Vous êtes sur la page 1sur 41

DATOS DE OBRA

PROPIETARIO
LICITACION
CONTRATO
CONTRATISTA
INSPECTOR
OBRA

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
OBRA
: "INSTALACION
DE LOS
SERVICIOS
EDUCATIVOS EN LA
SUPERVISOR
: ING. YUNER
SANTOS
ROSALES
N 664
DELDEL
CENTRO
POBLADO DE SACUATUNA, DISTRITO DE
I.E.I
N 664
CENTRO
LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO
BASE_PRES
MOD. PRES
PRECIOS A
PLAZO
INICIO
TERMINO

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PRECIOS : DICIEMBRE - 2013
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014

SETIEMBRE DEL 2014


VALORIZACION N
01
02
03
04
05
06
07
08
09
10

FECHA
JUNIO
JULIO
AGOSTO
SETIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE
ENERO
FEBRERO
MARZO

1754.24
11500
460
1294.24

8315
1496.7

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70
PROCESO : LICITACION PUBLICA N 043-2013-GRH.
PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
CONTRATO N : 277-2014-GRH/PR
MODALIDAD :A SUMA ALZADA
CONTRATISTA : "CONSORCIO TAPARACO"
PLAZO DE OBRA : 120 DIAS CALENDARIO
SUPERVISOR : ING. YUNER SANTOS ROSALES
FECHA DE INICIO : 02 DE JUNIO DEL 204
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N FECHA
664 DEL
DECENTRO
TERMINO :29 DE SETIEMBRE DEL 2014
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PARALIZADO 12/09/2014
PROVINCIA DE HUAMALIES - REGION HUANUCO".
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

RESUMEN DE VALORIZACION DE OBRA


SETIEMBRE DEL 2014
CONCEPTO
MONTO VALORIZADO EN EL PRESENTE MES
Valorizaci N03
MONTO POR REAJUSTE EN EL PRESENTE MES
Reajuste valorizacin
Regularizacion de Reajuste
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE
Deduccion Por el Adelanto Directo
Regularizacion de la Deduccion Por el Adelanto Directo
Deduccion Por el Adelanto de Materiales
Regularizacion de la Deduccion Por el Adelanto de Materiales
I.- VALORIZACION BRUTA

SOLES S/.
295,782.63
295,782.63
8,049.84
8,049.84
0.00
0.00
0.00
0.00
0.00
0.00
303,832.47

AMORTIZACION DEL ADELANTO DIRECTO EN EL PRESENTE MES


Por el Adelanto Directo x%

0.00
0.00

AMORTIZACION DEL ADELANTO POR MATERIALES EN EL PRESENTE MES


Por el Adelante de materiales

0.00
0.00

II.- VALORIZACION NETA

303,832.47

MONTO RETENIDO POR FONDO DE GARANTIA


Fondo de Garantia 10%

0.00
0.00

MULTA POR ATRASOS


Multa Por atrasos Injustificados

0.00
0.00

III.- VALORIZACION LIQUIDA A PAGAR


IV.- I. G. V. (18.00 % DE III)
V.- MONTO A FACTURAR ( I + IV )

271574020.xls / Res-Val Yuler A.G.

303,832.47
54,689.84
358,522.31

METRADOS EJECUTADOS DEL MES


ITEM
02
2.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05

PARTIDAS

UND

MET.

ESTRUCTURAS
LOSAS ARMADA
LOSAS ARMADA: CONCRETO, fc= 210kg/cm2
LOSAS ARMADA: ENCOFRADO Y DESENCOFRADO
LOSAS ARMADA: ACERO, fy= 4200kg/cm2

m3
m2

0.22
1.96

kg

10.37

02.03.05.01
02.03.05.02

LOSAS ALIGERADA EN DOS DIRECCIONES


LOSAS ALIGERADA EN DOS DIRECCIONES: CONCRETO, fc= 210kg/cm2
LOSAS ALIGERADA EN DOS DIRECCIONES: ENCOFRADO Y DESENCOFR

m3
m2

4.22
49.67

02.03.05.03
02.03.05.04

LOSAS ALIGERADA EN DOS DIRECCIONES: ACERO, fy= 4200kg/cm2


LOSAS ALIGERADA EN DOS DIRECCIONES: ALIGERADO DE TECKNOPOR

kg
m2

301.66
24.79

2.04
02.04.01
03

VARIOS
JUNTAS DE DILATACIN C/TECNOPORT, e= 1"x15cm, EN MUROS

237.66

m3

1.79

m2
kg

28.43
141.04

3.04
03.04.01
03.04.02
03.04.03

ARQUITECTURA
MESA DE CONCRETO
MESA DE CONCRETO: CONCRETO, fc= 175kg/cm2
MESA DE CONCRETO: ENCOFRADO Y DESENCOFRADO
MESA DE CONCRETO, fy= 4200kg/cm2
REVOQUES Y REVESTIMIENTOS

3.05
03.05.01

TARRAJEO PRIMARIO O RAYADO

m2

0.00
89.28

03.05.02
03.05.03

TARRAJEO EN INTERIORES
TARRAJEO EN EXTERIORES

m2
m2

428.80
202.45

03.05.04
03.05.05
03.05.06

TARRAJEO DE COLUMNAS
m2
TARRAJEO DE VIGAS
m2
VESTIDURA DE DERRAMES EN VANOS DE PUERTAS Y VENTANAS, E=15 CM m

155.44
334.49
205.37

03.05.07
3.06

BRUAS EN MUROS DE e = 1" x 1/2"


CIELORASOS

459.00

03.06.01
3.07

CIELORASOS C/MEZCLA DE C:A


PISOS Y PAVIMENTOS

m2

99.34

03.07.01
03.07.02

CONTRAPISO DE 42 mm.
PISO DE CEMENTO SEMI PULIDO

m2
m2

88.76
12.79

03.07.03
03.07.04

PISO: MACHIMBRADO
PISO DE CERMICO, 30x30cm.

m2
m2

224.34
26.62

03.07.05
3.08
03.08.01

PISO DE CERMICO, 45x45cm.


ENCHAPE EN MESA DE CONCRETO
ENCHAPE EN MESA DE CONCRETO: CERMICO, 30x30cm. m2 28.43

m2

62.14

m2

28.43

3.09
03.09.01

ZOCALOS
ZOCALO DE CERAMICO VIDRIADO, 20x30 cm.

m2

0.00
60.85

3.10
03.10.01

CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.30 M

ml

0.00
156.86

03.10.02
3.11

CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.10 M


CUBIERTAS

ml

193.48
0.00

03.11.01

CUBIERTA DE LADRILLO PASTELERO ASENTADO CON MEZCLA C:A

m2

484.35

271574020.xls / METRADOSD Yuler A. G.

METRADOS EJECUTADOS DEL MES


ITEM

PARTIDAS

ITEM

PARTIDAS

UND

MET.

UND

MET.

3.12

CARPINTERIA DE MADERA

03.12.01
03.12.02

PUERTA APANELADA DE MADERA, E=40MM


PUERTA CON PLANCHA DE MELANINE, E=3/4"

m2
m2

39.05
6.97

03.12.03
03.12.04

VENTANA DE MADERA
CLOSET DE MADERA

m2
m2

124.47
15.51

03.12.05
03.12.06
03.12.07

DIVISION CON PLANCHA DE MELANINE PARA SERVICIOS HIGIENICOS


COLOCACIN DE PUERTA DE MADERA

und
und
und

10.82
14.00
5.00

und

38.00
0.00

03.12.08
04

COLOCACIN DE PUERTA DE MELAMINE


COLOCACIN DE VENTANA DE MADERA

0.00

4.02
04.02.01

INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA

04.02.01.01
04.02.02

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"


REDES DE ALIMENTACION

pto

19.00
0.00

04.02.02.01
04.02.02.02

EXCAV.ZANJAS RT<2kg/cm2 - 0.50m.x0.70m.


RELLENO MANUAL C/MATERIAL PROPIO

m
m

66.34
66.34

04.02.02.03
04.02.03
04.02.03.01

TUBERA PVC CLASE 10 - 1/2" C/R


ACCESORIOS DE REDES DE AGUA

CODO PVC - CLASE 10 CR 1/2"*90


CODO PVC - CLASE 10 CR 1/2"*45

und

78.84
0.00
8.00

und
und

1.00
25.00

und

1.00
0.00

u
u

9.00
1.00
0.00
1.00

04.02.03.02
04.02.03.03
04.02.03.04
04.02.04

TEE PVC - CLASE 10 CR 1/2"


CRUZ PVC SAPC-10 =1/2"

0.00
0.00

04.02.05.01
04.02.05.02

VALVULAS
VALVULA ESFERICA DE BRONCE 1/2"
VALVULA CHECK DE 1/2"

04.02.05
04.02.05.01

VARIOS
PRUEBA HIDRAULICA

GLB

04.02.05.02
04.02.05.03
4.03

CAJA CON TAPA METALICA PARA VALVULAS DE 12"x12"


CAJA PARA MEDIDOR DE 12"X12"

pza
pza

04.03.01
04.03.02

SISTEMA DE DRENAJE PLUVIAL


CANALETAS DE PLANCHA GALV.

9.00
1.00
0.00

m
m

156.40
59.13

04.03.03
04.03.04

TUBERIA DE PVC-SAP 4" P/LLUVIA


CODO PVC SAL 4"X90
CODO PVC SAL SANITARIO 4"X90

pza
pza

16.00
8.00

04.03.05
04.03.06

PEDESTAL: CONCRETO F'C= 140 KG/CM2


PEDESTAL: ENCOFRADO Y DESENCOFRADO

m3
m2

1.03
8.88

04.03.07
4.04

PEDESTAL: TARRAJEO
SISTEMA DE DESAGUE

m2

8.88
0.00

04.04.01
04.04.01.01
04.04.01.02

SALIDAS DE DESAGUE
SALIDA DE DESAGUE EN PVC 4" (INODORO)

04.04.01.03
04.04.01.04

SALIDA DE DESAGUE EN PVC 2" (LAVATORIOS Y URINARIOS)


SALIDA DE DESAGUE EN PVC 2" (SUMIDERO)

04.04.01.05
04.04.02

SALIDA DE REGISTRO ROSCADO 2"


SALIDA DE REGISTRO ROSCADO 4"
REDES DE DESAGUE

04.04.02.01

EXCAV.ZANJAS RT<2kg/cm2 - 0.50m.x0.70m.

271574020.xls / METRADOSD Yuler A. G.

pto
pto

0.00
7.00
12.00

pto
pto

7.00
2.00

pto

6.00
0.00

48.96

METRADOS EJECUTADOS DEL MES


ITEM
04.04.02.02
04.04.02.03
04.04.02.04

PARTIDAS
RELLENO MANUAL C/MATERIAL PROPIO
TUBERIA DE PVC-SAP 4"
TUBERIA DE PVC-SAP 2"

271574020.xls / METRADOSD Yuler A. G.

UND

MET.

m
m

48.96
38.20

21.08

METRADOS EJECUTADOS DEL MES


ITEM

PARTIDAS

ITEM

PARTIDAS

04.04.03

RED DE VENTILACIN

04.04.03.01
05

RED DE VENTILACION 2"


INSTALACIONES ELECTRICAS

5.01
05.01.01

SALIDAS
SALIDA DE TECHO (CENTRO DE LUZ)

05.01.02
05.01.03
05.01.04

SALIDA PARA TOMACORRIENTE C/LINEA A TIERRA


INTERRUPTOR UNIPOLAR SIMPLE

5.02
05.02.01

INTERRUPTOR UNIPOLAR DOBLE


CAJAS DE PASE

UND

MET.

UND

MET.
0.00

27.84
0.00

pto

0.00
65.00

pto
pto
pto

45.00
27.00
11.00

0.00
13.00

5.03
05.03.01

CAJA DE PASE FG PESADO 15x15x10 cm.


CANALIZACIONES Y/O TUBERIAS
TUBERIA PVC-SAP 50 mm.

ml

0.00
14.36

05.03.02
05.03.03

TUBERIA PVC-SAP 25 mm.


TUBERIA PVC-SAP 20 mm.

ml
ml

47.05
603.99

5.04
05.04.01

TABLEROS Y SUBTABLEROS
TABLERO GENERAL (TG)06 POLOS

05.04.02
05.04.03
05.04.04

TABLERO DE DISTRIBUCIN DE DE 4 POLOS


TABLERO DE DISTRIBUCIN DE DE 6 POLOS

05.04.05
05.04.06

INTERRUPTOR TERMOMAGNTICO 2 x 100A


INTERRUPTOR TERMOMAGNTICO 2 x 60A

und

0.00
1.00

und
und
und

1.00
1.00
1.00

und
und

3.00
2.00

und

10.00
0.00

05.04.07
5.05

INTERRUPTOR TERMOMAGNTICO 2 x 20A


INTERRUPTOR TERMOMAGNTICO 2 x 15A
CONDUCTORES Y/O CABLES

05.05.01
05.05.02

CONDUCTOR LSOH 2.5 mm2 - ALUMBRADO


CONDUCTOR LSOH 4 mm2 - TOMACORRIENTE

m
m

1,230.19
212.72

05.05.03
05.05.04

CONDUCTOR LSOH 10 mm2 - POZO A TIERRA


CONDUCTOR LSOH 16 mm2 - DE TABLERO GENERAL - TABLERO DE

m
m

52.20
49.00

05.05.05
01
1.06

CONDUCTOR LSOH 35 mm2 - MEDIDOR - TABLERO GENERAL

28.80
0
0

01.06.01
01.06.02

TARRAJEO EN MUROS
TARRAJEO EN COLUMNAS

m2

207.20
70.20

01.06.03
01.06.04

TARRAJEO EN VIGAS
BRUAS EN MUROS DE e = 1" x 1/2"

1.07
01.07.01

CONTRAZCALOS
CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.30 M

1.08
01.08.01

CARPINTERA METLICA
PUERTA DE FIERRO, CON PERFILES Y PLANCHA S/D

01.08.03
1.09
01.09.01

COLOCACIN DE PUERTA METALICA


CERRAJERIA
BISAGRAS DE FIERRO DE 5", C/EJE DE 1/2"

01.09.02
01.09.03

CERRADURA PARA PUERTAS (03 GOLPES)


PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M.

01.09.04
2.00

CERROJO DE FIERRO REDONDO DE 1/2" X 0.35 M.


EXPLANADA PATIO

2.01

EXPLANADA PATIO: CONCRETO F'C= 140 KG/CM2, FROTACHADO Y BRUA

CERCO PERIMETRICO
REVOQUES Y REVESTIMIENTOS

271574020.xls / METRADOSD Yuler A. G.

m2
m2
m

74.00
302.40

m2

0
140.00

m2

0
8.85

u
und
pza
und
und
m3

1.00
0
6.00
1.00
1.00
1.00
0
18.35

METRADOS EJECUTADOS DEL MES


ITEM
2.02
2.03

PARTIDAS
EXPLANADA PATIO: ENCOFRADO Y DESENCOFRADO
EXPLANADA PATIO: JUNTAS

271574020.xls / METRADOSD Yuler A. G.

UND
m2
m

MET.
19.20
95.43

METRADOS EJECUTADOS DEL MES


ITEM

PARTIDAS

ITEM

PARTIDAS

UND

MET.

UND

MET.

3.00

VEREDAS

3.01
3.02

VEREDAS: CONCRETO F'C= 140 KG/CM2, FROTACHADO Y BRUADO


VEREDAS: ENCOFRADO Y DESENCOFRADO

m3
m2

38.43
96.03

3.03
4.00

VEREDAS: JUNTAS
SARDINEL

270.76
0

4.01
4.02
4.03

EXCAVACION EN TERRENO NORMAL PARA SARDINEL


SARDINEL: CONCRETO F'C= 140 KG/CM2
SARDINEL: ENCOFRADO Y DESENCOFRADO

m3
m3

3.24
3.24
86.35

4.04
4.05

SARDINEL: JUNTAS DE DILATACIN


SARDINEL: TARRAJEO

4.06
5.00

SARDINEL: PINTURA
CUNETAS

5.01
5.02

EXCAVACION DE ZANJA PARA CANETAS


ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO

m3
m3

7.64
7.64

5.03
5.04

CUNETAS: CONCRETO F'C= 140 KG/CM2


CUNETAS: ENCOFRADO Y DESENCOFRADO

m3
m2

4.20
30.54

5.05
5.06
7

CUNETAS: TARRAJEO
REJILLA METALICA PARA CUNETAS
TANQUE SEPTICO

m2
m

42.00
38.18
0.00

7.03
07.03.01

OBRAS DE CONCRETO SIMPLE


SOLADO, E= 4" ; MEZCLA 1:12, C:H

7.04
07.04.01

OBRAS DE CONCRETO ARMADO


LOSA DE CIMENTACION

07.04.01.01
07.04.01.02

LOSA DE CIMENTACION: CONCRETO F'C=210KG/CM2


LOSA DE CIMENTACION: ACERO FY=4,200KG/CM2 GRADO 60

07.04.02
07.04.02.01

MUROS DE CONCRETO
MURO DE CONCRETO: CONCRETO F'C=210KG/CM2

07.04.02.02
07.04.02.03
07.04.03

MURO DE CONCRETO: ENCOFRADO Y DESENCOFRADO


MURO DE CONCRETO: ACERO FY=4,200KG/CM2
LOSA DE TECHO

m2
kg

46.07
152.29
0.00

07.04.03.01
07.04.03.02

LOSA DE TECHO: CONCRETO F'C=210KG/CM2


LOSA DE TECHO: ENCOFRADO Y DESENCOFRADO

m3
m2

0.42
4.18

07.04.03.03
07.04.03.04

LOSA DE TECHO: ACERO FY=4,200KG/CM2 GRADO 60


TAPA DE CONCRETO DE 0.70MX0.50M

kg
und

18.31
8.00

7.05
07.05.01

REVOQUES Y REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES

m3

0.00
23.13

7.06
07.06.01

INSTALACIONES SANITARIAS
TUBERIA DE PVC-SAP 4"

0.00
49.52

07.06.02
07.06.03
07.06.04

TEE PVC-SAL 4"


TUBERIA DE FG DE 3"
TEE DE FG DE 3"

pza
m
und

3.00
2.50
2.00

07.06.05
8

CODO DE FG DE 3"
POZO PERCOLADO

und

4.00
0.00

8.03
08.03.01

OBRAS DE CONCRETO SIMPLE


ANILLO: CONCRETO F'C=175KG/CM2

m3

0.00
0.37

08.03.02

ANILLO: ENCOFRADO Y DESENCOFRADO

m2

0.98

271574020.xls / METRADOSD Yuler A. G.

m2
m
m2
m2

m2

12.50
48.57
48.57
0.00

0.00
9.07
0.00
0.00

m3
kg

1.36
47.66

m3

0.00
4.61

METRADOS EJECUTADOS DEL MES


ITEM

PARTIDAS

ITEM

PARTIDAS

UND

MET.

UND

MET.

8.04
08.04.01

OBRAS DE CONCRETO ARMADO


MURO DE CONCRETO: CONCRETO F'C=210KG/CM2

m3

0.00
0.76

08.04.02
08.04.03

MURO DE CONCRETO: ENCOFRADO Y DESENCOFRADO


MURO DE CONCRETO: ACERO FY=4,200KG/CM2

m2
kg

4.52
68.15

08.04.04
8.05

TAPA DE CONCRETO DE 0.70MX0.50M


MUROS DE ALBAILERIA

und

4.00
0.00

08.05.01
8.06
08.06.01

MURO DE CABEZA DE LADRILLO K.K 18 HUECOS DE ARCILLA


INSTALACIONES SANITARIAS
TUBERIA DE PVC-SAP 4"

m2

30.52
0.00
5.00

08.06.02
8.07

TEE PVC-SAL 4"


FILTROS

pza

5.00
0.00

08.07.01
01

FILTRO DE GRAVA
DECLARATORIA DE IMPACTO AMBIENTAL
MEDIDAS DE PREVENCION

m3

6.04
0.00

1.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03

EDUCACIN ANBIENTAL
CHARLAS AL PERSONAL OBRERO

0.00
0.00
GLB
GLB

3.00
3.00

POLOS CON LOGOS AMBIENTALES


SEALIZACION

GLB

LETRERO DE UBICACIN
LETREROS AMBIENTALES

und

1.00
0.00
1.00

und
m

3.00
300.00

CHARLAS A LA COMUNIDAD BENEFICIARIA

1.02
01.02.01

CINTA SEALIZADORA DE OBRA


MEDIDAS DE MITIGACIN
MITIGACION DE IMPACTO AMBIENTAL

01.02.01.01
01.02.02

TRATAMIENTO DE BOTADEROS
MICRO RELLENO SANITARIO

GLB

1.00
0.00

01.02.02.01
01.02.02.02

CLAUSURA DEL RELLENO SANITARIO


CLAUSURA DE LETRINAS

m2
m2

5.00
5.00

01.02.02.03
01.02.02.04
01.02.03

BOTIQUIN DE PRIMEROS AUXILIOS


CHARLA AL PERSONAL DE OBRA

m3
m3

AREAS VERDES
ADECUACION Y PREPARACIN DEL TERRENO

12.50
10.00
0.00

m3

MEDIDAS DE CONTROL
PROVISIN DE RECIPIENTES PLASTICOS CON TAPA PARA RESIDUOS SOLI
CONTRUCION DE LETRINA

13.00
0.00

und
und

4.00
1.00

01.02.03.01
1.03
01.03.01
01.03.02

271574020.xls / METRADOSD Yuler A. G.

0.00
0.00

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
01
01.01
01.01.01
01.01.02
01.01.03
1.02
01.02.01
01.02.02
1.03
01.03.01
01.03.02
01.03.03
01.03.04
1.04
1.04.01
1.04.02
1.04.03
1.05
1.05.01
1.06
1.06.01
1.06.02
1.06.03
1.06.04
02
02.01
02.01.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06

PARTIDAS
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEG
CONSTRUCCIONES PROVISIONALES
ALMACEN OFICINA Y CASETA DE GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
CERCO PROVISIONAL h=2.20 m
INSTALACIONES PROVISIONALES
AGUA Y DESAGUE PARA LA CONSTRUCCION
ENERGIA ELECTRICA PROVISIONAL
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
CORTE DE MATERIAL SUELTO CON MAQUINARIA
RELLENO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
MOVILIZACION DE EQUIPOS Y HERRAMIENTAS
MOVILIZACIN DE MAQUINARI
FLETE A PIE DE OBRA
FLETE TERRESTRE
TRAZO, NIVELES Y REPLANTEO
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACIONES TEMPORAL DE SEGURIDAD
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA ZAPATAS
EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS
RELLENO CON MATERIAL PROPIO
NIVELACIN INTERIOR Y COMPACTACIN C/PLANCHA COMPACTADORA (10
ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

02.02
02.02.01
02.02.01.01
02.02.02
02.02.02.01

OBRAS DE CONCRETO SIMPLE


CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H + 30% PG
SOLADOS
SOLADO, E= 4" ; MEZCLA 1:12, C:H

02.02.03
02.02.03.01
02.02.03.02
02.02.04
02.02.04.01

SOBRECIMIENTO
SOBRECIMIENTO: CONCRETO 1:8 + 25% P.M.
SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO

2.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.02.03
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
2.03.04
02.03.04.01

FALSO PISO
FALSO PISO E= 4" f`c= 140 kg/cm2
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS: CONCRETO, fc= 210kg/cm2
ZAPATAS: ACERO, fy= 4200kg/cm2
COLUMNAS
COLUMNAS: CONCRETO, fc= 210kg/cm2
COLUMNAS: ENCOFRADO Y DESENCOFRADO
COLUMNAS: ACERO, fy= 4200kg/cm2
VIGAS
VIGAS: CONCRETO, fc= 210kg/cm2
VIGAS: ENCOFRADO Y DESENCOFRADO
VIGAS: ACERO, fy= 4200kg/cm2
LOSAS ARMADA
LOSAS ARMADA: CONCRETO, fc= 210kg/cm2

271574020.xls / Val-Obra Yuler A. G.

UND

MET.

P. U.
S/.

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

m2
und

56.00
1.00

52.19
593.88

140.00

7.78

2,922.640
593.880
1,089.200

100.00%
56.00
100.00%
1.00
100.00% 140.00

glb
glb

1.00
1.00

600.00
300.00

600.000
300.000

m2
m3
m2
m3

1,200.00
1,401.56
168.19
1,480.05

0.89
3.66
27.02
7.09

1,068.000
5,129.710
4,544.490
10,493.550

glb
glb
glb

1.00
1.00
1.00

16,500.00
648,374.83
31,541.01

16,500.000
648,374.830
31,541.010

100.00%
100.00%
100.00%

1.00
1.00
1.00

m2

1,200.00

1.05

1,260.000

100.00%

###

GLB
GLB

1.00
1.00

460.00
500.00

GLB
GLB

1.00
1.00

550.00
500.00

460.000
500.000
550.000
500.000

100.00%
100.00%
100.00%
100.00%

m3

28.06

30.27

m3
m3
m3
m2
m3

55.65
24.32
308.61
3.96
3.96

30.27
27.22
2.73
15.14
7.09

849.380
1,684.530
661.990
842.510
59.950
28.080

m3

45.71

244.09

11,157.350

100.00%

45.71

m2

20.05

25.15

504.260

100.00%

m3
m2

8.22
111.19

271.86
33.93

2,234.690
3,772.680

m2

308.61

32.44

10,011.310

m3
kg

10.02
412.61

363.83
4.35

3,645.580
1,794.850

m3
m2
kg

14.81
201.00
2,569.19

380.64
44.68
4.35

5,637.280
8,980.680
11,175.980

m3
m2
kg

27.49
334.49
2,774.69

363.83
44.52
4.53

10,001.690
14,891.490
12,569.350

m3

2.16

363.83

785.870

2,922.640
593.880
1,089.200

0.00%
0.00%
0.00%

600.000
300.000

0.00%
0.00%

1,068.000
5,129.710
4,544.490
10,493.550

0.00%
0.00%
0.00%
0.00%

16,500.000
648,374.830
31,541.010

0.00%
0.00%
0.00%

1,260.000

0.00%

1.00
1.00
1.00
1.00

460.000
500.000
550.000
500.000

0.00%
0.00%
0.00%
0.00%

100.00%
28.06
100.00%
55.65
100.00%
24.32
100.00% 308.61
100.00%
3.96
100.00%
3.96

849.380
1,684.530
661.990
842.510
59.950
28.080

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

11,157.350

0.00%

20.05

504.260

0.00%

100.00%
8.22
100.00% 111.19

2,234.690
3,772.680

0.00%
0.00%

100.00% 308.61

10,011.310

0.00%

100.00%
10.02
100.00% 412.61

3,645.580
1,794.850

0.00%
0.00%

100.00%
14.81
100.00% 201.00
100.00%
###

5,637.280
8,980.680
11,175.980

0.00%
0.00%
0.00%

100.00%
27.49
100.00% 334.49
100.00%
###

10,001.690
14,891.490
12,569.350

0.00%
0.00%
0.00%

707.290

10.00%

100.00%
100.00%

1.00
1.00

100.00%
###
100.00%
###
100.00% 168.19
100.00%
###

90.00%

1.94

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.22

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

0.000
0.000
0.000

100.00%
100.00%
100.00%

56.00
1.00
140.00

2,922.640
593.880
1,089.200

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

0.000
0.000

100.00%
100.00%

1.00
1.00

600.000
300.000

0.00%
0.00%

0.00
0.00

0.000
0.000

0.000
0.000
0.000
0.000

100.00% 1,200.00
100.00% 1,401.56
100.00% 168.19
100.00% 1,480.05

1,068.000
5,129.710
4,544.494
10,493.555

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.00
1.00
1.00

16,500.000
648,374.830
31,541.010

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

0.000

100.00% 1,200.00

1,260.000

0.00%

0.00

0.000

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00

460.000
500.000
550.000
500.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

28.06
55.65
24.32
308.61
3.96
3.96

849.376
1,684.526
661.990
842.505
59.954
28.076

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

0.000

100.00%

45.71

11,157.354

0.00%

0.00

0.000

0.000

100.00%

20.05

504.258

0.00%

0.00

0.000

0.000
0.000

100.00%
100.00%

8.22
111.19

2,234.689
3,772.677

0.00%
0.00%

0.00
0.00

0.000
0.000

0.000

100.00%

308.61

10,011.308

0.00%

0.00

0.000

0.000
0.000

100.00%
100.00%

10.02
412.61

3,645.577
1,794.854

0.00%
0.00%

0.00
0.00

0.000
0.000

0.000
0.000
0.000

100.00%
14.81
100.00% 201.00
100.00% 2,569.19

5,637.278
8,980.680
11,175.977

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

0.000
0.000
0.000

100.00%
27.49
100.00% 334.49
100.00% 2,774.69

10,001.687
14,891.495
12,569.346

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

785.873

0.00%

0.00

0.000

78.587

100.00%

2.16

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.05.04
2.04
02.04.01
03
3.01
03.01.01
03.01.02
3.02
03.02.01
03.02.02
03.02.03
3.03
03.03.01
03.03.02
03.03.03
3.04
03.04.01
03.04.02
03.04.03
3.05
03.05.01

PARTIDAS
LOSAS ARMADA: ENCOFRADO Y DESENCOFRADO
LOSAS ARMADA: ACERO, fy= 4200kg/cm2
LOSAS ALIGERADA EN DOS DIRECCIONES
LOSAS ALIGERADA EN DOS DIRECCIONES: CONCRETO, fc= 210kg/cm2
LOSAS ALIGERADA EN DOS DIRECCIONES: ENCOFRADO Y DESENCOFR
LOSAS ALIGERADA EN DOS DIRECCIONES: ACERO, fy= 4200kg/cm2
LOSAS ALIGERADA EN DOS DIRECCIONES: ALIGERADO DE TECKNOPOR
VARIOS
JUNTAS DE DILATACIN C/TECNOPORT, e= 1"x15cm, EN MUROS
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA LADRILLO K.K 18 HUECOS DE ARCILLA
ACERO D AMARRE, fy= 4200kg/cm2

UND

19.55
103.66

P. U.
S/.
34.19
4.53

m3

42.15

363.83

m2
kg
m2

496.71
3,016.62
247.92

37.73
4.53
26.64

15,335.430
18,740.870
13,665.290
6,604.590

237.66

4.42

1,050.460

m2
kg

321.04
43.68

68.69
4.53

m3
m2
kg

6.40
102.81
896.64

m2
m
kg
m3
m2
kg

m2
kg

MET.

TOTAL
S./

668.410
469.580

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

90.00%
90.00%

17.60
93.29

601.570
422.620

10.00%
10.00%

13,801.890
16,866.780
12,298.760
5,944.130

10.00%
10.00%
10.00%
10.00%

0.00

0.000

100.00%

22,052.240
197.870

100.00% 321.04
100.00%
43.68

22,052.240
197.870

0.00%
0.00%

376.70
34.35
4.53

2,410.880
3,531.520
4,061.780

100.00%
6.40
100.00% 102.81
100.00% 896.64

2,410.880
3,531.520
4,061.780

0.00%
0.00%
0.00%

1.72

376.70

27.64
264.40

35.46
4.53

647.920
980.110
1,197.730

647.920
980.110
1,197.730

0.00%
0.00%
0.00%

1.79
28.43
141.04

376.70
33.98
4.53

674.290
966.050
638.910

100.00%
1.72
100.00%
27.64
100.00% 264.40
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

80.00% 397.37

17,798.110

20.00%

90.00%
37.94
90.00% 447.04
90.00%
###
90.00% 223.13
0.00%

COLUMNAS DE AMARRE
COLUMNAS DE AMARRE: CONCRETO, fc= 175kg/cm2
COLUMNAS DE AMARRE: ENCOFRADO Y DESENCOFRADO
COLUMNAS DE AMARRE: ACERO, fy= 4200kg/cm2
VIGAS DE AMARRE
VIGAS DE AMARRE: CONCRETO, fc= 175kg/cm2
VIGAS DE AMARRE: ENCOFRADO Y DESENCOFRADO
VIGAS DE AMARRE: ACERO, fy= 4200kg/cm2
MESA DE CONCRETO
MESA DE CONCRETO: CONCRETO, fc= 175kg/cm2
MESA DE CONCRETO: ENCOFRADO Y DESENCOFRADO
MESA DE CONCRETO, fy= 4200kg/cm2
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO O RAYADO

m2

89.28

18.25

03.05.02
03.05.03
03.05.04
03.05.05
03.05.06

TARRAJEO EN INTERIORES
TARRAJEO EN EXTERIORES
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES EN VANOS DE PUERTAS Y VENTANAS, E=15 CM

m2
m2
m2
m2
m

428.80
202.45
155.44
334.49
205.37

18.25
18.25
21.75
23.17
7.17

03.05.07
3.06
03.06.01
3.07
03.07.01

BRUAS EN MUROS DE e = 1" x 1/2"


CIELORASOS
CIELORASOS C/MEZCLA DE C:A
PISOS Y PAVIMENTOS
CONTRAPISO DE 42 mm.

459.00

1.69

1,629.360
7,825.600
3,694.710
3,380.820
7,750.130
1,472.500
775.710

m2

496.71

44.79

22,247.640

m2

88.76

19.65

03.07.02
03.07.03
03.07.04
03.07.05
3.08

PISO DE CEMENTO SEMI PULIDO


PISO: MACHIMBRADO
PISO DE CERMICO, 30x30cm.
PISO DE CERMICO, 45x45cm.
ENCHAPE EN MESA DE CONCRETO

m2
m2
m2
m2

12.79
224.34
26.62
62.14

32.28
51.15
49.85
49.85

1,744.130
412.860
11,474.990
1,327.010
3,097.680

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

03.08.01
3.09
03.09.01
3.10
03.10.01
03.10.02
3.11
03.11.01
3.12
03.12.01
03.12.02
03.12.03
03.12.04
03.12.05

ENCHAPE EN MESA DE CONCRETO: CERMICO, 30x30cm. m2 28.43


ZOCALOS
ZOCALO DE CERAMICO VIDRIADO, 20x30 cm.
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.30 M
CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.10 M
CUBIERTAS
CUBIERTA DE LADRILLO PASTELERO ASENTADO CON MEZCLA C:A
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA, E=40MM
PUERTA CON PLANCHA DE MELANINE, E=3/4"
VENTANA DE MADERA
CLOSET DE MADERA
DIVISION CON PLANCHA DE MELANINE PARA SERVICIOS HIGIENICOS

m2

28.43

53.04

1,507.930

0.00%

0.00

0.000

100.00%

m2

60.85

62.29

3,790.350

0.00%

0.00

0.000

100.00%

ml
ml

156.86
193.48

9.02
5.86

1,414.880
1,133.790

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

m2

484.35

33.27

16,114.320

0.00%

0.00

0.000

100.00%

m2
m2
m2
m2
und

39.05
6.97
124.47
15.51
10.82

263.05
204.39
118.32
140.64
205.11

10,272.100
1,424.600
14,727.290
2,181.330
2,219.290

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

271574020.xls / Val-Obra Yuler A. G.

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

1.96
10.37
0.00
4.22
49.67
301.66
24.79
0.00
237.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.79
28.43
141.04
0.00
89.28
428.80
202.45
155.44
334.49
205.37
459.00
0.00
99.34
0.00
88.76
12.79
224.34
26.62
62.14
0.00
28.43
0.00
60.85
0.00
156.86
193.48
0.00
484.35
0.00
39.05
6.97
124.47
15.51
10.82

66.842
46.958

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

100.00%
100.00%

SALDO
MES ACTUAL
MET.
TOTAL
S/.

19.55
103.66

668.415
469.580

0.00%
0.00%

0.00
0.00

0.000
0.000

1,533.544
1,874.087
1,366.529
660.459

100.00%
42.15
100.00% 496.71
100.00% 3,016.62
100.00% 247.92

15,335.435
18,740.868
13,665.289
6,604.589

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

1,050.457

100.00%

237.66

1,050.457

0.00%

0.00

0.000

0.000
0.000

100.00%
100.00%

321.04
43.68

22,052.238
197.870

0.00%
0.00%

0.00
0.00

0.000
0.000

0.000
0.000
0.000

100.00%
100.00%
100.00%

6.40
102.81
896.64

2,410.880
3,531.524
4,061.779

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

0.000
0.000
0.000

100.00%
100.00%
100.00%

647.924
980.114
1,197.732

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

674.293
966.051
638.911

100.00%
100.00%
100.00%

1.72
27.64
264.40
0.00
1.79
28.43
141.04

674.293
966.051
638.911

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

1,629.360
7,825.600
3,694.713
3,380.820
7,750.133
1,472.503
775.710

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

89.28
428.80
202.45
155.44
334.49
205.37
459.00

1,629.360
7,825.600
3,694.713
3,380.820
7,750.133
1,472.503
775.710

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

4,449.528

100.00%

496.71

22,247.641

0.00%

0.00

0.000

1,744.134
412.861
11,474.991
1,327.007
3,097.679

100.00%
100.00%
100.00%
100.00%
100.00%

88.76
12.79
224.34
26.62
62.14

1,744.134
412.861
11,474.991
1,327.007
3,097.679

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

1,507.927

100.00%

28.43

1,507.927

0.00%

0.00

0.000

3,790.347

100.00%

60.85

3,790.347

0.00%

0.00

0.000

1,414.877
1,133.793

100.00%
100.00%

156.86
193.48

1,414.877
1,133.793

0.00%
0.00%

0.00
0.00

0.000
0.000

16,114.325

100.00%

484.35

16,114.325

0.00%

0.00

0.000

10,272.103
1,424.598
14,727.290
2,181.326
2,219.290

100.00%
100.00%
100.00%
100.00%
100.00%

39.05
6.97
124.47
15.51
10.82

10,272.103
1,424.598
14,727.290
2,181.326
2,219.290

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
03.12.06
03.12.07
03.12.08
3.13
03.13.01
03.13.02
03.13.03
03.13.04
3.14
03.14.01
03.14.02
3.15
03.15.01
03.15.02
03.15.03
03.15.04
03.15.05
03.15.06
03.15.07
03.15.08
03.15.09
03.15.10
03.15.11
3.16
03.16.01
04
4.01
04.01.01
04.01.01.01
04.01.01.02
04.01.01.03
04.01.01.04
04.01.01.05
04.01.01.06
04.01.01.07
04.01.02
04.01.02.01
04.01.03
04.01.03.01
04.01.04
04.01.04.01
4.02
04.02.01
04.02.01.01
04.02.02
04.02.02.01
04.02.02.02
04.02.02.03
04.02.03
04.02.03.01
04.02.03.02
04.02.03.03
04.02.03.04
04.02.04
04.02.05.01
04.02.05.02

PARTIDAS
COLOCACIN DE PUERTA DE MADERA
COLOCACIN DE PUERTA DE MELAMINE
COLOCACIN DE VENTANA DE MADERA
CERRAJERIA
BISAGRAS DE FIERRO; 3"x3", C/EJE DE 1/2" (PUERTAS)
CERRADURA PARA PUERTAS (03 GOLPES)
PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M.
CERROJO DE FIERRO REDONDO DE 1/2" X 0.35 M.
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO TRIPLE INCOLORO 6MM
ESPEJO DE 0.80x0.80m
PINTURA
PINTURA LTEX EN CIELORASO
PINTURA LTEX EN INTERIORES
PINTURA LTEX EN EXTERIORES
PINTURA LATEX EN COLUMNAS
PINTURA LATEX EN VIGAS
PINTURA EN PUERTA DE MADERA
PINTURA EN VENTANA DE MADERA
PINTURA EN CLOSET
PINTURA EN CONTRAZOCALOS H=30CM
PINTURA EN CONTRAZOCALOS H=10CM
PINTURA EN LADRILLO PASTELERO
VARIOS
LIMPIEZA FINAL DE OBRA
INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS
SUMINISTRO DE APARATOS SANITARIOS
INODORO TOP PIECE, COLOR C/ACCS. - "TREBOL"
INODORO BABY, COLOR C/ACCS "TREBOL"
LAVATORIO OVALN SONET, COLOR BLANCO - "TREBOL"
LAVATORIO DE COLOR C/PEDESTAL FONTAINE COLOR "TREBOL"
URINARIO CADET, COLOR - "TREBOL"
LAVADERO DE ACERO INOXIDABLE 21"X38", LINEA HOME(RECORD)
LAVADERO DE ACERO INOXIDABLE 21"X54", LINEA HOME(RECORD)
SUMINISTRO DE ACCESORIOS
PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO
INSTALACION DE APARATOS SANITARIOS
COLOCACION DE APARATOS SANITARIOS
INSTALACION DE ACCESORIOS
COLOCACION DE ACCESORIOS SANITARIOS
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
REDES DE ALIMENTACION
EXCAV.ZANJAS RT<2kg/cm2 - 0.50m.x0.70m.
RELLENO MANUAL C/MATERIAL PROPIO
TUBERA PVC CLASE 10 - 1/2" C/R
ACCESORIOS DE REDES DE AGUA
CODO PVC - CLASE 10 CR 1/2"*90
CODO PVC - CLASE 10 CR 1/2"*45
TEE PVC - CLASE 10 CR 1/2"
CRUZ PVC SAPC-10 =1/2"
VALVULAS
VALVULA ESFERICA DE BRONCE 1/2"
VALVULA CHECK DE 1/2"

271574020.xls / Val-Obra Yuler A. G.

UND

MET.

und
und
und

14.00
5.00
38.00

P. U.
S/.
61.31
49.05
61.31

pza
pza
und
und

57.00
14.00
14.00
7.00

p2
p3

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

858.340
245.250
2,329.780

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

9.74
82.99
24.87
35.18

555.180
1,161.860
348.180
246.260

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

115.95
6.00

75.54
86.91

8,758.860
521.460

0.00%
0.00%

0.00
0.00

0.000
0.000

0.00%
0.00%

m2
m2

700.35
428.80

9.18
9.18

m2
m2
m2
m2
m2

202.45
155.44
334.49
78.10
248.94

9.18
10.10
10.10
15.99
15.99

m2
m2
m2

31.02
156.86
193.48

15.99
2.65
1.78

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

m2

484.35

7.61

6,429.210
3,936.380
1,858.490
1,569.940
3,378.350
1,248.820
3,980.550
496.010
415.680
344.390
3,685.900

GLB

1.00

2,160.48

2,160.480

0.00%

0.00

0.000

0.00%

pza
pza
pza
pza

2.00
5.00
7.00
2.00

226.85
226.85
107.17
190.18

pza
pza
pza

1.00
1.00
1.00

176.31
115.57
166.42

453.700
1,134.250
750.190
380.360
176.310
115.570
166.420

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

und

8.00

32.57

260.560

0.00%

0.00

0.000

0.00%

und

19.00

61.31

1,164.890

0.00%

0.000

0.00%

und

8.00

24.03

192.240

0.00%

0.00
0.00
0.00

0.000

0.00%

pto

19.00

28.24

536.560

0.00%

0.00

0.000

100.00%

m
m
m

66.34
66.34
78.84

10.60
5.29
11.28

703.200
350.940
889.320

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

und
und
und
und

8.00
1.00
25.00
1.00

14.40
14.35
16.73
16.78

115.200
14.350
418.250
16.780

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

u
u

9.00
1.00

81.69
81.69

735.210
81.690

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

14.00
5.00
38.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
0.00
66.34
66.34
78.84
0.00
8.00
1.00
25.00
1.00
0.00
9.00
1.00

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

858.340
245.250
2,329.780

100.00%
100.00%
100.00%

14.00
5.00
38.00

858.340
245.250
2,329.780

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

57.00
14.00
14.00
7.00

555.180
1,161.860
348.180
246.260

0.000
0.000

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

115.95
6.00

8,758.860
521.460

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

700.35
428.80
202.45
155.44
334.49
78.10
248.94
31.02
156.86
193.48
484.35

6,429.210
3,936.380
1,858.490
1,569.940
3,378.350
1,248.820
3,980.550
496.010
415.680
344.390
3,685.900

0.000

0.00%

0.00

0.000

100.00%

1.00

2,160.480

0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

2.00
5.00
7.00
2.00
1.00
1.00
1.00

453.700
1,134.250
750.190
380.360
176.310
115.570
166.420

0.000

0.00%

0.00

0.000

100.00%

8.00

260.560

0.000

0.00%

0.000

100.00%

19.00

1,164.890

0.000

0.00%

0.00
0.00
0.00

0.000

100.00%

8.00

192.240

536.560

100.00%

19.00

536.560

0.00%

0.00

0.000

703.204
350.939
889.315

100.00%
100.00%
100.00%

66.34
66.34
78.84

703.204
350.939
889.315

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

115.200
14.350
418.250
16.780

100.00%
100.00%
100.00%
100.00%

8.00
1.00
25.00
1.00

115.200
14.350
418.250
16.780

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

735.210
81.690

100.00%
100.00%

9.00
1.00

735.210
81.690

0.00%
0.00%

0.00
0.00

0.000
0.000

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
04.02.05
04.02.05.01
04.02.05.02
04.02.05.03
4.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
4.04
04.04.01
04.04.01.01
04.04.01.02
04.04.01.03
04.04.01.04
04.04.01.05
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.02.04
04.04.03
04.04.03.01
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
04.04.04.04
04.04.04.05
04.04.04.06
04.04.04.07
04.04.04.08
04.04.04.09
04.04.04.10
04.04.04.11
04.04.05
04.04.05.01
04.04.05.02
04.04.05.03
04.04.05.04
04.04.05.05
05
5.01
05.01.01
05.01.02
05.01.03
05.01.04
5.02
05.02.01
5.03
05.03.01
05.03.02
05.03.03

PARTIDAS
VARIOS
PRUEBA HIDRAULICA
CAJA CON TAPA METALICA PARA VALVULAS DE 12"x12"
CAJA PARA MEDIDOR DE 12"X12"
SISTEMA DE DRENAJE PLUVIAL
CANALETAS DE PLANCHA GALV.
TUBERIA DE PVC-SAP 4" P/LLUVIA
CODO PVC SAL 4"X90
CODO PVC SAL SANITARIO 4"X90
PEDESTAL: CONCRETO F'C= 140 KG/CM2
PEDESTAL: ENCOFRADO Y DESENCOFRADO
PEDESTAL: TARRAJEO
SISTEMA DE DESAGUE
SALIDAS DE DESAGUE
SALIDA DE DESAGUE EN PVC 4" (INODORO)
SALIDA DE DESAGUE EN PVC 2" (LAVATORIOS Y URINARIOS)
SALIDA DE DESAGUE EN PVC 2" (SUMIDERO)
SALIDA DE REGISTRO ROSCADO 2"
SALIDA DE REGISTRO ROSCADO 4"
REDES DE DESAGUE
EXCAV.ZANJAS RT<2kg/cm2 - 0.50m.x0.70m.
RELLENO MANUAL C/MATERIAL PROPIO
TUBERIA DE PVC-SAP 4"
TUBERIA DE PVC-SAP 2"
RED DE VENTILACIN
RED DE VENTILACION 2"
ACCESORIOS DE REDES
CODO PVC SAL 4"X90
CODO PVC SAL 4"X45
CODO PVC SAL 2"X90
CODO PVC SAL 2"X45
YEE PVC-SAL 4"
YEE PVC-SAL 2"
YEE PVC-SAL 4"-2"
TEE PVC-SAL 4"
TEE PVC-SAL 4"X2"
CODO PVC SAL SANITARIO 4 A 2 "X90
REDUCCIONES PVC-SAL 4" A 2"
ADITAMENTOS VARIOS
SUMIDERO DE BRONCE 2"
REGISTRO DE BRONCE 4"
REGISTRO DE BRONCE 2"
CAJA DE DESAGUE DE 12"X24" DE C Y TAPA DE FF
PRUEBA A RED DE DESAGUE
INSTALACIONES ELECTRICAS
SALIDAS
SALIDA DE TECHO (CENTRO DE LUZ)
SALIDA PARA TOMACORRIENTE C/LINEA A TIERRA
INTERRUPTOR UNIPOLAR SIMPLE
INTERRUPTOR UNIPOLAR DOBLE
CAJAS DE PASE
CAJA DE PASE FG PESADO 15x15x10 cm.
CANALIZACIONES Y/O TUBERIAS
TUBERIA PVC-SAP 50 mm.
TUBERIA PVC-SAP 25 mm.
TUBERIA PVC-SAP 20 mm.

271574020.xls / Val-Obra Yuler A. G.

UND

MET.

P. U.
S/.

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

GLB
pza
pza

1.00
9.00
1.00

211.87
170.79
180.66

211.870
1,537.110
180.660

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

m
m
pza
pza

156.40
59.13
16.00
8.00

18.20
16.43
18.74
18.74

m3
m2
m2

1.03
8.88
8.88

290.81
35.41
20.21

2,846.480
971.510
299.840
149.920
299.530
314.440
179.460

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

pto
pto
pto
pto
pto

7.00
12.00
7.00
2.00
6.00

18.45
15.90
39.10
11.38
14.00

129.150
190.800
273.700
22.760
84.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

m
m

48.96
48.96

10.60
5.29

m
m

38.20
21.08

16.43
14.68

518.980
259.000
627.630
309.450

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

27.84

16.26

452.680

0.00%

0.00

0.000

100.00%

18.740
112.140
999.440
128.960
92.250
251.700
143.200
150.320
37.300
74.960
80.580

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%

pza
pza
pza
pza
pza

1.00
6.00
62.00
8.00
5.00

18.74
18.69
16.12
16.12
18.45

pza
pza
pza
pza
pza

10.00
8.00
8.00
2.00
4.00

25.17
17.90
18.79
18.65
18.74

pza

3.00

26.86

und
und
und

7.00
6.00
2.00

65.12
37.18
37.18

und
GLB

2.00
1.00

200.45
211.87

455.840
223.080
74.360
400.900
211.870

pto
pto
pto
pto

65.00
45.00
27.00
11.00

19.95
19.95
25.80
27.49

1,296.750
897.750
696.600
302.390

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

13.00

30.88

401.440

0.00%

0.00

0.000

100.00%

ml
ml
ml

14.36
47.05
603.99

4.53
4.17
3.59

65.050
196.200
2,168.320

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

0.00
1.00
9.00
1.00
0.00
156.40
59.13
16.00
8.00
1.03
8.88
8.88
0.00
0.00
7.00
12.00
7.00
2.00
6.00
0.00
48.96
48.96
38.20
21.08
0.00
27.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65.00
45.00
27.00
11.00
0.00
13.00
0.00
14.36
47.05
603.99

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

211.870
1,537.110
180.660

100.00%
100.00%
100.00%

1.00
9.00
1.00

211.870
1,537.110
180.660

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

2,846.480
971.506
299.840
149.920
299.534
314.441
179.465

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

156.40
59.13
16.00
8.00
1.03
8.88
8.88

2,846.480
971.506
299.840
149.920
299.534
314.441
179.465

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

129.150
190.800
273.700
22.760
84.000

100.00%
100.00%
100.00%
100.00%
100.00%

7.00
12.00
7.00
2.00
6.00

129.150
190.800
273.700
22.760
84.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

518.976
258.998
627.626
309.454

100.00%
100.00%
100.00%
100.00%

48.96
48.96
38.20
21.08

518.976
258.998
627.626
309.454

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

452.678

100.00%

27.84

452.678

0.00%

0.00

0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.00
6.00
62.00
8.00
5.00
10.00
8.00
8.00
2.00
4.00
3.00

18.740
112.140
999.440
128.960
92.250
251.700
143.200
150.320
37.300
74.960
80.580

0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

7.00
6.00
2.00
2.00
1.00

455.840
223.080
74.360
400.900
211.870

1,296.750
897.750
696.600
302.390

100.00%
100.00%
100.00%
100.00%

65.00
45.00
27.00
11.00

1,296.750
897.750
696.600
302.390

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

401.440

100.00%

13.00

401.440

0.00%

0.00

0.000

65.051
196.199
2,168.324

100.00%
100.00%
100.00%

14.36
47.05
603.99

65.051
196.199
2,168.324

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
5.04
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
05.04.06
05.04.07
5.05
05.05.01
05.05.02
05.05.03
05.05.04
05.05.05
5.06
05.06.01
05.06.02
5.07
05.07.01

PARTIDAS
TABLEROS Y SUBTABLEROS
TABLERO GENERAL (TG)06 POLOS
TABLERO DE DISTRIBUCIN DE DE 4 POLOS
TABLERO DE DISTRIBUCIN DE DE 6 POLOS
INTERRUPTOR TERMOMAGNTICO 2 x 100A
INTERRUPTOR TERMOMAGNTICO 2 x 60A
INTERRUPTOR TERMOMAGNTICO 2 x 20A
INTERRUPTOR TERMOMAGNTICO 2 x 15A
CONDUCTORES Y/O CABLES
CONDUCTOR LSOH 2.5 mm2 - ALUMBRADO
CONDUCTOR LSOH 4 mm2 - TOMACORRIENTE
CONDUCTOR LSOH 10 mm2 - POZO A TIERRA
CONDUCTOR LSOH 16 mm2 - DE TABLERO GENERAL - TABLERO DE
CONDUCTOR LSOH 35 mm2 - MEDIDOR - TABLERO GENERAL
ARTEFACTOS
ART. REJILLA ADOSADO ALUMINIO RAS-A 2X40W, JOSFEL
ART. ADOSADO LAMPARA PLAFON LARA C/1 FOCO ROSCA 36W

05.07.02
01
1.01

VARIOS
LNEA DE PUESTA A TIERRA
PRUEBAS ELCTRICAS
CERCO PERIMETRICO
TRABAJOS PRELIMINARES

01.01.01
01.01.02
01.02
01.02.01
01.02.02

LIMPIEZA DE TERRENO MANUAL


TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL
EXCAVACION DE ZANJAS PARA ZAPATAS AISLADAS

01.02.03
1.03
01.03.01
01.03.01.01
01.03.02

RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO (CON


OBRAS DE CONCRETO SIMPLE
CIMIENTO
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H + 30% PG
SOBRECIMIENTO

01.03.02.01
01.03.02.02
1.04
01.04.01
01.04.01

CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO-HORMIGON +25% PIEDRA


ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA
OBRAS DE CONCRETO ARMADO
COLUMNAS
COLUMNAS: CONCRETO, fc= 210kg/cm2

01.04.02
01.04.03
01.04.02
01.04.02.01
01.04.02.02

COLUMNAS: ENCOFRADO Y DESENCOFRADO


COLUMNAS: ACERO, fy= 4200kg/cm2
VIGAS
VIGAS: CONCRETO, fc= 210kg/cm2
VIGAS: ENCOFRADO Y DESENCOFRADO

01.04.02.03
1.05
01.05.01
1.06
01.06.01
01.06.02
01.06.03
01.06.04
1.07
01.07.01
1.08
01.08.01
01.08.02
01.08.03

VIGAS: ACERO, fy= 4200kg/cm2


MUROS Y TABIQUES DE ALBAILERA
MURO DE SOGA LADRILLO K.K 18 HUECOS DE ARCILLA
REVOQUES Y REVESTIMIENTOS
TARRAJEO EN MUROS
TARRAJEO EN COLUMNAS
TARRAJEO EN VIGAS
BRUAS EN MUROS DE e = 1" x 1/2"
CONTRAZCALOS
CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.30 M
CARPINTERA METLICA
PUERTA DE FIERRO, CON PERFILES Y PLANCHA S/D
TUBERIA DE F NEGRO DE 2"
COLOCACIN DE PUERTA METALICA

271574020.xls / Val-Obra Yuler A. G.

UND

MET.

P. U.
S/.

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

68.61
64.37
51.66
43.18

207.610
207.610
217.610
68.610
193.110
103.320
431.800

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1,230.19
212.72
52.20
49.00
28.80

2.43
2.84
4.84
6.55
8.15

2,989.360
604.120
252.650
320.950
234.720

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

EQU
EQU

33.00
32.00

219.02
74.95

7,227.660
2,398.400

0.00%
0.00%

0.00
0.00

0.000
0.000

0.00%
0.00%

und

3.00

621.14

glb

1.00

85.70

1,863.420
85.700

0.00%
0.00%

0.00
0.00

0.000
0.000

0.00%
0.00%

und
und
und

1.00
1.00
1.00

207.61
207.61
217.61

und
und
und
und

1.00
3.00
2.00
10.00

m
m
m
m
m

m2
m2

140.00
140.00

0.89
1.52

124.600
212.800

100.00% 140.00
100.00% 140.00

124.600
212.800

0.00%
0.00%

m3
m3
m3

112.00
112.00

30.27
15.14

112.00

7.95

3,390.240
1,695.680
890.400

100.00% 112.00
100.00% 112.00
100.00% 112.00

3,390.240
1,695.680
890.400

0.00%
0.00%
0.00%

m3

112.00

239.92

26,871.040

100.00% 112.00

26,871.040

0.00%

100.00%
100.00%

1,470.760
3,478.440

0.00%
0.00%

m3
m2

5.46
84

269.37
41.41

1,470.760
3,478.440

5.46
84.00

m3
m3
kg

6.30

380.64

110.4
1,322.09

47.85
4.35

2,398.030
5,282.640
5,751.090

100.00%
6.30
100.00% 110.40
100.00%
###

2,398.030
5,282.640
5,751.090

0.00%
0.00%
0.00%

4.20
56.00

363.83
38.13

100.00%
4.20
100.00%
56.00
100.00% 437.49

1,528.090
2,135.280
1,903.080

0.00%
0.00%
0.00%

100.00% 240.97

16,552.230

0.00%

m3
m2
kg

437.49

4.35

1,528.090
2,135.280
1,903.080

m2

240.97

68.69

16,552.230

m2
m2
m2
m

207.20
70.20
74.00
302.40

17.22
21.75
23.17
1.69

3,567.980
1,526.850
1,714.580
511.060

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

m2

140.00

9.02

1,262.800

0.00%

0.00

0.000

100.00%

m2
m
u

8.85
416.00
1.00

259.92
26.15
83.03

2,300.290
10,878.400
83.030

0.00%
0.00
100.00% 416.00
0.00%
0.00

0.000
10,878.400
0.000

100.00%
0.00%
100.00%

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

0.00
1.00
1.00
1.00
1.00
3.00
2.00
10.00
0.00
1,230.19
212.72
52.20
49.00
28.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
207.20
70.20
74.00
302.40
0.00
140.00
0.00
8.85
0.00
1.00

207.610
207.610
217.610
68.610
193.110
103.320
431.800
2,989.362
604.125
252.648
320.950
234.720

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

SALDO
MES ACTUAL
MET.
TOTAL
S/.

1.00
1.00
1.00
1.00
3.00
2.00
10.00

207.610
207.610
217.610
68.610
193.110
103.320
431.800

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00% 1,230.19
100.00% 212.72
100.00%
52.20
100.00%
49.00
100.00%
28.80

2,989.362
604.125
252.648
320.950
234.720

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

0.000
0.000

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

33.00
32.00

7,227.660
2,398.400

0.000
0.000

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

3.00
1.00

1,863.420
85.700

0.000
0.000

100.00%
100.00%

140.00
140.00

124.600
212.800

0.00%
0.00%

0.00
0.00

0.000
0.000

0.000
0.000
0.000

100.00%
100.00%
100.00%

112.00
112.00
112.00

3,390.240
1,695.680
890.400

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

0.000

100.00%

112.00

26,871.040

0.00%

0.00

0.000

0.000
0.000

100.00%
100.00%

5.46
84.00

1,470.760
3,478.440

0.00%
0.00%

0.00
0.00

0.000
0.000

0.000
0.000
0.000

100.00%
6.30
100.00% 110.40
100.00% 1,322.09

2,398.032
5,282.640
5,751.092

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

0.000
0.000
0.000

100.00%
100.00%
100.00%

4.20
56.00
437.49

1,528.086
2,135.280
1,903.082

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

0.000

100.00%

240.97

16,552.229

0.00%

0.00

0.000

3,567.984
1,526.850
1,714.580
511.056

100.00%
100.00%
100.00%
100.00%

207.20
70.20
74.00
302.40

3,567.984
1,526.850
1,714.580
511.056

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

1,262.800

100.00%

140.00

1,262.800

0.00%

0.00

0.000

2,300.292
0.000
83.030

100.00%
100.00%
100.00%

8.85
416.00
1.00

2,300.292
10,878.400
83.030

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM

PARTIDAS

1.09
01.09.01
01.09.02
01.09.03

CERRAJERIA
BISAGRAS DE FIERRO DE 5", C/EJE DE 1/2"
CERRADURA PARA PUERTAS (03 GOLPES)
PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M.

01.09.04
1.10
01.10.01
01.10.02
01.10.03

CERROJO DE FIERRO REDONDO DE 1/2" X 0.35 M.


PINTURA
PINTURA EN MUROS 2 MANOS
PINTURA LATEX EN COLUMNAS
PINTURA LATEX EN VIGAS

01.10.04
01.10.05
01.10.06
2.00
2.01

PINTURA EN CONTRAZOCALOS H=30CM


PINTURA EN PUERTA DE FIERRO, CON PERFILES Y PLANCHA S/D
PINTURA EN CERCO CON ESTRUCT. METALICA
EXPLANADA PATIO
EXPLANADA PATIO: CONCRETO F'C= 140 KG/CM2, FROTACHADO Y BRUAD

2.02
2.03
3.00
3.01
3.02

EXPLANADA PATIO: ENCOFRADO Y DESENCOFRADO


EXPLANADA PATIO: JUNTAS
VEREDAS
VEREDAS: CONCRETO F'C= 140 KG/CM2, FROTACHADO Y BRUADO
VEREDAS: ENCOFRADO Y DESENCOFRADO

3.03
4.00
4.01

VEREDAS: JUNTAS
SARDINEL
EXCAVACION EN TERRENO NORMAL PARA SARDINEL

4.02
4.03
4.04
4.05
4.06

SARDINEL: CONCRETO F'C= 140 KG/CM2


SARDINEL: ENCOFRADO Y DESENCOFRADO
SARDINEL: JUNTAS DE DILATACIN
SARDINEL: TARRAJEO
SARDINEL: PINTURA

5.00
5.01
5.02
5.03
5.04

CUNETAS
EXCAVACION DE ZANJA PARA CANETAS
ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO
CUNETAS: CONCRETO F'C= 140 KG/CM2
CUNETAS: ENCOFRADO Y DESENCOFRADO

5.05
5.06
6
6.01
7

CUNETAS: TARRAJEO
REJILLA METALICA PARA CUNETAS
JUEGOS INFANTILES
JUEGOS INFANTILES
TANQUE SEPTICO

7.01
07.01.01
07.01.02
7.02
07.02.01

TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL

07.02.02
07.02.03
07.02.04
7.03
07.03.01
7.04
07.04.01
07.04.01.01
07.04.01.02
07.04.02
07.04.02.01
07.04.02.02
07.04.02.03
07.04.03

NIVELACION Y APISONADO CON MATERIAL PROPIO


ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
OBRAS DE CONCRETO SIMPLE
SOLADO, E= 4" ; MEZCLA 1:12, C:H
OBRAS DE CONCRETO ARMADO
LOSA DE CIMENTACION
LOSA DE CIMENTACION: CONCRETO F'C=210KG/CM2
LOSA DE CIMENTACION: ACERO FY=4,200KG/CM2 GRADO 60
MUROS DE CONCRETO
MURO DE CONCRETO: CONCRETO F'C=210KG/CM2
MURO DE CONCRETO: ENCOFRADO Y DESENCOFRADO
MURO DE CONCRETO: ACERO FY=4,200KG/CM2
LOSA DE TECHO

271574020.xls / Val-Obra Yuler A. G.

UND

MET.

und

6.00
1.00
1.00

33.41
74.88
20.82

1.00

31.13

207.20
56.70
56.00

8.44
11.61
11.61

140.00
17.70
9.14

3.44
10.90
10.90

m3
m2
m

18.35

333.03

19.20
95.43

39.27
2.19

m3
m2
m

38.43
96.03

333.03
39.27

270.76

2.19

pza
und
und
m2
m2
m2
m
m2
m2

m3
m3
m2
m
m2
m2
m3
m3
m3
m2
m2
m

P. U.
S/.

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

200.460
74.880
20.820
31.130

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

1,748.770
658.290
650.160
481.600
192.930
99.630

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

6,111.100
753.980
208.990

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

12,798.340
3,771.100
592.960

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

114.440
1,133.480
3,390.960
69.130
1,136.540
335.620

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

3.24

35.32

3.24
86.35
12.50
48.57
48.57

349.84
39.27
5.53
23.40
6.91

7.64
7.64
4.20
30.54

30.27
15.14
349.84
39.27

42.00
38.18

23.40
54.36

231.260
115.670
1,469.330
1,199.310
982.800
2,075.460

1.00

8,646.55

8,646.550

0.00%

0.00

0.000

0.00%

m2
m2

9.07
18.14

0.89
1.52

8.070
27.570

100.00%
100.00%

9.07
18.14

8.070
27.570

0.00%
0.00%

m3

19.04

35.32

m2
m3
m3

9.07
22.85
22.85

8.16
15.14
8.35

672.490
74.010
345.950
190.800

100.00%
100.00%
100.00%
100.00%

19.04
9.07
22.85
22.85

672.490
74.010
345.950
190.800

0.00%
0.00%
0.00%
0.00%

m2

9.07

24.42

221.490

0.00%

0.00

0.000

100.00%

m3
kg

1.36
47.66

363.83
4.79

494.810
228.290

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

m3
m2
kg

4.61
46.07
152.29

380.64
53.51
4.79

1,754.750
2,465.210
729.470

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

0.00
6.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18.35
19.20
95.43
0.00
38.43
96.03
270.76
0.00
3.24
3.24
86.35
12.50
48.57
48.57
0.00
7.64
7.64
4.20
30.54
42.00
38.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.07
0.00
0.00
1.36
47.66
0.00
4.61
46.07
152.29
0.00

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

200.460
74.880
20.820
31.130

100.00%
100.00%
100.00%
100.00%

6.00
1.00
1.00
1.00

200.460
74.880
20.820
31.130

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

207.20
56.70
56.00
140.00
17.70
9.14

1,748.770
658.290
650.160
481.600
192.930
99.630

6,111.101
753.984
208.992

100.00%
100.00%
100.00%

18.35
19.20
95.43

6,111.101
753.984
208.992

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

12,798.343
3,771.098
592.964

100.00%
100.00%
100.00%

38.43
96.03
270.76

12,798.343
3,771.098
592.964

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

114.437
1,133.482
3,390.965
69.125
1,136.538
335.619

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

3.24
3.24
86.35
12.50
48.57
48.57

114.437
1,133.482
3,390.965
69.125
1,136.538
335.619

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

231.263
115.670
1,469.328
1,199.306
982.800
2,075.465

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

7.64
7.64
4.20
30.54
42.00
38.18

231.263
115.670
1,469.328
1,199.306
982.800
2,075.465

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

0.000

0.00%

0.00

0.000

100.00%

1.00

8,646.550

0.000
0.000

100.00%
100.00%

9.07
18.14

8.072
27.573

0.00%
0.00%

0.00
0.00

0.000
0.000

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

19.04
9.07
22.85
22.85

672.493
74.011
345.949
190.798

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

221.489

100.00%

9.07

221.489

0.00%

0.00

0.000

494.809
228.291

100.00%
100.00%

1.36
47.66

494.809
228.291

0.00%
0.00%

0.00
0.00

0.000
0.000

1,754.750
2,465.206
729.469

100.00%
100.00%
100.00%

4.61
46.07
152.29

1,754.750
2,465.206
729.469

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM

PARTIDAS

07.04.03.01
07.04.03.02
07.04.03.03
07.04.03.04

LOSA DE TECHO: CONCRETO F'C=210KG/CM2


LOSA DE TECHO: ENCOFRADO Y DESENCOFRADO
LOSA DE TECHO: ACERO FY=4,200KG/CM2 GRADO 60
TAPA DE CONCRETO DE 0.70MX0.50M

7.05
07.05.01
7.06
07.06.01
07.06.02

REVOQUES Y REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES
INSTALACIONES SANITARIAS
TUBERIA DE PVC-SAP 4"
TEE PVC-SAL 4"

07.06.03
07.06.04
07.06.05
8
8.01

UND

MET.

m3
m2
kg
und

0.42
4.18
18.31
8.00

P. U.
S/.
380.64
53.51
4.79
108.50

m3

23.13

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

159.870
223.670
87.700
868.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

30.12

696.680

0.00%

0.00

0.000

100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

m
pza

49.52
3.00

21.73
18.79

TUBERIA DE FG DE 3"
TEE DE FG DE 3"
CODO DE FG DE 3"
POZO PERCOLADO
TRABAJOS PRELIMINARES

m
und
und

2.50
2.00
4.00

32.66
48.74
48.74

1,076.070
56.370
81.650
97.480
194.960

08.01.01
08.01.02
08.01.03
8.02
08.02.01

LIMPIEZA DE TERRENO MANUAL


TRAZO, NIVELES Y REPLANTEO PRELIMINAR
TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL

m2
m2
m2

9.61
9.61
19.22

0.89
1.05
1.52

8.550
10.090
29.210

100.00%
100.00%
100.00%

9.61
9.61
19.22

8.550
10.090
29.210

0.00%
0.00%
0.00%

m3

26.80

35.32

08.02.02
08.02.03
8.03

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO


ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
OBRAS DE CONCRETO SIMPLE

m3
m3

32.16
32.16

15.14
8.35

946.580
486.900
268.540

100.00%
100.00%
100.00%

26.80
32.16
32.16

946.580
486.900
268.540

0.00%
0.00%
0.00%

08.03.01
08.03.02
8.04
08.04.01
08.04.02

ANILLO: CONCRETO F'C=175KG/CM2


ANILLO: ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
MURO DE CONCRETO: CONCRETO F'C=210KG/CM2
MURO DE CONCRETO: ENCOFRADO Y DESENCOFRADO

m3
m2

0.37
0.98

359.32
57.53

132.950
56.380

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

m3
m2

0.76
4.52

380.64
53.51

08.04.03
08.04.04
8.05
08.05.01
8.06

MURO DE CONCRETO: ACERO FY=4,200KG/CM2


TAPA DE CONCRETO DE 0.70MX0.50M
MUROS DE ALBAILERIA
MURO DE CABEZA DE LADRILLO K.K 18 HUECOS DE ARCILLA
INSTALACIONES SANITARIAS

kg
und

68.15
4.00

4.79
108.50

289.290
241.870
326.440
434.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

m2

30.52

95.20

2,905.500

0.00%

0.00

0.000

100.00%

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

08.06.01
08.06.02
8.07
08.07.01
01

TUBERIA DE PVC-SAP 4"


TEE PVC-SAL 4"
FILTROS
FILTRO DE GRAVA
MATERIALES DIDCTICOS, EQUIPOS Y MOBILIARIOS

1.01
01.01.01
01.01.02
01.01.03
01.01.04

MATERIALES DIDACTICOS
MATERIALES DIDACTICOS DE COMUNICACIN
MATERIALES DIDACTICOS DE MATEMTICA
MATERIALES DIDACTICOS DE PERSONAL SOCIAL
MATERIALES DIDACTICOS DE CIENCIA Y AMBIENTE

1.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01
1.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03

EQUIPOS Y MOVILIARIOS
EQUIPOS Y MOBILIARIOS DE AULA
EQUIPOS Y MOBILIARIOS DE SALA DE USOS MULTIBLES
EQUIPOS Y MOBILIARIOS DE COMEDOR
EQUIPOS Y MOBILIARIOS DE COCINA
EQUIPOS Y MOBILIARIOS DE DIRECCIN
EQUIPOS Y MOBILIARIOS DE TOPICO
EQUIPOS Y MOBILIARIOS DE DEPOSITO DE MATERIAL EDUCATIVO
DECLARATORIA DE IMPACTO AMBIENTAL
MEDIDAS DE PREVENCION
EDUCACIN ANBIENTAL
CHARLAS AL PERSONAL OBRERO
CHARLAS A LA COMUNIDAD BENEFICIARIA
POLOS CON LOGOS AMBIENTALES

271574020.xls / Val-Obra Yuler A. G.

m
pza

5.00
5.00

21.73
18.79

108.650
93.950

m3

6.04

182.82

1,104.230

0.00%

0.00

0.000

100.00%

GLB
GLB
GLB
GLB

1.00
1.00
1.00
1.00

11,510.00
4,059.00
3,176.00
3,828.00

11,510.000
4,059.000
3,176.000
3,828.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

GLB
GLB
GLB
GLB
GLB
GLB
GLB

1.00
1.00
1.00
1.00
1.00
1.00
1.00

14,035.00
52,915.00
3,707.00
4,356.00
11,750.00
3,408.00
916.00

14,035.000
52,915.000
3,707.000
4,356.000
11,750.000
3,408.000
916.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
94.00%
0.00%
0.00%
0.00%
0.00%
0.00%

GLB
GLB
GLB

3.00
3.00
1.00

550.00
550.00
932.25

1,650.000
1,650.000
932.250

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

0.42
4.18
18.31
8.00
0.00
23.13
0.00
49.52
3.00
2.50
2.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.37
0.98
0.00
0.76
4.52
68.15
4.00
0.00
30.52
0.00
5.00
5.00
0.00
6.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
3.00
1.00

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

159.869
223.672
87.705
868.000

100.00%
100.00%
100.00%
100.00%

0.42
4.18
18.31
8.00

SALDO
MES ACTUAL
MET.
TOTAL
S/.

159.869
223.672
87.705
868.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

696.676

100.00%

23.13

696.676

0.00%

0.00

0.000

1,076.070
56.370
81.650
97.480
194.960

100.00%
100.00%
100.00%
100.00%
100.00%

49.52
3.00
2.50
2.00
4.00

1,076.070
56.370
81.650
97.480
194.960

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000

100.00%
100.00%
100.00%

9.61
9.61
19.22

8.553
10.091
29.214

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

0.000
0.000
0.000

100.00%
100.00%
100.00%

26.80
32.16
32.16

946.576
486.902
268.536

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

132.948
56.379

100.00%
100.00%

0.37
0.98

132.948
56.379

0.00%
0.00%

0.00
0.00

0.000
0.000

289.286
241.865
326.439
434.000

100.00%
100.00%
100.00%
100.00%

0.76
4.52
68.15
4.00

289.286
241.865
326.439
434.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

2,905.504

100.00%

30.52

2,905.504

0.00%

0.00

0.000

108.650
93.950

100.00%
100.00%

5.00
5.00

108.650
93.950

0.00%
0.00%

0.00
0.00

0.000
0.000

1,104.233

100.00%

6.04

1,104.233

0.00%

0.00

0.000

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00

11,510.000
4,059.000
3,176.000
3,828.000

0.000
49,740.100
0.000
0.000
0.000
0.000
0.000

0.00%
94.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.94
0.00
0.00
0.00
0.00
0.00

0.000
49,740.100
0.000
0.000
0.000
0.000
0.000

100.00%
6.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.00
0.06
1.00
1.00
1.00
1.00
1.00

14,035.000
3,174.900
3,707.000
4,356.000
11,750.000
3,408.000
916.000

1,650.000
1,650.000
932.250

100.00%
100.00%
100.00%

3.00
3.00
1.00

1,650.000
1,650.000
932.250

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION GENERAL
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
1.02
01.02.01
01.02.01.01
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
1.03
01.03.01
01.03.02
1.04
01.04.01
01.04.02
01.04.03

PARTIDAS
SEALIZACION
LETRERO DE UBICACIN
LETREROS AMBIENTALES
CINTA SEALIZADORA DE OBRA
MEDIDAS DE MITIGACIN
MITIGACION DE IMPACTO AMBIENTAL
TRATAMIENTO DE BOTADEROS
MICRO RELLENO SANITARIO

UND

MET.

P. U.
S/.

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

und
und
m

1.00
3.00
300.00

296.62
296.62
1.18

296.620
889.860
354.000

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

GLB

1.00

423.73

423.730

0.00%

0.00

0.000

100.00%

CLAUSURA DEL RELLENO SANITARIO


CLAUSURA DE LETRINAS

m2
m2

5.00
5.00

0.89
1.05

BOTIQUIN DE PRIMEROS AUXILIOS


CHARLA AL PERSONAL DE OBRA
CHARLA A LOS ESTUDIANTES

m3
m3
und

12.50
10.00
1.00

35.32
9.75
105.97

4.450
5.250
441.500
97.500
105.970

0.00%
0.00%
0.00%
0.00%
100.00%

0.00
0.00
0.00
0.00
1.00

0.000
0.000
0.000
0.000
105.970

100.00%
100.00%
100.00%
100.00%
0.00%

m3

49.11

20.24

m2
und

196.45
20.00

4.14
14.96

993.990
813.300
299.200

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

26.47%
0.00%
0.00%

und
und

4.00
1.00

67.80
381.36

271.200
381.360

0.00%
0.00%

0.000
0.000

100.00%
100.00%

und
und
und

1.00
10.00
1.00

220.00
70.00
296.80

220.000
700.000
296.800
1,420,671.43
1,420,671.43
97,315.99
85,240.29
1,603,227.71
1.00000
1,603,227.71
288,580.99
1,891,808.70

100.00%
100.00%
100.00%
71.76%

0.00
0.00
0.00
1.00
10.00
1.00

220.000
700.000
296.800
1,019,406.47

0.00%
0.00%
0.00%
18.45%

AREAS VERDES
ADECUACION Y PREPARACIN DEL TERRENO
SEMBRADO DE GRASS
SEMBRADO DE PLANTONES
MEDIDAS DE CONTROL
PROVISIN DE RECIPIENTES PLASTICOS CON TAPA PARA RESIDUOS SOLI
CONTRUCION DE LETRINA
PLAN DE SALUD Y SEGURIDAD
PROVISION DE EXTINTORES DE 12KG
PROVISIN DE ENVASE MAS SURTIDOR DE AGUA PARA CONSUMO HUMAN
PROVISION DE BOTIQUIN

COSDIRECTO
COSTO DIRECTO TOTAL
GASTOS GENERALES ( 6.85 %)
UTILIDADES ( 6%)
SUBTOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V. ( 18.00 % )
TOTAL PRESUPUESTO

271574020.xls / Val-Obra Yuler A. G.

F.R=

71.76%

69,829.34
61,164.39
1,150,400.20
1.00000
1,150,400.20
207,072.04
1,357,472.24

18.45%

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

0.00
1.00
3.00
300.00
0.00
0.00
1.00
0.00
5.00
5.00
12.50
10.00
0.00
0.00
13.00
0.00
0.00
0.00
4.00
1.00
0.00
0.00
0.00
0.00

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

296.620
889.860
354.000

100.00%
100.00%
100.00%

1.00
3.00
300.00

296.620
889.860
354.000

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

423.730

100.00%

1.00

423.730

0.00%

0.00

0.000

4.450
5.250
441.500
97.500
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

5.00
5.00
12.50
10.00
1.00

4.450
5.250
441.500
97.500
105.970

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

263.120
0.000
0.000

26.47%
0.00%
0.00%

13.00
0.00
0.00

263.120
0.000
0.000

73.53%
100.00%
100.00%

36.11
196.45
20.00

730.870
813.300
299.200

271.200
381.360

100.00%
100.00%

271.200
381.360

0.00%
0.00%

0.00
0.00

0.000
0.000

0.000
0.000
0.000
262,102.47

100.00%
100.00%
100.00%
90.20%

4.00
1.00
0.00
1.00
10.00
1.00

220.000
700.000
296.800
1,281,508.95

0.00%
0.00%
0.00%
9.80%

0.00
0.00
0.00

0.000
0.000
0.000
139,162.51

17,954.02
15,726.15
295,782.63
1.00000
295,782.63
53,240.87
349,023.50

90.20%

87,783.36
76,890.54
1,446,182.84
1.00000
1,446,182.84
260,312.91
1,706,495.75

9.80%

9,532.63
8,349.75
157,044.89
1.00000
157,044.89
28,268.08
185,312.97

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION MODULO I Y II
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
01
01.01

PARTIDAS
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEG
CONSTRUCCIONES PROVISIONALES
ALMACEN OFICINA Y CASETA DE GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m

UND

MET.

P. U.
S/.

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

###
m2
und

56.00
1.00

52.19
593.88

CERCO PROVISIONAL h=2.20 m

140.00

7.78

2,922.640
593.880
1,089.200

100.00%
100.00%
100.00%

56.00
1.00
140.00

2,922.640
593.880
1,089.200

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

56.00
1.00
140.00

2,922.640
593.880
1,089.200

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

01.02.01
01.02.02

INSTALACIONES PROVISIONALES
AGUA Y DESAGUE PARA LA CONSTRUCCION
ENERGIA ELECTRICA PROVISIONAL

glb
glb

1.00
1.00

600.00
300.00

600.000
300.000

100.00%
100.00%

1.00
1.00

600.000
300.000

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

1.00
1.00

600.000
300.000

0.00%
0.00%

0.00
0.00

0.000
0.000

1.03
01.03.01

TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

m2

1,200.00

0.89

01.03.02
01.03.03
01.03.04

CORTE DE MATERIAL SUELTO CON MAQUINARIA


RELLENO CON MATERIAL PROPIO

m3
m2
m3

1,401.56
168.19
1,480.05

3.66
27.02
7.09

1,068.000
5,129.710
4,544.490
10,493.550

100.00%
100.00%
100.00%
100.00%

1,068.000
5,129.710
4,544.490
10,493.550

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

1,068.000
5,129.710
4,544.494
10,493.555

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

16,500.000
648,374.830
31,541.010

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.00
1.00
1.00

16,500.000
648,374.830
31,541.010

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

1,260.000

0.00%

0.00

0.000

100.00%

###

1,260.000

0.00%

0.00

0.000

01.01.01
01.01.02
01.01.03
1.02

###
###
168.19
###

###
###
168.19
###

1.04
1.04.01

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA


MOVILIZACION DE EQUIPOS Y HERRAMIENTAS
MOVILIZACIN DE MAQUINARI

glb

1.00

16,500.00

1.04.02
1.04.03

FLETE A PIE DE OBRA


FLETE TERRESTRE

glb
glb

1.00
1.00

648,374.83
31,541.01

16,500.000
648,374.830
31,541.010

100.00%
100.00%
100.00%

1.00
1.00
1.00

1.05
1.05.01

TRAZO, NIVELES Y REPLANTEO


TRAZO, NIVELES Y REPLANTEO PRELIMINAR

m2

1,200.00

1.05

1,260.000

100.00%

###

1.06
1.06.01

SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE

GLB

1.00

460.00

1.06.02
1.06.03

EQUIPOS DE PROTECCION INDIVIDUAL


EQUIPOS DE PROTECCION COLECTIVA

GLB
GLB

1.00
1.00

500.00
550.00

1.06.04
02

SEALIZACIONES TEMPORAL DE SEGURIDAD


ESTRUCTURAS

GLB

1.00

500.00

460.000
500.000
550.000
500.000

100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00

460.000
500.000
550.000
500.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00

460.000
500.000
550.000
500.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

02.01
02.01.01

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA ZAPATAS

m3

28.06

30.27

02.02.02
02.02.03

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS


RELLENO CON MATERIAL PROPIO

m3
m3

55.65
24.32

30.27
27.22

02.02.04
02.02.05

NIVELACIN INTERIOR Y COMPACTACIN C/PLANCHA COMPACTADORA (10 m3


ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO
m2
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
m3

308.61
3.96

2.73
15.14

3.96

7.09

849.380
1,684.530
661.990
842.510
59.950
28.080

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

28.06
55.65
24.32
308.61
3.96
3.96

849.380
1,684.530
661.990
842.510
59.950
28.080

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

28.06
55.65
24.32
308.61
3.96
3.96

849.376
1,684.526
661.990
842.505
59.954
28.076

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

02.02.06
02.02
02.02.01

OBRAS DE CONCRETO SIMPLE


CIMIENTOS CORRIDOS

02.02.01.01
02.02.02

CIMIENTOS CORRIDOS MEZCLA 1:10 C-H + 30% PG


SOLADOS

m3

45.71

244.09

11,157.350

100.00%

45.71

11,157.350

0.00%

0.00

0.000

100.00%

45.71

11,157.354

0.00%

0.00

0.000

02.02.02.01
02.02.03

SOLADO, E= 4" ; MEZCLA 1:12, C:H

m2

20.05

25.15

504.260

100.00%

20.05

504.260

0.00%

0.00

0.000

100.00%

20.05

504.258

0.00%

0.00

0.000

02.02.03.01
02.02.03.02

SOBRECIMIENTO
SOBRECIMIENTO: CONCRETO 1:8 + 25% P.M.
SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO

m3
m2

8.22
111.19

271.86
33.93

2,234.690
3,772.680

100.00%
100.00%

8.22
111.19

2,234.690
3,772.680

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

8.22
111.19

2,234.689
3,772.677

0.00%
0.00%

0.00
0.00

0.000
0.000

02.02.04
02.02.04.01

FALSO PISO
FALSO PISO E= 4" f`c= 140 kg/cm2

m2

308.61

32.44

10,011.310

100.00%

308.61

10,011.310

0.00%

0.00

0.000

100.00%

308.61

10,011.308

0.00%

0.00

0.000

10.02
412.61

363.83
4.35

3,645.580
1,794.850

100.00%
100.00%

10.02
412.61

3,645.580
1,794.850

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

10.02
412.61

3,645.577
1,794.854

0.00%
0.00%

0.00
0.00

0.000
0.000

5,637.280
8,980.680
11,175.980

100.00%
100.00%
100.00%

14.81
201.00
###

5,637.280
8,980.680
11,175.980

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

14.81
201.00
###

5,637.278
8,980.680
11,175.977

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

10,001.690
14,891.490
12,569.350

100.00%
100.00%
100.00%

27.49
334.49
###

10,001.690
14,891.490
12,569.350

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

27.49
334.49
###

10,001.687
14,891.495
12,569.346

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

OBRAS DE CONCRETO ARMADO

2.03
02.03.01

ZAPATAS

02.03.01.01
02.03.01.02

ZAPATAS: CONCRETO, fc= 210kg/cm2


ZAPATAS: ACERO, fy= 4200kg/cm2

m3
kg

02.03.02
02.03.02.01

COLUMNAS
COLUMNAS: CONCRETO, fc= 210kg/cm2

m3

14.81

380.64

02.03.02.02
02.03.02.03

COLUMNAS: ENCOFRADO Y DESENCOFRADO


COLUMNAS: ACERO, fy= 4200kg/cm2

m2
kg

201.00
2,569.19

44.68
4.35

02.03.03
02.03.03.01

VIGAS
VIGAS: CONCRETO, fc= 210kg/cm2

m3

27.49

363.83

02.03.03.02
02.03.03.03

VIGAS: ENCOFRADO Y DESENCOFRADO


VIGAS: ACERO, fy= 4200kg/cm2

m2
kg

334.49
2,774.69

44.52
4.53

271574020.xls / VAL MODULO Yuler A. G.

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION MODULO I Y II
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
2.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05

PARTIDAS
LOSAS ARMADA
LOSAS ARMADA: CONCRETO, fc= 210kg/cm2
LOSAS ARMADA: ENCOFRADO Y DESENCOFRADO
LOSAS ARMADA: ACERO, fy= 4200kg/cm2

UND

MET.

P. U.
S/.

TOTAL
S./

m3
m2

2.16
19.55

363.83
34.19

kg

103.66

4.53

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

785.870
668.410
469.580

90.00%
90.00%
90.00%

1.94
17.60
93.29

90.00%
90.00%
90.00%
90.00%

37.94
447.04
###
223.13

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

707.290
601.570
422.620

10.00%
10.00%
10.00%

0.22
1.96
10.37

78.587
66.842
46.958

100.00%
100.00%
100.00%

2.16
19.55
103.66

13,801.890
16,866.780
12,298.760
5,944.130

10.00%
10.00%
10.00%
10.00%

4.22
49.67
301.66
24.79

1,533.544
1,874.087
1,366.529
660.459

100.00%
100.00%
100.00%
100.00%

42.15
496.71
###
247.92

SALDO
MES ACTUAL
MET.
TOTAL
S/.

785.873
668.415
469.580

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

15,335.435
18,740.868
13,665.289
6,604.589

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

02.03.05.01
02.03.05.02

LOSAS ALIGERADA EN DOS DIRECCIONES


LOSAS ALIGERADA EN DOS DIRECCIONES: CONCRETO, fc= 210kg/cm2
LOSAS ALIGERADA EN DOS DIRECCIONES: ENCOFRADO Y DESENCOFR

m3
m2

42.15
496.71

363.83
37.73

02.03.05.03
02.03.05.04

LOSAS ALIGERADA EN DOS DIRECCIONES: ACERO, fy= 4200kg/cm2


LOSAS ALIGERADA EN DOS DIRECCIONES: ALIGERADO DE TECKNOPOR

kg
m2

3,016.62
247.92

4.53
26.64

15,335.430
18,740.870
13,665.290
6,604.590

2.04
02.04.01
03

VARIOS
JUNTAS DE DILATACIN C/TECNOPORT, e= 1"x15cm, EN MUROS

237.66

4.42

1,050.460

0.00%

0.00

0.000

100.00%

237.66

1,050.457

100.00%

237.66

1,050.457

0.00%

0.00

0.000

ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA LADRILLO K.K 18 HUECOS DE ARCILLA

m2

321.04

68.69

ACERO D AMARRE, fy= 4200kg/cm2

kg

43.68

4.53

22,052.240
197.870

100.00%
100.00%

321.04
43.68

22,052.240
197.870

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

321.04
43.68

22,052.238
197.870

0.00%
0.00%

0.00
0.00

0.000
0.000

m3
m2

6.40
102.81

376.70
34.35

kg

896.64

4.53

2,410.880
3,531.520
4,061.780

100.00%
100.00%
100.00%

6.40
102.81
896.64

2,410.880
3,531.520
4,061.780

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

6.40
102.81
896.64

2,410.880
3,531.524
4,061.779

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

647.920
980.110
1,197.730

100.00%
100.00%
100.00%

1.72
27.64
264.40

647.920
980.110
1,197.730

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.72
27.64
264.40

647.924
980.114
1,197.732

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

674.290
966.050
638.910

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.79
28.43
141.04

674.293
966.051
638.911

100.00%
100.00%
100.00%

1.79
28.43
141.04

674.293
966.051
638.911

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

89.28
428.80
202.45
155.44
334.49
205.37
459.00

1,629.360
7,825.600
3,694.713
3,380.820
7,750.133
1,472.503
775.710

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

89.28
428.80
202.45
155.44
334.49
205.37
459.00

1,629.360
7,825.600
3,694.713
3,380.820
7,750.133
1,472.503
775.710

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

3.01
03.01.01
03.01.02
3.02

COLUMNAS DE AMARRE

03.02.01
03.02.02

COLUMNAS DE AMARRE: CONCRETO, fc= 175kg/cm2


COLUMNAS DE AMARRE: ENCOFRADO Y DESENCOFRADO

03.02.03
3.03
03.03.01
03.03.02

COLUMNAS DE AMARRE: ACERO, fy= 4200kg/cm2


VIGAS DE AMARRE
VIGAS DE AMARRE: CONCRETO, fc= 175kg/cm2
VIGAS DE AMARRE: ENCOFRADO Y DESENCOFRADO

m2
m

1.72
27.64

376.70
35.46

03.03.03
3.04

VIGAS DE AMARRE: ACERO, fy= 4200kg/cm2


MESA DE CONCRETO

kg

264.40

4.53

03.04.01
03.04.02

MESA DE CONCRETO: CONCRETO, fc= 175kg/cm2


MESA DE CONCRETO: ENCOFRADO Y DESENCOFRADO

m3
m2

1.79
28.43

376.70
33.98

03.04.03
3.05

MESA DE CONCRETO, fy= 4200kg/cm2


REVOQUES Y REVESTIMIENTOS

kg

141.04

4.53

03.05.01
03.05.02

TARRAJEO PRIMARIO O RAYADO


TARRAJEO EN INTERIORES

m2
m2

89.28
428.80

18.25
18.25

03.05.03
03.05.04
03.05.05

TARRAJEO EN EXTERIORES
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS

m2
m2
m2

202.45
155.44
334.49

18.25
21.75
23.17

03.05.06
03.05.07

VESTIDURA DE DERRAMES EN VANOS DE PUERTAS Y VENTANAS, E=15 CM


BRUAS EN MUROS DE e = 1" x 1/2"

m
m

205.37
459.00

7.17
1.69

1,629.360
7,825.600
3,694.710
3,380.820
7,750.130
1,472.500
775.710

3.06
03.06.01

CIELORASOS
CIELORASOS C/MEZCLA DE C:A

m2

496.71

44.79

22,247.640

80.00%

397.37

17,798.110

20.00%

99.34

4,449.528

100.00%

496.71

22,247.641

0.00%

0.00

0.000

3.07
03.07.01

PISOS Y PAVIMENTOS
CONTRAPISO DE 42 mm.

m2

88.76

19.65

03.07.02
03.07.03

PISO DE CEMENTO SEMI PULIDO


PISO: MACHIMBRADO

m2
m2

12.79
224.34

32.28
51.15

03.07.04
03.07.05

PISO DE CERMICO, 30x30cm.


PISO DE CERMICO, 45x45cm.

m2
m2

26.62
62.14

49.85
49.85

1,744.130
412.860
11,474.990
1,327.010
3,097.680

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

88.76
12.79
224.34
26.62
62.14

1,744.134
412.861
11,474.991
1,327.007
3,097.679

100.00%
100.00%
100.00%
100.00%
100.00%

88.76
12.79
224.34
26.62
62.14

1,744.134
412.861
11,474.991
1,327.007
3,097.679

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

3.08
03.08.01

ENCHAPE EN MESA DE CONCRETO


ENCHAPE EN MESA DE CONCRETO: CERMICO, 30x30cm. m2 28.43

m2

28.43

53.04

1,507.930

0.00%

0.00

0.000

100.00%

28.43

1,507.927

100.00%

28.43

1,507.927

0.00%

0.00

0.000

3.09
03.09.01

ZOCALOS
ZOCALO DE CERAMICO VIDRIADO, 20x30 cm.

m2

60.85

62.29

3,790.350

0.00%

0.00

0.000

100.00%

60.85

3,790.347

100.00%

60.85

3,790.347

0.00%

0.00

0.000

3.10
03.10.01

CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.30 M

ml

156.86

9.02

03.10.02
3.11

CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.10 M


CUBIERTAS

ml

193.48

5.86

1,414.880
1,133.790

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

156.86
193.48

1,414.877
1,133.793

100.00%
100.00%

156.86
193.48

1,414.877
1,133.793

0.00%
0.00%

0.00
0.00

0.000
0.000

03.11.01

CUBIERTA DE LADRILLO PASTELERO ASENTADO CON MEZCLA C:A

m2

484.35

33.27

16,114.320

0.00%

0.00

0.000

100.00%

484.35

16,114.325

100.00%

484.35

16,114.325

0.00%

0.00

0.000

271574020.xls / VAL MODULO Yuler A. G.

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION MODULO I Y II
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM

PARTIDAS

UND

MET.

P. U.
S/.

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

39.05
6.97
124.47
15.51
10.82
14.00
5.00
38.00

10,272.103
1,424.598
14,727.290
2,181.326
2,219.290
858.340
245.250
2,329.780

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

39.05
6.97
124.47
15.51
10.82
14.00
5.00
38.00

10,272.103
1,424.598
14,727.290
2,181.326
2,219.290
858.340
245.250
2,329.780

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

57.00
14.00
14.00
7.00

555.180
1,161.860
348.180
246.260

m2

39.05

263.05

03.12.02
03.12.03

PUERTA CON PLANCHA DE MELANINE, E=3/4"


VENTANA DE MADERA

m2
m2

6.97
124.47

204.39
118.32

03.12.04
03.12.05

CLOSET DE MADERA
DIVISION CON PLANCHA DE MELANINE PARA SERVICIOS HIGIENICOS

m2
und

15.51
10.82

140.64
205.11

03.12.06
03.12.07

COLOCACIN DE PUERTA DE MADERA


COLOCACIN DE PUERTA DE MELAMINE

und
und

14.00
5.00

61.31
49.05

03.12.08
3.13

COLOCACIN DE VENTANA DE MADERA


CERRAJERIA

und

38.00

61.31

03.13.01
03.13.02
03.13.03

BISAGRAS DE FIERRO; 3"x3", C/EJE DE 1/2" (PUERTAS)


CERRADURA PARA PUERTAS (03 GOLPES)

pza
pza
und

57.00
14.00
14.00

9.74
82.99
24.87

und

7.00

35.18

555.180
1,161.860
348.180
246.260

SALDO
MES ACTUAL
MET.
TOTAL
S/.

10,272.100
1,424.600
14,727.290
2,181.330
2,219.290
858.340
245.250
2,329.780

CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA, E=40MM

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

3.12
03.12.01

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

TOTAL
S./

03.13.04
3.14

PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M.


CERROJO DE FIERRO REDONDO DE 1/2" X 0.35 M.
VIDRIOS, CRISTALES Y SIMILARES

03.14.01
03.14.02

VIDRIO TRIPLE INCOLORO 6MM


ESPEJO DE 0.80x0.80m

p2
p3

115.95
6.00

75.54
86.91

8,758.860
521.460

0.00%
0.00%

0.00
0.00

0.000
0.000

0.00%
0.00%

0.00
0.00

0.000
0.000

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

115.95
6.00

8,758.860
521.460

3.15
03.15.01

PINTURA
PINTURA LTEX EN CIELORASO

m2

700.35

9.18

03.15.02
03.15.03

PINTURA LTEX EN INTERIORES


PINTURA LTEX EN EXTERIORES

m2
m2

428.80
202.45

9.18
9.18

03.15.04
03.15.05

PINTURA LATEX EN COLUMNAS


PINTURA LATEX EN VIGAS

m2
m2

155.44
334.49

10.10
10.10

03.15.06
03.15.07

PINTURA EN PUERTA DE MADERA


PINTURA EN VENTANA DE MADERA

m2
m2

78.10
248.94

15.99
15.99

03.15.08
03.15.09

PINTURA EN CLOSET
PINTURA EN CONTRAZOCALOS H=30CM

m2
m2

31.02
156.86

15.99
2.65

03.15.10
03.15.11

PINTURA EN CONTRAZOCALOS H=10CM


PINTURA EN LADRILLO PASTELERO

m2
m2

193.48
484.35

1.78
7.61

6,429.210
3,936.380
1,858.490
1,569.940
3,378.350
1,248.820
3,980.550
496.010
415.680
344.390
3,685.900

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

700.35
428.80
202.45
155.44
334.49
78.10
248.94
31.02
156.86
193.48
484.35

6,429.210
3,936.380
1,858.490
1,569.940
3,378.350
1,248.820
3,980.550
496.010
415.680
344.390
3,685.900

3.16
03.16.01

VARIOS
LIMPIEZA FINAL DE OBRA

GLB

1.00

2,160.48

2,160.480

0.00%

0.00

0.000

0.00%

0.00

0.000

0.00%

0.00

0.000

100.00%

1.00

2,160.480

04
4.01
04.01.01

INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

2.00
5.00
7.00
2.00
1.00
1.00
1.00

453.700
1,134.250
750.190
380.360
176.310
115.570
166.420

04.01.01.01
04.01.01.02

SUMINISTRO DE APARATOS SANITARIOS


INODORO TOP PIECE, COLOR C/ACCS. - "TREBOL"
INODORO BABY, COLOR C/ACCS "TREBOL"

pza
pza

2.00
5.00

226.85
226.85

04.01.01.03
04.01.01.04

LAVATORIO OVALN SONET, COLOR BLANCO - "TREBOL"


LAVATORIO DE COLOR C/PEDESTAL FONTAINE COLOR "TREBOL"

pza
pza

7.00
2.00

107.17
190.18

04.01.01.05
04.01.01.06

URINARIO CADET, COLOR - "TREBOL"


LAVADERO DE ACERO INOXIDABLE 21"X38", LINEA HOME(RECORD)

pza
pza

1.00
1.00

176.31
115.57

04.01.01.07
04.01.02

LAVADERO DE ACERO INOXIDABLE 21"X54", LINEA HOME(RECORD)


SUMINISTRO DE ACCESORIOS

pza

1.00

166.42

453.700
1,134.250
750.190
380.360
176.310
115.570
166.420

04.01.02.01
04.01.03

PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO


INSTALACION DE APARATOS SANITARIOS

und

8.00

32.57

260.560

0.00%

0.00

0.000

0.00%

0.00

0.000

0.00%

0.00

0.000

100.00%

8.00

260.560

04.01.03.01
04.01.04

COLOCACION DE APARATOS SANITARIOS


INSTALACION DE ACCESORIOS

und

19.00

61.31

1,164.890

0.00%

0.00

0.000

0.00%

0.00

0.000

0.00%

0.00

0.000

100.00%

19.00

1,164.890

04.01.04.01
4.02

COLOCACION DE ACCESORIOS SANITARIOS


SISTEMA DE AGUA FRIA

und

8.00

24.03

192.240

0.00%

0.00

0.000

0.00%

0.00

0.000

0.00%

0.00

0.000

100.00%

8.00

192.240

04.02.01
04.02.01.01

SALIDA DE AGUA FRIA


SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"

pto

19.00

28.24

04.02.02
04.02.02.01

REDES DE ALIMENTACION
m

0.00
66.34

0.00
10.60

m
m

66.34
78.84

5.29
11.28

536.560
0.000
703.200
350.940
889.320

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
0.00%
100.00%
100.00%
100.00%

19.00
0.00
66.34
66.34
78.84

536.560
0.000
703.204
350.939
889.315

100.00%
0.00%
100.00%
100.00%
100.00%

19.00
0.00
66.34
66.34
78.84

536.560
0.000
703.204
350.939
889.315

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

04.02.02.02
04.02.02.03

EXCAV.ZANJAS RT<2kg/cm2 - 0.50m.x0.70m.


RELLENO MANUAL C/MATERIAL PROPIO
TUBERA PVC CLASE 10 - 1/2" C/R

271574020.xls / VAL MODULO Yuler A. G.

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION MODULO I Y II
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM

PARTIDAS

UND

MET.

P. U.
S/.

04.02.03

ACCESORIOS DE REDES DE AGUA

04.02.03.01
04.02.03.02

CODO PVC - CLASE 10 CR 1/2"*90


CODO PVC - CLASE 10 CR 1/2"*45

und
und

8.00
1.00

14.40
14.35

04.02.03.03
04.02.03.04

TEE PVC - CLASE 10 CR 1/2"


CRUZ PVC SAPC-10 =1/2"

und
und

25.00
1.00

16.73
16.78

04.02.04
04.02.05.01

VALVULAS
VALVULA ESFERICA DE BRONCE 1/2"

9.00

81.69

04.02.05.02
04.02.05

VALVULA CHECK DE 1/2"


VARIOS

1.00

04.02.05.01
04.02.05.02
04.02.05.03

VALVULAS DE COMPUERTA DE BRONCE DE 3/4"


CAJA CON TAPA METALICA PARA VALVULAS DE 12"x12"

GLB
pza
pza

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

115.200
14.350
418.250
16.780

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

8.00
1.00
25.00
1.00

115.200
14.350
418.250
16.780

100.00%
100.00%
100.00%
100.00%

8.00
1.00
25.00
1.00

115.200
14.350
418.250
16.780

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

81.69

735.210
81.690

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

9.00
1.00

735.210
81.690

100.00%
100.00%

9.00
1.00

735.210
81.690

0.00%
0.00%

0.00
0.00

0.000
0.000

1.00
9.00
1.00

211.87
170.79
180.66

211.870
1,537.110
180.660

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.00
9.00
1.00

211.870
1,537.110
180.660

100.00%
100.00%
100.00%

1.00
9.00
1.00

211.870
1,537.110
180.660

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

2,846.480
971.510
299.840
149.920
299.530
314.440
179.460

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

156.40
59.13
16.00
8.00
1.03
8.88
8.88

2,846.480
971.506
299.840
149.920
299.534
314.441
179.465

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

156.40
59.13
16.00
8.00
1.03
8.88
8.88

2,846.480
971.506
299.840
149.920
299.534
314.441
179.465

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

129.150
190.800
273.700
22.760
84.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

7.00
12.00
7.00
2.00
6.00

129.150
190.800
273.700
22.760
84.000

100.00%
100.00%
100.00%
100.00%
100.00%

7.00
12.00
7.00
2.00
6.00

129.150
190.800
273.700
22.760
84.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

48.96
48.96
38.20
21.08

518.976
258.998
627.626
309.454

100.00%
100.00%
100.00%
100.00%

48.96
48.96
38.20
21.08

518.976
258.998
627.626
309.454

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

4.03
04.03.01

CAJA PARA MEDIDOR DE 12"X12"


SISTEMA DE DRENAJE PLUVIAL
CANALETAS DE PLANCHA GALV.

156.40

18.20

04.03.02
04.03.03

TUBERIA DE PVC-SAP 4" P/LLUVIA


CODO PVC SAL 4"X90

m
pza

59.13
16.00

16.43
18.74

04.03.04
04.03.05

CODO PVC SAL SANITARIO 4"X90


PEDESTAL: CONCRETO F'C= 140 KG/CM2

pza
m3

8.00
1.03

18.74
290.81

04.03.06
04.03.07

PEDESTAL: ENCOFRADO Y DESENCOFRADO


PEDESTAL: TARRAJEO

m2
m2

8.88
8.88

35.41
20.21

4.04
04.04.01

SISTEMA DE DESAGUE
SALIDAS DE DESAGUE

04.04.01.01
04.04.01.02

SALIDA DE DESAGUE EN PVC 4" (INODORO)


SALIDA DE DESAGUE EN PVC 2" (LAVATORIOS Y URINARIOS)

pto
pto

7.00
12.00

18.45
15.90

04.04.01.03
04.04.01.04

SALIDA DE DESAGUE EN PVC 2" (SUMIDERO)


SALIDA DE REGISTRO ROSCADO 2"

pto
pto

7.00
2.00

39.10
11.38

04.04.01.05
04.04.02

SALIDA DE REGISTRO ROSCADO 4"


REDES DE DESAGUE

pto

6.00

14.00

04.04.02.01
04.04.02.02

EXCAV.ZANJAS RT<2kg/cm2 - 0.50m.x0.70m.


RELLENO MANUAL C/MATERIAL PROPIO

m
m

48.96
48.96

10.60
5.29

04.04.02.03
04.04.02.04
04.04.03

TUBERIA DE PVC-SAP 4"


TUBERIA DE PVC-SAP 2"

m
m

38.20
21.08

16.43
14.68

518.980
259.000
627.630
309.450

04.04.03.01
04.04.04

RED DE VENTILACIN
RED DE VENTILACION 2"
ACCESORIOS DE REDES

27.84

16.26

452.680

0.00%

0.00

0.000

100.00%

27.84

452.678

100.00%

27.84

452.678

0.00%

0.00

0.000

04.04.04.01
04.04.04.02

CODO PVC SAL 4"X90


CODO PVC SAL 4"X45

pza
pza

1.00
6.00

18.74
18.69

04.04.04.03
04.04.04.04

CODO PVC SAL 2"X90


CODO PVC SAL 2"X45

pza
pza

62.00
8.00

16.12
16.12

04.04.04.05
04.04.04.06

YEE PVC-SAL 4"


YEE PVC-SAL 2"

pza
pza

5.00
10.00

18.45
25.17

04.04.04.07
04.04.04.08

YEE PVC-SAL 4"-2"


TEE PVC-SAL 4"

pza
pza

8.00
8.00

17.90
18.79

04.04.04.09
04.04.04.10

TEE PVC-SAL 4"X2"


CODO PVC SAL SANITARIO 4 A 2 "X90

pza
pza

2.00
4.00

18.65
18.74

04.04.04.11
04.04.05

REDUCCIONES PVC-SAL 4" A 2"


ADITAMENTOS VARIOS

pza

3.00

26.86

18.740
112.140
999.440
128.960
92.250
251.700
143.200
150.320
37.300
74.960
80.580

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.00
6.00
62.00
8.00
5.00
10.00
8.00
8.00
2.00
4.00
3.00

18.740
112.140
999.440
128.960
92.250
251.700
143.200
150.320
37.300
74.960
80.580

04.04.05.01
04.04.05.02

SUMIDERO DE BRONCE 2"


REGISTRO DE BRONCE 4"

und
und

7.00
6.00

65.12
37.18

04.04.05.03
04.04.05.04

REGISTRO DE BRONCE 2"


CAJA DE DESAGUE DE 12"X24" DE C Y TAPA DE FF

und
und

2.00
2.00

37.18
200.45

04.04.05.05

PRUEBA A RED DE DESAGUE

GLB

1.00

211.87

455.840
223.080
74.360
400.900
211.870

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

7.00
6.00
2.00
2.00
1.00

455.840
223.080
74.360
400.900
211.870

271574020.xls / VAL MODULO Yuler A. G.

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION MODULO I Y II
SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM

PARTIDAS

UND

05
5.01

INSTALACIONES ELECTRICAS
SALIDAS

05.01.01
05.01.02
05.01.03

SALIDA DE TECHO (CENTRO DE LUZ)


SALIDA PARA TOMACORRIENTE C/LINEA A TIERRA
INTERRUPTOR UNIPOLAR SIMPLE

pto
pto
pto

05.01.04
5.02

INTERRUPTOR UNIPOLAR DOBLE


CAJAS DE PASE

05.02.01
5.03

CAJA DE PASE FG PESADO 15x15x10 cm.


CANALIZACIONES Y/O TUBERIAS

05.03.01
05.03.02

TUBERIA PVC-SAP 50 mm.


TUBERIA PVC-SAP 25 mm.

05.03.03
5.04

TUBERIA PVC-SAP 20 mm.


TABLEROS Y SUBTABLEROS

05.04.01
05.04.02

TABLERO GENERAL (TG)06 POLOS


TABLERO DE DISTRIBUCIN DE DE 4 POLOS

und
und

05.04.03
05.04.04

TABLERO DE DISTRIBUCIN DE DE 6 POLOS


INTERRUPTOR TERMOMAGNTICO 2 x 100A

und
und

05.04.05
05.04.06

INTERRUPTOR TERMOMAGNTICO 2 x 60A


INTERRUPTOR TERMOMAGNTICO 2 x 20A

05.04.07
5.05

INTERRUPTOR TERMOMAGNTICO 2 x 15A


CONDUCTORES Y/O CABLES

05.05.01
05.05.02

CONDUCTOR LSOH 2.5 mm2 - ALUMBRADO


CONDUCTOR LSOH 4 mm2 - TOMACORRIENTE

05.05.03
05.05.04
05.05.05

CONDUCTOR LSOH 10 mm2 - POZO A TIERRA


CONDUCTOR LSOH 16 mm2 - DE TABLERO GENERAL - TABLERO DE

MET.

P. U.
S/.

TOTAL
S./

AVANCE ACUMULADO
MES ACTUAL
%
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

27.49

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

65.00
45.00
27.00
11.00

1,296.750
897.750
696.600
302.390

100.00%
100.00%
100.00%
100.00%

65.00
45.00
27.00
11.00

1,296.750
897.750
696.600
302.390

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

30.88

401.440

0.00%

0.00

0.000

100.00%

13.00

401.440

100.00%

13.00

401.440

0.00%

0.00

0.000

4.53
4.17

65.050
196.200
2,168.320

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

14.36
47.05
603.99

65.051
196.199
2,168.324

100.00%
100.00%
100.00%

14.36
47.05
603.99

65.051
196.199
2,168.324

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

207.610
207.610
217.610
68.610
193.110
103.320
431.800

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00
3.00
2.00
10.00

207.610
207.610
217.610
68.610
193.110
103.320
431.800

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00
3.00
2.00
10.00

207.610
207.610
217.610
68.610
193.110
103.320
431.800

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000

2,989.360
604.120
252.650
320.950
234.720

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

###
212.72
52.20
49.00
28.80

2,989.362
604.125
252.648
320.950
234.720

100.00%
100.00%
100.00%
100.00%
100.00%

###
212.72
52.20
49.00
28.80

2,989.362
604.125
252.648
320.950
234.720

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

7,227.660
2,398.400

0.00%
0.00%

0.00
0.00

0.000
0.000

0.00%
0.00%

0.00
0.00

0.000
0.000

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

33.00
32.00

7,227.660
2,398.400

1,863.420
85.700
1,133,160.88
1,133,160.88
77,621.52
67,989.65
1,278,772.05
1.00000
1,278,772.05
230,178.97
1,508,951.02

0.00%
0.00%
82.11%

0.00
0.00

0.000
0.000
930,452.14

0.00%
0.00%
12.51%

0.00
0.00

0.000
0.000
141,787.45

0.00%
0.00%
94.62%

0.00
0.00

0.000
0.000
1,072,239.59

100.00%
100.00%
5.38%

3.00
1.00

1,863.420
85.700
60,921.31

19.95
19.95
25.80

pto

11.00

13.00

ml
ml

14.36
47.05

ml

603.99

3.59

1.00
1.00

207.61
207.61

1.00
1.00

217.61
68.61

und
und

3.00
2.00

64.37
51.66

und

10.00

43.18

m
m

1,230.19
212.72

2.43
2.84

m
m
m

52.20
49.00
28.80

4.84
6.55
8.15

5.06
05.06.01

EQU

33.00

219.02

05.06.02
5.07

ART. ADOSADO LAMPARA PLAFON LARA C/1 FOCO ROSCA 36W


VARIOS

EQU

32.00

74.95

05.07.01
05.07.02

LNEA DE PUESTA A TIERRA


PRUEBAS ELCTRICAS

und
glb

3.00
1.00

621.14
85.70

271574020.xls / VAL MODULO Yuler A. G.

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

1,296.750
897.750
696.600
302.390

65.00
45.00
27.00

CONDUCTOR LSOH 35 mm2 - MEDIDOR - TABLERO GENERAL


ARTEFACTOS
ART. REJILLA ADOSADO ALUMINIO RAS-A 2X40W, JOSFEL

COSDIRECTO
COSTO DIRECTO TOTAL
GASTOS GENERALES ( 6.85 %)
UTILIDADES ( 6%)
SUBTOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V. ( 18.00 % )
TOTAL PRESUPUESTO

AVANCE ACUMULADO
MES ANTERIOR
%
MET.
TOTAL
S/.

F.R=

82.11%

63,735.97
55,827.13
1,050,015.24
1.00000
1,050,015.24
189,002.74
1,239,017.98

12.51%

9,712.44
8,507.25
160,007.13
1.00000
160,007.13
28,801.28
188,808.41

94.62%

73,448.41
64,334.38
1,210,022.37
1.00000
1,210,022.37
217,804.03
1,427,826.40

5.38%

4,173.11
3,655.28
68,749.70
1.00000
68,749.70
12,374.95
81,124.65

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION OBRAS EXTERIORES


SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM

PARTIDAS

UND

MET.

P. U.
S/.

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
%
MET.
TOTAL
S/.

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

AVANCE ACUMULADO
MES ACTUAL
%
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

01
1.01

CERCO PERIMETRICO
TRABAJOS PRELIMINARES

01.01.01
01.01.02

LIMPIEZA DE TERRENO MANUAL


TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO

m2
m2

140.00
140.00

0.89
1.52

124.600
212.800

100.00%
100.00%

140.00
140.00

124.600
212.800

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

140.00
140.00

124.600
212.800

0.00%
0.00%

0.00
0.00

0.000
0.000

01.02
01.02.01

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL

m3

112.00

30.27

01.02.02
01.02.03

EXCAVACION DE ZANJAS PARA ZAPATAS AISLADAS


RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO (CON

m3
m3

112.00
112.00

15.14
7.95

3,390.240
1,695.680
890.400

100.00%
100.00%
100.00%

112.00
112.00
112.00

3,390.240
1,695.680
890.400

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

112.00
112.00
112.00

3,390.240
1,695.680
890.400

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

1.03
01.03.01
01.03.01.01

OBRAS DE CONCRETO SIMPLE


CIMIENTO
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H + 30% PG

m3

112.00

239.92

26,871.040

100.00%

112.00

26,871.040

0.00%

0.00

0.000

100.00%

112.00

26,871.040

0.00%

0.00

0.000

01.03.02
01.03.02.01

SOBRECIMIENTO
CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO-HORMIGON +25% PIEDRA

01.03.02.02
1.04

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA


OBRAS DE CONCRETO ARMADO

1,470.760
3,478.440

100.00%
100.00%

5.46
84.00

1,470.760
3,478.440

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

5.46
84.00

1,470.760
3,478.440

0.00%
0.00%

0.00
0.00

0.000
0.000

01.04.01
01.04.01

COLUMNAS
COLUMNAS: CONCRETO, fc= 210kg/cm2

01.04.02
01.04.03

COLUMNAS: ENCOFRADO Y DESENCOFRADO


COLUMNAS: ACERO, fy= 4200kg/cm2

2,398.030
5,282.640
5,751.090

100.00%
100.00%
100.00%

6.30
110.40
###

2,398.030
5,282.640
5,751.090

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

6.30
110.40
###

2,398.032
5,282.640
5,751.092

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

01.04.02
01.04.02.01

VIGAS
VIGAS: CONCRETO, fc= 210kg/cm2

01.04.02.02
01.04.02.03

VIGAS: ENCOFRADO Y DESENCOFRADO


VIGAS: ACERO, fy= 4200kg/cm2

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

4.20
56.00
437.49

1,528.086
2,135.280
1,903.082

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

1.05
01.05.01
1.06
01.06.01

163,023.57

m3

5.46

269.37

m2

84.00

41.41

m3

6.30

380.64

m3
kg

110.40
1322.09

47.85
4.35

m3

4.20

363.83

m2
kg

56.00
437.49

38.13
4.35

1,528.090
2,135.280
1,903.080

100.00%
100.00%
100.00%

4.20
56.00
437.49

1,528.090
2,135.280
1,903.080

MUROS Y TABIQUES DE ALBAILERA


MURO DE SOGA LADRILLO K.K 18 HUECOS DE ARCILLA

m2

240.97

68.69

16,552.230

100.00%

240.97

16,552.230

0.00%

0.00

0.000

100.00%

240.97

16,552.229

0.00%

0.00

0.000

REVOQUES Y REVESTIMIENTOS
TARRAJEO EN MUROS

m2

207.20

17.22

01.06.02
01.06.03

TARRAJEO EN COLUMNAS
TARRAJEO EN VIGAS

m2
m2

70.20
74.00

21.75
23.17

01.06.04
1.07
01.07.01

BRUAS EN MUROS DE e = 1" x 1/2"


CONTRAZCALOS
CONTRAZOCALO DE CEMENTO PULIDO S/COLOREAR H = 0.30 M

302.40

1.69

3,567.980
1,526.850
1,714.580
511.060

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

207.20
70.20
74.00
302.40

3,567.984
1,526.850
1,714.580
511.056

100.00%
100.00%
100.00%
100.00%

207.20
70.20
74.00
302.40

3,567.984
1,526.850
1,714.580
511.056

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

m2

140.00

9.02

1,262.800

0.00%

0.00

0.000

100.00%

140.00

1,262.800

100.00%

140.00

1,262.800

0.00%

0.00

0.000

1.08
01.08.01

CARPINTERA METLICA
PUERTA DE FIERRO, CON PERFILES Y PLANCHA S/D

m2

8.85

259.92

01.08.02
01.08.03

TUBERIA DE F NEGRO DE 2"


COLOCACIN DE PUERTA METALICA

m
u

416.00
1.00

26.15
83.03

2,300.290
10,878.400
83.030

0.00%
100.00%
0.00%

0.00
416.00
0.00

0.000
10,878.400
0.000

100.00%
0.00%
100.00%

8.85
0.00
1.00

2,300.292
0.000
83.030

100.00%
100.00%
100.00%

8.85
416.00
1.00

2,300.292
10,878.400
83.030

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

1.09
01.09.01

CERRAJERIA
BISAGRAS DE FIERRO DE 5", C/EJE DE 1/2"

und

6.00

33.41

01.09.02
01.09.03

CERRADURA PARA PUERTAS (03 GOLPES)


PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 M.

pza
und

1.00
1.00

74.88
20.82

01.09.04
1.10

CERROJO DE FIERRO REDONDO DE 1/2" X 0.35 M.


PINTURA

und

1.00

31.13

200.460
74.880
20.820
31.130

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

6.00
1.00
1.00
1.00

200.460
74.880
20.820
31.130

100.00%
100.00%
100.00%
100.00%

6.00
1.00
1.00
1.00

200.460
74.880
20.820
31.130

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

01.10.01
01.10.02

PINTURA EN MUROS 2 MANOS


PINTURA LATEX EN COLUMNAS

m2
m2

207.20
56.70

8.44
11.61

01.10.03
01.10.04

PINTURA LATEX EN VIGAS


PINTURA EN CONTRAZOCALOS H=30CM

m2
m

56.00
140.00

11.61
3.44

01.10.05
01.10.06

PINTURA EN PUERTA DE FIERRO, CON PERFILES Y PLANCHA S/D


PINTURA EN CERCO CON ESTRUCT. METALICA

m2
m2

17.70
9.14

10.90
10.90

1,748.770
658.290
650.160
481.600
192.930
99.630

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

207.20
56.70
56.00
140.00
17.70
9.14

1,748.770
658.290
650.160
481.600
192.930
99.630

2.00
2.01

EXPLANADA PATIO
EXPLANADA PATIO: CONCRETO F'C= 140 KG/CM2, FROTACHADO Y BRUA

m3

18.35

333.03

2.02
2.03
3.00

EXPLANADA PATIO: ENCOFRADO Y DESENCOFRADO


EXPLANADA PATIO: JUNTAS
VEREDAS

m2
m

19.20
95.43

39.27
2.19

6,111.100
753.980
208.990

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

18.35
19.20
95.43

6,111.101
753.984
208.992

100.00%
100.00%
100.00%

18.35
19.20
95.43

6,111.101
753.984
208.992

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

3.01
3.02

VEREDAS: CONCRETO F'C= 140 KG/CM2, FROTACHADO Y BRUADO


VEREDAS: ENCOFRADO Y DESENCOFRADO

m3
m2

38.43
96.03

333.03
39.27

12,798.340
3,771.100

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

38.43
96.03

12,798.343
3,771.098

100.00%
100.00%

38.43
96.03

12,798.343
3,771.098

0.00%
0.00%

0.00
0.00

0.000
0.000

271574020.xls / VAL OBRAS EXTERIORES Yuler A. G.

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION OBRAS EXTERIORES


SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
3.03

PARTIDAS
VEREDAS: JUNTAS

271574020.xls / VAL OBRAS EXTERIORES Yuler A. G.

UND

MET.

270.76

P. U.
S/.

TOTAL
S./
2.19

592.960

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

0.00%

0.00

0.000

100.00%

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

270.76

592.964

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

100.00%

270.76

592.964

0.00%

SALDO
MES ACTUAL
MET.
TOTAL
S/.

0.00

0.000

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION OBRAS EXTERIORES


SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM

PARTIDAS

UND

MET.

P. U.
S/.

TOTAL
S./

4.00
4.01

SARDINEL
EXCAVACION EN TERRENO NORMAL PARA SARDINEL

m3

3.24

35.32

4.02
4.03

SARDINEL: CONCRETO F'C= 140 KG/CM2


SARDINEL: ENCOFRADO Y DESENCOFRADO

m3
m2

3.24
86.35

349.84
39.27

4.04
4.05

SARDINEL: JUNTAS DE DILATACIN


SARDINEL: TARRAJEO

m
m2

12.50
48.57

5.53
23.40

4.06
5.00

SARDINEL: PINTURA
CUNETAS

m2

48.57

6.91

5.01
5.02
5.03

EXCAVACION DE ZANJA PARA CANETAS


ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO
CUNETAS: CONCRETO F'C= 140 KG/CM2

m3
m3
m3

7.64
7.64
4.20

30.27
15.14
349.84

5.04
5.05

CUNETAS: ENCOFRADO Y DESENCOFRADO


CUNETAS: TARRAJEO

m2
m2

30.54
42.00

39.27
23.40

5.06
6

REJILLA METALICA PARA CUNETAS


JUEGOS INFANTILES

38.18

6.01
7

JUEGOS INFANTILES
TANQUE SEPTICO

7.01
07.01.01

TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

07.01.02
7.02

TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO


MOVIMIENTO DE TIERRAS

07.02.01
07.02.02

AVANCE ACUMULADO
MES ANTERIOR
%
MET.
TOTAL
S/.

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

AVANCE ACUMULADO
MES ACTUAL
%
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

114.440
1,133.480
3,390.960
69.130
1,136.540
335.620

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

3.24
3.24
86.35
12.50
48.57
48.57

114.437
1,133.482
3,390.965
69.125
1,136.538
335.619

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

3.24
3.24
86.35
12.50
48.57
48.57

114.437
1,133.482
3,390.965
69.125
1,136.538
335.619

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

54.36

231.260
115.670
1,469.330
1,199.310
982.800
2,075.460

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

7.64
7.64
4.20
30.54
42.00
38.18

231.263
115.670
1,469.328
1,199.306
982.800
2,075.465

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

7.64
7.64
4.20
30.54
42.00
38.18

231.263
115.670
1,469.328
1,199.306
982.800
2,075.465

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

1.00

8,646.55

8,646.550

0.00%

0.00

0.000

0.00%

0.00

0.000

0.00%

0.00

0.000

100.00%

1.00

8,646.550

m2

9.07

0.89

m2

18.14

1.52

8.070
27.570

100.00%
100.00%

9.07
18.14

8.070
27.570

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

9.07
18.14

8.072
27.573

0.00%
0.00%

0.00
0.00

0.000
0.000

EXCAVACION MANUAL EN TERRENO NORMAL


NIVELACION Y APISONADO CON MATERIAL PROPIO

m3
m2

19.04
9.07

35.32
8.16

07.02.03
07.02.04

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO


ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

m3
m3

22.85
22.85

15.14
8.35

672.490
74.010
345.950
190.800

100.00%
100.00%
100.00%
100.00%

19.04
9.07
22.85
22.85

672.490
74.010
345.950
190.800

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

19.04
9.07
22.85
22.85

672.493
74.011
345.949
190.798

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

7.03
07.03.01

OBRAS DE CONCRETO SIMPLE


SOLADO, E= 4" ; MEZCLA 1:12, C:H

m2

9.07

24.42

221.490

0.00%

0.00

0.000

100.00%

9.07

221.489

100.00%

9.07

221.489

0.00%

0.00

0.000

7.04
07.04.01

OBRAS DE CONCRETO ARMADO


LOSA DE CIMENTACION

07.04.01.01
07.04.01.02
07.04.02

LOSA DE CIMENTACION: CONCRETO F'C=210KG/CM2


LOSA DE CIMENTACION: ACERO FY=4,200KG/CM2 GRADO 60
MUROS DE CONCRETO

m3
kg

1.36
47.66

363.83
4.79

494.810
228.290

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

1.36
47.66

494.809
228.291

100.00%
100.00%

1.36
47.66

494.809
228.291

0.00%
0.00%

0.00
0.00

0.000
0.000

07.04.02.01
07.04.02.02

MURO DE CONCRETO: CONCRETO F'C=210KG/CM2


MURO DE CONCRETO: ENCOFRADO Y DESENCOFRADO

m3
m2

4.61
46.07

380.64
53.51

07.04.02.03
07.04.03

MURO DE CONCRETO: ACERO FY=4,200KG/CM2


LOSA DE TECHO

kg

152.29

4.79

1,754.750
2,465.210
729.470

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

4.61
46.07
152.29

1,754.750
2,465.206
729.469

100.00%
100.00%
100.00%

4.61
46.07
152.29

1,754.750
2,465.206
729.469

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

07.04.03.01
07.04.03.02

LOSA DE TECHO: CONCRETO F'C=210KG/CM2


LOSA DE TECHO: ENCOFRADO Y DESENCOFRADO

m3
m2

0.42
4.18

380.64
53.51

07.04.03.03
07.04.03.04

LOSA DE TECHO: ACERO FY=4,200KG/CM2 GRADO 60


TAPA DE CONCRETO DE 0.70MX0.50M

kg
und

18.31
8.00

4.79
108.50

159.870
223.670
87.700
868.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

0.42
4.18
18.31
8.00

159.869
223.672
87.705
868.000

100.00%
100.00%
100.00%
100.00%

0.42
4.18
18.31
8.00

159.869
223.672
87.705
868.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

7.05
07.05.01

REVOQUES Y REVESTIMIENTOS
TARRAJEO CON IMPERMEABILIZANTES

m3

23.13

30.12

696.680

0.00%

0.00

0.000

100.00%

23.13

696.676

100.00%

23.13

696.676

0.00%

0.00

0.000

7.06
07.06.01

INSTALACIONES SANITARIAS
TUBERIA DE PVC-SAP 4"

49.52

21.73

07.06.02
07.06.03

TEE PVC-SAL 4"


TUBERIA DE FG DE 3"

pza
m

3.00
2.50

18.79
32.66

07.06.04
07.06.05

TEE DE FG DE 3"
CODO DE FG DE 3"

und
und

2.00
4.00

48.74
48.74

1,076.070
56.370
81.650
97.480
194.960

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

49.52
3.00
2.50
2.00
4.00

1,076.070
56.370
81.650
97.480
194.960

100.00%
100.00%
100.00%
100.00%
100.00%

49.52
3.00
2.50
2.00
4.00

1,076.070
56.370
81.650
97.480
194.960

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

8
8.01

POZO PERCOLADO
TRABAJOS PRELIMINARES

08.01.01
08.01.02
08.01.03

LIMPIEZA DE TERRENO MANUAL


TRAZO, NIVELES Y REPLANTEO PRELIMINAR
TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO

m2
m2
m2

9.61
9.61
19.22

0.89
1.05
1.52

8.550
10.090
29.210

100.00%
100.00%
100.00%

9.61
9.61
19.22

8.550
10.090
29.210

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

9.61
9.61
19.22

8.553
10.091
29.214

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

8.02
08.02.01

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL

m3

26.80

35.32

946.580

100.00%

26.80

946.580

0.00%

0.00

0.000

100.00%

26.80

946.576

0.00%

0.00

0.000

271574020.xls / VAL OBRAS EXTERIORES Yuler A. G.

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION OBRAS EXTERIORES


SETIEMBRE DEL 2014
PRESUPUESTO OFERTA

ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO

m3

32.16

08.02.03
8.03

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA


OBRAS DE CONCRETO SIMPLE

m3

32.16

8.35

08.03.01
08.03.02

ANILLO: CONCRETO F'C=175KG/CM2


ANILLO: ENCOFRADO Y DESENCOFRADO

m3
m2

0.37
0.98

359.32
57.53

132.950
56.380

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

0.37
0.98

132.948
56.379

100.00%
100.00%

0.37
0.98

132.948
56.379

0.00%
0.00%

0.00
0.00

0.000
0.000

8.04
08.04.01

OBRAS DE CONCRETO ARMADO


MURO DE CONCRETO: CONCRETO F'C=210KG/CM2

m3

0.76

380.64

08.04.02
08.04.03

MURO DE CONCRETO: ENCOFRADO Y DESENCOFRADO


MURO DE CONCRETO: ACERO FY=4,200KG/CM2

m2
kg

4.52
68.15

53.51
4.79

08.04.04
8.05

TAPA DE CONCRETO DE 0.70MX0.50M


MUROS DE ALBAILERIA

und

4.00

108.50

289.290
241.870
326.440
434.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

0.76
4.52
68.15
4.00

289.286
241.865
326.439
434.000

100.00%
100.00%
100.00%
100.00%

0.76
4.52
68.15
4.00

289.286
241.865
326.439
434.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

08.05.01
8.06

MURO DE CABEZA DE LADRILLO K.K 18 HUECOS DE ARCILLA


INSTALACIONES SANITARIAS

m2

30.52
0.00

95.20
0.00

08.06.01
08.06.02

TUBERIA DE PVC-SAP 4"


TEE PVC-SAL 4"

m
pza

5.00
5.00

21.73
18.79

2,905.500
0.000
108.650
93.950

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
0.00%
100.00%
100.00%

30.52
0.00
5.00
5.00

2,905.504
0.000
108.650
93.950

100.00%
0.00%
100.00%
100.00%

30.52
0.00
5.00
5.00

2,905.504
0.000
108.650
93.950

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

8.07
08.07.01

FILTROS
FILTRO DE GRAVA

m3

6.04

182.82

1,104.230
163,023.57
163,023.57
11,167.11
9,781.41
183,972.10
1.00000
183,972.10
33,114.98
217,087.08

0.00%
53.75%

0.00

0.000
87,631.56

100.00%
38.59%

6.04

1,104.233
62,914.08

100.00%
92.35%

6.04

1,104.233
150,545.65

0.00%
7.65%

0.00

0.000
12,477.93

271574020.xls / VAL OBRAS EXTERIORES Yuler A. G.

F.R=

SALDO
MES ACTUAL
MET.
TOTAL
S/.

08.02.02

COSDIRECTO
COSTO DIRECTO TOTAL
GASTOS GENERALES ( 6.85 %)
UTILIDADES ( 6%)
SUBTOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V. ( 18.00 % )
TOTAL PRESUPUESTO

TOTAL
S./

AVANCE ACUMULADO
MES ACTUAL
%
MET.
TOTAL
S/.

486.900
268.540

PARTIDAS

MET.

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

P. U.
S/.
15.14

ITEM

UND

AVANCE ACUMULADO
MES ANTERIOR
%
MET.
TOTAL
S/.

100.00%
100.00%

32.16
32.16

486.900
268.540

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

32.16
32.16

486.902
268.536

0.00%
0.00%

0.00
0.00

0.000
0.000

53.75%

6,002.76
5,257.89
98,892.22
1.00000
98,892.22
17,800.60
116,692.82

38.59%

4,309.61
3,774.84
70,998.54
1.00000
70,998.54
12,779.74
83,778.28

92.35%

10,312.38
9,032.74
169,890.76
1.00000
169,890.76
30,580.34
200,471.10

7.65%

854.74
748.68
14,081.34
1.00000
14,081.34
2,534.64
16,615.98

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION MATERIAL DIDACTICO, EQUIPOS Y MOVILIARIOS


SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM

PARTIDAS

01
1.01
01.01.01
01.01.02
01.01.03

MATERIALES DIDCTICOS, EQUIPOS Y MOBILIARIOS


MATERIALES DIDACTICOS
MATERIALES DIDACTICOS DE COMUNICACIN
MATERIALES DIDACTICOS DE MATEMTICA
MATERIALES DIDACTICOS DE PERSONAL SOCIAL

01.01.04
1.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07

UND

MET.

P. U.
S/.

1.00
1.00
1.00

11,510.00
4,059.00
3,176.00

MATERIALES DIDACTICOS DE CIENCIA Y AMBIENTE


EQUIPOS Y MOVILIARIOS
EQUIPOS Y MOBILIARIOS DE AULA
EQUIPOS Y MOBILIARIOS DE SALA DE USOS MULTIBLES
EQUIPOS Y MOBILIARIOS DE COMEDOR

GLB

1.00

3,828.00

GLB
GLB
GLB

1.00
1.00
1.00

14,035.00
52,915.00
3,707.00

EQUIPOS Y MOBILIARIOS DE COCINA


EQUIPOS Y MOBILIARIOS DE DIRECCIN
EQUIPOS Y MOBILIARIOS DE TOPICO
EQUIPOS Y MOBILIARIOS DE DEPOSITO DE MATERIAL EDUCATIVO

GLB
GLB
GLB
GLB

1.00
1.00
1.00
1.00

4,356.00
11,750.00
3,408.00
916.00

271574020.xls / VAL MATERIAL.D Yuler A. G.

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

AVANCE ACUMULADO
MES ACTUAL
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

11,510.000
4,059.000
3,176.000
3,828.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

100.00%
100.00%
100.00%
100.00%

1.00
1.00
1.00
1.00

11,510.000
4,059.000
3,176.000
3,828.000

14,035.000
52,915.000
3,707.000
4,356.000
11,750.000
3,408.000
916.000
113,660.00
113,660.00
7,785.71
6,819.60
128,265.31
1.00000
128,265.31
23,087.76
151,353.07

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00

0.00%
94.00%
0.00%
0.00%
0.00%
0.00%
0.00%
43.76%

0.00
0.94
0.00
0.00
0.00
0.00
0.00

0.000
49,740.100
0.000
0.000
0.000
0.000
0.000
49,740.10

0.00%
94.00%
0.00%
0.00%
0.00%
0.00%
0.00%
43.76%

0.00
0.94
0.00
0.00
0.00
0.00
0.00

0.000
49,740.100
0.000
0.000
0.000
0.000
0.000
49,740.10

100.00%
6.00%
100.00%
100.00%
100.00%
100.00%
100.00%
56.24%

1.00
0.06
1.00
1.00
1.00
1.00
1.00

14,035.000
3,174.900
3,707.000
4,356.000
11,750.000
3,408.000
916.000
63,919.90

113,660.00
GLB
GLB
GLB

COSDIRECTO
COSTO DIRECTO TOTAL
GASTOS GENERALES ( 6.85 %)
UTILIDADES ( 6%)
SUBTOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V. ( 18.00 % )
TOTAL PRESUPUESTO

AVANCE ACUMULADO
MES ANTERIOR
MET.
TOTAL
S/.

TOTAL
S./

F.R=

0.00%

0.00
0.00
0.00
1.00000
0.00
0.00
0.00

43.76%

3,407.20
2,984.41
56,131.70
1.00000
56,131.70
10,103.71
66,235.41

43.76%

3,407.20
2,984.41
56,131.70
1.00000
56,131.70
10,103.71
66,235.41

56.24%

4,378.51
3,835.19
72,133.61
1.00000
72,133.61
12,984.05
85,117.66

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
PARALIZADO 12/09/2014
REINICIO DE TRABAJOS 13/11/2014
NUEVA FECHA DE TERMINO 30/11/2014

VALORIZACION DECLARATORIA DE IMPACTO AMBIENTAL


SETIEMBRE DEL 2014
PRESUPUESTO OFERTA
ITEM
01
1.01
01.01.01

PARTIDAS

UND

MET.

P. U.
S/.

TOTAL
S./

AVANCE ACUMULADO
MES ANTERIOR
%
MET.
TOTAL
S/.

AVANCE ACTUAL
PRESENTE MES
MET.
TOTAL
S/.

AVANCE ACUMULADO
MES ACTUAL
%
MET.
TOTAL
S/.

SALDO
MES ACTUAL
MET.
TOTAL
S/.

DECLARATORIA DE IMPACTO AMBIENTAL


MEDIDAS DE PREVENCION
EDUCACIN ANBIENTAL
CHARLAS AL PERSONAL OBRERO

10,826.98

01.01.01.03
01.01.02

POLOS CON LOGOS AMBIENTALES


SEALIZACION

GLB

1.00

932.25

1,650.000
1,650.000
932.250

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

3.00
3.00
1.00

1,650.000
1,650.000
932.250

100.00%
100.00%
100.00%

3.00
3.00
1.00

1,650.000
1,650.000
932.250

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

01.01.02.01
01.01.02.02
01.01.02.03

LETRERO DE UBICACIN
LETREROS AMBIENTALES

und
und
m

1.00
3.00
300.00

296.62
296.62
1.18

296.620
889.860
354.000

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

100.00%
100.00%
100.00%

1.00
3.00
300.00

296.620
889.860
354.000

100.00%
100.00%
100.00%

1.00
3.00
300.00

296.620
889.860
354.000

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

GLB

1.00

423.73

423.730

0.00%

0.00

0.000

100.00%

1.00

423.730

100.00%

1.00

423.730

0.00%

0.00

0.000

0.89
1.05

4.450
5.250
441.500
97.500
105.970

0.00%
0.00%
0.00%
0.00%
100.00%

0.00
0.00
0.00
0.00
1.00

0.000
0.000
0.000
0.000
105.970

100.00%
100.00%
100.00%
100.00%
0.00%

5.00
5.00
12.50
10.00
0.00

4.450
5.250
441.500
97.500
0.000

100.00%
100.00%
100.00%
100.00%
100.00%

5.00
5.00
12.50
10.00
1.00

4.450
5.250
441.500
97.500
105.970

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000

01.01.01.01
01.01.01.02

1.02
01.02.01
01.02.01.01
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.03

CHARLAS A LA COMUNIDAD BENEFICIARIA

CINTA SEALIZADORA DE OBRA


MEDIDAS DE MITIGACIN
MITIGACION DE IMPACTO AMBIENTAL
TRATAMIENTO DE BOTADEROS
MICRO RELLENO SANITARIO
CLAUSURA DEL RELLENO SANITARIO

GLB
GLB

3.00
3.00

550.00
550.00

CLAUSURA DE LETRINAS

m2
m2

5.00
5.00

BOTIQUIN DE PRIMEROS AUXILIOS


CHARLA AL PERSONAL DE OBRA
CHARLA A LOS ESTUDIANTES

m3
m3

12.50
10.00

35.32
9.75

und

1.00

105.97

AREAS VERDES
ADECUACION Y PREPARACIN DEL TERRENO
SEMBRADO DE GRASS
SEMBRADO DE PLANTONES

m3
m2

49.11
196.45

20.24
4.14

und

20.00

14.96

993.990
813.300
299.200

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.000
0.000
0.000

26.47%
0.00%
0.00%

13.00
0.00
0.00

263.120
0.000
0.000

26.47%
0.00%
0.00%

13.00
0.00
0.00

263.120
0.000
0.000

73.53%
100.00%
100.00%

36.11
196.45
20.00

730.870
813.300
299.200

01.03.01
01.03.02

MEDIDAS DE CONTROL
PROVISIN DE RECIPIENTES PLASTICOS CON TAPA PARA RESIDUOS SOL
CONTRUCION DE LETRINA

und
und

4.00
1.00

67.80
381.36

271.200
381.360

0.00%
0.00%

0.00
0.00

0.000
0.000

100.00%
100.00%

4.00
1.00

271.200
381.360

100.00%
100.00%

4.00
1.00

271.200
381.360

0.00%
0.00%

0.00
0.00

0.000
0.000

1.04
01.04.01

PLAN DE SALUD Y SEGURIDAD


PROVISION DE EXTINTORES DE 12KG

und

1.00

220.00

01.04.02
01.04.03

PROVISIN DE ENVASE MAS SURTIDOR DE AGUA PARA CONSUMO HUMA


PROVISION DE BOTIQUIN

und
und

10.00
1.00

70.00
296.80

220.000
700.000
296.800
10,826.98
10,826.98
741.65
649.62
12,218.25
1.00000
12,218.25
2,199.29
14,417.54

100.00%
100.00%
100.00%
12.22%

1.00
10.00
1.00

220.000
700.000
296.800
1,322.77

0.00%
0.00%
0.00%
70.76%

0.00
0.00
0.00

0.000
0.000
0.000
7,660.84

100.00%
100.00%
100.00%
82.97%

1.00
10.00
1.00

220.000
700.000
296.800
8,983.61

0.00%
0.00%
0.00%
17.03%

0.00
0.00
0.00

0.000
0.000
0.000
1,843.37

01.02.03.01
01.02.03.02
01.02.03.03
1.03

COSDIRECTO
COSTO DIRECTO TOTAL
GASTOS GENERALES ( 6.85 %)
UTILIDADES ( 6%)
SUBTOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V. ( 18.00 % )
TOTAL PRESUPUESTO

271574020.xls / VAL IMPACTO A. Yuler A. G.

F.R=

90.61
79.37
1,492.75
12.22%

1,492.75
268.70
1,761.45

524.77
459.65
8,645.26
70.76%

8,645.26
1,556.15
10,201.40

615.38
539.02
10,138.00
82.97%

10,138.00
1,824.84
11,962.84

165.90
158.59
2,167.86
17.74%

2,167.86
390.21
2,558.07

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70
PROCESO : LICITACION PUBLICA N 043-2013-GRH.
PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
CONTRATO N : 277-2014-GRH/PR
MODALIDAD :A SUMA ALZADA
CONTRATISTA : "CONSORCIO TAPARACO"
PLAZO DE OBRA : 120 DIAS CALENDARIO
SUPERVISOR : ING. YUNER SANTOS ROSALES
FECHA DE INICIO : 02 DE JUNIO DEL 204
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664
FECHA
DELDE
CENTRO
TERMINO :29 DE SETIEMBRE DEL 2014
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PARALIZADO 12/09/2014
PROVINCIA DE HUAMALIES - REGION HUANUCO".
REINICIO DE TRABAJOS 13/11/2014

AVA N C E M E N S UA L A C U M U L A D O ( % )

NUEVA FECHA DE TERMINO 30/11/2014

CURVA S PROGAMADO VS EJECUTADO


SETIEMBRE DEL 2014

CURVA "S" DE VALORIZACIONES DE OBRA


1
CALENDARIO CONTRACTUAL
CALENDARIO INTERNO

0.9

AVANCE REAL

0.8

0.7

0.6

0.5

0.4

0.3

0.2

0.1

0
MAYO

JUNIO

JULIO

CUADRO
CONTRACTUAL (SIN. IGV)
MES
PARCIAL
PARCIAL ACUMUL.
S/.
%
%
MAYO
0
JUNIO
33.81%
33.81%
542,020.33
JULIO
21.40%
55.21%
343,163.72
AGOSTO
16.54%
71.76%
265,216.16
SETIEMBRE 295,782.63
18.45%
90.20%
OCTUBRE
0.00
0.00%
90.20%
NOVIEMBRE 157,044.89
9.80%
100.00%
###
100.00%

271574020.xls / Curva S-Val Yuler A. G.

AGOSTO

SETIEMBRE

PLAZ O DE EJECUCION (MESES)

OCTUBRE

NOVIEMBRE

DE VALORIZACIONES DE OBRA
INTERNO (SIN. IGV)
REAL (SIN. IGV)
PARCIAL
PARCIAL ACUMUL.
PARCIAL
PARCIAL ACUMUL.
S/.
%
%
S/.
%
%
0
0
33.81%
33.81%
542,020.33
33.81%
33.81%
542,020.33
21.40%
55.21%
343,163.72
21.40%
55.21%
343,163.72
16.54%
71.76%
16.54%
71.76%
265,216.16
265216.17
18.45%
90.20%
295,782.63
18.45%
90.20%
295,782.63
0.00%
90.20%
0.00
0.00
9.80%
100.00%
157,044.89
###
90.20%
1,446,182.80
90.20%
90.20%

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70
PROCESO : LICITACION PUBLICA N 043-2013-GRH.
PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
CONTRATO N : 277-2014-GRH/PR
MODALIDAD :A SUMA ALZADA
CONTRATISTA : "CONSORCIO TAPARACO"
PLAZO DE OBRA : 120 DIAS CALENDARIO
SUPERVISOR : ING. YUNER SANTOS ROSALES
FECHA DE INICIO : 02 DE JUNIO DEL 204
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

TABLA DE INDICES UNIFICADOS DE PRECIOS ("TABLA")


SETIEMBRE DEL 2014
- LLENAR DATOS MENSUALES

I.U.
3
21
30
32
38
39
47

1
2
3
4
5
6
BASE
01
02
03
04
05
Dec-13 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14
469.58
### 451.86 459.19 468.10
354.74
### 354.74 354.74 354.74
378.29
### 387.37 386.98 390.72
455.19
### 468.30 468.30 468.30
824.44
### 844.07 847.66 850.91
392.22
### 400.98 402.72 402.37
497.55
### 498.10 523.70 523.70

271574020.xls / Indices Unif. Yuler A. G.

7
06
###

8
07
###

9
08
Jan-15

10
09
###

11
10
###

12
11
Apr-15

13
12
###

14
15
13
14
Jun-15 Jul-15

30

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014

CALCULO DEL COEFICIENTE "K" DE MODULOS 01 Y 02


SETIEMBRE DEL 2014
Frmula polinmica, rea geogrfica 3 - Huanuco (Anexo N ... del Contrato):
K = 0.071 x Ar / Ao + 0.113 x Cr / Co + 0.114 x Ir / Io + 0.142 x Mr / Mo+0.560 x Fr / Fo

SIMBOLO I.U.
A

21

39

47

32

CONCEPTO
ACERO DE CONSTRUCCION CORRUGADO
0.071 x Ar / Ao
CEMENTO PORTLAND TIPO I
0.113 x Cr / Co
INDICE GENERAL DE PRECIOS AL COSUMIDOR
0.114 x Ir / Io
MANO DE OBRA INC. LEYES SOCIALES
0.142 x Mr / Mo
FLETE TERRESTRE
0.560 x Fr / Fo
COEFICIENTE DE REAJUSTE ( K ):

271574020.xls / FP-MODUL 01 Y 02 Yuler A. G.

COEFIC. INCIDENCIA (BASE)


ESPECIFICA
0.071
100.00%
0.113

100.00%

0.114

100.00%

0.142

100.00%

0.560

100.00%

03

04

05

06

07

08

09

Dec-13
469.58
0.071
354.74
0.113
392.22
0.114
497.55
0.142
455.19
0.560

Jun-14
473.03
0.072
354.74
0.113
400.34
0.116
498.10
0.142
465.69
0.573

01

Jul-14
451.86
0.068
354.74
0.113
400.98
0.117
498.10
0.142
468.30
0.576

02

Aug-14
459.19
0.069
354.74
0.113
402.72
0.115
523.70
0.149
468.30
0.576

Sep-14
468.10
0.071
354.74
0.113
402.37
0.117
523.70
0.149
468.30
0.576

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

1.000

1.016

1.017

1.023

1.026

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014

CALCULO DEL COEFICIENTE "K" DE OBRAS EXTERIORES


SETIEMBRE DEL 2014
Frmula polinmica, rea geogrfica 3 - Huanuco (Anexo N ... del Contrato):
K = 0.114 x Ir / Io + 0.121 x Ar / Ao + 0.145 x Hr / Ho + 0.294 x Cr / Co+0.326 x Mr / Mo

SIMBOLO I.U.
I

39

38

21

47

CONCEPTO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
0.114 x Ir / Io
ACERO DE CONSTRUCCION CORRUGADO
0.121 x Ar / Ao
HORMIGON
0.145 x Hr / Ho
CEMENTO PORTLAND TIPO I
0.294 x Cr / Co
MANO DE OBRA INC. LEYES SOCIALES
0.326 x Mr / Mo
COEFICIENTE DE REAJUSTE ( K ):

271574020.xls / FP-Obras Exteriores Yuler A. G.

COEFIC. INCIDENCIA (BASE)


ESPECIFICA
0.114
100.00%
0.121

100.00%

0.145

100.00%

0.294

100.00%

0.326

100.00%

03

04

05

06

07

08

09

Dec-13
392.22
0.114
469.58
0.121
824.44
0.145
354.74
0.294
497.55
0.326

Jun-14
400.34
0.116
473.03
0.122
847.71
0.149
354.74
0.294
498.10
0.326

01

Jul-14
400.98
0.117
451.86
0.116
844.07
0.148
354.74
0.294
498.10
0.326

02

Aug-14
402.72
0.117
459.19
0.118
847.66
0.145
354.74
0.294
523.70
0.343

Sep-14
402.37
0.117
468.10
0.121
850.91
0.150
354.74
0.294
523.70
0.343

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

1.000

1.007

1.001

1.018

1.025

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014

CALCULO DEL COEFICIENTE "K" DE MATERIAL DIDACTICO, EQUIPOS Y MOBILIARIOS


SETIEMBRE DEL 2014
Frmula polinmica, rea geogrfica 3 - Huanuco (Anexo N ... del Contrato):
K = 0.114 x Ir / Io +0.886 x Dr / Do

SIMBOLO I.U.
I

39

30

CONCEPTO
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
0.114 x Ir / Io
DLAR (GENERAL PONDERADO)
0.886 x Dr / Do
COEFICIENTE DE REAJUSTE ( K ):

271574020.xls / FP-Material Did. Yuler A. G.

COEFIC. INCIDENCIA (BASE)


ESPECIFICA
0.114
100.00%
0.886

100.00%

03

04

05

06

07

08

09

Dec-13
392.22
0.114
378.29
0.886

Jun-14
400.34
0.116
385.05
0.902

01

Jul-14
400.98
0.117
387.37
0.907

02

Aug-14
402.72
0.117
386.98
0.906

Sep-14
402.37
0.117
390.72
0.915

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

1.000

1.018

1.024

1.023

1.032

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
MODALIDAD :A SUMA ALZADA
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014

CALCULO DEL COEFICIENTE "K" DE DECLARATORIA DE IMPACTO AMBIENTAL


SETIEMBRE DEL 2014
Frmula polinmica, rea geogrfica 3 - Huanuco (Anexo N ... del Contrato):
K = 0.068 x Hr / Ho + 0.114 x Ir / Io + 0.163 x Mr / Mo +0.655 x Dr / Do

SIMBOLO I.U.
H

38

39

47

30

CONCEPTO
HORMIGON
0.068 x Hr / Ho
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
0.114 x Ir / Io
MANO DE OBRA INC. LEYES SOCIALES
0.163 x Mr / Mo
DLAR (GENERAL PONDERADO)
0.655 x Dr / Do
COEFICIENTE DE REAJUSTE ( K ):

271574020.xls / FP-Declar Impac Amb. Yuler A. G.

COEFIC. INCIDENCIA (BASE)


ESPECIFICA
0.068
100.00%
0.114

100.00%

0.163

100.00%

0.655

100.00%

03

04

05

06

07

08

09

Dec-13
824.44
0.068
392.22
0.114
497.55
0.163
378.29
0.655

Jun-14
847.71
0.070
400.34
0.116
498.10
0.163
385.05
0.667

01

Jul-14
844.07
0.070
400.98
0.117
498.10
0.163
387.37
0.671

02

Aug-14
847.66
0.070
402.72
0.117
523.70
0.172
386.98
0.670

Sep-14
850.91
0.070
402.37
0.117
523.70
0.172
390.72
0.677

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

1.000

1.016

1.020

1.029

1.035

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70
PROCESO : LICITACION PUBLICA N 043-2013-GRH.
PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
CONTRATO N : 277-2014-GRH/PR
MODALIDAD :A SUMA ALZADA
CONTRATISTA : "CONSORCIO TAPARACO"
PLAZO DE OBRA : 120 DIAS CALENDARIO
SUPERVISOR : ING. YUNER SANTOS ROSALES
FECHA DE INICIO : 02 DE JUNIO DEL 204
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

CUADRO RESUMEN DE REAJUSTES DE MODULO I Y II


SETIEMBRE DEL 2014
Reajuste por Indice K

No. Fecha

Valorizacin Bruta (sin


IGV)

01 Jun-14
02
Jul-14
03 Aug-14
04 Sep-14
05 Oct-14
06 Nov-14

541,639.57
343,163.72
217,822.95
160,007.13

1,262,633.37

271574020.xls / Reajuste Modulo I Y II

Indice "K"
Valorizacin Reajuste
(del mes
Reajustada
Bruto
anterior)

1.016
1.017
1.023
1.026

Regularizacin
a fecha de pago

Regularizacin del Reajuste

###
###
###
###
-

TOTAL :

8,666.23
5,698.70
5,014.47
4,219.08
-

###

Valorizaci
Indice "K" n Anterior
(del
Reajustada
mismo
con K del
mes)
mismo
mes

Valorizaci
n Anterior
Reajustada Regularizaci
con K del n Reajuste
mes
anterior

Valorizaci
Valorizaci
n a
n
Regulariz.
Indice "K"
Reajustar
Reajustada Reajuste a
(del mes
con K del
con K del fecha de
de pago)
mes de
mes de
pago
pago
pago

TOTAL :

TOTAL :

0.00

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70
PROCESO : LICITACION PUBLICA N 043-2013-GRH.
PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
CONTRATO N : 277-2014-GRH/PR
MODALIDAD :A SUMA ALZADA
CONTRATISTA : "CONSORCIO TAPARACO"
PLAZO DE OBRA : 120 DIAS CALENDARIO
SUPERVISOR : ING. YUNER SANTOS ROSALES
FECHA DE INICIO : 02 DE JUNIO DEL 204
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

CUADRO RESUMEN DE REAJUSTES DE OBRAS EXTERIORES


SETIEMBRE DEL 2014
Reajuste por Indice K

No. Fecha

Valorizacin Bruta (sin


IGV)

01 Jun-14
02
Jul-14
03 Aug-14
04 Sep-14
05 Oct-14
06 Nov-14

380.76
51,118.26
47,393.21
70,998.54

169,890.77

271574020.xls / Reajuste Obras Ext.

Indice "K"
Valorizacin Reajuste
(del mes
Reajustada
Bruto
anterior)

1.00700
1.00134
1.018
1.025

Regularizacin
a fecha de pago

Regularizacin del Reajuste

383.43
51,186.78
48,222.99
72,752.38
-

2.67
68.52
829.78
1,753.84
-

TOTAL :

2,654.81

Valorizaci
Indice "K" n Anterior
(del
Reajustada
mismo
con K del
mes)
mismo
mes

Valorizaci
n Anterior
Reajustada Regularizaci
con K del n Reajuste
mes
anterior

Valorizaci
Valorizaci
n a
n
Regulariz.
Indice "K"
Reajustar
Reajustada Reajuste a
(del mes
con K del
con K del fecha de
de pago)
mes de
mes de
pago
pago
pago

TOTAL :

TOTAL :

0.00

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70
PROCESO : LICITACION PUBLICA N 043-2013-GRH.
PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
CONTRATO N : 277-2014-GRH/PR
MODALIDAD :A SUMA ALZADA
CONTRATISTA : "CONSORCIO TAPARACO"
PLAZO DE OBRA : 120 DIAS CALENDARIO
SUPERVISOR : ING. YUNER SANTOS ROSALES
FECHA DE INICIO : 02 DE JUNIO DEL 204
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

CUADRO RESUMEN DE REAJUSTES DE MATERIAL DIDACTICO, EQUIPOS Y MOBILIARIOS


SETIEMBRE DEL 2014
Reajuste por Indice K

No. Fecha

Valorizacin Bruta (sin


IGV)

01 Jun-14
02
Jul-14
03 Aug-14
04 Sep-14
05 Oct-14
06 Nov-14

56,131.70

56,131.70

271574020.xls / Reajuste Material D.

Indice "K"
Valorizacin Reajuste
(del mes
Reajustada
Bruto
anterior)

1.018
1.024
1.023
1.032

Regularizacin
a fecha de pago

Regularizacin del Reajuste

57,931.43
-

1,799.73
-

TOTAL :

1,799.73

Valorizaci
Indice "K" n Anterior
(del
Reajustada
mismo
con K del
mes)
mismo
mes

Valorizaci
n Anterior
Reajustada Regularizaci
con K del n Reajuste
mes
anterior

Valorizaci
Valorizaci
n a
n
Regulariz.
Indice "K"
Reajustar
Reajustada Reajuste a
(del mes
con K del
con K del fecha de
de pago)
mes de
mes de
pago
pago
pago

TOTAL :

TOTAL :

0.00

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70
PROCESO : LICITACION PUBLICA N 043-2013-GRH.
PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
CONTRATO N : 277-2014-GRH/PR
MODALIDAD :A SUMA ALZADA
CONTRATISTA : "CONSORCIO TAPARACO"
PLAZO DE OBRA : 120 DIAS CALENDARIO
SUPERVISOR : ING. YUNER SANTOS ROSALES
FECHA DE INICIO : 02 DE JUNIO DEL 204
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014
N 664 DEL CENTRO POBLADO DE SACUATUNA, DISTRITO DE LLATA,
PROVINCIA DE HUAMALIES - REGION HUANUCO".

CUADRO RESUMEN DE REAJUSTES DE DECLARATORIA DE IMPACTO AMBIENTAL


SETIEMBRE DEL 2014
Reajuste por Indice K

No. Fecha

Valorizacin Bruta (sin


IGV)

01 Jun-14
02
Jul-14
03 Aug-14
04 Sep-14
05 Oct-14
06 Oct-14

8,645.26

8,645.26

271574020.xls / Reajuste Declaratoria Imp.

Indice "K"
Valorizacin Reajuste
(del mes
Reajustada
Bruto
anterior)

1.016
1.024
1.023
1.032

Regularizacin
a fecha de pago

Regularizacin del Reajuste

8,922.45
-

277.19
-

TOTAL :

277.19

Valorizaci
Indice "K" n Anterior
(del
Reajustada
mismo
con K del
mes)
mismo
mes

Valorizaci
n Anterior
Reajustada Regularizaci
con K del n Reajuste
mes
anterior

Valorizaci
Valorizaci
n a
n
Regulariz.
Indice "K"
Reajustar
Reajustada Reajuste a
(del mes
con K del
con K del fecha de
de pago)
mes de
mes de
pago
pago
pago

TOTAL :

TOTAL :

0.00

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70
PROCESO : LICITACION PUBLICA N 043-2013-GRH.
PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
CONTRATO N : 277-2014-GRH/PR
MODALIDAD :A SUMA ALZADA
CONTRATISTA : "CONSORCIO TAPARACO"
PLAZO DE OBRA : 120 DIAS CALENDARIO
SUPERVISOR : ING. YUNER SANTOS ROSALES
FECHA DE INICIO : 02 DE JUNIO DEL 204
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014

RETENCION DE REAJUSTE POR ATRASO DE OBRA


SETIEMBRE DEL 2014
No.

Fecha

Avance Programado
Mensual
Acumulado

01 Jun-14 542,020.33
02 Jan-05 343,163.72
03 Feb-05 265,216.16
04 Mar-05
05 Apr-05
06 May-05

542,020.33
885,184.05
###
-

R_EJEC <R_PROG
R_EJEC >R_PROG

271574020.xls / Cont-Reajuste

Avance Real
Coef. "K" Reajuste Programado
Mensual
Acumulado de Reajuste Mensual Acumulado

542,020.33
160,007.13
#REF!
-

###
###
#REF!
-

#REF!
1.016
1.010
1.006
1.026
-

#REF!
###
###
###
-

#REF!
5,420.20
7,479.18
###
-

Reajuste Real
Retenciones
Devolucin
Mensual Acumulado Definitivo Retenido Regulariz.
#REF!
5,420.20
960.04
#REF!
-

#REF!
###
###
#REF!
-

OBRA ATRASADA

EL MAXIMO REAJUSTE QUE SE RECONOCE ES EL REAJUSTE PROGRAMADO

OBRA ADELANTADA

EL MAXIMO REAJUSTE QUE SE RECONOCE ES EL REAJUSTE EJECUTADO

PROPIETARIO : GOBIERNO REGIONAL DE HUANUCO


PROCESO : LICITACION PUBLICA N 043-2013-GRH.
CONTRATO N : 277-2014-GRH/PR
CONTRATISTA : "CONSORCIO TAPARACO"
SUPERVISOR : ING. YUNER SANTOS ROSALES
OBRA : "INSTALACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E.I N 664 DEL CENTRO

MONTO DE CONTRATO DE OBRA (INC. IGV) : S/. 1'891,808.70


PRESUPUESTO BASE (INC. IGV) : S/. 1'891,808.70
PLAZO DE OBRA : 120 DIAS CALENDARIO
FECHA DE INICIO : 02 DE JUNIO DEL 204
FECHA DE TERMINO :29 DE SETIEMBRE DEL 2014

CUADRO DE VALORIZACIONES - SETIEMBRE 2014


VALORIZACION (Sin IGV)
Valorizacin

ADELANTOS
IGV

Mes

01
02
03
04
05
06

Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14

Efectivo
0.00

Totales
0.00
Total Adelanto (Inc. I

271574020.xls / Cont-Val

IGV

(A. E.)

Materiales

(A.M.)

0.00

0.00
0.00

0.00

0.00
0.00

Bruta Inc.
Val Mat.
Cancha
###
###
###
###
-

AMORTIZACIONES

Reajuste Regulariz. Total Valoriz.


Valoriz. Reajustada
Actual
8,668.90
5,798.43
5,844.25
8,049.84

### 28,361.42

Val. Ant.
-

Adelanto

Bruta

Efectivo

Reajustada

(Sin IGV)

550,689.23
348,962.15
271,060.42
303,832.47

0.00
###
Saldo Amortizar (Sin IGV

DEDUCCIONES

(Sin IGV)

I.G.V.

Adelanto Reajuste que no Corresponde Fondo


Total
Monto
Del Monto
Materiales AdelantoReg. Reaj.Adelanto
de
Deducc. Facturable Facturable
(Sin IGV)
Efectivo Ade. Efec.Materiales Garantia (Sin IGV) (Sin IGV) (18.00 %)

Monto
a
Facturar

###
###
###
###
###
###

###
###
###
###
###
###

###
###
###
###
-

###
###
###
###
-

###
###
###
###
-

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

###

###

###

CONCEPTO

S/.

Monto Valorizado en el Presente Mes :


Monto por Reajuste en el Presente Mes :

295,782.63
5,844.25

I.- MONTO FACTURABLE (Sin IGV)

301,626.88

II.- TOTAL RETENCION


III.- MONTO LIQUIDO A PAGAR ( I - II )
IV.- I. G. V. (18.00 % DE I)
V.- MONTO A FACTURAR ( I + IV )

INSPECTOR VAL N04

0.00
301,626.88
54,292.84
355,919.72