CONSULTANT:
CONTRACTOR:
Table of Contents
S. No.
Description
Page No.
1.
Project Particulars
2.
Scope of Work
3.
4.
6.
Progress Review
7.
Financial Status
22
8.
Contractors Resources
23
9.
QA/ QC Reports
27
10.
Engineers Comments
31
11.
Project Correspondence
32
12.
Progress Photographs
36
Page 1
Project Particulars
Client:
Ministry
of
Transport
&
Communications
P.O. Box 684, Muscat, Postal Code 113
Directorate General of Roads
Sultanate of Oman.
Consultant:
Contractor:
30.10.2013
Mobilization Period:
60 Days
Construction Period:
548 Days
Completion date:
29.06.2015
R.O. 17,884,403.000
Amount of Contingencies:
R.O. 1,402,155.613
R.O. 16,482,247.387
42.37%
22.55%
Page 2
Scope of Work
This project is located in Batinah Region on existing Batinah Highway in the Wilayat Sohar and
consists of construction of an interchange in place of existing roundabout along with allied works.
Total length of the project along Batinah highway is about 4.0 km which shall be converted from four
lanes to six lanes with tapering back to 4lanes, all as shown on plans. Also included in the scope of
work is the construction of service roads, pedestrian underpasses.
The work also includes expropriation of properties, relocation/protection of services (sewerage,
telephone, electricity, water, irrigation) road lighting works and traffic signals.
Major items within the scope of work consist of but not limited to the following:
Removal of existing asphalt surface, extension of existing embankment and earthwork to achieve
the designed profile and gradient.
Removal of existing drainage structures and construction of new ones including protection works
as shown on construction drawings and as directed.
Expropriation of open/built up properties and removal of existing structures thereupon.
Construction of interchange ramps, Box Girder Bridge, roundabout, pedestrian underpasses and
service roads.
Provision of new street lighting system/traffic signals and removal/disposal of existing street light
poles including conductors/cables, transformers, feeder pillars, foundations etc., all for the
proper completion of the job.
Construction of earthen embankment/sub grade, sub-base, aggregate base course, bituminous base
course and bituminous wearing course as per details on the construction drawings.
Installation of road side furniture (traffic signs, road marking etc.) and protection works on
embankment slopes.
Relocation/Protection of existing LT, 11KV and 33KV transmission lines and allied items
(transformers etc.) as per the requirements of concerned authority.
Relocation/Protection of existing utilities (sewerage, telephone, electricity, water lines and
irrigation) as per the requirements of concerned authorities.
Provision of ducts for future utilities as per the requirements of utility operator.
Construction of concrete safety barriers, fixing of guard rails and paving tiles.
Provision of traffic diversion in coordination with concerned authorities.
Page 3
Page 4
Page 5
Date
Meeting
with
Director
of
Maintenance, Sohar Municipality for
the approval of MAS for Street
Lighting Luminaires.
01.07.2014
Meeting
with
Director
of
Maintenance, Sohar Municipality for
the approval of MAS for Street
Lighting Luminaires.
08.07.2014
17.07.2014
Page 6
Designation
Date of
Joining
2.
Muneer Abdul
Resident Engineer
19.03.2014
3.
Hussein Shah
Material Engineer
04.01.2014
4.
Ernesto B. Paredes
Bridge Engineer
16.04.2014
5.
Sande H Tangaras
Civil Engineer
08.06.2014
6.
Danilo
Quantity Surveyor
19.06.2014
6.
Mohamed Safie
Land Surveyor
04.01.2014
7.
Aseef Iqbal
Site Inspector
10.02.2014
8.
Site Inspector
30.03.2014
9.
Material Inspector
01.04.2014
Secretary
13.04.2014
Page 7
% MONTHLY
Dec
MONTHLY PROGRESS
2013
Jan
CUMULATIVE PROGRESS
MONTHS
10
Jun
May
Apr
Mar
0.01
0.01
Dec
2013
0.28
0.26
0.28
0.25
Jan
2014
Jul
0.45
1.67
0.18
1.42
Feb
Aug
1.46
5.91
1.01
4.23
Mar
Sep
4.36
13.15
2.89
7.25
Apr
Oct
10.01
23.21
5.65
10.06
May
15.19
32.64
5.18
9.42
Jun
7.36
9.73
Jul
22.55
42.37
Nov
2014
Dec
52.58
10.21
Aug
Jan
62.37
9.79
Sep
Apr
Feb
70.86
8.49
Oct
76.59
5.72
Nov
81.13
4.55
Dec
84.69
3.56
Jan
Mar
12
May
87.48
2.79
Feb
Jun
91.31
3.83
Mar
2015
Jul
94.86
3.55
Apr
Sep
Aug
98.33
1.67
Jun
100.00
2015
3.47
May
100.00
Jul
Actual Cumulative
Oct
100.00
Aug
100.00
Sep
0.00
20.00
40.00
60.00
80.00
Oct
% Cumulative
100.00
100.00
120.00
Page 8
Feb
Incidental
Construction
MSE walls
73,724
50,004
14,821
2,063,644
83,264
141,190
275,037
30,920
456,522
788,138
CUMULATIVE PROGRESS
MONTHLY PROGRESS
TOTAL
Drainage Works
Bituminous
Pavement
Concrete for
Box Culvert
/Underpas
Concrete for
Bridge
Structural
Excavation
Subbase &
Aggregate Base
Embankment
19,558
Clearing &
Removal of
Obstructions
74,043
56,423
Road Diversions
Budgeted
Man-Hrs
Description
Item
0.00
0.00
Actual
CL14 Plan %
Actual
CL14 Plan %
0.00
0.00
0.00
0.00
0.00
0.11
-
Actual
CL14 Plan %
Actual
CL14 Plan %
Actual
CL14 Plan %
Actual
CL14 Plan %
Actual
CL14 Plan %
Actual
Revised Plan
Actual Cum
0.01
0.01
-
Dec
2013
0.00
CL14 Plan %
Actual
CL14 Plan %
0.00
0.00
CL14 Plan %
Actual
Actual
0.00
Actual
CL14 Plan %
0.30
Dec
2013
CL14 Plan %
Plan/
Actual
100.000
4.03
6.84
13.33
1.50
22.12
38.19
3.57
2.42
0.72
3.59
0.95
2.73
Wtd.
%
0.28
0.26
0.28
0.25
Jan
0.28
0.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.09
0.00
6.62
8.67
Jan
0.45
1.67
0.18
1.42
Feb
0.45
0.48
0.00
0.00
0.00
4.02
0.00
0.23
0.00
1.01
0.00
0.00
10.09
0.38
13.03
19.23
Feb
1.46
5.91
1.01
4.23
Mar
1.46
0.76
0.13
0.00
6.16
4.43
0.00
2.50
15.21
0.01
0.00
0.48
1.43
0.00
9.21
5.00
0.00
0.78
17.59
20.37
22.36
26.89
Mar
4.36
13.15
2.89
7.25
Apr
4.36
2.47
5.52
0.00
9.87
17.23
0.00
16.19
34.62
6.05
0.00
1.26
2.97
0.00
29.30
5.00
0.00
4.35
6.58
19.52
47.70
37.31
31.77
Apr
10.01
23.21
5.65
10.06
May
10.01
5.64
9.26
0.17
17.63
33.36
2.61
0.00
14.39
57.89
14.73
0.38
5.59
10.17
0.00
45.91
53.23
0.00
4.89
16.76
77.42
48.33
43.00
36.64
May
15.19
32.64
5.18
9.42
Jun
2014
15.19
12.48
13.38
0.79
25.69
49.13
4.98
0.00
13.24
69.26
18.14
1.21
14.93
23.65
0.00
56.90
62.16
0.00
29.38
69.96
48.33
44.11
41.51
Jun
2014
22.55
42.37
7.36
9.73
Jul
22.55
21.64
16.87
1.43
35.90
65.07
6.42
2.80
16.19
81.40
22.33
2.63
27.72
36.51
0.00
62.24
74.91
0.00
5.27
41.37
70.18
48.33
51.21
46.39
Jul
52.58
10.21
Aug
30.78
5.65
80.79
62.37
9.79
Sep
39.87
13.41
93.82
43.85
4.23
3.42
17.87
83.46
63.06
83.38
51.47
0.08
26.27
11.07
0.00
67.94
66.60
48.33
56.13
Sep
64.59
58.64
48.33
51.26
Aug
70.86
8.49
Oct
48.35
21.84
100.00
61.59
5.50
84.50
74.26
7.77
41.98
69.08
74.18
48.33
61.01
Oct
76.59
5.72
Nov
56.26
30.56
100.00
72.98
6.08
92.89
75.97
19.32
59.98
69.08
82.85
48.33
65.88
Nov
81.13
4.55
Dec
64.34
32.94
100.00
81.15
6.08
99.96
77.37
31.22
78.73
75.05
84.75
48.33
70.76
Dec
84.69
3.56
Jan
71.05
70.94
100.00
83.94
34.35
100.00
80.05
44.94
79.90
82.85
84.75
59.91
75.63
Jan
87.48
2.79
Feb
77.31
75.04
100.00
84.42
99.38
100.00
82.40
51.98
79.90
93.48
85.24
77.84
80.50
Feb
91.31
3.83
Mar
81.99
94.02
100.00
85.35
99.76
100.00
88.97
52.14
85.20
98.64
92.34
90.27
85.38
Mar
REV.:
0
PERIOD ENDING:
94.86
3.55
Apr
85.59
96.43
100.00
92.86
99.76
100.00
92.13
90.14
89.45
100.00
92.34
94.93
90.25
Apr
Jul-14
98.33
100.00
1.67
Jun
93.35
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
2015
3.47
May
88.93
100.00
100.00
96.39
100.00
100.00
98.55
90.14
92.60
100.00
98.36
100.00
Jun
100.00
2015
95.13
May
Jul
100.00
Jul
96.64
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Aug
100.00
Aug
98.27
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Sep
100.00
Sep
99.38
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Oct
100.00
Oct
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Page 9
Description
Unit
BOQ Qty.
Actual
Qty.
% This
Month
% Last
Month
M2
161,752
137,490
85.00%
85.00%
Removal of Trees
No.
956
656
68.62%
68.62%
Removal of Existing
Pavement
Removal of Reinforced
Concrete
Removal of Signboards
M3
24,000
13,500
56.25%
56.25%
M3
1,000
493.5
49.35%
0.32%
Nr.
60
15
25.00%
25.00%
Nr.
400
Revised
200
50.00%
50.00%
M3
6,000
1,902
31.70%
31.70%
Removal of Drainage
Protection Works
Expandable Piles
No.
100.0%
100.0%
Working Piles
No.
110
Revised
95
86.36%
83.63%
10
M2
13,030
4,742
36.39%
23.72%
832
22.61%
22.61%
938.4
20.40%
12.22%
4
5
Revised
11
LM
12
Steel Fixing
Tons
13
M3
17,200
4,139
24.06%
10.76%
14
M3
2,600
2,512
96.61%
81.3%
15
Precast NJB
6,400
2,209
34.51%
21.1%
3,680
Revised
4,600
Revised
Page 10
LOCATION
PILE NO.
CASTING
SETTING OUT
BORING,
REBARS, &
CONCRETE
INTEGRITY
TEST
EP 01
EP 02
EP 03
EP 04
3
2
1
4
26/3/2014
25/3/2014
25/3/2014
26/3/2014
26/3/2014
25/3/2014
25/3/2014
26/3/2014
7-8/5/2014
16-17/4/2014
5-6/4/2014
13-14/5/2014
P3R
P3R
P3R
P3R
P3R
P1R
P1R
P3R
P3R
P3R
P1R
P1R
P1R
P3R
P3L
P1R
P1R
P1R
P3L
P3L
P3L
P1R
P1L
P1L
P3L
P3L
P3L
P2R
P2R
P2R
P2L
P3L
P3L
P1L
P1L
P1L
P2L
P2L
P2L
P1L
85
87
83
81
79
63
65
86
84
82
68
66
61
80
28
62
67
69
26
30
32
64
6 WP
14
25
27
29
78
76
74
23 WP
24
31
8
10
12
17
18
22
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
7/4/2014
7/4/2014
8/4/2014
8/4/2014
8/4/2014
9/4/2014
9/4/2014
10/4/2014
10/4/2014
10/4/2014
12/4/2014
12/4/2014
9/4/2014
13/4/2014
13/4/2014
12/4/2014
14/4/2014
14/4/2014
15/4/2014
15/4/2014
15/4/2014
16/4/2014
16/4/2014
16/4/2014
17/4/2014
17/4/2014
8/4/2014
8/4/2014
9/4/2014
9/4/2014
9/4/2014
10/4/2014
10/4/2014
12/4/2014
12/4/2014
12/4/2014
13/4/2014
13/4/2014
13/4/2014
14/4/2014
14/4/2014
15/4/2014
15/4/2014
15/4/2014
16/4/2014
16/4/2014
16/4/2014
17/4/2014
17/4/2014
17/4/2014
20/4/2014
20/4/2014
20/4/2014
21/4/2014
21/4/2014
21/4/2014
22/4/2014
22/4/2014
22/4/2014
23/4/2014
23/4/2014
23/4/2014
24/4/2014
24/4/2014
24/4/2014
26/4/2014
23/4/2014
23/4/2014
23/4/2014
23/4/2014
23/4/2014
28/4/2014
28/4/2014
23/4/2014
23/4/2014
23/4/2014
28/4/2014
28/4/2014
28/4/2014
23/4/2014
28/4/2014
28/4/2014
28/4/2014
28/4/2014
28/4/2014
28/4/2014
28/4/2014
28/4/2014
11/5/2014
11/5/2014
28/4/2014
28/4/2014
28/4/2014
11/5/2014
11/5/2014
11/5/2014
14/6/2014
28/4/2014
28/4/2014
11/5/2014
11/5/2014
11/5/2014
14/6/2014
14/6/2014
14/6/2014
11/5/2014
30/4/2014 to 1/5/2014
1 - 2/6/2014
-
19/4/2014
19/4/2014
19/4/2014
21/4/2014
21/4/2014
20/4/2014
22/4/2014
22/4/2014
22/4/2014
23/4/2014
23/4/2014
23/4/2014
24/4/2014
Page 11
LOCATION
PILE NO.
CASTING
SETTING
OUT
BORING,
REBARS, &
CONCRETE
INTEGRITY
TEST
P1L
P1L
P1L
P2L
P2L
P2L
P2R
P2R
P2L
P2L
P2R
P2R
P2R
P2R
P5R
P5R
P5R
P5R
P5R
P5R
P5R
P5R
P5R
P5L
P5L
P5L
P5L
P5L
P5L
P5L
P5L
P5L
AB1 R
AB1 R
AB1 R
AB1 L
AB1 L
AB1 L
AB1 R
AB1 R
AB1 L
AB1 L
AB2 L
AB2 L
AB2 L
AB2 R
AB2 L
AB2 R
AB2 R
9
13
11
16
21
19
72
77
15
20
70
71
73
75
105
104
103
102
101
100
97
98
99
48 WP
49
50
42
44
46
43
45
47
56
58
60
1
3
5
57
59
2
4
51
53
55
106
54
108
110
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
24/4/2014
24/4/2014
26/4/2014
26/4/2014
26/4/2014
27/4/2014
27/4/2014
27/4/2014
28/4/2014
27/4/2014
28/4/2014
29/4/2014
29/4/2014
29/4/2014
4/5/2014
4/5/2014
4/5/2014
5/5/2014
5/5/2014
5/5/2014
6/5/2014
6/5/2014
6/5/2014
7/5/2014
7/5/2014
7/5/2014
10/5/2014
10/5/2014
10/5/2014
10/5/2014
10/5/2014
10/5/2014
12/5/2014
12/5/2014
12/5/2014
14/5/2014
14/5/2014
14/5/2014
13/6/2014
13/6/2014
15/5/2014
15/5/2014
19/5/2014
19/5/2014
19/5/2014
19/5/2014
20/5/2014
20/5/2014
20/5/2014
26/4/2014
26/4/2014
27/4/2014
27/4/2014
27/4/2014
28/4/2014
28/4/2014
28/4/2014
29/4/2014
29/4/2014
29/4/2014
30/4/2014
30/4/2014
30/4/2014
5/5/2014
5/5/2014
5/5/2014
6/5/2014
6/5/2014
6/5/2014
7/5/2014
7/5/2014
7/5/2014
8/5/2014
8/5/2014
8/5/2014
11/5/2014
11/5/2014
11/5/2014
12/5/2014
12/5/2014
12/5/2014
13/5/2014
13/5/2014
13/5/2014
15/5/2014
15/5/2014
15/5/2014
14/6/2014
14/6/2014
17/5/2014
17/5/2014
20/5/2014
20/5/2014
20/5/2014
20/5/2014
21/5/2014
21/5/2014
21/5/2014
11/5/2014
11/5/2014
11/5/2014
14/6/2014
14/6/2014
14/6/2014
11/5/2014
11/5/2014
14/6/2014
14/6/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
18/5/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
21/5/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
24/5/2014 to 25/5/2014
-
Page 12
LOCATION
PILE NO.
CASTING
SETTING OUT
BORING,
REBARS, &
CONCRETE
INTEGRITY
TEST
AB2 L
52
90
21/5/2014
22/5/2014
3/6/2014
AB2 R
107
91
21/5/2014
22/5/2014
3/6/2014
AB2 R
109
92
21/5/2014
22/5/2014
3/6/2014
P4L
33
93
30/7/2014
31/7/2014
P4L
37
94
30/7/2014
31/7/2014
P4L
39
95
30/7/2014
31/7/2014
P1L
P2L
P3L
P4L
P5L
AB2
L
-
N/A
N/A
2nd Lift
on-going
24-Jul-14
Height (m)
6.920
6.920
6.920
6.920
6.920
1st Lift
23-Jul-14
on-going
29-Jun-14
on-going
Height (m)
1.153
1.210
1.440
1.248
1.225
26-Jun-14
17-May-14
23-Jun-14
18-Jun-14
8-May-14
11-Jun-14
11-Jun-14
1-May-14
3-Jun-14
N/A
ACTIVITY
PEDESTAL
PIER
BIT. PAINTING
PILE CAP
F/P &
BLINDING
N/A
28-May14
17-May14
11-May14
P1R
P2R
P3R
P4R
P5R
AB2
R
-
N/A
N/A
2nd Lift
9-Jun-14
28-Jun-14
22-Jun-14
10-Jul-14
Height (m)
6.920
6.920
6.920
6.920
6.920
1st Lift
11-Jun-14
26-May-14
22-Jun-14
Height (m)
0.423
0.649
0.461
0.438
8-May-14
4/30/2014
22-Apr-14
ACTIVITY
PEDESTAL
PIER
20-May14
0.366
BIT. PAINTING
12-May14
PILE CAP
4-May-14
F/P &
BLINDING
N/A
27-Apr-14
PREVIOUS
25-May14
13-May14
7-May-14
PREVIOUS
MONTH
31-May14
20-May14
14-May14
N/A
THIS
MONTH
Page 13
STATION
1
0+003 - 0+022
2
0+022 - 0+040
3
0+040 - 0+052
MH
0+043
4
0+052 - 0+070
5
0+070 - 0+100
6
0+100 - 0+104
MH
0+104
7
0+104 - 0+122
8
0+122 - 0+139
9
0+139 - 0+150
10
0+150 - 0+170
MH
0+165
11
0+170 - 0+182
12
0+182 - 0+200
13 0+200 - 0+213.5
14 0+213.5 - 0+225
MH
0+225
15
0+225 - 0+232
16
0+232 - 0+250
17
0+250 - 0+258
18
0+258 - 0+268
MH
0+268
TOTAL LENGTH (m) =
BALANCE (m) =
NO.
19.00
18.00
12.00
18.00
30.00
4.00
18.00
17.00
11.00
20.00
12.00
18.00
13.50
11.50
7.00
18.00
8.00
10.00
265.00
0.00
LENGTH
(m)
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 2.0
1.0 x 1.5
1.0 x 1.5
1.0 x 1.5
1.0 x 1.5
-
13-Jul-14
28-May-14
15-Apr-14
5-Mar-14
2-Mar-14
10-May-14
10-May-14
10-May-14
5-Mar-14
2-Mar-14
19-May-14
19-May-14
24-Feb-14
28-May-14
28-May-14
10-Apr-14
23-Apr-14
13-Jul-14
-
F/P &
BLINDING
14-Jul-14
4-Jun-14
16-Apr-14
24-Mar-14
5-Mar-14
8-Jun-14
17-May-14
14-May-14
1-Apr-14
6-Mar-14
22-May-14
21-May-14
27-Feb-14
3-Jun-14
3-Jun-14
13-Apr-14
26-Apr-14
14-Jul-14
-
Rebars
P R E V IO US
M ON T H
14-Jul-14
4-Jun-14
16-Apr-14
24-Mar-14
5-Mar-14
8-Jun-14
17-May-14
14-May-14
1-Apr-14
6-Mar-14
22-May-14
21-May-14
27-Feb-14
3-Jun-14
3-Jun-14
13-Apr-14
26-Apr-14
14-Jul-14
-
Concrete
BASE SLAB
THIS MONTH
15-Jul-14
12-Jun-14
19-Apr-14
8-Apr-14
6-Mar-14
14-Jun-14
16-Jul-14
20-May-14
17-May-14
5-Apr-14
5-Apr-14
2-Jun-14
2-Jun-14
25-May-14
1-Mar-14
8-Jun-14
5-Jul-14
8-Jun-14
15-Apr-14
27-Apr-14
15-Jul-14
-
Concrete
WALL
15-Jul-14
12-Jun-14
19-Apr-14
8-Apr-14
6-Mar-14
14-Jun-14
16-Jul-14
20-May-14
17-May-14
5-Apr-14
5-Apr-14
2-Jun-14
2-Jun-14
25-May-14
1-Mar-14
8-Jun-14
5-Jul-14
8-Jun-14
15-Apr-14
27-Apr-14
15-Jul-14
-
Rebars
17-Jul-14
16-Jun-14
21-Apr-14
12-Apr-14
11-Mar-14
17-Jun-14
24-May-14
19-May-14
8-Apr-14
12-Apr-14
5-Jun-14
2-Jun-14
4-Mar-14
17-Jun-14
17-Jun-14
19-Apr-14
1-May-14
17-Jul-14
-
Rebars
17-Jul-14
16-Jun-14
21-Apr-14
12-Apr-14
11-Mar-14
17-Jun-14
24-May-14
19-May-14
8-Apr-14
12-Apr-14
5-Jun-14
2-Jun-14
4-Mar-14
17-Jun-14
17-Jun-14
19-Apr-14
1-May-14
17-Jul-14
-
Concrete
TOP SLAB
22-Jul-14
29-Jun-14
29-Apr-14
19-Apr-14
19-Mar-14
24-Jun-14
29-May-14
29-May-14
12-Apr-14
10-Apr-14
16-Jun-14
16-Jun-14
10-Mar-14
28-Jun-14
28-Jun-14
13-May-14
13-May-14
22-Jul-14
-
Bituminous
Paint (2 Coats)
Page 14
21+260
Block 1
Block 2
21+485
Block 1a
Block 1b
Block 2a
Block 2b
21+838
Block 1a
Block 1b
Block 2
Block 3
Block 4a
Block 4b
Block 5
Block 6
21+972.4
Block 1
Block 2
Block 3
Block 4
Block 5
Block 6
Block 7
Block 8
Block 9
Block 10
Block 11
Block 12
Block 13
Block 14
Block 15
Block 16
Block 17
Block 18
Block 19
Block 20
Block 21
Block 22
1
LHS
RHS
2
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
STATION
NO.
43.039
19.526
23.493
49.750
3.000
17.290
7.710
21.730
57.210
5.000
22.590
22.580
7.000
5.000
22.590
22.580
7.000
57.629
28.038
28.031
28.026
28.022
28.019
28.018
28.019
28.022
28.026
28.031
28.038
21.015
21.010
21.006
21.003
21.001
21.000
21.001
21.003
21.006
21.010
21.015
LENGTH (m)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
SKEW ( )
1-Jul-14
1-Jul-14
21-Jul-14
3-Jul-14
3-Jul-14
21-Jul-14
3-Jul-14
3-Jul-14
24-May-14
24-May-14
17-May-14
18-May-14
18-May-14
18-May-14
18-May-14
26-May-14
26-May-14
28-May-14
28-May-14
27-Jul-14
27-Jul-14
24-Jul-14
16-Jun-14
16-Jun-14
12-Jun-14
12-Jun-14
8-Jun-14
8-Jun-14
8-Jun-14
F/P &
BLINDING
Rebars
24-Jun-14
3-Jun-14
8-Jun-14
1-Jul-14
8-Jul-14
20-Jul-14
30-Jul-14
Concrete
WALL
5-Jun-14 24-Jun-14
10-Jul-14
25-May-14 3-Jun-14
13-Jul-14
29-May-14 8-Jun-14
31-Jul-14
10-Jun-14 1-Jul-14
15-Jun-14 7-Jul-14
19-Jun-14 20-Jul-14
27-Jul-14
25-Jun-14 30-Jul-14
5-Jun-14
9-Jul-14
25-May-14
12-Jul-14
29-May-14
31-Jul-14
10-Jun-14
15-Jun-14
19-Jun-14
27-Jul-14
25-Jun-14
Concrete
Rebars
BASE SLAB
15-Jul-14
23-Jun-14
2-Jul-14
23-Jul-14
-
16-Jul-14
23-Jun-14
2-Jul-14
24-Jul-14
-
Concrete
TOP SLAB
Rebars
Bituminous
Paint (2 Coats)
Page 15
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
Block 1
Block 2
Block 3
Block 4
Block 5
Block 6
Block 7
Block 8
Block 1
Block 2
Block 3
Block 4
Block 5
Block 6
Block 7
Block 8
Block 9
Block 10
Block 11
Block 12
23+492
21+972.4
Block 23
Block 24
Block 25
Block 26
Block 27
Block 28
Block 29
Block 30
Block 31
Block 32
Block 33
22+655
RHS
STATION
NO.
6.457
31.546
31.546
7.982
7.039
31.546
31.546
5.525
9.675
32.711
32.711
20.315
19.035
32.711
32.711
10.95
25.03
32.711
32.711
3.130
79.065
57.629
6.635
6.782
6.819
7.217
7.975
8.571
9.267
9.949
10.260
10.262
10.265
95.482
LENGTH (m)
15 R
15 R
15 R
15 R
15 R
15 R
15 R
15 R
45 R
45 R
45 R
45 R
45 R
45 R
45 R
45 R
45 R
45 R
45 R
45 R
15 R
0
0
0
0
0
0
0
0
0
0
0
0
45 R
SKEW ( )
30-Jun-14
24-Jun-14
29-Jun-14
24-Jun-14
28-Jun-14
29-Jun-14
24-Jun-14
24-Jun-14
24-Jun-14
24-Jun-14
-
F/P &
BLINDING
21-Jul-14
27-Jul-14
9-Jul-14
14-Jul-14
-
Rebars
21-Jul-14
27-Jul-14
9-Jul-14
14-Jul-14
-
Concrete
BASE SLAB
30-Jul-14
-
Concrete
WALL
30-Jul-14
-
Rebars
Concrete
TOP SLAB
Rebars
Bituminous
Paint (2 Coats)
Page 16
23+756.5
Block 1
Block 2
Block 3a
Block 3b
Block 4
23+997
Block 1
Block 2a
Block 2b
Block 3a
Block 3b
Block 4a
Block 4b
24+235
Block 1a
Block 1b
Block 2a
Block 2b
Block 2c
24+570
Block 1
Block 2a
Block 2b
67.550
12.090
20.180
14.430
8.700
12.090
70.268
16.128
4.933
13.860
16.300
4.942
7.848
6.197
59.106
15.566
15.000
8.900
15.600
4.020
51.953
25.846
13.500
12.587
LENGTH (m)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
SKEW ( )
12-Jul-14
12-Jul-14
-
12-Jul-14
12-Jul-14
8-Jul-14
8-Jul-14
F/P &
BLINDING
PREVIOUS
Note: Precast RCBC were used for all 1 cell - 2.0m x 1.5m locations.
RHS
10
LHS
RHS
LHS
RHS
LHS
RHS
LHS
STATION
NO.
P R E V IO US
M ON T H
23-Jul-14
23-Jul-14
-
23-Jul-14
23-Jul-14
23-Jul-14
23-Jul-14
Rebars
23-Jul-14
23-Jul-14
-
23-Jul-14
23-Jul-14
23-Jul-14
23-Jul-14
Concrete
BASE SLAB
THIS MONTH
23-Jul-14
23-Jul-14
-
23-Jul-14
23-Jul-14
-
23-Jul-14
23-Jul-14
23-Jul-14
23-Jul-14
Concrete
WALL
23-Jul-14
23-Jul-14
23-Jul-14
23-Jul-14
Rebars
23-Jul-14
23-Jul-14
-
23-Jul-14
23-Jul-14
23-Jul-14
23-Jul-14
23-Jul-14
23-Jul-14
-
23-Jul-14
23-Jul-14
23-Jul-14
23-Jul-14
Concrete
TOP SLAB
Rebars
24-Jul-14
24-Jul-14
-
24-Jul-14
24-Jul-14
24-Jul-14
24-Jul-14
Bituminous
Paint (2 Coats)
Page 17
7
8
9
10
23+756.5
23+997
24+235
24+570
23+492
21+260
21+485
21+838
21+972.4
22+655
1
2
3
4
STATION
NO.
TYPE
PREVIOUS
F/P &
BLINDING
Rebars
P R E V IO US
M ON T H
Concrete
INLET
Bit. Paint
THIS MONTH
Rebars
Concrete
OUTLET
Bit. Paint
Page 18
DRAWING NO.
Location
CHAINAGE
DIA
TYPE
NO. OF
PIPES
LEFT STAGE
CCC/FQI/IR/06
MIDDLE STAGE 0+030
SERVICE ROAD-3
RIGHT STAGE
200
uPVC
LEFT STAGE
CCC/FQR/IR/11 SOLMIDDLE STAGE 0+150
2
RIGHT STAGE
300
uPVC
LEFT STAGE
CCC/FQR/IR/10 SOLMIDDLE STAGE 0+300
3
RIGHT STAGE
200
uPVC
LEFT STAGE
CCC/FQR/WA/05 SRMIDDLE STAGE 0+600
1
RIGHT STAGE
300
uPVC
150
uPVC
LEFT STAGE
5
CCC/FQI/EL/01
MIDDLE STAGE
SETOUT/EX
INSTALLATI
BACKFILLIN
C/BED
CONCRETE
ON
G
Setting out/
PREP
Exc/Install
RFI REF.
Concrete
Backfill
RIGHT STAGE
LEFT STAGE
6
CCC/FQI/IR/01
MIDDLE STAGE
300
uPVC
RIGHT STAGE
LEFT STAGE
7
150
uPVC
UTL-BF-
RIGHT STAGE
LEFT STAGE
8
CCC/FQI/IR/02
MIDDLE STAGE
21+780
300
uPVC
RIGHT STAGE
LEFT STAGE
9
150
uPVC
RIGHT STAGE
LEFT STAGE
10
CCC/FQI/EL/04
MIDDLE STAGE
150
uPVC
UTL-CON106
UTL-BF-44
RIGHT STAGE
LEFT STAGE
11
CCC/FQI/EL/05
MIDDLE STAGE
150
uPVC
UTL-CON107
UTL-BF-46
RIGHT STAGE
LEFT STAGE
12
CCC/FQI/IR/03
MIDDLE STAGE
200
uPVC
UTL-CON108
UTL-BF-45
RIGHT STAGE
13
LEFT STAGE
CCC/FQI/IR/04
MIDDLE STAGE22+520 LHS
JUNCTION CROSSING
RIGHT STAGE
200
uPVC
14
LEFT STAGE
CCC/FQI/IR/05
MIDDLE STAGE22+587 LHS
JUNCTION CROSSING
RIGHT STAGE
200
uPVC
150
uPVC
300
uPVC
LEFT STAGE
15
CCC/FQI/EL/06
MIDDLE STAGE
RIGHT STAGE
16
LEFT STAGE
CCC/FQI/WA/02
MIDDLE STAGE23+008 LHS
JUNCTION
RIGHT STAGE
Page 19
PIPE
DIA
TYPE
NO. OF
PIPES
23+020
900
RC
23+060
150
uPVC
23+210
150
uPVC
23+240
150
uPVC
23+560
150
uPVC
23+820
150
uPVC
23+900
600
RC
23+980
150
uPVC
600
RC
24+020
300
uPVC
24+120
150
uPVC
24+220
150
uPVC
24+340
300
uPVC
24+520
150
uPVC
150
uPVC
300
uPVC
S. NO.
DRAWING NO.
17
CCC/FQI/WA/01
Location
CHAINAGE
LEFT STAGE
MIDDLE STAGE
SETOUT/EX
INSTALLATI
BACKFILLIN
C/BED
CONCRETE
Setting out/
ON
G
PREP
Exc/Install
6/16/2014 6/16/2014 6/16/2014 7/20/2014 UTL-LAY- 102
7/8/2014
7/8/2014
7/9/2014
RFI REF.
Concrete
Backfill
UTL-CON-
UTL-BF-19
RIGHT STAGE
LEFT STAGE
18
CCC/FQI/EL/07
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
19
CCC/FQI/EL/13
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
20
CCC/FQI/EL/08
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
21
CCC/FQI/EL/09
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
22
CCC/FQI/EL/10
MIDDLE STAGE
5/29/2014 6/2/2014
6/2/2014
UTL-CON102
RIGHT STAGE
LEFT STAGE
23
CCC/FQI/WA/03
MIDDLE STAGE
5/29/2014 6/2/2014
6/2/2014
UTL-CON101
RIGHT STAGE
LEFT STAGE
24
CCC/FQI/EL/11
MIDDLE STAGE
5/29/2014 6/2/2014
6/3/2014
6/3/2014
6/4/2014
RIGHT STAGE
LEFT STAGE
25
RIGHT STAGE
LEFT STAGE
26
CCC/FQI/IR/07
MIDDLE STAGE
6/4/2014
UTL-LAY-140
R1
UTL-CON114
RIGHT STAGE
LEFT STAGE
27
CCC/FQI/EL/12
MIDDLE STAGE
6/4/2014
6/5/2014
7/23/2014 7/24/2014
UTL-LAY-139
RIGHT STAGE
LEFT STAGE
28
CCC/FQI/EL/14
MIDDLE STAGE
6/9/2014
6/9/2014
7/5/2014
7/5/2014
7/5/2014
RIGHT STAGE
LEFT STAGE
29
CCC/FQI/IR/08
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
30
CCC/FQI/EL/15
MIDDLE STAGE
UTL-CON105
UTL-BF- 43
RIGHT STAGE
LEFT STAGE
31
RIGHT STAGE
LEFT STAGE
32
Page 20
PIPE
S. NO.
DIA
TYPE
NO. OF
PIPES
150
uPVC
21+870
100
uPVC
23+580
100
uPVC
100
uPVC
100
uPVC
100
uPVC
22+820
150
uPVC
22+990
150
uPVC
DRAWING NO.
Location
CHAINAGE
SETOUT/EX
INSTALLATI
BACKFILLIN
C/BED
CONCRETE
Setting out/
ON
G
PREP
Exc/Install
RFI REF.
Concrete
Backfill
LEFT STAGE
33
34
CCC/FQI/NAW.2
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
35
CCC/FQI/NAW.3
MIDDLE STAGE
UTL-LAY- 120
R1
7/9/2014
7/9/2014
UTL-LAY- 116
UTL-LAY-126
UTL-LAY-136
RIGHT STAGE
LEFT STAGE
36
RIGHT STAGE
LEFT STAGE
37
38
CCC/FQI/OMANTEL.2MIDDLE STAGE
0+140 SOL-3
RIGHT STAGE
LEFT STAGE
39
CCC/FQI/SL/03
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
40
CCC/FQI/SL/04
MIDDLE STAGE
RIGHT STAGE
UTL-CON103
UTL-CON110
Page 21
10
11
12
13
14
15
16
17
18
Jun-15
May-15
Apr-15
Mar-15
Feb-15
Jan-15
Dec-14
Nov-14
Oct-14
Sep-14
Aug-14
Jul-14
Jun-14
May-14
Apr-14
Feb&Mar-14
Jan-14
Dec-13
PAYMENT FOR
THE MONTH OF
DESCRIPTION
Sl. No.
4,293,764
4,293,764
4,109,460
3,315,692
2,808,644
2,291,277
1,648,225
GROSS
AMOUNT
(R.O.)
4,293,764
184,304
793,768
507,048
517,367
643,052
1,648,225
4,117,632
382,116
650,802
417,900
504,147
514,442
1,648,225
GROSS
NET AMOUNT
AMOUNT
CLAIMED
CLAIMED (R.O.)
(R.O.)
15-Jul-14
05-Jun-14
08-May-14
06-Apr-14
12-Feb-14
23-Nov-13
DATE
SUBMITTED
3,832,946
382,116
445,708
407,538
434,917
514,442
1,648,225
16-Jul-14
04-Jul-14
05-Jun-14
03-May-14
02-Apr-14
29-Jan-14
AMOUNT
DATE CERTIFIED
CERTIFIED (R.O.)
2,161,833
513,608
1,648,225
AMOUNT
RECEIVED
(R.O.)
14-Sep-14
02-Sep-14
04-Aug-14
02-Jul-14
DATE
PAYMENT DUE
10-Apr-14
6-Feb-14
DATE
PAYMENT
RECEIVED
Page 22
DESCRIPTION
CCC
HIRED
TOTAL
AVAILABLE
AT SITE
COMPRESSOR
AIR COMPRESSOR
GENERATOR
CRANES
3
-
DIESEL TANKER
FLAT TRAILER
10
HIAB TRUCK
11
12
TIPPER TRUCKS
11
11
13
14
15
BOBCAT
16
EXCAVATOR
17
18
19
DOZER D9N/D8R
20
TELEHANDLER
4
2
5
3
1
-
21
22
CONCRETE MIXER
23
DYNAPAC S/ROLLER
24
E/WORK ROLLER
25
MOTOR GRADER
26
27
28
PAVER MACHINE
29
1
1
30
DYNA TRUCK
31
MAINTENANCE TRUCKS
32
33
34
TOYOTA COROLLA/CIVIC/YARIS
35
TOYOTA PICKUP/ISUZU
36
37
38
11
11
12
NISSAN PATHFINDER/X-TRAIL
44
88
Total
44
Page 23
20
40
60
33
Jan-14
No. of EQUIPMENT
80
55
Feb-14
100
66
Mar-14
120
68
Apr-14
202
66
154
77
May-14
297
68
222
390
77
299
68
86
Jun-14
115
55
88
87
95
Aug-14
47
33
33
88
Jul-14
110
87
607
88
473
93
108
95
715
Sep-14
107
68
497
86
385
107
102
93
817
Oct-14
108
107
93
95
87
68
47
93
110
110
108
82
102
1,184
102
87
108
1,102
98
110
1,015
100
107
917
98
95
PROJECT MONTHS
Nov-14
87
87
68
Dec-14
47
Jan-15
82
100
102
100
79
100
1,263
98
77
98
1,340
87
53
1,500
66
1,500
77
1,500
41
79
1,500
53
82
1,459
66
87
1,406
41
1,500
Oct-15
82
79
77
66
53
Sep-15
Aug-15
Jul-15
May-15 Jun-15
Apr-15
2015
Jan-15 Feb-15 Mar-15
79
Dec-14
Feb-15
Nov-14
77
Oct-14
Mar-15
Aug-14 Sep-14
66
Jul-14
Apr-15
2014
53
Jun-14
May-15
May-14
41
Apr-14
Jun-15
Mar-14
Jul-15
Feb-14
Aug-15
Jan-14
Sep-15
Total
473
1500
41
Oct-15
EQUIPMENT HISTOGRAM
Page 24
EXPATRIATES
NATIONALS
TOTAL
ACTUAL
BUDGET
ACTUAL
BUDGET
ACTUAL
A - MANAGEMENT ***
B - COMMERCIAL STAFF *
C - ENGINEERS
21
22
E - ENGINEERING TECHNICIANS **
22
29
1 - SKILLED CRAFTSMEN
132
71
203
2 - SEMI-SKILLED/UNSKILLED
494
59
553
10
686
139
825
G - SUBCONTRACTORS
Number of Personnel employed by Subcontractor on Company Work :
16
Page 25
No. of Men
100
200
300
400
391
Jan-14
500
425
630
222
340
340
18
68
731
391
26
365
848
2,202
748
3,362
638
1,353
603
54
657
2,614
425
715
581
49
630
1,957
1,327
596
46
550
291
222
596
Feb-14
600
11
57
Mar-14
851
57
691
4,135
773
64
709
3,052
627
851
63
59
565
4,960
825
69
756
3,910
840
858
84
59
756
4,764
838
854
84
6,923
6,383
5,618
7,365
741
442
74
61
667
Dec-14
381
7,691
616
326
61
57
554
Jan-15
269
7,988
573
297
57
51
516
Feb-15
246
306
9,033
330
8,693
8,342
PROJECT MONTHS
340
351
429
354
31
33
43
35
276
44
297
387
47
May-15
305
Apr-15
307
2015
Mar-15
307
725
778
541
764
833
72
61
652
854
78
63
61
83
700
750
60
754
858
825
Jul-14
322
638
657
Apr-14
57
0
Aug-14
700
11
52
854
Nov-14
480
0
Sep-14
11
848
Oct-14
701
0
Oct-14
800
340
Dec-13
50
854
0
Nov-14
900
57
36
764
0
Dec-14
23
748
May-14
Sep-14
793
541
0
Jan-15
773
Jun-14
Aug-14
794
442
Jul-14
799
9,212
406
179
40
30
365
Jun-15
149
6
57
10
102
15
150
301
4960
383
4577
9,212
8651
9215
862
914
7788
51
92
135
271
30
Total
8301
Oct-15
Sep-15
Aug-15
Jul-15
Aug-15
2014
326
Jun-14
792
297
May-14
791
Feb-15 0
Apr-14
586
354
Mar-14
375
0
Mar-15
Feb-14
186
351
0
Apr-15
Jan-14
34
Jul-15
Dec-13
6
340
0
May-15
Sep-15
Oct-15
2013
179
0
Page 26
Page 27
Page 28
Page 29
MAS/CCC/FQI/MSE/003
MAS/CCC/FQI/PVC/004
MAS/CCC/FQI/HDPE/005
MAS/CCC/FQI/PW/006
MAS/CCC/FQI/MC/007
MAS/CCC/FQI/RS/008
MAS/CCC/FQI/PT/009-1
MAS/CCC/FQI/PT/009-2
MAS/CCC/FQI/PT/009-3
MAS/CCC/FQI/PB/010A-Rev.1
MAS/CCC/FQI/PB/010B
MAS/CCC/FQI/HDPE/011
MAS/CCC/FQI/RCBC/012
MAS/CCC/FQI/BP/013
MAS/CCC/FQI/BP/013A
MAS/CCC/FQI/EJ/014A-Rev.1
MAS/CCC/FQI/RC/015
MAS/CCC/FQI/WS/016 B
MAS/CCC/FQI/TW/017
MAS/CCC/FQI/EW/019
MAS/CCC/FQI/EC/020
MAS/CCC/FQI/PS/021
MAS/CCC/FQI/LL/022
MAS/CCC/FQI/LP/023A
MAS/CCC/FQI/FP/024
MAS/CCC/FQI/JS/025
MAS/CCC/FQI/GT/026
CCC/FQI/REN/MAS/003
CCC/FQI/REN/MAS/004
CCC/FQI/REN/MAS/005
CCC/FQI/REN/MAS/006
CCC/FQI/REN/MAS/007
CCC/FQI/REN/MAS/008
CCC/FQI/REN/MAS/009-1
CCC/FQI/REN/MAS/009-2
CCC/FQI/REN/MAS/009-3
CCC/FQI/REN/MAS/010A-Rev.1
CCC/FQI/REN/MAS/010B
CCC/FQI/REN/MAS/011
CCC/FQI/REN/MAS/012
CCC/FQI/REN/MAS/013
CCC/FQI/REN/MAS/013A
CCC/FQI/REN/MAS/014A-Rev.1
CCC/FQI/REN/MAS/015
CCC/FQI/REN/MAS/016 B
CCC/FQI/REN/MAS/017
CCC/FQI/REN/MAS/019
CCC/FQI/REN/MAS/020
CCC/FQI/REN/MAS/021
CCC/FQI/REN/MAS/022
CCC/FQI/REN/MAS/023A
CCC/FQI/REN/MAS/024
CCC/FQI/REN/MAS/025
CCC/FQI/REN/MAS/026
MAS/CCC/FQI/GT/026A
MAS/CCC/FQI/GTI/002
CCC/FQI/REN/MAS/026A
MAS/CCC/FQI/BBC/001
CCC/FQI/REN/MAS/002
MAR No.
CCC/FQI/REN/MAS/001
Reference No.
Geotextile
Package Substation
MV & LV Cables
Electrical Works
Telephone Works
Reinforcing Steel
Piling Works
UPVC Pipes
Geotechnical Investigation
Material/ Work
Amiantit Oman
Al Ammar International
Amiantit Oman
Amiantit Oman
Al Ammar International
APCC LLC
Amiantit Oman
Amiantit Oman
Manufacturer/Supplier/
Subcontractor
15/06/2014
21/05/2014
27/03/2014
27/03/2014
22/05/2014
27/03/2014
22/03/2014
19/03/2014
22/03/2014
12/03/2014
25/03/2014
02/03/2014
07/05/2014
17/06/2014
02/03/2014
22/02/2014
22/02/2014
11/05/2014
07/05/2014
22/02/2014
22/02/2014
22/02/2014
02/02/2014
30/01/2014
26/01/2014
26/12/2013
26/12/2013
26/12/2013
26/12/2013
22/12/2013
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
REN/FQI/CCC/111
SO/FQI/CCC/091
SO/FQI/CCC/090
SO/FQI/CCC/089
SO/FQI/CCC/063
SO/FQI/CCC/069
SO/FQI/CCC/026
SO/FQI/CCC/020
SO/FQI/CCC/019
SO/FQI/CCC/014
SO/FQI/CCC/015
SO/FQI/CCC/087
25/03/2014
09/03/2014
SO/FQI/CCC/064
SO/FQI/CCC/038
25/05/2014 REN/FQI/CCC/122
---
27/03/2014
27/03/2014
27/03/2014
20/03/2014
09/03/2014
19/02/2014
09/02/2014
09/02/2014
02/02/2014
02/02/2014
01/04/2014
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
APPROVED
No meet the
HDS
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
SO/FQI/CCC/077
SO/FQI/CCC/082
SO/FQI/CCC/083
---
REN/FQI/CCC/119
16/04/2014 REN/FQI/CCC/100
08/06/2014 REN/FQI/CCC/130
27/03/2014
29/05/2014 REN/FQI/CCC/131
17/03/2014
16/04/2014 REN/FQI/CCC/099
23/03/2014
20/05/2014 REN/FQI/CCC/123
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
Renardet
27/05/2014
28/04/2014
16/06/2014
03/04/2014
16/06/2014
03/04/2014
28/04/2014
02/04/2014
31/05/2014
05/05/2014
26/03/2014
11/03/2014
31/05/2014
13/05/2014
14/04/2014
14/04/2014
14/04/2014
24/03/2014
27/03/2014
25/02/2014
18/02/2014
18/02/2014
12/02/2014
12/02/2014
07/04/2014
MOTC
Renardet
Submitte Remarks
Via Renardet
Comment
Letter
d To
By MOTC
Letter Ref. No.
Submitted
s dated
Dated
Date
Page 30
Engineers Comments
The Planned percentage of progress as per the construction program is 42.37%.
The Actual percentage of progress is 15.29%.
There is a shortfall of 17.35% in progress which is mainly due to the additional
works due to relocation of Falaj.
Construction works for relocation of Falaj are completed in all respects.
Pile foundation works for Pier No. 4 are recommenced on 22.07.2014.
MSE Wall works are in progress on Abutment No. 1 (Muscat) side.
Site working hours are re-adjusted to accommodate the Break during peak
temperatures of summer and Holy Ramadan .
Future Utility Ducts and Box Culvert works are in progress at various locations.
Page 31
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/2/2014
7/3/2014
7/6/2014
7/6/2014
7/6/2014
7/7/2014
7/7/2014
7/7/2014
10
11
12
13
14
S.
Date
No. Received
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
From
Subject
FQI/REN/TR- 156
FQI/RENARDET/185
Reference
No.
Reference
No.
7/22/2014
7/22/2014
7/20/2014
7/6/2014
7/6/2014
7/6/2014
REN/FQI/CCC/154
REN/FQI/CCC/154
7/8/2014 REN/FQI/CCC/145
Reply
date
Approved
Approved
Approved
Approved
Remarks
Page 32
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/8/2014
7/8/2014
7/8/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
18
19
20
21
22
23
24
25
26
27
28
29
30
31
7/10/2014
7/7/2014
7/7/2014
16
17
32
7/7/2014
15
S.
Date
No. Received
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
From
Subject
FQI/REN/TR- 159
Reference
No.
7/10/2014
7/22/2014
7/9/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/13/2014
7/23/2014
7/7/2014
Reply
date
REN/FQI/CCC/147
Reference
No.
Approved as Noted
Approved
Approved
Approved
Approved as Noted
Remarks
Page 33
7/15/2014
7/16/2014
7/16/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
39
40
41
42
43
44
45
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
7/15/2014
7/15/2014
CCC
37
38
7/13/2014
35
CCC
CCC
7/12/2014
34
CCC
From
36
7/10/2014
33
S.
Date
No. Received
Subject
FQI/REN/TR- 185
FQI/REN/TR- 184
FQI/REN/TR- 183
FQI/REN/TR- 182
Reference
No.
7/22/2014
7/22/2014
7/23/2014
7/22/2014
7/22/2014
7/16/2014
7/22/2014
Reply
date
REN/FQI/CCC/149
Reference
No.
Approved as Noted
Approved as Noted
Approved
Approved
Approved
Remarks
Page 34
7/17/2014
7/20/2014
7/21/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/23/2014
7/23/2014
7/23/2014
7/24/2014
7/22/2014
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
S.
Date
No. Received
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
CCC
From
REN/FQI/CCC/153
FQI/RENARDET/211
FQI/RENARDET/208
FQI/REN/TR- 192
FQI/REN/TR- 191
FQI/REN/TR- 190
FQI/REN/TR- 189
FQI/REN/TR- 188
FQI/RENARDET/206
FQI/RENARDET/205
FQI/RENARDET/204
FQI/RENARDET/202
FQI/RENARDET/203
FQI/REN/TR- 187
FQI/REN/TR- 186
FQI/RENARDET/200
Reference
No.
Approved Shop Drawing from water
Department
Statical Calculation Deck Formwork (
PERILLC)
Bar bending schedule for 8 cell Box
culvert ch.21+838-Rev.0
Eid Alfitr Holidays
Working Hours on August 2014
Static load test for working pile #
SOP48
Static load test for working pile #
SOP23
Construction of Utility Ducts Payment for Surround Concrete
Grade Sheet for SOL-6 from Ch.0+000
TO 0+674.985LHS & CL
2Way #150mm upvc street lighting
Ducts @SR-02 CH.1+050
Drainage Ditch Inlet Type-I details @
ch.21+500
Profile ( SOL-5) @CH.0+000TO
0+979.780
Grade Sheet for SOL-6 from Ch.0+000
TO 0+674.985LHS & CL
Relocation of Telecom Utilities Additional works
Project progress Photographs &
Videose with Hard & Printed copy
Approved Shop Drawing for water
pipeline utilities
Subject
7/23/2014
7/23/2014
7/22/2014
7/22/2014
8/13/2014
7/22/2014
Reply
date
REN/FQI/CCC/156
REN/FQI/CCC/200
Reference
No.
Approved
Approved
Approved as Noted
Remarks
Page 35
PROGRESS PHOTOGRAPHS
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42