START

INSTALL
LOADOUT/
TRANSPORTATION
CROSS BEAM

START

Pre-Loadout :
Job Safety analysis Meeting / Risk analysis
Mobilization of MWS
Pre-loadout meeting

BARGE PORT IN @
WHARF/QUAY

Abbreviation & definition of terms :


SPMT : Self Propelled Modular Transporter
MWS : Marine Warranty Surveyor

END

SAILAWAY
WHARF ALONGSIDE
& MOORING

CASTING OF
MOORING LINE &
BARGE HANDOVER

SETTING
SPMT
INSPECTION BY
MWS

GAS FREE CHECK


SAILAWAY
CERTIFICATE ISSUED
BY MWS
SITE MOVE TO
WHARF/QUAY
BARGE JOINT
INSPECTION

INSTALL
RAMP BETWEEN
BARGE & WHARF

BARGE HANDOVER

COMPLETE
SEAFASTENING

LOADOUT
CERTIFICATE ISSUED
BY MWS

TOWING BALLAST

BARGE PREBALLASTING

LOADOUT TO BARGE

difference between
pre-ballasting & towing
ballast

To be done by MULTIPANEL
To be done by BARGE/BUYER

INITIAL SEA
FASTENING

TYPICAL LOADOUT PROCEDURE


FLOWCHART