, de los supervisores
y el uso de las herramientas apropiadas. Todo esto esta respaldado por

una estructura de apoyo lo cual queda demostrado con nuestra excelente


reputacin en el campo.
Operaciones de Slickline
En el mantenimiento y completacion de pozos en produccin se ofrecen
los siguientes servicios:

Calibracin de fondo de pozo


Apertura y cierre de camisas deslizables
Desarenado de tubera, toma de muestra de fondo
Tubing puncher mecnico
Desparafinado de tubera, desabollado, desarenado
Asentamiento y recuperacin de tapones y valvulas de
Pistoneo
Pescas
Registros con Sensores de presion y temperatura
Operacin con vlvulas de cierre en fondo electrnicas

gas lift