PROPIETARIO
LICITACION
CONTRATO
CONTRATISTA
INSPECTOR
OBRA
MONTO
BASE_PRES
MOD. PRES
PRECIOS A
PLAZO
INICIO
TERMINO
FECHA
JUNIO
JULIO
AGOSTO
SETIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE
ENERO
FEBRERO
MARZO
1754.24
11500
460
1294.24
8315
1496.7
SOLES S/.
295,782.63
295,782.63
8,049.84
8,049.84
0.00
0.00
0.00
0.00
0.00
0.00
303,832.47
0.00
0.00
0.00
0.00
303,832.47
0.00
0.00
0.00
0.00
303,832.47
54,689.84
358,522.31
PARTIDAS
UND
MET.
ESTRUCTURAS
LOSAS ARMADA
LOSAS ARMADA: CONCRETO, fc= 210kg/cm2
LOSAS ARMADA: ENCOFRADO Y DESENCOFRADO
LOSAS ARMADA: ACERO, fy= 4200kg/cm2
m3
m2
0.22
1.96
kg
10.37
02.03.05.01
02.03.05.02
m3
m2
4.22
49.67
02.03.05.03
02.03.05.04
kg
m2
301.66
24.79
2.04
02.04.01
03
VARIOS
JUNTAS DE DILATACIN C/TECNOPORT, e= 1"x15cm, EN MUROS
237.66
m3
1.79
m2
kg
28.43
141.04
3.04
03.04.01
03.04.02
03.04.03
ARQUITECTURA
MESA DE CONCRETO
MESA DE CONCRETO: CONCRETO, fc= 175kg/cm2
MESA DE CONCRETO: ENCOFRADO Y DESENCOFRADO
MESA DE CONCRETO, fy= 4200kg/cm2
REVOQUES Y REVESTIMIENTOS
3.05
03.05.01
m2
0.00
89.28
03.05.02
03.05.03
TARRAJEO EN INTERIORES
TARRAJEO EN EXTERIORES
m2
m2
428.80
202.45
03.05.04
03.05.05
03.05.06
TARRAJEO DE COLUMNAS
m2
TARRAJEO DE VIGAS
m2
VESTIDURA DE DERRAMES EN VANOS DE PUERTAS Y VENTANAS, E=15 CM m
155.44
334.49
205.37
03.05.07
3.06
459.00
03.06.01
3.07
m2
99.34
03.07.01
03.07.02
CONTRAPISO DE 42 mm.
PISO DE CEMENTO SEMI PULIDO
m2
m2
88.76
12.79
03.07.03
03.07.04
PISO: MACHIMBRADO
PISO DE CERMICO, 30x30cm.
m2
m2
224.34
26.62
03.07.05
3.08
03.08.01
m2
62.14
m2
28.43
3.09
03.09.01
ZOCALOS
ZOCALO DE CERAMICO VIDRIADO, 20x30 cm.
m2
0.00
60.85
3.10
03.10.01
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.30 M
ml
0.00
156.86
03.10.02
3.11
ml
193.48
0.00
03.11.01
m2
484.35
PARTIDAS
ITEM
PARTIDAS
UND
MET.
UND
MET.
3.12
CARPINTERIA DE MADERA
03.12.01
03.12.02
m2
m2
39.05
6.97
03.12.03
03.12.04
VENTANA DE MADERA
CLOSET DE MADERA
m2
m2
124.47
15.51
03.12.05
03.12.06
03.12.07
und
und
und
10.82
14.00
5.00
und
38.00
0.00
03.12.08
04
0.00
4.02
04.02.01
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA
04.02.01.01
04.02.02
pto
19.00
0.00
04.02.02.01
04.02.02.02
m
m
66.34
66.34
04.02.02.03
04.02.03
04.02.03.01
und
78.84
0.00
8.00
und
und
1.00
25.00
und
1.00
0.00
u
u
9.00
1.00
0.00
1.00
04.02.03.02
04.02.03.03
04.02.03.04
04.02.04
0.00
0.00
04.02.05.01
04.02.05.02
VALVULAS
VALVULA ESFERICA DE BRONCE 1/2"
VALVULA CHECK DE 1/2"
04.02.05
04.02.05.01
VARIOS
PRUEBA HIDRAULICA
GLB
04.02.05.02
04.02.05.03
4.03
pza
pza
04.03.01
04.03.02
9.00
1.00
0.00
m
m
156.40
59.13
04.03.03
04.03.04
pza
pza
16.00
8.00
04.03.05
04.03.06
m3
m2
1.03
8.88
04.03.07
4.04
PEDESTAL: TARRAJEO
SISTEMA DE DESAGUE
m2
8.88
0.00
04.04.01
04.04.01.01
04.04.01.02
SALIDAS DE DESAGUE
SALIDA DE DESAGUE EN PVC 4" (INODORO)
04.04.01.03
04.04.01.04
04.04.01.05
04.04.02
04.04.02.01
pto
pto
0.00
7.00
12.00
pto
pto
7.00
2.00
pto
6.00
0.00
48.96
PARTIDAS
RELLENO MANUAL C/MATERIAL PROPIO
TUBERIA DE PVC-SAP 4"
TUBERIA DE PVC-SAP 2"
UND
MET.
m
m
48.96
38.20
21.08
PARTIDAS
ITEM
PARTIDAS
04.04.03
RED DE VENTILACIN
04.04.03.01
05
5.01
05.01.01
SALIDAS
SALIDA DE TECHO (CENTRO DE LUZ)
05.01.02
05.01.03
05.01.04
5.02
05.02.01
UND
MET.
UND
MET.
0.00
27.84
0.00
pto
0.00
65.00
pto
pto
pto
45.00
27.00
11.00
0.00
13.00
5.03
05.03.01
ml
0.00
14.36
05.03.02
05.03.03
ml
ml
47.05
603.99
5.04
05.04.01
TABLEROS Y SUBTABLEROS
TABLERO GENERAL (TG)06 POLOS
05.04.02
05.04.03
05.04.04
05.04.05
05.04.06
und
0.00
1.00
und
und
und
1.00
1.00
1.00
und
und
3.00
2.00
und
10.00
0.00
05.04.07
5.05
05.05.01
05.05.02
m
m
1,230.19
212.72
05.05.03
05.05.04
m
m
52.20
49.00
05.05.05
01
1.06
28.80
0
0
01.06.01
01.06.02
TARRAJEO EN MUROS
TARRAJEO EN COLUMNAS
m2
207.20
70.20
01.06.03
01.06.04
TARRAJEO EN VIGAS
BRUAS EN MUROS DE e = 1" x 1/2"
1.07
01.07.01
CONTRAZCALOS
CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.30 M
1.08
01.08.01
CARPINTERA METLICA
PUERTA DE FIERRO, CON PERFILES Y PLANCHA S/D
01.08.03
1.09
01.09.01
01.09.02
01.09.03
01.09.04
2.00
2.01
CERCO PERIMETRICO
REVOQUES Y REVESTIMIENTOS
m2
m2
m
74.00
302.40
m2
0
140.00
m2
0
8.85
u
und
pza
und
und
m3
1.00
0
6.00
1.00
1.00
1.00
0
18.35
PARTIDAS
EXPLANADA PATIO: ENCOFRADO Y DESENCOFRADO
EXPLANADA PATIO: JUNTAS
UND
m2
m
MET.
19.20
95.43
PARTIDAS
ITEM
PARTIDAS
UND
MET.
UND
MET.
3.00
VEREDAS
3.01
3.02
m3
m2
38.43
96.03
3.03
4.00
VEREDAS: JUNTAS
SARDINEL
270.76
0
4.01
4.02
4.03
m3
m3
3.24
3.24
86.35
4.04
4.05
4.06
5.00
SARDINEL: PINTURA
CUNETAS
5.01
5.02
m3
m3
7.64
7.64
5.03
5.04
m3
m2
4.20
30.54
5.05
5.06
7
CUNETAS: TARRAJEO
REJILLA METALICA PARA CUNETAS
TANQUE SEPTICO
m2
m
42.00
38.18
0.00
7.03
07.03.01
7.04
07.04.01
07.04.01.01
07.04.01.02
07.04.02
07.04.02.01
MUROS DE CONCRETO
MURO DE CONCRETO: CONCRETO F'C=210KG/CM2
07.04.02.02
07.04.02.03
07.04.03
m2
kg
46.07
152.29
0.00
07.04.03.01
07.04.03.02
m3
m2
0.42
4.18
07.04.03.03
07.04.03.04
kg
und
18.31
8.00
7.05
07.05.01
REVOQUES Y REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES
m3
0.00
23.13
7.06
07.06.01
INSTALACIONES SANITARIAS
TUBERIA DE PVC-SAP 4"
0.00
49.52
07.06.02
07.06.03
07.06.04
pza
m
und
3.00
2.50
2.00
07.06.05
8
CODO DE FG DE 3"
POZO PERCOLADO
und
4.00
0.00
8.03
08.03.01
m3
0.00
0.37
08.03.02
m2
0.98
m2
m
m2
m2
m2
12.50
48.57
48.57
0.00
0.00
9.07
0.00
0.00
m3
kg
1.36
47.66
m3
0.00
4.61
PARTIDAS
ITEM
PARTIDAS
UND
MET.
UND
MET.
8.04
08.04.01
m3
0.00
0.76
08.04.02
08.04.03
m2
kg
4.52
68.15
08.04.04
8.05
und
4.00
0.00
08.05.01
8.06
08.06.01
m2
30.52
0.00
5.00
08.06.02
8.07
pza
5.00
0.00
08.07.01
01
FILTRO DE GRAVA
DECLARATORIA DE IMPACTO AMBIENTAL
MEDIDAS DE PREVENCION
m3
6.04
0.00
1.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
EDUCACIN ANBIENTAL
CHARLAS AL PERSONAL OBRERO
0.00
0.00
GLB
GLB
3.00
3.00
GLB
LETRERO DE UBICACIN
LETREROS AMBIENTALES
und
1.00
0.00
1.00
und
m
3.00
300.00
1.02
01.02.01
01.02.01.01
01.02.02
TRATAMIENTO DE BOTADEROS
MICRO RELLENO SANITARIO
GLB
1.00
0.00
01.02.02.01
01.02.02.02
m2
m2
5.00
5.00
01.02.02.03
01.02.02.04
01.02.03
m3
m3
AREAS VERDES
ADECUACION Y PREPARACIN DEL TERRENO
12.50
10.00
0.00
m3
MEDIDAS DE CONTROL
PROVISIN DE RECIPIENTES PLASTICOS CON TAPA PARA RESIDUOS SOLI
CONTRUCION DE LETRINA
13.00
0.00
und
und
4.00
1.00
01.02.03.01
1.03
01.03.01
01.03.02
0.00
0.00
VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
01
01.01
01.01.01
01.01.02
01.01.03
1.02
01.02.01
01.02.02
1.03
01.03.01
01.03.02
01.03.03
01.03.04
1.04
1.04.01
1.04.02
1.04.03
1.05
1.05.01
1.06
1.06.01
1.06.02
1.06.03
1.06.04
02
02.01
02.01.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
PARTIDAS
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEG
CONSTRUCCIONES PROVISIONALES
ALMACEN OFICINA Y CASETA DE GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
CERCO PROVISIONAL h=2.20 m
INSTALACIONES PROVISIONALES
AGUA Y DESAGUE PARA LA CONSTRUCCION
ENERGIA ELECTRICA PROVISIONAL
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
CORTE DE MATERIAL SUELTO CON MAQUINARIA
RELLENO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
MOVILIZACION DE EQUIPOS Y HERRAMIENTAS
MOVILIZACIN DE MAQUINARI
FLETE A PIE DE OBRA
FLETE TERRESTRE
TRAZO, NIVELES Y REPLANTEO
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACIONES TEMPORAL DE SEGURIDAD
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA ZAPATAS
EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS
RELLENO CON MATERIAL PROPIO
NIVELACIN INTERIOR Y COMPACTACIN C/PLANCHA COMPACTADORA (10
ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
02.02
02.02.01
02.02.01.01
02.02.02
02.02.02.01
02.02.03
02.02.03.01
02.02.03.02
02.02.04
02.02.04.01
SOBRECIMIENTO
SOBRECIMIENTO: CONCRETO 1:8 + 25% P.M.
SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO
2.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.02.03
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
2.03.04
02.03.04.01
FALSO PISO
FALSO PISO E= 4" f`c= 140 kg/cm2
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO, fc= 210kg/cm2
ZAPATAS: ACERO, fy= 4200kg/cm2
COLUMNAS
COLUMNAS: CONCRETO, fc= 210kg/cm2
COLUMNAS: ENCOFRADO Y DESENCOFRADO
COLUMNAS: ACERO, fy= 4200kg/cm2
VIGAS
VIGAS: CONCRETO, fc= 210kg/cm2
VIGAS: ENCOFRADO Y DESENCOFRADO
VIGAS: ACERO, fy= 4200kg/cm2
LOSAS ARMADA
LOSAS ARMADA: CONCRETO, fc= 210kg/cm2
UND
MET.
P. U.
S/.
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
m2
und
56.00
1.00
52.19
593.88
140.00
7.78
2,922.640
593.880
1,089.200
100.00%
56.00
100.00%
1.00
100.00% 140.00
glb
glb
1.00
1.00
600.00
300.00
600.000
300.000
m2
m3
m2
m3
1,200.00
1,401.56
168.19
1,480.05
0.89
3.66
27.02
7.09
1,068.000
5,129.710
4,544.490
10,493.550
glb
glb
glb
1.00
1.00
1.00
16,500.00
648,374.83
31,541.01
16,500.000
648,374.830
31,541.010
100.00%
100.00%
100.00%
1.00
1.00
1.00
m2
1,200.00
1.05
1,260.000
100.00%
###
GLB
GLB
1.00
1.00
460.00
500.00
GLB
GLB
1.00
1.00
550.00
500.00
460.000
500.000
550.000
500.000
100.00%
100.00%
100.00%
100.00%
m3
28.06
30.27
m3
m3
m3
m2
m3
55.65
24.32
308.61
3.96
3.96
30.27
27.22
2.73
15.14
7.09
849.380
1,684.530
661.990
842.510
59.950
28.080
m3
45.71
244.09
11,157.350
100.00%
45.71
m2
20.05
25.15
504.260
100.00%
m3
m2
8.22
111.19
271.86
33.93
2,234.690
3,772.680
m2
308.61
32.44
10,011.310
m3
kg
10.02
412.61
363.83
4.35
3,645.580
1,794.850
m3
m2
kg
14.81
201.00
2,569.19
380.64
44.68
4.35
5,637.280
8,980.680
11,175.980
m3
m2
kg
27.49
334.49
2,774.69
363.83
44.52
4.53
10,001.690
14,891.490
12,569.350
m3
2.16
363.83
785.870
2,922.640
593.880
1,089.200
0.00%
0.00%
0.00%
600.000
300.000
0.00%
0.00%
1,068.000
5,129.710
4,544.490
10,493.550
0.00%
0.00%
0.00%
0.00%
16,500.000
648,374.830
31,541.010
0.00%
0.00%
0.00%
1,260.000
0.00%
1.00
1.00
1.00
1.00
460.000
500.000
550.000
500.000
0.00%
0.00%
0.00%
0.00%
100.00%
28.06
100.00%
55.65
100.00%
24.32
100.00% 308.61
100.00%
3.96
100.00%
3.96
849.380
1,684.530
661.990
842.510
59.950
28.080
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
11,157.350
0.00%
20.05
504.260
0.00%
100.00%
8.22
100.00% 111.19
2,234.690
3,772.680
0.00%
0.00%
100.00% 308.61
10,011.310
0.00%
100.00%
10.02
100.00% 412.61
3,645.580
1,794.850
0.00%
0.00%
100.00%
14.81
100.00% 201.00
100.00%
###
5,637.280
8,980.680
11,175.980
0.00%
0.00%
0.00%
100.00%
27.49
100.00% 334.49
100.00%
###
10,001.690
14,891.490
12,569.350
0.00%
0.00%
0.00%
707.290
10.00%
100.00%
100.00%
1.00
1.00
100.00%
###
100.00%
###
100.00% 168.19
100.00%
###
90.00%
1.94
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.22
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
0.000
0.000
0.000
100.00%
100.00%
100.00%
56.00
1.00
140.00
2,922.640
593.880
1,089.200
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
1.00
1.00
600.000
300.000
0.00%
0.00%
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00% 1,200.00
100.00% 1,401.56
100.00% 168.19
100.00% 1,480.05
1,068.000
5,129.710
4,544.494
10,493.555
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
1.00
1.00
1.00
16,500.000
648,374.830
31,541.010
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00% 1,200.00
1,260.000
0.00%
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
460.000
500.000
550.000
500.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
28.06
55.65
24.32
308.61
3.96
3.96
849.376
1,684.526
661.990
842.505
59.954
28.076
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
45.71
11,157.354
0.00%
0.00
0.000
0.000
100.00%
20.05
504.258
0.00%
0.00
0.000
0.000
0.000
100.00%
100.00%
8.22
111.19
2,234.689
3,772.677
0.00%
0.00%
0.00
0.00
0.000
0.000
0.000
100.00%
308.61
10,011.308
0.00%
0.00
0.000
0.000
0.000
100.00%
100.00%
10.02
412.61
3,645.577
1,794.854
0.00%
0.00%
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
14.81
100.00% 201.00
100.00% 2,569.19
5,637.278
8,980.680
11,175.977
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
27.49
100.00% 334.49
100.00% 2,774.69
10,001.687
14,891.495
12,569.346
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
785.873
0.00%
0.00
0.000
78.587
100.00%
2.16
VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.05.04
2.04
02.04.01
03
3.01
03.01.01
03.01.02
3.02
03.02.01
03.02.02
03.02.03
3.03
03.03.01
03.03.02
03.03.03
3.04
03.04.01
03.04.02
03.04.03
3.05
03.05.01
PARTIDAS
LOSAS ARMADA: ENCOFRADO Y DESENCOFRADO
LOSAS ARMADA: ACERO, fy= 4200kg/cm2
LOSAS ALIGERADA EN DOS DIRECCIONES
LOSAS ALIGERADA EN DOS DIRECCIONES: CONCRETO, fc= 210kg/cm2
LOSAS ALIGERADA EN DOS DIRECCIONES: ENCOFRADO Y DESENCOFR
LOSAS ALIGERADA EN DOS DIRECCIONES: ACERO, fy= 4200kg/cm2
LOSAS ALIGERADA EN DOS DIRECCIONES: ALIGERADO DE TECKNOPOR
VARIOS
JUNTAS DE DILATACIN C/TECNOPORT, e= 1"x15cm, EN MUROS
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA LADRILLO K.K 18 HUECOS DE ARCILLA
ACERO D AMARRE, fy= 4200kg/cm2
UND
19.55
103.66
P. U.
S/.
34.19
4.53
m3
42.15
363.83
m2
kg
m2
496.71
3,016.62
247.92
37.73
4.53
26.64
15,335.430
18,740.870
13,665.290
6,604.590
237.66
4.42
1,050.460
m2
kg
321.04
43.68
68.69
4.53
m3
m2
kg
6.40
102.81
896.64
m2
m
kg
m3
m2
kg
m2
kg
MET.
TOTAL
S./
668.410
469.580
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
90.00%
90.00%
17.60
93.29
601.570
422.620
10.00%
10.00%
13,801.890
16,866.780
12,298.760
5,944.130
10.00%
10.00%
10.00%
10.00%
0.00
0.000
100.00%
22,052.240
197.870
100.00% 321.04
100.00%
43.68
22,052.240
197.870
0.00%
0.00%
376.70
34.35
4.53
2,410.880
3,531.520
4,061.780
100.00%
6.40
100.00% 102.81
100.00% 896.64
2,410.880
3,531.520
4,061.780
0.00%
0.00%
0.00%
1.72
376.70
27.64
264.40
35.46
4.53
647.920
980.110
1,197.730
647.920
980.110
1,197.730
0.00%
0.00%
0.00%
1.79
28.43
141.04
376.70
33.98
4.53
674.290
966.050
638.910
100.00%
1.72
100.00%
27.64
100.00% 264.40
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
80.00% 397.37
17,798.110
20.00%
90.00%
37.94
90.00% 447.04
90.00%
###
90.00% 223.13
0.00%
COLUMNAS DE AMARRE
COLUMNAS DE AMARRE: CONCRETO, fc= 175kg/cm2
COLUMNAS DE AMARRE: ENCOFRADO Y DESENCOFRADO
COLUMNAS DE AMARRE: ACERO, fy= 4200kg/cm2
VIGAS DE AMARRE
VIGAS DE AMARRE: CONCRETO, fc= 175kg/cm2
VIGAS DE AMARRE: ENCOFRADO Y DESENCOFRADO
VIGAS DE AMARRE: ACERO, fy= 4200kg/cm2
MESA DE CONCRETO
MESA DE CONCRETO: CONCRETO, fc= 175kg/cm2
MESA DE CONCRETO: ENCOFRADO Y DESENCOFRADO
MESA DE CONCRETO, fy= 4200kg/cm2
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO O RAYADO
m2
89.28
18.25
03.05.02
03.05.03
03.05.04
03.05.05
03.05.06
TARRAJEO EN INTERIORES
TARRAJEO EN EXTERIORES
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES EN VANOS DE PUERTAS Y VENTANAS, E=15 CM
m2
m2
m2
m2
m
428.80
202.45
155.44
334.49
205.37
18.25
18.25
21.75
23.17
7.17
03.05.07
3.06
03.06.01
3.07
03.07.01
459.00
1.69
1,629.360
7,825.600
3,694.710
3,380.820
7,750.130
1,472.500
775.710
m2
496.71
44.79
22,247.640
m2
88.76
19.65
03.07.02
03.07.03
03.07.04
03.07.05
3.08
m2
m2
m2
m2
12.79
224.34
26.62
62.14
32.28
51.15
49.85
49.85
1,744.130
412.860
11,474.990
1,327.010
3,097.680
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
03.08.01
3.09
03.09.01
3.10
03.10.01
03.10.02
3.11
03.11.01
3.12
03.12.01
03.12.02
03.12.03
03.12.04
03.12.05
m2
28.43
53.04
1,507.930
0.00%
0.00
0.000
100.00%
m2
60.85
62.29
3,790.350
0.00%
0.00
0.000
100.00%
ml
ml
156.86
193.48
9.02
5.86
1,414.880
1,133.790
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
m2
484.35
33.27
16,114.320
0.00%
0.00
0.000
100.00%
m2
m2
m2
m2
und
39.05
6.97
124.47
15.51
10.82
263.05
204.39
118.32
140.64
205.11
10,272.100
1,424.600
14,727.290
2,181.330
2,219.290
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
1.96
10.37
0.00
4.22
49.67
301.66
24.79
0.00
237.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.79
28.43
141.04
0.00
89.28
428.80
202.45
155.44
334.49
205.37
459.00
0.00
99.34
0.00
88.76
12.79
224.34
26.62
62.14
0.00
28.43
0.00
60.85
0.00
156.86
193.48
0.00
484.35
0.00
39.05
6.97
124.47
15.51
10.82
66.842
46.958
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
100.00%
100.00%
SALDO
MES ACTUAL
MET.
TOTAL
S/.
19.55
103.66
668.415
469.580
0.00%
0.00%
0.00
0.00
0.000
0.000
1,533.544
1,874.087
1,366.529
660.459
100.00%
42.15
100.00% 496.71
100.00% 3,016.62
100.00% 247.92
15,335.435
18,740.868
13,665.289
6,604.589
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
1,050.457
100.00%
237.66
1,050.457
0.00%
0.00
0.000
0.000
0.000
100.00%
100.00%
321.04
43.68
22,052.238
197.870
0.00%
0.00%
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
6.40
102.81
896.64
2,410.880
3,531.524
4,061.779
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
647.924
980.114
1,197.732
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
674.293
966.051
638.911
100.00%
100.00%
100.00%
1.72
27.64
264.40
0.00
1.79
28.43
141.04
674.293
966.051
638.911
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
1,629.360
7,825.600
3,694.713
3,380.820
7,750.133
1,472.503
775.710
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
89.28
428.80
202.45
155.44
334.49
205.37
459.00
1,629.360
7,825.600
3,694.713
3,380.820
7,750.133
1,472.503
775.710
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
4,449.528
100.00%
496.71
22,247.641
0.00%
0.00
0.000
1,744.134
412.861
11,474.991
1,327.007
3,097.679
100.00%
100.00%
100.00%
100.00%
100.00%
88.76
12.79
224.34
26.62
62.14
1,744.134
412.861
11,474.991
1,327.007
3,097.679
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
1,507.927
100.00%
28.43
1,507.927
0.00%
0.00
0.000
3,790.347
100.00%
60.85
3,790.347
0.00%
0.00
0.000
1,414.877
1,133.793
100.00%
100.00%
156.86
193.48
1,414.877
1,133.793
0.00%
0.00%
0.00
0.00
0.000
0.000
16,114.325
100.00%
484.35
16,114.325
0.00%
0.00
0.000
10,272.103
1,424.598
14,727.290
2,181.326
2,219.290
100.00%
100.00%
100.00%
100.00%
100.00%
39.05
6.97
124.47
15.51
10.82
10,272.103
1,424.598
14,727.290
2,181.326
2,219.290
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
03.12.06
03.12.07
03.12.08
3.13
03.13.01
03.13.02
03.13.03
03.13.04
3.14
03.14.01
03.14.02
3.15
03.15.01
03.15.02
03.15.03
03.15.04
03.15.05
03.15.06
03.15.07
03.15.08
03.15.09
03.15.10
03.15.11
3.16
03.16.01
04
4.01
04.01.01
04.01.01.01
04.01.01.02
04.01.01.03
04.01.01.04
04.01.01.05
04.01.01.06
04.01.01.07
04.01.02
04.01.02.01
04.01.03
04.01.03.01
04.01.04
04.01.04.01
4.02
04.02.01
04.02.01.01
04.02.02
04.02.02.01
04.02.02.02
04.02.02.03
04.02.03
04.02.03.01
04.02.03.02
04.02.03.03
04.02.03.04
04.02.04
04.02.05.01
04.02.05.02
PARTIDAS
COLOCACIN DE PUERTA DE MADERA
COLOCACIN DE PUERTA DE MELAMINE
COLOCACIN DE VENTANA DE MADERA
CERRAJERIA
BISAGRAS DE FIERRO; 3"x3", C/EJE DE 1/2" (PUERTAS)
CERRADURA PARA PUERTAS (03 GOLPES)
PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M.
CERROJO DE FIERRO REDONDO DE 1/2" X 0.35 M.
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO TRIPLE INCOLORO 6MM
ESPEJO DE 0.80x0.80m
PINTURA
PINTURA LTEX EN CIELORASO
PINTURA LTEX EN INTERIORES
PINTURA LTEX EN EXTERIORES
PINTURA LATEX EN COLUMNAS
PINTURA LATEX EN VIGAS
PINTURA EN PUERTA DE MADERA
PINTURA EN VENTANA DE MADERA
PINTURA EN CLOSET
PINTURA EN CONTRAZOCALOS H=30CM
PINTURA EN CONTRAZOCALOS H=10CM
PINTURA EN LADRILLO PASTELERO
VARIOS
LIMPIEZA FINAL DE OBRA
INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS
SUMINISTRO DE APARATOS SANITARIOS
INODORO TOP PIECE, COLOR C/ACCS. - "TREBOL"
INODORO BABY, COLOR C/ACCS "TREBOL"
LAVATORIO OVALN SONET, COLOR BLANCO - "TREBOL"
LAVATORIO DE COLOR C/PEDESTAL FONTAINE COLOR "TREBOL"
URINARIO CADET, COLOR - "TREBOL"
LAVADERO DE ACERO INOXIDABLE 21"X38", LINEA HOME(RECORD)
LAVADERO DE ACERO INOXIDABLE 21"X54", LINEA HOME(RECORD)
SUMINISTRO DE ACCESORIOS
PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO
INSTALACION DE APARATOS SANITARIOS
COLOCACION DE APARATOS SANITARIOS
INSTALACION DE ACCESORIOS
COLOCACION DE ACCESORIOS SANITARIOS
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
REDES DE ALIMENTACION
EXCAV.ZANJAS RT<2kg/cm2 - 0.50m.x0.70m.
RELLENO MANUAL C/MATERIAL PROPIO
TUBERA PVC CLASE 10 - 1/2" C/R
ACCESORIOS DE REDES DE AGUA
CODO PVC - CLASE 10 CR 1/2"*90
CODO PVC - CLASE 10 CR 1/2"*45
TEE PVC - CLASE 10 CR 1/2"
CRUZ PVC SAPC-10 =1/2"
VALVULAS
VALVULA ESFERICA DE BRONCE 1/2"
VALVULA CHECK DE 1/2"
UND
MET.
und
und
und
14.00
5.00
38.00
P. U.
S/.
61.31
49.05
61.31
pza
pza
und
und
57.00
14.00
14.00
7.00
p2
p3
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
858.340
245.250
2,329.780
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
9.74
82.99
24.87
35.18
555.180
1,161.860
348.180
246.260
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
115.95
6.00
75.54
86.91
8,758.860
521.460
0.00%
0.00%
0.00
0.00
0.000
0.000
0.00%
0.00%
m2
m2
700.35
428.80
9.18
9.18
m2
m2
m2
m2
m2
202.45
155.44
334.49
78.10
248.94
9.18
10.10
10.10
15.99
15.99
m2
m2
m2
31.02
156.86
193.48
15.99
2.65
1.78
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
m2
484.35
7.61
6,429.210
3,936.380
1,858.490
1,569.940
3,378.350
1,248.820
3,980.550
496.010
415.680
344.390
3,685.900
GLB
1.00
2,160.48
2,160.480
0.00%
0.00
0.000
0.00%
pza
pza
pza
pza
2.00
5.00
7.00
2.00
226.85
226.85
107.17
190.18
pza
pza
pza
1.00
1.00
1.00
176.31
115.57
166.42
453.700
1,134.250
750.190
380.360
176.310
115.570
166.420
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
und
8.00
32.57
260.560
0.00%
0.00
0.000
0.00%
und
19.00
61.31
1,164.890
0.00%
0.000
0.00%
und
8.00
24.03
192.240
0.00%
0.00
0.00
0.00
0.000
0.00%
pto
19.00
28.24
536.560
0.00%
0.00
0.000
100.00%
m
m
m
66.34
66.34
78.84
10.60
5.29
11.28
703.200
350.940
889.320
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
und
und
und
und
8.00
1.00
25.00
1.00
14.40
14.35
16.73
16.78
115.200
14.350
418.250
16.780
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
u
u
9.00
1.00
81.69
81.69
735.210
81.690
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
14.00
5.00
38.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
0.00
66.34
66.34
78.84
0.00
8.00
1.00
25.00
1.00
0.00
9.00
1.00
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
858.340
245.250
2,329.780
100.00%
100.00%
100.00%
14.00
5.00
38.00
858.340
245.250
2,329.780
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
57.00
14.00
14.00
7.00
555.180
1,161.860
348.180
246.260
0.000
0.000
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
115.95
6.00
8,758.860
521.460
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
700.35
428.80
202.45
155.44
334.49
78.10
248.94
31.02
156.86
193.48
484.35
6,429.210
3,936.380
1,858.490
1,569.940
3,378.350
1,248.820
3,980.550
496.010
415.680
344.390
3,685.900
0.000
0.00%
0.00
0.000
100.00%
1.00
2,160.480
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
2.00
5.00
7.00
2.00
1.00
1.00
1.00
453.700
1,134.250
750.190
380.360
176.310
115.570
166.420
0.000
0.00%
0.00
0.000
100.00%
8.00
260.560
0.000
0.00%
0.000
100.00%
19.00
1,164.890
0.000
0.00%
0.00
0.00
0.00
0.000
100.00%
8.00
192.240
536.560
100.00%
19.00
536.560
0.00%
0.00
0.000
703.204
350.939
889.315
100.00%
100.00%
100.00%
66.34
66.34
78.84
703.204
350.939
889.315
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
115.200
14.350
418.250
16.780
100.00%
100.00%
100.00%
100.00%
8.00
1.00
25.00
1.00
115.200
14.350
418.250
16.780
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
735.210
81.690
100.00%
100.00%
9.00
1.00
735.210
81.690
0.00%
0.00%
0.00
0.00
0.000
0.000
VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
04.02.05
04.02.05.01
04.02.05.02
04.02.05.03
4.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
4.04
04.04.01
04.04.01.01
04.04.01.02
04.04.01.03
04.04.01.04
04.04.01.05
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.02.04
04.04.03
04.04.03.01
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
04.04.04.04
04.04.04.05
04.04.04.06
04.04.04.07
04.04.04.08
04.04.04.09
04.04.04.10
04.04.04.11
04.04.05
04.04.05.01
04.04.05.02
04.04.05.03
04.04.05.04
04.04.05.05
05
5.01
05.01.01
05.01.02
05.01.03
05.01.04
5.02
05.02.01
5.03
05.03.01
05.03.02
05.03.03
PARTIDAS
VARIOS
PRUEBA HIDRAULICA
CAJA CON TAPA METALICA PARA VALVULAS DE 12"x12"
CAJA PARA MEDIDOR DE 12"X12"
SISTEMA DE DRENAJE PLUVIAL
CANALETAS DE PLANCHA GALV.
TUBERIA DE PVC-SAP 4" P/LLUVIA
CODO PVC SAL 4"X90
CODO PVC SAL SANITARIO 4"X90
PEDESTAL: CONCRETO F'C= 140 KG/CM2
PEDESTAL: ENCOFRADO Y DESENCOFRADO
PEDESTAL: TARRAJEO
SISTEMA DE DESAGUE
SALIDAS DE DESAGUE
SALIDA DE DESAGUE EN PVC 4" (INODORO)
SALIDA DE DESAGUE EN PVC 2" (LAVATORIOS Y URINARIOS)
SALIDA DE DESAGUE EN PVC 2" (SUMIDERO)
SALIDA DE REGISTRO ROSCADO 2"
SALIDA DE REGISTRO ROSCADO 4"
REDES DE DESAGUE
EXCAV.ZANJAS RT<2kg/cm2 - 0.50m.x0.70m.
RELLENO MANUAL C/MATERIAL PROPIO
TUBERIA DE PVC-SAP 4"
TUBERIA DE PVC-SAP 2"
RED DE VENTILACIN
RED DE VENTILACION 2"
ACCESORIOS DE REDES
CODO PVC SAL 4"X90
CODO PVC SAL 4"X45
CODO PVC SAL 2"X90
CODO PVC SAL 2"X45
YEE PVC-SAL 4"
YEE PVC-SAL 2"
YEE PVC-SAL 4"-2"
TEE PVC-SAL 4"
TEE PVC-SAL 4"X2"
CODO PVC SAL SANITARIO 4 A 2 "X90
REDUCCIONES PVC-SAL 4" A 2"
ADITAMENTOS VARIOS
SUMIDERO DE BRONCE 2"
REGISTRO DE BRONCE 4"
REGISTRO DE BRONCE 2"
CAJA DE DESAGUE DE 12"X24" DE C Y TAPA DE FF
PRUEBA A RED DE DESAGUE
INSTALACIONES ELECTRICAS
SALIDAS
SALIDA DE TECHO (CENTRO DE LUZ)
SALIDA PARA TOMACORRIENTE C/LINEA A TIERRA
INTERRUPTOR UNIPOLAR SIMPLE
INTERRUPTOR UNIPOLAR DOBLE
CAJAS DE PASE
CAJA DE PASE FG PESADO 15x15x10 cm.
CANALIZACIONES Y/O TUBERIAS
TUBERIA PVC-SAP 50 mm.
TUBERIA PVC-SAP 25 mm.
TUBERIA PVC-SAP 20 mm.
UND
MET.
P. U.
S/.
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
GLB
pza
pza
1.00
9.00
1.00
211.87
170.79
180.66
211.870
1,537.110
180.660
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
m
m
pza
pza
156.40
59.13
16.00
8.00
18.20
16.43
18.74
18.74
m3
m2
m2
1.03
8.88
8.88
290.81
35.41
20.21
2,846.480
971.510
299.840
149.920
299.530
314.440
179.460
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
pto
pto
pto
pto
pto
7.00
12.00
7.00
2.00
6.00
18.45
15.90
39.10
11.38
14.00
129.150
190.800
273.700
22.760
84.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
m
m
48.96
48.96
10.60
5.29
m
m
38.20
21.08
16.43
14.68
518.980
259.000
627.630
309.450
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
27.84
16.26
452.680
0.00%
0.00
0.000
100.00%
18.740
112.140
999.440
128.960
92.250
251.700
143.200
150.320
37.300
74.960
80.580
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
pza
pza
pza
pza
pza
1.00
6.00
62.00
8.00
5.00
18.74
18.69
16.12
16.12
18.45
pza
pza
pza
pza
pza
10.00
8.00
8.00
2.00
4.00
25.17
17.90
18.79
18.65
18.74
pza
3.00
26.86
und
und
und
7.00
6.00
2.00
65.12
37.18
37.18
und
GLB
2.00
1.00
200.45
211.87
455.840
223.080
74.360
400.900
211.870
pto
pto
pto
pto
65.00
45.00
27.00
11.00
19.95
19.95
25.80
27.49
1,296.750
897.750
696.600
302.390
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
13.00
30.88
401.440
0.00%
0.00
0.000
100.00%
ml
ml
ml
14.36
47.05
603.99
4.53
4.17
3.59
65.050
196.200
2,168.320
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
0.00
1.00
9.00
1.00
0.00
156.40
59.13
16.00
8.00
1.03
8.88
8.88
0.00
0.00
7.00
12.00
7.00
2.00
6.00
0.00
48.96
48.96
38.20
21.08
0.00
27.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65.00
45.00
27.00
11.00
0.00
13.00
0.00
14.36
47.05
603.99
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
211.870
1,537.110
180.660
100.00%
100.00%
100.00%
1.00
9.00
1.00
211.870
1,537.110
180.660
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
2,846.480
971.506
299.840
149.920
299.534
314.441
179.465
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
156.40
59.13
16.00
8.00
1.03
8.88
8.88
2,846.480
971.506
299.840
149.920
299.534
314.441
179.465
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
129.150
190.800
273.700
22.760
84.000
100.00%
100.00%
100.00%
100.00%
100.00%
7.00
12.00
7.00
2.00
6.00
129.150
190.800
273.700
22.760
84.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
518.976
258.998
627.626
309.454
100.00%
100.00%
100.00%
100.00%
48.96
48.96
38.20
21.08
518.976
258.998
627.626
309.454
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
452.678
100.00%
27.84
452.678
0.00%
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
6.00
62.00
8.00
5.00
10.00
8.00
8.00
2.00
4.00
3.00
18.740
112.140
999.440
128.960
92.250
251.700
143.200
150.320
37.300
74.960
80.580
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
7.00
6.00
2.00
2.00
1.00
455.840
223.080
74.360
400.900
211.870
1,296.750
897.750
696.600
302.390
100.00%
100.00%
100.00%
100.00%
65.00
45.00
27.00
11.00
1,296.750
897.750
696.600
302.390
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
401.440
100.00%
13.00
401.440
0.00%
0.00
0.000
65.051
196.199
2,168.324
100.00%
100.00%
100.00%
14.36
47.05
603.99
65.051
196.199
2,168.324
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
5.04
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
05.04.06
05.04.07
5.05
05.05.01
05.05.02
05.05.03
05.05.04
05.05.05
5.06
05.06.01
05.06.02
5.07
05.07.01
PARTIDAS
TABLEROS Y SUBTABLEROS
TABLERO GENERAL (TG)06 POLOS
TABLERO DE DISTRIBUCIN DE DE 4 POLOS
TABLERO DE DISTRIBUCIN DE DE 6 POLOS
INTERRUPTOR TERMOMAGNTICO 2 x 100A
INTERRUPTOR TERMOMAGNTICO 2 x 60A
INTERRUPTOR TERMOMAGNTICO 2 x 20A
INTERRUPTOR TERMOMAGNTICO 2 x 15A
CONDUCTORES Y/O CABLES
CONDUCTOR LSOH 2.5 mm2 - ALUMBRADO
CONDUCTOR LSOH 4 mm2 - TOMACORRIENTE
CONDUCTOR LSOH 10 mm2 - POZO A TIERRA
CONDUCTOR LSOH 16 mm2 - DE TABLERO GENERAL - TABLERO DE
CONDUCTOR LSOH 35 mm2 - MEDIDOR - TABLERO GENERAL
ARTEFACTOS
ART. REJILLA ADOSADO ALUMINIO RAS-A 2X40W, JOSFEL
ART. ADOSADO LAMPARA PLAFON LARA C/1 FOCO ROSCA 36W
05.07.02
01
1.01
VARIOS
LNEA DE PUESTA A TIERRA
PRUEBAS ELCTRICAS
CERCO PERIMETRICO
TRABAJOS PRELIMINARES
01.01.01
01.01.02
01.02
01.02.01
01.02.02
01.02.03
1.03
01.03.01
01.03.01.01
01.03.02
01.03.02.01
01.03.02.02
1.04
01.04.01
01.04.01
01.04.02
01.04.03
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
1.05
01.05.01
1.06
01.06.01
01.06.02
01.06.03
01.06.04
1.07
01.07.01
1.08
01.08.01
01.08.02
01.08.03
UND
MET.
P. U.
S/.
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
68.61
64.37
51.66
43.18
207.610
207.610
217.610
68.610
193.110
103.320
431.800
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1,230.19
212.72
52.20
49.00
28.80
2.43
2.84
4.84
6.55
8.15
2,989.360
604.120
252.650
320.950
234.720
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
EQU
EQU
33.00
32.00
219.02
74.95
7,227.660
2,398.400
0.00%
0.00%
0.00
0.00
0.000
0.000
0.00%
0.00%
und
3.00
621.14
glb
1.00
85.70
1,863.420
85.700
0.00%
0.00%
0.00
0.00
0.000
0.000
0.00%
0.00%
und
und
und
1.00
1.00
1.00
207.61
207.61
217.61
und
und
und
und
1.00
3.00
2.00
10.00
m
m
m
m
m
m2
m2
140.00
140.00
0.89
1.52
124.600
212.800
100.00% 140.00
100.00% 140.00
124.600
212.800
0.00%
0.00%
m3
m3
m3
112.00
112.00
30.27
15.14
112.00
7.95
3,390.240
1,695.680
890.400
100.00% 112.00
100.00% 112.00
100.00% 112.00
3,390.240
1,695.680
890.400
0.00%
0.00%
0.00%
m3
112.00
239.92
26,871.040
100.00% 112.00
26,871.040
0.00%
100.00%
100.00%
1,470.760
3,478.440
0.00%
0.00%
m3
m2
5.46
84
269.37
41.41
1,470.760
3,478.440
5.46
84.00
m3
m3
kg
6.30
380.64
110.4
1,322.09
47.85
4.35
2,398.030
5,282.640
5,751.090
100.00%
6.30
100.00% 110.40
100.00%
###
2,398.030
5,282.640
5,751.090
0.00%
0.00%
0.00%
4.20
56.00
363.83
38.13
100.00%
4.20
100.00%
56.00
100.00% 437.49
1,528.090
2,135.280
1,903.080
0.00%
0.00%
0.00%
100.00% 240.97
16,552.230
0.00%
m3
m2
kg
437.49
4.35
1,528.090
2,135.280
1,903.080
m2
240.97
68.69
16,552.230
m2
m2
m2
m
207.20
70.20
74.00
302.40
17.22
21.75
23.17
1.69
3,567.980
1,526.850
1,714.580
511.060
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
m2
140.00
9.02
1,262.800
0.00%
0.00
0.000
100.00%
m2
m
u
8.85
416.00
1.00
259.92
26.15
83.03
2,300.290
10,878.400
83.030
0.00%
0.00
100.00% 416.00
0.00%
0.00
0.000
10,878.400
0.000
100.00%
0.00%
100.00%
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
0.00
1.00
1.00
1.00
1.00
3.00
2.00
10.00
0.00
1,230.19
212.72
52.20
49.00
28.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
207.20
70.20
74.00
302.40
0.00
140.00
0.00
8.85
0.00
1.00
207.610
207.610
217.610
68.610
193.110
103.320
431.800
2,989.362
604.125
252.648
320.950
234.720
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
SALDO
MES ACTUAL
MET.
TOTAL
S/.
1.00
1.00
1.00
1.00
3.00
2.00
10.00
207.610
207.610
217.610
68.610
193.110
103.320
431.800
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00% 1,230.19
100.00% 212.72
100.00%
52.20
100.00%
49.00
100.00%
28.80
2,989.362
604.125
252.648
320.950
234.720
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
33.00
32.00
7,227.660
2,398.400
0.000
0.000
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
3.00
1.00
1,863.420
85.700
0.000
0.000
100.00%
100.00%
140.00
140.00
124.600
212.800
0.00%
0.00%
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
112.00
112.00
112.00
3,390.240
1,695.680
890.400
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
112.00
26,871.040
0.00%
0.00
0.000
0.000
0.000
100.00%
100.00%
5.46
84.00
1,470.760
3,478.440
0.00%
0.00%
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
6.30
100.00% 110.40
100.00% 1,322.09
2,398.032
5,282.640
5,751.092
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
4.20
56.00
437.49
1,528.086
2,135.280
1,903.082
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
240.97
16,552.229
0.00%
0.00
0.000
3,567.984
1,526.850
1,714.580
511.056
100.00%
100.00%
100.00%
100.00%
207.20
70.20
74.00
302.40
3,567.984
1,526.850
1,714.580
511.056
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
1,262.800
100.00%
140.00
1,262.800
0.00%
0.00
0.000
2,300.292
0.000
83.030
100.00%
100.00%
100.00%
8.85
416.00
1.00
2,300.292
10,878.400
83.030
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
PARTIDAS
1.09
01.09.01
01.09.02
01.09.03
CERRAJERIA
BISAGRAS DE FIERRO DE 5", C/EJE DE 1/2"
CERRADURA PARA PUERTAS (03 GOLPES)
PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M.
01.09.04
1.10
01.10.01
01.10.02
01.10.03
01.10.04
01.10.05
01.10.06
2.00
2.01
2.02
2.03
3.00
3.01
3.02
3.03
4.00
4.01
VEREDAS: JUNTAS
SARDINEL
EXCAVACION EN TERRENO NORMAL PARA SARDINEL
4.02
4.03
4.04
4.05
4.06
5.00
5.01
5.02
5.03
5.04
CUNETAS
EXCAVACION DE ZANJA PARA CANETAS
ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO
CUNETAS: CONCRETO F'C= 140 KG/CM2
CUNETAS: ENCOFRADO Y DESENCOFRADO
5.05
5.06
6
6.01
7
CUNETAS: TARRAJEO
REJILLA METALICA PARA CUNETAS
JUEGOS INFANTILES
JUEGOS INFANTILES
TANQUE SEPTICO
7.01
07.01.01
07.01.02
7.02
07.02.01
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
07.02.02
07.02.03
07.02.04
7.03
07.03.01
7.04
07.04.01
07.04.01.01
07.04.01.02
07.04.02
07.04.02.01
07.04.02.02
07.04.02.03
07.04.03
UND
MET.
und
6.00
1.00
1.00
33.41
74.88
20.82
1.00
31.13
207.20
56.70
56.00
8.44
11.61
11.61
140.00
17.70
9.14
3.44
10.90
10.90
m3
m2
m
18.35
333.03
19.20
95.43
39.27
2.19
m3
m2
m
38.43
96.03
333.03
39.27
270.76
2.19
pza
und
und
m2
m2
m2
m
m2
m2
m3
m3
m2
m
m2
m2
m3
m3
m3
m2
m2
m
P. U.
S/.
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
200.460
74.880
20.820
31.130
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
1,748.770
658.290
650.160
481.600
192.930
99.630
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6,111.100
753.980
208.990
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
12,798.340
3,771.100
592.960
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
114.440
1,133.480
3,390.960
69.130
1,136.540
335.620
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
3.24
35.32
3.24
86.35
12.50
48.57
48.57
349.84
39.27
5.53
23.40
6.91
7.64
7.64
4.20
30.54
30.27
15.14
349.84
39.27
42.00
38.18
23.40
54.36
231.260
115.670
1,469.330
1,199.310
982.800
2,075.460
1.00
8,646.55
8,646.550
0.00%
0.00
0.000
0.00%
m2
m2
9.07
18.14
0.89
1.52
8.070
27.570
100.00%
100.00%
9.07
18.14
8.070
27.570
0.00%
0.00%
m3
19.04
35.32
m2
m3
m3
9.07
22.85
22.85
8.16
15.14
8.35
672.490
74.010
345.950
190.800
100.00%
100.00%
100.00%
100.00%
19.04
9.07
22.85
22.85
672.490
74.010
345.950
190.800
0.00%
0.00%
0.00%
0.00%
m2
9.07
24.42
221.490
0.00%
0.00
0.000
100.00%
m3
kg
1.36
47.66
363.83
4.79
494.810
228.290
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
m3
m2
kg
4.61
46.07
152.29
380.64
53.51
4.79
1,754.750
2,465.210
729.470
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
0.00
6.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18.35
19.20
95.43
0.00
38.43
96.03
270.76
0.00
3.24
3.24
86.35
12.50
48.57
48.57
0.00
7.64
7.64
4.20
30.54
42.00
38.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.07
0.00
0.00
1.36
47.66
0.00
4.61
46.07
152.29
0.00
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
200.460
74.880
20.820
31.130
100.00%
100.00%
100.00%
100.00%
6.00
1.00
1.00
1.00
200.460
74.880
20.820
31.130
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
207.20
56.70
56.00
140.00
17.70
9.14
1,748.770
658.290
650.160
481.600
192.930
99.630
6,111.101
753.984
208.992
100.00%
100.00%
100.00%
18.35
19.20
95.43
6,111.101
753.984
208.992
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
12,798.343
3,771.098
592.964
100.00%
100.00%
100.00%
38.43
96.03
270.76
12,798.343
3,771.098
592.964
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
114.437
1,133.482
3,390.965
69.125
1,136.538
335.619
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
3.24
3.24
86.35
12.50
48.57
48.57
114.437
1,133.482
3,390.965
69.125
1,136.538
335.619
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
231.263
115.670
1,469.328
1,199.306
982.800
2,075.465
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
7.64
7.64
4.20
30.54
42.00
38.18
231.263
115.670
1,469.328
1,199.306
982.800
2,075.465
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00
0.000
100.00%
1.00
8,646.550
0.000
0.000
100.00%
100.00%
9.07
18.14
8.072
27.573
0.00%
0.00%
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
19.04
9.07
22.85
22.85
672.493
74.011
345.949
190.798
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
221.489
100.00%
9.07
221.489
0.00%
0.00
0.000
494.809
228.291
100.00%
100.00%
1.36
47.66
494.809
228.291
0.00%
0.00%
0.00
0.00
0.000
0.000
1,754.750
2,465.206
729.469
100.00%
100.00%
100.00%
4.61
46.07
152.29
1,754.750
2,465.206
729.469
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
PARTIDAS
07.04.03.01
07.04.03.02
07.04.03.03
07.04.03.04
7.05
07.05.01
7.06
07.06.01
07.06.02
REVOQUES Y REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES
INSTALACIONES SANITARIAS
TUBERIA DE PVC-SAP 4"
TEE PVC-SAL 4"
07.06.03
07.06.04
07.06.05
8
8.01
UND
MET.
m3
m2
kg
und
0.42
4.18
18.31
8.00
P. U.
S/.
380.64
53.51
4.79
108.50
m3
23.13
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
159.870
223.670
87.700
868.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
30.12
696.680
0.00%
0.00
0.000
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
m
pza
49.52
3.00
21.73
18.79
TUBERIA DE FG DE 3"
TEE DE FG DE 3"
CODO DE FG DE 3"
POZO PERCOLADO
TRABAJOS PRELIMINARES
m
und
und
2.50
2.00
4.00
32.66
48.74
48.74
1,076.070
56.370
81.650
97.480
194.960
08.01.01
08.01.02
08.01.03
8.02
08.02.01
m2
m2
m2
9.61
9.61
19.22
0.89
1.05
1.52
8.550
10.090
29.210
100.00%
100.00%
100.00%
9.61
9.61
19.22
8.550
10.090
29.210
0.00%
0.00%
0.00%
m3
26.80
35.32
08.02.02
08.02.03
8.03
m3
m3
32.16
32.16
15.14
8.35
946.580
486.900
268.540
100.00%
100.00%
100.00%
26.80
32.16
32.16
946.580
486.900
268.540
0.00%
0.00%
0.00%
08.03.01
08.03.02
8.04
08.04.01
08.04.02
m3
m2
0.37
0.98
359.32
57.53
132.950
56.380
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
m3
m2
0.76
4.52
380.64
53.51
08.04.03
08.04.04
8.05
08.05.01
8.06
kg
und
68.15
4.00
4.79
108.50
289.290
241.870
326.440
434.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
m2
30.52
95.20
2,905.500
0.00%
0.00
0.000
100.00%
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
08.06.01
08.06.02
8.07
08.07.01
01
1.01
01.01.01
01.01.02
01.01.03
01.01.04
MATERIALES DIDACTICOS
MATERIALES DIDACTICOS DE COMUNICACIN
MATERIALES DIDACTICOS DE MATEMTICA
MATERIALES DIDACTICOS DE PERSONAL SOCIAL
MATERIALES DIDACTICOS DE CIENCIA Y AMBIENTE
1.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01
1.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
EQUIPOS Y MOVILIARIOS
EQUIPOS Y MOBILIARIOS DE AULA
EQUIPOS Y MOBILIARIOS DE SALA DE USOS MULTIBLES
EQUIPOS Y MOBILIARIOS DE COMEDOR
EQUIPOS Y MOBILIARIOS DE COCINA
EQUIPOS Y MOBILIARIOS DE DIRECCIN
EQUIPOS Y MOBILIARIOS DE TOPICO
EQUIPOS Y MOBILIARIOS DE DEPOSITO DE MATERIAL EDUCATIVO
DECLARATORIA DE IMPACTO AMBIENTAL
MEDIDAS DE PREVENCION
EDUCACIN ANBIENTAL
CHARLAS AL PERSONAL OBRERO
CHARLAS A LA COMUNIDAD BENEFICIARIA
POLOS CON LOGOS AMBIENTALES
m
pza
5.00
5.00
21.73
18.79
108.650
93.950
m3
6.04
182.82
1,104.230
0.00%
0.00
0.000
100.00%
GLB
GLB
GLB
GLB
1.00
1.00
1.00
1.00
11,510.00
4,059.00
3,176.00
3,828.00
11,510.000
4,059.000
3,176.000
3,828.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
GLB
GLB
GLB
GLB
GLB
GLB
GLB
1.00
1.00
1.00
1.00
1.00
1.00
1.00
14,035.00
52,915.00
3,707.00
4,356.00
11,750.00
3,408.00
916.00
14,035.000
52,915.000
3,707.000
4,356.000
11,750.000
3,408.000
916.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
94.00%
0.00%
0.00%
0.00%
0.00%
0.00%
GLB
GLB
GLB
3.00
3.00
1.00
550.00
550.00
932.25
1,650.000
1,650.000
932.250
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
0.42
4.18
18.31
8.00
0.00
23.13
0.00
49.52
3.00
2.50
2.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.37
0.98
0.00
0.76
4.52
68.15
4.00
0.00
30.52
0.00
5.00
5.00
0.00
6.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
3.00
1.00
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
159.869
223.672
87.705
868.000
100.00%
100.00%
100.00%
100.00%
0.42
4.18
18.31
8.00
SALDO
MES ACTUAL
MET.
TOTAL
S/.
159.869
223.672
87.705
868.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
696.676
100.00%
23.13
696.676
0.00%
0.00
0.000
1,076.070
56.370
81.650
97.480
194.960
100.00%
100.00%
100.00%
100.00%
100.00%
49.52
3.00
2.50
2.00
4.00
1,076.070
56.370
81.650
97.480
194.960
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
9.61
9.61
19.22
8.553
10.091
29.214
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
26.80
32.16
32.16
946.576
486.902
268.536
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
132.948
56.379
100.00%
100.00%
0.37
0.98
132.948
56.379
0.00%
0.00%
0.00
0.00
0.000
0.000
289.286
241.865
326.439
434.000
100.00%
100.00%
100.00%
100.00%
0.76
4.52
68.15
4.00
289.286
241.865
326.439
434.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
2,905.504
100.00%
30.52
2,905.504
0.00%
0.00
0.000
108.650
93.950
100.00%
100.00%
5.00
5.00
108.650
93.950
0.00%
0.00%
0.00
0.00
0.000
0.000
1,104.233
100.00%
6.04
1,104.233
0.00%
0.00
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
11,510.000
4,059.000
3,176.000
3,828.000
0.000
49,740.100
0.000
0.000
0.000
0.000
0.000
0.00%
94.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.94
0.00
0.00
0.00
0.00
0.00
0.000
49,740.100
0.000
0.000
0.000
0.000
0.000
100.00%
6.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
0.06
1.00
1.00
1.00
1.00
1.00
14,035.000
3,174.900
3,707.000
4,356.000
11,750.000
3,408.000
916.000
1,650.000
1,650.000
932.250
100.00%
100.00%
100.00%
3.00
3.00
1.00
1,650.000
1,650.000
932.250
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
1.02
01.02.01
01.02.01.01
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
1.03
01.03.01
01.03.02
1.04
01.04.01
01.04.02
01.04.03
PARTIDAS
SEALIZACION
LETRERO DE UBICACIN
LETREROS AMBIENTALES
CINTA SEALIZADORA DE OBRA
MEDIDAS DE MITIGACIN
MITIGACION DE IMPACTO AMBIENTAL
TRATAMIENTO DE BOTADEROS
MICRO RELLENO SANITARIO
UND
MET.
P. U.
S/.
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
und
und
m
1.00
3.00
300.00
296.62
296.62
1.18
296.620
889.860
354.000
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
GLB
1.00
423.73
423.730
0.00%
0.00
0.000
100.00%
m2
m2
5.00
5.00
0.89
1.05
m3
m3
und
12.50
10.00
1.00
35.32
9.75
105.97
4.450
5.250
441.500
97.500
105.970
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
1.00
0.000
0.000
0.000
0.000
105.970
100.00%
100.00%
100.00%
100.00%
0.00%
m3
49.11
20.24
m2
und
196.45
20.00
4.14
14.96
993.990
813.300
299.200
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
26.47%
0.00%
0.00%
und
und
4.00
1.00
67.80
381.36
271.200
381.360
0.00%
0.00%
0.000
0.000
100.00%
100.00%
und
und
und
1.00
10.00
1.00
220.00
70.00
296.80
220.000
700.000
296.800
1,420,671.43
1,420,671.43
97,315.99
85,240.29
1,603,227.71
1.00000
1,603,227.71
288,580.99
1,891,808.70
100.00%
100.00%
100.00%
71.76%
0.00
0.00
0.00
1.00
10.00
1.00
220.000
700.000
296.800
1,019,406.47
0.00%
0.00%
0.00%
18.45%
AREAS VERDES
ADECUACION Y PREPARACIN DEL TERRENO
SEMBRADO DE GRASS
SEMBRADO DE PLANTONES
MEDIDAS DE CONTROL
PROVISIN DE RECIPIENTES PLASTICOS CON TAPA PARA RESIDUOS SOLI
CONTRUCION DE LETRINA
PLAN DE SALUD Y SEGURIDAD
PROVISION DE EXTINTORES DE 12KG
PROVISIN DE ENVASE MAS SURTIDOR DE AGUA PARA CONSUMO HUMAN
PROVISION DE BOTIQUIN
COSDIRECTO
COSTO DIRECTO TOTAL
GASTOS GENERALES ( 6.85 %)
UTILIDADES ( 6%)
SUBTOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V. ( 18.00 % )
TOTAL PRESUPUESTO
F.R=
71.76%
69,829.34
61,164.39
1,150,400.20
1.00000
1,150,400.20
207,072.04
1,357,472.24
18.45%
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
0.00
1.00
3.00
300.00
0.00
0.00
1.00
0.00
5.00
5.00
12.50
10.00
0.00
0.00
13.00
0.00
0.00
0.00
4.00
1.00
0.00
0.00
0.00
0.00
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
296.620
889.860
354.000
100.00%
100.00%
100.00%
1.00
3.00
300.00
296.620
889.860
354.000
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
423.730
100.00%
1.00
423.730
0.00%
0.00
0.000
4.450
5.250
441.500
97.500
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
5.00
5.00
12.50
10.00
1.00
4.450
5.250
441.500
97.500
105.970
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
263.120
0.000
0.000
26.47%
0.00%
0.00%
13.00
0.00
0.00
263.120
0.000
0.000
73.53%
100.00%
100.00%
36.11
196.45
20.00
730.870
813.300
299.200
271.200
381.360
100.00%
100.00%
271.200
381.360
0.00%
0.00%
0.00
0.00
0.000
0.000
0.000
0.000
0.000
262,102.47
100.00%
100.00%
100.00%
90.20%
4.00
1.00
0.00
1.00
10.00
1.00
220.000
700.000
296.800
1,281,508.95
0.00%
0.00%
0.00%
9.80%
0.00
0.00
0.00
0.000
0.000
0.000
139,162.51
17,954.02
15,726.15
295,782.63
1.00000
295,782.63
53,240.87
349,023.50
90.20%
87,783.36
76,890.54
1,446,182.84
1.00000
1,446,182.84
260,312.91
1,706,495.75
9.80%
9,532.63
8,349.75
157,044.89
1.00000
157,044.89
28,268.08
185,312.97
VALORIZACION MODULO I Y II
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
01
01.01
PARTIDAS
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEG
CONSTRUCCIONES PROVISIONALES
ALMACEN OFICINA Y CASETA DE GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
UND
MET.
P. U.
S/.
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
###
m2
und
56.00
1.00
52.19
593.88
140.00
7.78
2,922.640
593.880
1,089.200
100.00%
100.00%
100.00%
56.00
1.00
140.00
2,922.640
593.880
1,089.200
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
56.00
1.00
140.00
2,922.640
593.880
1,089.200
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
01.02.01
01.02.02
INSTALACIONES PROVISIONALES
AGUA Y DESAGUE PARA LA CONSTRUCCION
ENERGIA ELECTRICA PROVISIONAL
glb
glb
1.00
1.00
600.00
300.00
600.000
300.000
100.00%
100.00%
1.00
1.00
600.000
300.000
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
1.00
1.00
600.000
300.000
0.00%
0.00%
0.00
0.00
0.000
0.000
1.03
01.03.01
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
1,200.00
0.89
01.03.02
01.03.03
01.03.04
m3
m2
m3
1,401.56
168.19
1,480.05
3.66
27.02
7.09
1,068.000
5,129.710
4,544.490
10,493.550
100.00%
100.00%
100.00%
100.00%
1,068.000
5,129.710
4,544.490
10,493.550
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
1,068.000
5,129.710
4,544.494
10,493.555
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
16,500.000
648,374.830
31,541.010
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
1.00
1.00
1.00
16,500.000
648,374.830
31,541.010
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
1,260.000
0.00%
0.00
0.000
100.00%
###
1,260.000
0.00%
0.00
0.000
01.01.01
01.01.02
01.01.03
1.02
###
###
168.19
###
###
###
168.19
###
1.04
1.04.01
glb
1.00
16,500.00
1.04.02
1.04.03
glb
glb
1.00
1.00
648,374.83
31,541.01
16,500.000
648,374.830
31,541.010
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.05
1.05.01
m2
1,200.00
1.05
1,260.000
100.00%
###
1.06
1.06.01
SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE
GLB
1.00
460.00
1.06.02
1.06.03
GLB
GLB
1.00
1.00
500.00
550.00
1.06.04
02
GLB
1.00
500.00
460.000
500.000
550.000
500.000
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
460.000
500.000
550.000
500.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
460.000
500.000
550.000
500.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
02.01
02.01.01
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA ZAPATAS
m3
28.06
30.27
02.02.02
02.02.03
m3
m3
55.65
24.32
30.27
27.22
02.02.04
02.02.05
308.61
3.96
2.73
15.14
3.96
7.09
849.380
1,684.530
661.990
842.510
59.950
28.080
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
28.06
55.65
24.32
308.61
3.96
3.96
849.380
1,684.530
661.990
842.510
59.950
28.080
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
28.06
55.65
24.32
308.61
3.96
3.96
849.376
1,684.526
661.990
842.505
59.954
28.076
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
02.02.06
02.02
02.02.01
02.02.01.01
02.02.02
m3
45.71
244.09
11,157.350
100.00%
45.71
11,157.350
0.00%
0.00
0.000
100.00%
45.71
11,157.354
0.00%
0.00
0.000
02.02.02.01
02.02.03
m2
20.05
25.15
504.260
100.00%
20.05
504.260
0.00%
0.00
0.000
100.00%
20.05
504.258
0.00%
0.00
0.000
02.02.03.01
02.02.03.02
SOBRECIMIENTO
SOBRECIMIENTO: CONCRETO 1:8 + 25% P.M.
SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO
m3
m2
8.22
111.19
271.86
33.93
2,234.690
3,772.680
100.00%
100.00%
8.22
111.19
2,234.690
3,772.680
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
8.22
111.19
2,234.689
3,772.677
0.00%
0.00%
0.00
0.00
0.000
0.000
02.02.04
02.02.04.01
FALSO PISO
FALSO PISO E= 4" f`c= 140 kg/cm2
m2
308.61
32.44
10,011.310
100.00%
308.61
10,011.310
0.00%
0.00
0.000
100.00%
308.61
10,011.308
0.00%
0.00
0.000
10.02
412.61
363.83
4.35
3,645.580
1,794.850
100.00%
100.00%
10.02
412.61
3,645.580
1,794.850
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
10.02
412.61
3,645.577
1,794.854
0.00%
0.00%
0.00
0.00
0.000
0.000
5,637.280
8,980.680
11,175.980
100.00%
100.00%
100.00%
14.81
201.00
###
5,637.280
8,980.680
11,175.980
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
14.81
201.00
###
5,637.278
8,980.680
11,175.977
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
10,001.690
14,891.490
12,569.350
100.00%
100.00%
100.00%
27.49
334.49
###
10,001.690
14,891.490
12,569.350
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
27.49
334.49
###
10,001.687
14,891.495
12,569.346
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
2.03
02.03.01
ZAPATAS
02.03.01.01
02.03.01.02
m3
kg
02.03.02
02.03.02.01
COLUMNAS
COLUMNAS: CONCRETO, fc= 210kg/cm2
m3
14.81
380.64
02.03.02.02
02.03.02.03
m2
kg
201.00
2,569.19
44.68
4.35
02.03.03
02.03.03.01
VIGAS
VIGAS: CONCRETO, fc= 210kg/cm2
m3
27.49
363.83
02.03.03.02
02.03.03.03
m2
kg
334.49
2,774.69
44.52
4.53
VALORIZACION MODULO I Y II
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
2.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
PARTIDAS
LOSAS ARMADA
LOSAS ARMADA: CONCRETO, fc= 210kg/cm2
LOSAS ARMADA: ENCOFRADO Y DESENCOFRADO
LOSAS ARMADA: ACERO, fy= 4200kg/cm2
UND
MET.
P. U.
S/.
TOTAL
S./
m3
m2
2.16
19.55
363.83
34.19
kg
103.66
4.53
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
785.870
668.410
469.580
90.00%
90.00%
90.00%
1.94
17.60
93.29
90.00%
90.00%
90.00%
90.00%
37.94
447.04
###
223.13
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
707.290
601.570
422.620
10.00%
10.00%
10.00%
0.22
1.96
10.37
78.587
66.842
46.958
100.00%
100.00%
100.00%
2.16
19.55
103.66
13,801.890
16,866.780
12,298.760
5,944.130
10.00%
10.00%
10.00%
10.00%
4.22
49.67
301.66
24.79
1,533.544
1,874.087
1,366.529
660.459
100.00%
100.00%
100.00%
100.00%
42.15
496.71
###
247.92
SALDO
MES ACTUAL
MET.
TOTAL
S/.
785.873
668.415
469.580
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
15,335.435
18,740.868
13,665.289
6,604.589
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
02.03.05.01
02.03.05.02
m3
m2
42.15
496.71
363.83
37.73
02.03.05.03
02.03.05.04
kg
m2
3,016.62
247.92
4.53
26.64
15,335.430
18,740.870
13,665.290
6,604.590
2.04
02.04.01
03
VARIOS
JUNTAS DE DILATACIN C/TECNOPORT, e= 1"x15cm, EN MUROS
237.66
4.42
1,050.460
0.00%
0.00
0.000
100.00%
237.66
1,050.457
100.00%
237.66
1,050.457
0.00%
0.00
0.000
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA LADRILLO K.K 18 HUECOS DE ARCILLA
m2
321.04
68.69
kg
43.68
4.53
22,052.240
197.870
100.00%
100.00%
321.04
43.68
22,052.240
197.870
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
321.04
43.68
22,052.238
197.870
0.00%
0.00%
0.00
0.00
0.000
0.000
m3
m2
6.40
102.81
376.70
34.35
kg
896.64
4.53
2,410.880
3,531.520
4,061.780
100.00%
100.00%
100.00%
6.40
102.81
896.64
2,410.880
3,531.520
4,061.780
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
6.40
102.81
896.64
2,410.880
3,531.524
4,061.779
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
647.920
980.110
1,197.730
100.00%
100.00%
100.00%
1.72
27.64
264.40
647.920
980.110
1,197.730
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
1.72
27.64
264.40
647.924
980.114
1,197.732
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
674.290
966.050
638.910
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
1.79
28.43
141.04
674.293
966.051
638.911
100.00%
100.00%
100.00%
1.79
28.43
141.04
674.293
966.051
638.911
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
89.28
428.80
202.45
155.44
334.49
205.37
459.00
1,629.360
7,825.600
3,694.713
3,380.820
7,750.133
1,472.503
775.710
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
89.28
428.80
202.45
155.44
334.49
205.37
459.00
1,629.360
7,825.600
3,694.713
3,380.820
7,750.133
1,472.503
775.710
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3.01
03.01.01
03.01.02
3.02
COLUMNAS DE AMARRE
03.02.01
03.02.02
03.02.03
3.03
03.03.01
03.03.02
m2
m
1.72
27.64
376.70
35.46
03.03.03
3.04
kg
264.40
4.53
03.04.01
03.04.02
m3
m2
1.79
28.43
376.70
33.98
03.04.03
3.05
kg
141.04
4.53
03.05.01
03.05.02
m2
m2
89.28
428.80
18.25
18.25
03.05.03
03.05.04
03.05.05
TARRAJEO EN EXTERIORES
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
m2
m2
m2
202.45
155.44
334.49
18.25
21.75
23.17
03.05.06
03.05.07
m
m
205.37
459.00
7.17
1.69
1,629.360
7,825.600
3,694.710
3,380.820
7,750.130
1,472.500
775.710
3.06
03.06.01
CIELORASOS
CIELORASOS C/MEZCLA DE C:A
m2
496.71
44.79
22,247.640
80.00%
397.37
17,798.110
20.00%
99.34
4,449.528
100.00%
496.71
22,247.641
0.00%
0.00
0.000
3.07
03.07.01
PISOS Y PAVIMENTOS
CONTRAPISO DE 42 mm.
m2
88.76
19.65
03.07.02
03.07.03
m2
m2
12.79
224.34
32.28
51.15
03.07.04
03.07.05
m2
m2
26.62
62.14
49.85
49.85
1,744.130
412.860
11,474.990
1,327.010
3,097.680
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
88.76
12.79
224.34
26.62
62.14
1,744.134
412.861
11,474.991
1,327.007
3,097.679
100.00%
100.00%
100.00%
100.00%
100.00%
88.76
12.79
224.34
26.62
62.14
1,744.134
412.861
11,474.991
1,327.007
3,097.679
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
3.08
03.08.01
m2
28.43
53.04
1,507.930
0.00%
0.00
0.000
100.00%
28.43
1,507.927
100.00%
28.43
1,507.927
0.00%
0.00
0.000
3.09
03.09.01
ZOCALOS
ZOCALO DE CERAMICO VIDRIADO, 20x30 cm.
m2
60.85
62.29
3,790.350
0.00%
0.00
0.000
100.00%
60.85
3,790.347
100.00%
60.85
3,790.347
0.00%
0.00
0.000
3.10
03.10.01
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.30 M
ml
156.86
9.02
03.10.02
3.11
ml
193.48
5.86
1,414.880
1,133.790
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
156.86
193.48
1,414.877
1,133.793
100.00%
100.00%
156.86
193.48
1,414.877
1,133.793
0.00%
0.00%
0.00
0.00
0.000
0.000
03.11.01
m2
484.35
33.27
16,114.320
0.00%
0.00
0.000
100.00%
484.35
16,114.325
100.00%
484.35
16,114.325
0.00%
0.00
0.000
VALORIZACION MODULO I Y II
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
PARTIDAS
UND
MET.
P. U.
S/.
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
39.05
6.97
124.47
15.51
10.82
14.00
5.00
38.00
10,272.103
1,424.598
14,727.290
2,181.326
2,219.290
858.340
245.250
2,329.780
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
39.05
6.97
124.47
15.51
10.82
14.00
5.00
38.00
10,272.103
1,424.598
14,727.290
2,181.326
2,219.290
858.340
245.250
2,329.780
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
57.00
14.00
14.00
7.00
555.180
1,161.860
348.180
246.260
m2
39.05
263.05
03.12.02
03.12.03
m2
m2
6.97
124.47
204.39
118.32
03.12.04
03.12.05
CLOSET DE MADERA
DIVISION CON PLANCHA DE MELANINE PARA SERVICIOS HIGIENICOS
m2
und
15.51
10.82
140.64
205.11
03.12.06
03.12.07
und
und
14.00
5.00
61.31
49.05
03.12.08
3.13
und
38.00
61.31
03.13.01
03.13.02
03.13.03
pza
pza
und
57.00
14.00
14.00
9.74
82.99
24.87
und
7.00
35.18
555.180
1,161.860
348.180
246.260
SALDO
MES ACTUAL
MET.
TOTAL
S/.
10,272.100
1,424.600
14,727.290
2,181.330
2,219.290
858.340
245.250
2,329.780
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA, E=40MM
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
3.12
03.12.01
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
TOTAL
S./
03.13.04
3.14
03.14.01
03.14.02
p2
p3
115.95
6.00
75.54
86.91
8,758.860
521.460
0.00%
0.00%
0.00
0.00
0.000
0.000
0.00%
0.00%
0.00
0.00
0.000
0.000
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
115.95
6.00
8,758.860
521.460
3.15
03.15.01
PINTURA
PINTURA LTEX EN CIELORASO
m2
700.35
9.18
03.15.02
03.15.03
m2
m2
428.80
202.45
9.18
9.18
03.15.04
03.15.05
m2
m2
155.44
334.49
10.10
10.10
03.15.06
03.15.07
m2
m2
78.10
248.94
15.99
15.99
03.15.08
03.15.09
PINTURA EN CLOSET
PINTURA EN CONTRAZOCALOS H=30CM
m2
m2
31.02
156.86
15.99
2.65
03.15.10
03.15.11
m2
m2
193.48
484.35
1.78
7.61
6,429.210
3,936.380
1,858.490
1,569.940
3,378.350
1,248.820
3,980.550
496.010
415.680
344.390
3,685.900
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
700.35
428.80
202.45
155.44
334.49
78.10
248.94
31.02
156.86
193.48
484.35
6,429.210
3,936.380
1,858.490
1,569.940
3,378.350
1,248.820
3,980.550
496.010
415.680
344.390
3,685.900
3.16
03.16.01
VARIOS
LIMPIEZA FINAL DE OBRA
GLB
1.00
2,160.48
2,160.480
0.00%
0.00
0.000
0.00%
0.00
0.000
0.00%
0.00
0.000
100.00%
1.00
2,160.480
04
4.01
04.01.01
INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
2.00
5.00
7.00
2.00
1.00
1.00
1.00
453.700
1,134.250
750.190
380.360
176.310
115.570
166.420
04.01.01.01
04.01.01.02
pza
pza
2.00
5.00
226.85
226.85
04.01.01.03
04.01.01.04
pza
pza
7.00
2.00
107.17
190.18
04.01.01.05
04.01.01.06
pza
pza
1.00
1.00
176.31
115.57
04.01.01.07
04.01.02
pza
1.00
166.42
453.700
1,134.250
750.190
380.360
176.310
115.570
166.420
04.01.02.01
04.01.03
und
8.00
32.57
260.560
0.00%
0.00
0.000
0.00%
0.00
0.000
0.00%
0.00
0.000
100.00%
8.00
260.560
04.01.03.01
04.01.04
und
19.00
61.31
1,164.890
0.00%
0.00
0.000
0.00%
0.00
0.000
0.00%
0.00
0.000
100.00%
19.00
1,164.890
04.01.04.01
4.02
und
8.00
24.03
192.240
0.00%
0.00
0.000
0.00%
0.00
0.000
0.00%
0.00
0.000
100.00%
8.00
192.240
04.02.01
04.02.01.01
pto
19.00
28.24
04.02.02
04.02.02.01
REDES DE ALIMENTACION
m
0.00
66.34
0.00
10.60
m
m
66.34
78.84
5.29
11.28
536.560
0.000
703.200
350.940
889.320
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
0.00%
100.00%
100.00%
100.00%
19.00
0.00
66.34
66.34
78.84
536.560
0.000
703.204
350.939
889.315
100.00%
0.00%
100.00%
100.00%
100.00%
19.00
0.00
66.34
66.34
78.84
536.560
0.000
703.204
350.939
889.315
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
04.02.02.02
04.02.02.03
VALORIZACION MODULO I Y II
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
PARTIDAS
UND
MET.
P. U.
S/.
04.02.03
04.02.03.01
04.02.03.02
und
und
8.00
1.00
14.40
14.35
04.02.03.03
04.02.03.04
und
und
25.00
1.00
16.73
16.78
04.02.04
04.02.05.01
VALVULAS
VALVULA ESFERICA DE BRONCE 1/2"
9.00
81.69
04.02.05.02
04.02.05
1.00
04.02.05.01
04.02.05.02
04.02.05.03
GLB
pza
pza
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
115.200
14.350
418.250
16.780
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
8.00
1.00
25.00
1.00
115.200
14.350
418.250
16.780
100.00%
100.00%
100.00%
100.00%
8.00
1.00
25.00
1.00
115.200
14.350
418.250
16.780
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
81.69
735.210
81.690
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
9.00
1.00
735.210
81.690
100.00%
100.00%
9.00
1.00
735.210
81.690
0.00%
0.00%
0.00
0.00
0.000
0.000
1.00
9.00
1.00
211.87
170.79
180.66
211.870
1,537.110
180.660
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
1.00
9.00
1.00
211.870
1,537.110
180.660
100.00%
100.00%
100.00%
1.00
9.00
1.00
211.870
1,537.110
180.660
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
2,846.480
971.510
299.840
149.920
299.530
314.440
179.460
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
156.40
59.13
16.00
8.00
1.03
8.88
8.88
2,846.480
971.506
299.840
149.920
299.534
314.441
179.465
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
156.40
59.13
16.00
8.00
1.03
8.88
8.88
2,846.480
971.506
299.840
149.920
299.534
314.441
179.465
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
129.150
190.800
273.700
22.760
84.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
7.00
12.00
7.00
2.00
6.00
129.150
190.800
273.700
22.760
84.000
100.00%
100.00%
100.00%
100.00%
100.00%
7.00
12.00
7.00
2.00
6.00
129.150
190.800
273.700
22.760
84.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
48.96
48.96
38.20
21.08
518.976
258.998
627.626
309.454
100.00%
100.00%
100.00%
100.00%
48.96
48.96
38.20
21.08
518.976
258.998
627.626
309.454
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
4.03
04.03.01
156.40
18.20
04.03.02
04.03.03
m
pza
59.13
16.00
16.43
18.74
04.03.04
04.03.05
pza
m3
8.00
1.03
18.74
290.81
04.03.06
04.03.07
m2
m2
8.88
8.88
35.41
20.21
4.04
04.04.01
SISTEMA DE DESAGUE
SALIDAS DE DESAGUE
04.04.01.01
04.04.01.02
pto
pto
7.00
12.00
18.45
15.90
04.04.01.03
04.04.01.04
pto
pto
7.00
2.00
39.10
11.38
04.04.01.05
04.04.02
pto
6.00
14.00
04.04.02.01
04.04.02.02
m
m
48.96
48.96
10.60
5.29
04.04.02.03
04.04.02.04
04.04.03
m
m
38.20
21.08
16.43
14.68
518.980
259.000
627.630
309.450
04.04.03.01
04.04.04
RED DE VENTILACIN
RED DE VENTILACION 2"
ACCESORIOS DE REDES
27.84
16.26
452.680
0.00%
0.00
0.000
100.00%
27.84
452.678
100.00%
27.84
452.678
0.00%
0.00
0.000
04.04.04.01
04.04.04.02
pza
pza
1.00
6.00
18.74
18.69
04.04.04.03
04.04.04.04
pza
pza
62.00
8.00
16.12
16.12
04.04.04.05
04.04.04.06
pza
pza
5.00
10.00
18.45
25.17
04.04.04.07
04.04.04.08
pza
pza
8.00
8.00
17.90
18.79
04.04.04.09
04.04.04.10
pza
pza
2.00
4.00
18.65
18.74
04.04.04.11
04.04.05
pza
3.00
26.86
18.740
112.140
999.440
128.960
92.250
251.700
143.200
150.320
37.300
74.960
80.580
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
6.00
62.00
8.00
5.00
10.00
8.00
8.00
2.00
4.00
3.00
18.740
112.140
999.440
128.960
92.250
251.700
143.200
150.320
37.300
74.960
80.580
04.04.05.01
04.04.05.02
und
und
7.00
6.00
65.12
37.18
04.04.05.03
04.04.05.04
und
und
2.00
2.00
37.18
200.45
04.04.05.05
GLB
1.00
211.87
455.840
223.080
74.360
400.900
211.870
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
7.00
6.00
2.00
2.00
1.00
455.840
223.080
74.360
400.900
211.870
VALORIZACION MODULO I Y II
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
PARTIDAS
UND
05
5.01
INSTALACIONES ELECTRICAS
SALIDAS
05.01.01
05.01.02
05.01.03
pto
pto
pto
05.01.04
5.02
05.02.01
5.03
05.03.01
05.03.02
05.03.03
5.04
05.04.01
05.04.02
und
und
05.04.03
05.04.04
und
und
05.04.05
05.04.06
05.04.07
5.05
05.05.01
05.05.02
05.05.03
05.05.04
05.05.05
MET.
P. U.
S/.
TOTAL
S./
AVANCE ACUMULADO
MES ACTUAL
%
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
27.49
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
65.00
45.00
27.00
11.00
1,296.750
897.750
696.600
302.390
100.00%
100.00%
100.00%
100.00%
65.00
45.00
27.00
11.00
1,296.750
897.750
696.600
302.390
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
30.88
401.440
0.00%
0.00
0.000
100.00%
13.00
401.440
100.00%
13.00
401.440
0.00%
0.00
0.000
4.53
4.17
65.050
196.200
2,168.320
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
14.36
47.05
603.99
65.051
196.199
2,168.324
100.00%
100.00%
100.00%
14.36
47.05
603.99
65.051
196.199
2,168.324
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
207.610
207.610
217.610
68.610
193.110
103.320
431.800
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
3.00
2.00
10.00
207.610
207.610
217.610
68.610
193.110
103.320
431.800
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
3.00
2.00
10.00
207.610
207.610
217.610
68.610
193.110
103.320
431.800
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2,989.360
604.120
252.650
320.950
234.720
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
###
212.72
52.20
49.00
28.80
2,989.362
604.125
252.648
320.950
234.720
100.00%
100.00%
100.00%
100.00%
100.00%
###
212.72
52.20
49.00
28.80
2,989.362
604.125
252.648
320.950
234.720
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
7,227.660
2,398.400
0.00%
0.00%
0.00
0.00
0.000
0.000
0.00%
0.00%
0.00
0.00
0.000
0.000
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
33.00
32.00
7,227.660
2,398.400
1,863.420
85.700
1,133,160.88
1,133,160.88
77,621.52
67,989.65
1,278,772.05
1.00000
1,278,772.05
230,178.97
1,508,951.02
0.00%
0.00%
82.11%
0.00
0.00
0.000
0.000
930,452.14
0.00%
0.00%
12.51%
0.00
0.00
0.000
0.000
141,787.45
0.00%
0.00%
94.62%
0.00
0.00
0.000
0.000
1,072,239.59
100.00%
100.00%
5.38%
3.00
1.00
1,863.420
85.700
60,921.31
19.95
19.95
25.80
pto
11.00
13.00
ml
ml
14.36
47.05
ml
603.99
3.59
1.00
1.00
207.61
207.61
1.00
1.00
217.61
68.61
und
und
3.00
2.00
64.37
51.66
und
10.00
43.18
m
m
1,230.19
212.72
2.43
2.84
m
m
m
52.20
49.00
28.80
4.84
6.55
8.15
5.06
05.06.01
EQU
33.00
219.02
05.06.02
5.07
EQU
32.00
74.95
05.07.01
05.07.02
und
glb
3.00
1.00
621.14
85.70
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
1,296.750
897.750
696.600
302.390
65.00
45.00
27.00
COSDIRECTO
COSTO DIRECTO TOTAL
GASTOS GENERALES ( 6.85 %)
UTILIDADES ( 6%)
SUBTOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V. ( 18.00 % )
TOTAL PRESUPUESTO
AVANCE ACUMULADO
MES ANTERIOR
%
MET.
TOTAL
S/.
F.R=
82.11%
63,735.97
55,827.13
1,050,015.24
1.00000
1,050,015.24
189,002.74
1,239,017.98
12.51%
9,712.44
8,507.25
160,007.13
1.00000
160,007.13
28,801.28
188,808.41
94.62%
73,448.41
64,334.38
1,210,022.37
1.00000
1,210,022.37
217,804.03
1,427,826.40
5.38%
4,173.11
3,655.28
68,749.70
1.00000
68,749.70
12,374.95
81,124.65
PARTIDAS
UND
MET.
P. U.
S/.
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
%
MET.
TOTAL
S/.
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
AVANCE ACUMULADO
MES ACTUAL
%
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
01
1.01
CERCO PERIMETRICO
TRABAJOS PRELIMINARES
01.01.01
01.01.02
m2
m2
140.00
140.00
0.89
1.52
124.600
212.800
100.00%
100.00%
140.00
140.00
124.600
212.800
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
140.00
140.00
124.600
212.800
0.00%
0.00%
0.00
0.00
0.000
0.000
01.02
01.02.01
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL
m3
112.00
30.27
01.02.02
01.02.03
m3
m3
112.00
112.00
15.14
7.95
3,390.240
1,695.680
890.400
100.00%
100.00%
100.00%
112.00
112.00
112.00
3,390.240
1,695.680
890.400
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
112.00
112.00
112.00
3,390.240
1,695.680
890.400
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
1.03
01.03.01
01.03.01.01
m3
112.00
239.92
26,871.040
100.00%
112.00
26,871.040
0.00%
0.00
0.000
100.00%
112.00
26,871.040
0.00%
0.00
0.000
01.03.02
01.03.02.01
SOBRECIMIENTO
CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO-HORMIGON +25% PIEDRA
01.03.02.02
1.04
1,470.760
3,478.440
100.00%
100.00%
5.46
84.00
1,470.760
3,478.440
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
5.46
84.00
1,470.760
3,478.440
0.00%
0.00%
0.00
0.00
0.000
0.000
01.04.01
01.04.01
COLUMNAS
COLUMNAS: CONCRETO, fc= 210kg/cm2
01.04.02
01.04.03
2,398.030
5,282.640
5,751.090
100.00%
100.00%
100.00%
6.30
110.40
###
2,398.030
5,282.640
5,751.090
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
6.30
110.40
###
2,398.032
5,282.640
5,751.092
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
01.04.02
01.04.02.01
VIGAS
VIGAS: CONCRETO, fc= 210kg/cm2
01.04.02.02
01.04.02.03
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
4.20
56.00
437.49
1,528.086
2,135.280
1,903.082
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
1.05
01.05.01
1.06
01.06.01
163,023.57
m3
5.46
269.37
m2
84.00
41.41
m3
6.30
380.64
m3
kg
110.40
1322.09
47.85
4.35
m3
4.20
363.83
m2
kg
56.00
437.49
38.13
4.35
1,528.090
2,135.280
1,903.080
100.00%
100.00%
100.00%
4.20
56.00
437.49
1,528.090
2,135.280
1,903.080
m2
240.97
68.69
16,552.230
100.00%
240.97
16,552.230
0.00%
0.00
0.000
100.00%
240.97
16,552.229
0.00%
0.00
0.000
REVOQUES Y REVESTIMIENTOS
TARRAJEO EN MUROS
m2
207.20
17.22
01.06.02
01.06.03
TARRAJEO EN COLUMNAS
TARRAJEO EN VIGAS
m2
m2
70.20
74.00
21.75
23.17
01.06.04
1.07
01.07.01
302.40
1.69
3,567.980
1,526.850
1,714.580
511.060
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
207.20
70.20
74.00
302.40
3,567.984
1,526.850
1,714.580
511.056
100.00%
100.00%
100.00%
100.00%
207.20
70.20
74.00
302.40
3,567.984
1,526.850
1,714.580
511.056
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
m2
140.00
9.02
1,262.800
0.00%
0.00
0.000
100.00%
140.00
1,262.800
100.00%
140.00
1,262.800
0.00%
0.00
0.000
1.08
01.08.01
CARPINTERA METLICA
PUERTA DE FIERRO, CON PERFILES Y PLANCHA S/D
m2
8.85
259.92
01.08.02
01.08.03
m
u
416.00
1.00
26.15
83.03
2,300.290
10,878.400
83.030
0.00%
100.00%
0.00%
0.00
416.00
0.00
0.000
10,878.400
0.000
100.00%
0.00%
100.00%
8.85
0.00
1.00
2,300.292
0.000
83.030
100.00%
100.00%
100.00%
8.85
416.00
1.00
2,300.292
10,878.400
83.030
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
1.09
01.09.01
CERRAJERIA
BISAGRAS DE FIERRO DE 5", C/EJE DE 1/2"
und
6.00
33.41
01.09.02
01.09.03
pza
und
1.00
1.00
74.88
20.82
01.09.04
1.10
und
1.00
31.13
200.460
74.880
20.820
31.130
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
6.00
1.00
1.00
1.00
200.460
74.880
20.820
31.130
100.00%
100.00%
100.00%
100.00%
6.00
1.00
1.00
1.00
200.460
74.880
20.820
31.130
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
01.10.01
01.10.02
m2
m2
207.20
56.70
8.44
11.61
01.10.03
01.10.04
m2
m
56.00
140.00
11.61
3.44
01.10.05
01.10.06
m2
m2
17.70
9.14
10.90
10.90
1,748.770
658.290
650.160
481.600
192.930
99.630
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
207.20
56.70
56.00
140.00
17.70
9.14
1,748.770
658.290
650.160
481.600
192.930
99.630
2.00
2.01
EXPLANADA PATIO
EXPLANADA PATIO: CONCRETO F'C= 140 KG/CM2, FROTACHADO Y BRUA
m3
18.35
333.03
2.02
2.03
3.00
m2
m
19.20
95.43
39.27
2.19
6,111.100
753.980
208.990
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
18.35
19.20
95.43
6,111.101
753.984
208.992
100.00%
100.00%
100.00%
18.35
19.20
95.43
6,111.101
753.984
208.992
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
3.01
3.02
m3
m2
38.43
96.03
333.03
39.27
12,798.340
3,771.100
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
38.43
96.03
12,798.343
3,771.098
100.00%
100.00%
38.43
96.03
12,798.343
3,771.098
0.00%
0.00%
0.00
0.00
0.000
0.000
PARTIDAS
VEREDAS: JUNTAS
UND
MET.
270.76
P. U.
S/.
TOTAL
S./
2.19
592.960
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
0.00%
0.00
0.000
100.00%
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
270.76
592.964
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
100.00%
270.76
592.964
0.00%
SALDO
MES ACTUAL
MET.
TOTAL
S/.
0.00
0.000
PARTIDAS
UND
MET.
P. U.
S/.
TOTAL
S./
4.00
4.01
SARDINEL
EXCAVACION EN TERRENO NORMAL PARA SARDINEL
m3
3.24
35.32
4.02
4.03
m3
m2
3.24
86.35
349.84
39.27
4.04
4.05
m
m2
12.50
48.57
5.53
23.40
4.06
5.00
SARDINEL: PINTURA
CUNETAS
m2
48.57
6.91
5.01
5.02
5.03
m3
m3
m3
7.64
7.64
4.20
30.27
15.14
349.84
5.04
5.05
m2
m2
30.54
42.00
39.27
23.40
5.06
6
38.18
6.01
7
JUEGOS INFANTILES
TANQUE SEPTICO
7.01
07.01.01
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
07.01.02
7.02
07.02.01
07.02.02
AVANCE ACUMULADO
MES ANTERIOR
%
MET.
TOTAL
S/.
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
AVANCE ACUMULADO
MES ACTUAL
%
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
114.440
1,133.480
3,390.960
69.130
1,136.540
335.620
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
3.24
3.24
86.35
12.50
48.57
48.57
114.437
1,133.482
3,390.965
69.125
1,136.538
335.619
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
3.24
3.24
86.35
12.50
48.57
48.57
114.437
1,133.482
3,390.965
69.125
1,136.538
335.619
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
54.36
231.260
115.670
1,469.330
1,199.310
982.800
2,075.460
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
7.64
7.64
4.20
30.54
42.00
38.18
231.263
115.670
1,469.328
1,199.306
982.800
2,075.465
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
7.64
7.64
4.20
30.54
42.00
38.18
231.263
115.670
1,469.328
1,199.306
982.800
2,075.465
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
1.00
8,646.55
8,646.550
0.00%
0.00
0.000
0.00%
0.00
0.000
0.00%
0.00
0.000
100.00%
1.00
8,646.550
m2
9.07
0.89
m2
18.14
1.52
8.070
27.570
100.00%
100.00%
9.07
18.14
8.070
27.570
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
9.07
18.14
8.072
27.573
0.00%
0.00%
0.00
0.00
0.000
0.000
m3
m2
19.04
9.07
35.32
8.16
07.02.03
07.02.04
m3
m3
22.85
22.85
15.14
8.35
672.490
74.010
345.950
190.800
100.00%
100.00%
100.00%
100.00%
19.04
9.07
22.85
22.85
672.490
74.010
345.950
190.800
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
19.04
9.07
22.85
22.85
672.493
74.011
345.949
190.798
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
7.03
07.03.01
m2
9.07
24.42
221.490
0.00%
0.00
0.000
100.00%
9.07
221.489
100.00%
9.07
221.489
0.00%
0.00
0.000
7.04
07.04.01
07.04.01.01
07.04.01.02
07.04.02
m3
kg
1.36
47.66
363.83
4.79
494.810
228.290
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
1.36
47.66
494.809
228.291
100.00%
100.00%
1.36
47.66
494.809
228.291
0.00%
0.00%
0.00
0.00
0.000
0.000
07.04.02.01
07.04.02.02
m3
m2
4.61
46.07
380.64
53.51
07.04.02.03
07.04.03
kg
152.29
4.79
1,754.750
2,465.210
729.470
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
4.61
46.07
152.29
1,754.750
2,465.206
729.469
100.00%
100.00%
100.00%
4.61
46.07
152.29
1,754.750
2,465.206
729.469
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
07.04.03.01
07.04.03.02
m3
m2
0.42
4.18
380.64
53.51
07.04.03.03
07.04.03.04
kg
und
18.31
8.00
4.79
108.50
159.870
223.670
87.700
868.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
0.42
4.18
18.31
8.00
159.869
223.672
87.705
868.000
100.00%
100.00%
100.00%
100.00%
0.42
4.18
18.31
8.00
159.869
223.672
87.705
868.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
7.05
07.05.01
REVOQUES Y REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES
m3
23.13
30.12
696.680
0.00%
0.00
0.000
100.00%
23.13
696.676
100.00%
23.13
696.676
0.00%
0.00
0.000
7.06
07.06.01
INSTALACIONES SANITARIAS
TUBERIA DE PVC-SAP 4"
49.52
21.73
07.06.02
07.06.03
pza
m
3.00
2.50
18.79
32.66
07.06.04
07.06.05
TEE DE FG DE 3"
CODO DE FG DE 3"
und
und
2.00
4.00
48.74
48.74
1,076.070
56.370
81.650
97.480
194.960
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
49.52
3.00
2.50
2.00
4.00
1,076.070
56.370
81.650
97.480
194.960
100.00%
100.00%
100.00%
100.00%
100.00%
49.52
3.00
2.50
2.00
4.00
1,076.070
56.370
81.650
97.480
194.960
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
8
8.01
POZO PERCOLADO
TRABAJOS PRELIMINARES
08.01.01
08.01.02
08.01.03
m2
m2
m2
9.61
9.61
19.22
0.89
1.05
1.52
8.550
10.090
29.210
100.00%
100.00%
100.00%
9.61
9.61
19.22
8.550
10.090
29.210
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
9.61
9.61
19.22
8.553
10.091
29.214
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
8.02
08.02.01
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
m3
26.80
35.32
946.580
100.00%
26.80
946.580
0.00%
0.00
0.000
100.00%
26.80
946.576
0.00%
0.00
0.000
m3
32.16
08.02.03
8.03
m3
32.16
8.35
08.03.01
08.03.02
m3
m2
0.37
0.98
359.32
57.53
132.950
56.380
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
0.37
0.98
132.948
56.379
100.00%
100.00%
0.37
0.98
132.948
56.379
0.00%
0.00%
0.00
0.00
0.000
0.000
8.04
08.04.01
m3
0.76
380.64
08.04.02
08.04.03
m2
kg
4.52
68.15
53.51
4.79
08.04.04
8.05
und
4.00
108.50
289.290
241.870
326.440
434.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
0.76
4.52
68.15
4.00
289.286
241.865
326.439
434.000
100.00%
100.00%
100.00%
100.00%
0.76
4.52
68.15
4.00
289.286
241.865
326.439
434.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
08.05.01
8.06
m2
30.52
0.00
95.20
0.00
08.06.01
08.06.02
m
pza
5.00
5.00
21.73
18.79
2,905.500
0.000
108.650
93.950
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
0.00%
100.00%
100.00%
30.52
0.00
5.00
5.00
2,905.504
0.000
108.650
93.950
100.00%
0.00%
100.00%
100.00%
30.52
0.00
5.00
5.00
2,905.504
0.000
108.650
93.950
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
8.07
08.07.01
FILTROS
FILTRO DE GRAVA
m3
6.04
182.82
1,104.230
163,023.57
163,023.57
11,167.11
9,781.41
183,972.10
1.00000
183,972.10
33,114.98
217,087.08
0.00%
53.75%
0.00
0.000
87,631.56
100.00%
38.59%
6.04
1,104.233
62,914.08
100.00%
92.35%
6.04
1,104.233
150,545.65
0.00%
7.65%
0.00
0.000
12,477.93
F.R=
SALDO
MES ACTUAL
MET.
TOTAL
S/.
08.02.02
COSDIRECTO
COSTO DIRECTO TOTAL
GASTOS GENERALES ( 6.85 %)
UTILIDADES ( 6%)
SUBTOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V. ( 18.00 % )
TOTAL PRESUPUESTO
TOTAL
S./
AVANCE ACUMULADO
MES ACTUAL
%
MET.
TOTAL
S/.
486.900
268.540
PARTIDAS
MET.
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
P. U.
S/.
15.14
ITEM
UND
AVANCE ACUMULADO
MES ANTERIOR
%
MET.
TOTAL
S/.
100.00%
100.00%
32.16
32.16
486.900
268.540
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
32.16
32.16
486.902
268.536
0.00%
0.00%
0.00
0.00
0.000
0.000
53.75%
6,002.76
5,257.89
98,892.22
1.00000
98,892.22
17,800.60
116,692.82
38.59%
4,309.61
3,774.84
70,998.54
1.00000
70,998.54
12,779.74
83,778.28
92.35%
10,312.38
9,032.74
169,890.76
1.00000
169,890.76
30,580.34
200,471.10
7.65%
854.74
748.68
14,081.34
1.00000
14,081.34
2,534.64
16,615.98
PARTIDAS
01
1.01
01.01.01
01.01.02
01.01.03
01.01.04
1.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
UND
MET.
P. U.
S/.
1.00
1.00
1.00
11,510.00
4,059.00
3,176.00
GLB
1.00
3,828.00
GLB
GLB
GLB
1.00
1.00
1.00
14,035.00
52,915.00
3,707.00
GLB
GLB
GLB
GLB
1.00
1.00
1.00
1.00
4,356.00
11,750.00
3,408.00
916.00
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
11,510.000
4,059.000
3,176.000
3,828.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
11,510.000
4,059.000
3,176.000
3,828.000
14,035.000
52,915.000
3,707.000
4,356.000
11,750.000
3,408.000
916.000
113,660.00
113,660.00
7,785.71
6,819.60
128,265.31
1.00000
128,265.31
23,087.76
151,353.07
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00
0.00%
94.00%
0.00%
0.00%
0.00%
0.00%
0.00%
43.76%
0.00
0.94
0.00
0.00
0.00
0.00
0.00
0.000
49,740.100
0.000
0.000
0.000
0.000
0.000
49,740.10
0.00%
94.00%
0.00%
0.00%
0.00%
0.00%
0.00%
43.76%
0.00
0.94
0.00
0.00
0.00
0.00
0.00
0.000
49,740.100
0.000
0.000
0.000
0.000
0.000
49,740.10
100.00%
6.00%
100.00%
100.00%
100.00%
100.00%
100.00%
56.24%
1.00
0.06
1.00
1.00
1.00
1.00
1.00
14,035.000
3,174.900
3,707.000
4,356.000
11,750.000
3,408.000
916.000
63,919.90
113,660.00
GLB
GLB
GLB
COSDIRECTO
COSTO DIRECTO TOTAL
GASTOS GENERALES ( 6.85 %)
UTILIDADES ( 6%)
SUBTOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V. ( 18.00 % )
TOTAL PRESUPUESTO
AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.
TOTAL
S./
F.R=
0.00%
0.00
0.00
0.00
1.00000
0.00
0.00
0.00
43.76%
3,407.20
2,984.41
56,131.70
1.00000
56,131.70
10,103.71
66,235.41
43.76%
3,407.20
2,984.41
56,131.70
1.00000
56,131.70
10,103.71
66,235.41
56.24%
4,378.51
3,835.19
72,133.61
1.00000
72,133.61
12,984.05
85,117.66
PARTIDAS
UND
MET.
P. U.
S/.
TOTAL
S./
AVANCE ACUMULADO
MES ANTERIOR
%
MET.
TOTAL
S/.
AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.
AVANCE ACUMULADO
MES ACTUAL
%
MET.
TOTAL
S/.
SALDO
MES ACTUAL
MET.
TOTAL
S/.
10,826.98
01.01.01.03
01.01.02
GLB
1.00
932.25
1,650.000
1,650.000
932.250
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
3.00
3.00
1.00
1,650.000
1,650.000
932.250
100.00%
100.00%
100.00%
3.00
3.00
1.00
1,650.000
1,650.000
932.250
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
01.01.02.01
01.01.02.02
01.01.02.03
LETRERO DE UBICACIN
LETREROS AMBIENTALES
und
und
m
1.00
3.00
300.00
296.62
296.62
1.18
296.620
889.860
354.000
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
100.00%
100.00%
100.00%
1.00
3.00
300.00
296.620
889.860
354.000
100.00%
100.00%
100.00%
1.00
3.00
300.00
296.620
889.860
354.000
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
GLB
1.00
423.73
423.730
0.00%
0.00
0.000
100.00%
1.00
423.730
100.00%
1.00
423.730
0.00%
0.00
0.000
0.89
1.05
4.450
5.250
441.500
97.500
105.970
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
1.00
0.000
0.000
0.000
0.000
105.970
100.00%
100.00%
100.00%
100.00%
0.00%
5.00
5.00
12.50
10.00
0.00
4.450
5.250
441.500
97.500
0.000
100.00%
100.00%
100.00%
100.00%
100.00%
5.00
5.00
12.50
10.00
1.00
4.450
5.250
441.500
97.500
105.970
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
01.01.01.01
01.01.01.02
1.02
01.02.01
01.02.01.01
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.03
GLB
GLB
3.00
3.00
550.00
550.00
CLAUSURA DE LETRINAS
m2
m2
5.00
5.00
m3
m3
12.50
10.00
35.32
9.75
und
1.00
105.97
AREAS VERDES
ADECUACION Y PREPARACIN DEL TERRENO
SEMBRADO DE GRASS
SEMBRADO DE PLANTONES
m3
m2
49.11
196.45
20.24
4.14
und
20.00
14.96
993.990
813.300
299.200
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.000
0.000
0.000
26.47%
0.00%
0.00%
13.00
0.00
0.00
263.120
0.000
0.000
26.47%
0.00%
0.00%
13.00
0.00
0.00
263.120
0.000
0.000
73.53%
100.00%
100.00%
36.11
196.45
20.00
730.870
813.300
299.200
01.03.01
01.03.02
MEDIDAS DE CONTROL
PROVISIN DE RECIPIENTES PLASTICOS CON TAPA PARA RESIDUOS SOL
CONTRUCION DE LETRINA
und
und
4.00
1.00
67.80
381.36
271.200
381.360
0.00%
0.00%
0.00
0.00
0.000
0.000
100.00%
100.00%
4.00
1.00
271.200
381.360
100.00%
100.00%
4.00
1.00
271.200
381.360
0.00%
0.00%
0.00
0.00
0.000
0.000
1.04
01.04.01
und
1.00
220.00
01.04.02
01.04.03
und
und
10.00
1.00
70.00
296.80
220.000
700.000
296.800
10,826.98
10,826.98
741.65
649.62
12,218.25
1.00000
12,218.25
2,199.29
14,417.54
100.00%
100.00%
100.00%
12.22%
1.00
10.00
1.00
220.000
700.000
296.800
1,322.77
0.00%
0.00%
0.00%
70.76%
0.00
0.00
0.00
0.000
0.000
0.000
7,660.84
100.00%
100.00%
100.00%
82.97%
1.00
10.00
1.00
220.000
700.000
296.800
8,983.61
0.00%
0.00%
0.00%
17.03%
0.00
0.00
0.00
0.000
0.000
0.000
1,843.37
01.02.03.01
01.02.03.02
01.02.03.03
1.03
COSDIRECTO
COSTO DIRECTO TOTAL
GASTOS GENERALES ( 6.85 %)
UTILIDADES ( 6%)
SUBTOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V. ( 18.00 % )
TOTAL PRESUPUESTO
F.R=
90.61
79.37
1,492.75
12.22%
1,492.75
268.70
1,761.45
524.77
459.65
8,645.26
70.76%
8,645.26
1,556.15
10,201.40
615.38
539.02
10,138.00
82.97%
10,138.00
1,824.84
11,962.84
165.90
158.59
2,167.86
17.74%
2,167.86
390.21
2,558.07
AVA N C E M E N S UA L A C U M U L A D O ( % )
0.9
AVANCE REAL
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
MAYO
JUNIO
JULIO
CUADRO
CONTRACTUAL (SIN. IGV)
MES
PARCIAL
PARCIAL ACUMUL.
S/.
%
%
MAYO
0
JUNIO
33.81%
33.81%
542,020.33
JULIO
21.40%
55.21%
343,163.72
AGOSTO
16.54%
71.76%
265,216.16
SETIEMBRE 295,782.63
18.45%
90.20%
OCTUBRE
0.00
0.00%
90.20%
NOVIEMBRE 157,044.89
9.80%
100.00%
###
100.00%
AGOSTO
SETIEMBRE
OCTUBRE
NOVIEMBRE
DE VALORIZACIONES DE OBRA
INTERNO (SIN. IGV)
REAL (SIN. IGV)
PARCIAL
PARCIAL ACUMUL.
PARCIAL
PARCIAL ACUMUL.
S/.
%
%
S/.
%
%
0
0
33.81%
33.81%
542,020.33
33.81%
33.81%
542,020.33
21.40%
55.21%
343,163.72
21.40%
55.21%
343,163.72
16.54%
71.76%
16.54%
71.76%
265,216.16
265216.17
18.45%
90.20%
295,782.63
18.45%
90.20%
295,782.63
0.00%
90.20%
0.00
0.00
9.80%
100.00%
157,044.89
###
90.20%
1,446,182.80
90.20%
90.20%
I.U.
3
21
30
32
38
39
47
1
2
3
4
5
6
BASE
01
02
03
04
05
Dec-13 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14
469.58
### 451.86 459.19 468.10
354.74
### 354.74 354.74 354.74
378.29
### 387.37 386.98 390.72
455.19
### 468.30 468.30 468.30
824.44
### 844.07 847.66 850.91
392.22
### 400.98 402.72 402.37
497.55
### 498.10 523.70 523.70
7
06
###
8
07
###
9
08
Jan-15
10
09
###
11
10
###
12
11
Apr-15
13
12
###
14
15
13
14
Jun-15 Jul-15
30
SIMBOLO I.U.
A
21
39
47
32
CONCEPTO
ACERO DE CONSTRUCCION CORRUGADO
0.071 x Ar / Ao
CEMENTO PORTLAND TIPO I
0.113 x Cr / Co
INDICE GENERAL DE PRECIOS AL COSUMIDOR
0.114 x Ir / Io
MANO DE OBRA INC. LEYES SOCIALES
0.142 x Mr / Mo
FLETE TERRESTRE
0.560 x Fr / Fo
COEFICIENTE DE REAJUSTE ( K ):
100.00%
0.114
100.00%
0.142
100.00%
0.560
100.00%
03
04
05
06
07
08
09
Dec-13
469.58
0.071
354.74
0.113
392.22
0.114
497.55
0.142
455.19
0.560
Jun-14
473.03
0.072
354.74
0.113
400.34
0.116
498.10
0.142
465.69
0.573
01
Jul-14
451.86
0.068
354.74
0.113
400.98
0.117
498.10
0.142
468.30
0.576
02
Aug-14
459.19
0.069
354.74
0.113
402.72
0.115
523.70
0.149
468.30
0.576
Sep-14
468.10
0.071
354.74
0.113
402.37
0.117
523.70
0.149
468.30
0.576
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
1.000
1.016
1.017
1.023
1.026
SIMBOLO I.U.
I
39
38
21
47
CONCEPTO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
0.114 x Ir / Io
ACERO DE CONSTRUCCION CORRUGADO
0.121 x Ar / Ao
HORMIGON
0.145 x Hr / Ho
CEMENTO PORTLAND TIPO I
0.294 x Cr / Co
MANO DE OBRA INC. LEYES SOCIALES
0.326 x Mr / Mo
COEFICIENTE DE REAJUSTE ( K ):
100.00%
0.145
100.00%
0.294
100.00%
0.326
100.00%
03
04
05
06
07
08
09
Dec-13
392.22
0.114
469.58
0.121
824.44
0.145
354.74
0.294
497.55
0.326
Jun-14
400.34
0.116
473.03
0.122
847.71
0.149
354.74
0.294
498.10
0.326
01
Jul-14
400.98
0.117
451.86
0.116
844.07
0.148
354.74
0.294
498.10
0.326
02
Aug-14
402.72
0.117
459.19
0.118
847.66
0.145
354.74
0.294
523.70
0.343
Sep-14
402.37
0.117
468.10
0.121
850.91
0.150
354.74
0.294
523.70
0.343
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
1.000
1.007
1.001
1.018
1.025
SIMBOLO I.U.
I
39
30
CONCEPTO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
0.114 x Ir / Io
DLAR (GENERAL PONDERADO)
0.886 x Dr / Do
COEFICIENTE DE REAJUSTE ( K ):
100.00%
03
04
05
06
07
08
09
Dec-13
392.22
0.114
378.29
0.886
Jun-14
400.34
0.116
385.05
0.902
01
Jul-14
400.98
0.117
387.37
0.907
02
Aug-14
402.72
0.117
386.98
0.906
Sep-14
402.37
0.117
390.72
0.915
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
1.000
1.018
1.024
1.023
1.032
SIMBOLO I.U.
H
38
39
47
30
CONCEPTO
HORMIGON
0.068 x Hr / Ho
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
0.114 x Ir / Io
MANO DE OBRA INC. LEYES SOCIALES
0.163 x Mr / Mo
DLAR (GENERAL PONDERADO)
0.655 x Dr / Do
COEFICIENTE DE REAJUSTE ( K ):
100.00%
0.163
100.00%
0.655
100.00%
03
04
05
06
07
08
09
Dec-13
824.44
0.068
392.22
0.114
497.55
0.163
378.29
0.655
Jun-14
847.71
0.070
400.34
0.116
498.10
0.163
385.05
0.667
01
Jul-14
844.07
0.070
400.98
0.117
498.10
0.163
387.37
0.671
02
Aug-14
847.66
0.070
402.72
0.117
523.70
0.172
386.98
0.670
Sep-14
850.91
0.070
402.37
0.117
523.70
0.172
390.72
0.677
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
1.000
1.016
1.020
1.029
1.035
No. Fecha
01 Jun-14
02
Jul-14
03 Aug-14
04 Sep-14
05 Oct-14
06 Nov-14
541,639.57
343,163.72
217,822.95
160,007.13
1,262,633.37
Indice "K"
Valorizacin Reajuste
(del mes
Reajustada
Bruto
anterior)
1.016
1.017
1.023
1.026
Regularizacin
a fecha de pago
###
###
###
###
-
TOTAL :
8,666.23
5,698.70
5,014.47
4,219.08
-
###
Valorizaci
Indice "K" n Anterior
(del
Reajustada
mismo
con K del
mes)
mismo
mes
Valorizaci
n Anterior
Reajustada Regularizaci
con K del n Reajuste
mes
anterior
Valorizaci
Valorizaci
n a
n
Regulariz.
Indice "K"
Reajustar
Reajustada Reajuste a
(del mes
con K del
con K del fecha de
de pago)
mes de
mes de
pago
pago
pago
TOTAL :
TOTAL :
0.00
No. Fecha
01 Jun-14
02
Jul-14
03 Aug-14
04 Sep-14
05 Oct-14
06 Nov-14
380.76
51,118.26
47,393.21
70,998.54
169,890.77
Indice "K"
Valorizacin Reajuste
(del mes
Reajustada
Bruto
anterior)
1.00700
1.00134
1.018
1.025
Regularizacin
a fecha de pago
383.43
51,186.78
48,222.99
72,752.38
-
2.67
68.52
829.78
1,753.84
-
TOTAL :
2,654.81
Valorizaci
Indice "K" n Anterior
(del
Reajustada
mismo
con K del
mes)
mismo
mes
Valorizaci
n Anterior
Reajustada Regularizaci
con K del n Reajuste
mes
anterior
Valorizaci
Valorizaci
n a
n
Regulariz.
Indice "K"
Reajustar
Reajustada Reajuste a
(del mes
con K del
con K del fecha de
de pago)
mes de
mes de
pago
pago
pago
TOTAL :
TOTAL :
0.00
No. Fecha
01 Jun-14
02
Jul-14
03 Aug-14
04 Sep-14
05 Oct-14
06 Nov-14
56,131.70
56,131.70
Indice "K"
Valorizacin Reajuste
(del mes
Reajustada
Bruto
anterior)
1.018
1.024
1.023
1.032
Regularizacin
a fecha de pago
57,931.43
-
1,799.73
-
TOTAL :
1,799.73
Valorizaci
Indice "K" n Anterior
(del
Reajustada
mismo
con K del
mes)
mismo
mes
Valorizaci
n Anterior
Reajustada Regularizaci
con K del n Reajuste
mes
anterior
Valorizaci
Valorizaci
n a
n
Regulariz.
Indice "K"
Reajustar
Reajustada Reajuste a
(del mes
con K del
con K del fecha de
de pago)
mes de
mes de
pago
pago
pago
TOTAL :
TOTAL :
0.00
No. Fecha
01 Jun-14
02
Jul-14
03 Aug-14
04 Sep-14
05 Oct-14
06 Oct-14
8,645.26
8,645.26
Indice "K"
Valorizacin Reajuste
(del mes
Reajustada
Bruto
anterior)
1.016
1.024
1.023
1.032
Regularizacin
a fecha de pago
8,922.45
-
277.19
-
TOTAL :
277.19
Valorizaci
Indice "K" n Anterior
(del
Reajustada
mismo
con K del
mes)
mismo
mes
Valorizaci
n Anterior
Reajustada Regularizaci
con K del n Reajuste
mes
anterior
Valorizaci
Valorizaci
n a
n
Regulariz.
Indice "K"
Reajustar
Reajustada Reajuste a
(del mes
con K del
con K del fecha de
de pago)
mes de
mes de
pago
pago
pago
TOTAL :
TOTAL :
0.00
Fecha
Avance Programado
Mensual
Acumulado
01 Jun-14 542,020.33
02 Jan-05 343,163.72
03 Feb-05 265,216.16
04 Mar-05
05 Apr-05
06 May-05
542,020.33
885,184.05
###
-
R_EJEC <R_PROG
R_EJEC >R_PROG
271574020.xls / Cont-Reajuste
Avance Real
Coef. "K" Reajuste Programado
Mensual
Acumulado de Reajuste Mensual Acumulado
542,020.33
160,007.13
#REF!
-
###
###
#REF!
-
#REF!
1.016
1.010
1.006
1.026
-
#REF!
###
###
###
-
#REF!
5,420.20
7,479.18
###
-
Reajuste Real
Retenciones
Devolucin
Mensual Acumulado Definitivo Retenido Regulariz.
#REF!
5,420.20
960.04
#REF!
-
#REF!
###
###
#REF!
-
OBRA ATRASADA
OBRA ADELANTADA
ADELANTOS
IGV
Mes
01
02
03
04
05
06
Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14
Efectivo
0.00
Totales
0.00
Total Adelanto (Inc. I
271574020.xls / Cont-Val
IGV
(A. E.)
Materiales
(A.M.)
0.00
0.00
0.00
0.00
0.00
0.00
Bruta Inc.
Val Mat.
Cancha
###
###
###
###
-
AMORTIZACIONES
### 28,361.42
Val. Ant.
-
Adelanto
Bruta
Efectivo
Reajustada
(Sin IGV)
550,689.23
348,962.15
271,060.42
303,832.47
0.00
###
Saldo Amortizar (Sin IGV
DEDUCCIONES
(Sin IGV)
I.G.V.
Monto
a
Facturar
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
-
###
###
###
###
-
###
###
###
###
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
###
###
###
CONCEPTO
S/.
295,782.63
5,844.25
301,626.88
0.00
301,626.88
54,292.84
355,919.72