Académique Documents
Professionnel Documents
Culture Documents
Ultima Actualizacin:
Categora de Riesgo
Community
Subcategoria de Riesgo
Gerencia:
rea:
Safety: Fire/Explosion
RRR
Cada de Objetos
CONTROLES CRITICOS
N
CO1
Minimum Performance
Codigo
Control Element
TA01
Implementation
TA02
Implementation
Nombre de la Tarea
TA03
TA04
TA05
N
CO2
Minimum Performance
Codigo
TA01
Control Element
Nombre de la Tarea
Training / Competency
TA02
TA03
TA04
TA05
N
CO1
Minimum Performance
Codigo
TA01
Control Element
Nombre de la Tarea
Training / Competency
TA02
TA03
TA04
TA05
N
CO1
Minimum Performance
Codigo
TA01
TA02
TA03
Control Element
Training / Competency
Nombre de la Tarea
MFL US$M
TA04
TA05
Risk Owner
Validation Date
Produccion - CMCC
Planta
Nivel No Financiero
Riesgo Material
No Material
Gas Rating
Requires some improvement
Dueo
Due Date
Due Date
Due Date
Due Date
Risk Issue
Salud y Seguridad
Risk Owner
CA1
CA2
CA3
CA4
CA5
CA6
CA7
CA8
CA9
CAUSES
PC1
1.7
PC2
1.7
PC3
2,3,4
PC4
PC5
PC6
1,2,3,5
8,7
3,4,9
PC7
PC8
PC10
1,2,3,5,6,7,8
1,5,7
1.6
IMPROVEMENT TASKS
OWNER
Juan Rodriguez
Supervisor de
Ejecucin
Juan Rodriguez
Supervisor de
Ejecucin
Juan Rodriguez
Supervisor de
Ejecucin
SEVERITY FACTOR
SEVERITY
H&S
Environment
Social &
Cultural
Reputation
Legal
Financial
USD M
Non Financial
30
10
2.2
30
MFL
MFL
Se concidera una perdida de produccin de 3 das. La base de calculo "Valuation Risk Tabel" FY -13 indica una
Se concidera una fatalidad con un valor de US$200 mil
Se concidera una implementacin para segregar el rea con un valor de US$200 mil.
Valor total de perdidad US$6.4 millones.
SEVERITY:
Se considera una perdida de produccin de 1 da. La base de calculo "Valuation Risk Tabel" FY -13 indica una pe
Se concidera una fatalidad con un valor de US$200 mil.
Valor total de perdidad US$2.2 millones.
Date Validation
BOW-TIE
Last Review
1 de
10/1/2013
EVENT
IMPACTS
IM1
IM2
IM3
Financial:
Prdida de produccin
IM4
Cada de Objetos
IM5
IM6
IM7
IM9
OWNER
Juan Rodriguez
Supervisor de Ejecucin
MC1
Juan Rodriguez
Supervisor de Ejecucin
MC2
Juan Rodriguez
Supervisor de Ejecucin
MC3
Juan Rodriguez
Supervisor de Ejecucin
MC4
Juan Rodriguez
Supervisor de Ejecucin
MC5
Juan Rodriguez
Supervisor de Ejecucin
MC6
Juan Rodriguez
Supervisor de Ejecucin
MC7
Juan Rodriguez
Supervisor de Ejecucin
MC8
Juan Rodriguez
Supervisor de Ejecucin
MC10
START
END
IMPROVEMENT TASKS
01/10/13 31/12/13
01/10/13 31/12/13
01/10/13 31/12/13
MFL
USD M
Non Financial
6.4
Participants
Severity Factor
Likelihood Factor
30
0.3
1 de octubre de 2013
13
Version
CTS
duccin
onder
E-HS-
IMPACTS
OWNER
1.2
SI Salud y
Seguridad
1.2
SI Salud y
Seguridad
1.2
SI Salud y
Seguridad
SI Planificacin
OWNER
START
RRR
END
#
1
1.1
Cada de Objetos
Critical Control:
Segregacin de rea para cargas suspendidas contemplando el radio de giro y la posible proyeccin de cada de objetos.
Purpose of Critical
Control:
Asegurar que el rea donde cargas suspendidas se encuentran libre de personas no autorizadas.
Type of Control:
Basado en Ingeniera
Control Element:
1.1.1
When to Measure
Decribes how often the particular
control element will be inspected as
part of the verification process.
Note: Anyone doing a verification
observation can do this inspection
Who is Accountable?
(for
Control Element)
This is the technical owner who is
accountable for this specific part of
the Control Element
Anual
Juan Rodriguez
Supervisor de Ejecucin
Semestral
Juan Rodriguez
Supervisor de Ejecucin
Anual
Juan Rodriguez
Supervisor de Ejecucin
Owner
Start
End
Juan Rodriguez
Supervisor de Ejecucin
01/10/13
31/12/13
How to Measure/Confirm
What to Measure
Provides details of how the person, doing the
These are binary questions to ensure that only a yes /
verication observation, will answer the question to
no type of response is possible
confirm if the element is in place as required
1.1.3
GAS Rating
Training / Competency
(Are the people
involved, trained &
competent on the
controls?)
#
1
1.1
Cada de Objetos
Critical Control:
Purpose of Critical
Control:
Type of Control:
Asegurar que la tarea se realice de forma planificada para evitar accidentes en operaciones de levante
Basado en Sistemas
Superintendente Ejecucin rea Seca
When to Measure
How to Measure/Confirm
Who is Accountable?
(for Control
Decribes how often the particular control element
Element)
These are binary questions to ensure that only a yes / no Provides details of how the person, doing the verication
will be inspected as part of the verification
observation, will answer the question to confirm if the element is
This is the technical owner who is accountable
type of response is possible
process. Note: Anyone doing a verification
in place as required
for this specific part of the Control Element
observation can do this inspection
What to Measure
Control Element:
Estn definidas en el estandaro las actividades que - Verificar que en el estandar se definan las tareas que
necesitan un plan de izaje?
necesitan un plan de izaje
1.1.1
1.1.2
Design / Preparation
(Are controls adequately
designed & planned to
control the risk?)
GAS Rating
Anual
Juan Rodriguez
Supervisor de Ejecucin
- Verificar en terreno
Implementation (Are
Se inspeccionaron los equipos y accesorios de izaje - Verificar uso de elementos de acuerdo al plan
controls used & maintained que se usarn en la tarea?
as per the design & plan?)
La carga se levant de acuerdo al estrobado y
considerado en el plan de izaje?
1.1.3
Semestral
Juan Rodriguez
Supervisor de Ejecucin
Anual
Juan Rodriguez
Supervisor de Ejecucin
Owner
Start
End
Juan Rodriguez
Supervisor de Ejecucin
01/10/13
31/12/13
Los participantes de la tarea han sido instruidos en Verificar instruccion en operaciones de levante
operaciones de levante?
Training / Competency
(Are the people involved, El supervisor y operadores han sido instruidos plan Verificar instruccion en operaciones de levante
trained & competent on the de izaje?
controls?)
Control Element to
Improve
Training / Competency
Implementation
Implementation
Implementation
Task Name
#
1
1.1
Control Element:
1.1.1
Design / Preparation
(Are controls
adequately designed &
planned to control the
risk?)
Implementation
1.1.2
1.1.3
GAS Rating
Training / Competency
(Are the people
involved, trained &
competent on the
controls?)
Control Element to
Task Name
Improve
Training /
Instruir a los operadores en la utilizacion de los canastil
Competency
n niveles superiores
How to Measure/Confirm
Provides details of how the person, doing the
verication observation, will answer the question to
confirm if the element is in place as required
When to Measure
Decribes how often the particular
control element will be inspected as
part of the verification process.
Note: Anyone doing a verification
observation can do this inspection
Who is Accountable?
(for
Control Element)
This is the technical owner who is
accountable for this specific part of
the Control Element
Anual
Juan Rodriguez
Supervisor de Ejecucin
Semestral
Juan Rodriguez
Supervisor de Ejecucin
Anual
Juan Rodriguez
Supervisor de Ejecucin
Start
End
01/10/13