0.125 HK
150 MPM
eff- 90%
Draft- 95
waste- 5%
Idle-12%
prodn/card/8hr =
0.12HK
450 MPM
8 Dobling
eff-85%
Draft- 7.8
waste- 0.73%
Idle-8%
dia- 35mm
double deli very
prodn/machine/8hr =
2 Fin Drg
[RSB]
0.12 HK
400 MPM
8 Dobling
eff-85%
Draft- 7.8
Idle-8%
waste- 0.73%
dia-40 mm
single deli very
prodn/machine/8hr =
3 Simplex
[Zinser]
1 HK
Rpm-950
TM-1.31
eff-75%
Draft- 10.8
waste-0. 54%
Idle-10%
dia-27 mm
prodn/spdl/8hr =
14 Ringfram
G5/1
14500rpm
TM-4.2 to 4.3
eff-90%
Draft- 23
waste- 2.7%
idle- 2.7%
dia-27 mm
prodn/spdl/ 8hr =
3 Autoconer
Muratec
prodn/spdl/ 8hr =
Kindly suggest the production per machine and the hand allocation per machine in
[sider,tenter,reliever,operator,fitter,helper] for the above counts.
Please also mention the UKG and HOK including cost per spindle production for the
with formula for calculating the same. Necessary modification of the data already p
may be changed / corrected if required for keeping the balance in spin plan.
Please calculate also the realisation achieved for this production and the time take
drawing, simplex bobbin and ring bobbin with vice-versa empty for the above proc
regardsBhaskar Mitra
prodn/card/8hr =
prodn/card/8hr =
prodn/machine/8hr =
prodn/machine/8hr =
prodn/machine/8hr =
prodn/machine/8hr =
prodn/spdl/ 8hr =
prodn/spdl/ 8hr =
16000rpm
TM-4.2 to 4.3
16000rpm
TM-4.2 to 4.3
prodn/spdl/ 8hr =
prodn/spdl/ 8hr =
prodn/spdl/ 8hr =
prodn/spdl/ 8hr =